Vous êtes sur la page 1sur 7

-Site Office

Contract 487
SONIC LOGGING TEST REPORT FOR BORE PILE BP_MC140

REPORT NO: 1

TESTING DATE: 04-Mar-2011

Main Contractor:

TUKSU ENGINEERING AND CONSTRUCTION (S) LTD


Sonic Logging Test Contractor:

FJADI Engineering (S) Pte Ltd


128 Joo Seng Road #05-06 DP Computer Building Singapore 368356 Tel: 62876408 Fax: 62875848
Prepared by: Checked by:

Content

I.

General .............................................................................................................................. 3

II.

Test Results ....................................................................................................................... 5

1. General Information: ....................................................................................................... 5 2. Summary results: ............................................................................................................ 6 3. Interpretation and Comment: .......................................................................................... 6 4. Detail processed result, Graph and Image: ..................................................................... 7 III. Appendix ........................................................................................................................... 7 1. Sonic Testing Filed Work Record Sheet 2. Pile Record 3. Calibration Certificate 4. Pile location and layout 5. Photo records

Notes:

Test and report are conducted and prepared in accordance to standard ASTM 6760-02

I.

General

The CSL (Cross hole Sonic Logging) test has been adopted to evaluate the integrity of Bore Pile by measuring the response of an ultrasonic pulse passing from a signal source in one access tube to a receiver in a second access tube.

RS-ST01D

Digital. Ultrasonic Unit

Computer Data processing

Pile

Tubes

Transducer

Figure.1 Sonic Logging Test Scene Diagram

5~6 Access tubes had been pre-installed by main contractor during the Bored Pile casting for each testing pile. The typical layout of the access tubes and section elevation are as follows:

50mm Sonic logging tube 150mm Sonic Coring Tube

Links Main Bars Spacer blocks


5 tubes layout

6 tubes layout

Figure.2:Section layout for Bored pile with Sonic logging and coring tube

Spacer blocks

Bored hole 50MM Sonic logging tubes 150mm Sonic Coring tube Main bars Bentonite slurry

External Links 500mm Toe Level Figure: 3 Section Elevation 4

500mm

200mm

RS-ST10D Digital Ultrasonic Unite with a microprocessor-based system has been used for the field test and data processing in this project. The equipment has been sent for the calibration before the test, the field work has been carried out according to the submitted method statement.

Sonic logging test has been carried out on site for the Bored Pile BP_MC140 on 04.03.11. This report is to present the summary results of sonic logging test for BP_MC140. The

details comprise tabulated data and graph on wave velocity vs. depth, amplitude of the pulse vs. depth and first arrival time vs. depth. The logging wave images are also attached in this report for information. Based on the field record, processed results and analysis, the

engineering interpretation for each pile test is given in this report.

II. Test Results


1. General Information:
Pile No: Location: BP_MC140 N30592.486 E32676.798 Test Date: 04.03.2011

Ground Level: 105.12 (m RL) Pile length (below C.O.L): 53.997m Actual Toe. Level: 36.0 (m RL) No. of Tubes: 6

Cut off Level: 89.997 mRL Pile/Barrette Size: Grade of concrete: 1800 G40

4 5

2 1 6

BP_MC140

2. Summary results:
Section No. 1-2 2-3 3-4 4-5 5-6 6-1 1-5 1-4 1-3 2-6 2-5 2-4 3-5 3-6 4-6 First Arrival Wave Speed Time (ms) (m/s) 0.161 0.146 0.189 0.151 0.155 0.167 0.279 0.332 0.264 0.286 0.315 0.278 0.272 0.329 0.248 5707 2946 4043 2801 2934 3085 3085 3289 4450 3644 3997 4627 4051 3225 2629 Dis. of Tube (mm) 920 430 760 420 290 410 860 1090 1170 1040 1260 1080 1200 1060 650 Test Depth (m)* 67 67 69 69 69 69 69 69 69 67 67 67 69 69 69 Interpretation / Remarks Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated Integrated

* Cut off Level 89.997m RL @ depth 11.218m from top level 101.084 m RL of the access tubes. * The distance of section are base on distance measuring on site between the accesses tubes of the top potion of the pile. * Access tube 2 blocked at depth 67m so all testing depth relevant to tube 2 is 67m. * The depth measured from the top of the Access tube 105.097~105.235 m RL.

3. Interpretation and Conclusion:


The most of first arrival time(FAT) and the amplitude of the longitudinal wave in all the section are consistent and no significant weak signal potion found from the bottom to the cut off level of the pile during testing of BP_MC_140. The average transmission velocities of all section which calculated base on the distance measured on site is typical of being good quality concrete as stipulated in ASTM6760-08. There was no clear outright indication of major irregularities in all sections. This pile was identified to be structurally sound with no significant defects detectable. The velocity range of Concrete is from around 3000 to 6000 mps that base on the brand of cement, density of concrete, steel bar distributing, casting time and distance between access testing tubes. The

analysis of the initial pulse arrival time, velocity, relative pulse energy/amplitude and stacked waveform plotted versus depth. Base the results on the percent reduction in velocity value from a nearby zone of good quality concrete with good signal amplitude and energy as correlated to the following:

Concrete Condition Rating Criteria (CCRC) CCRC Good Questionable Defect Poor Rating Symbol G Q P/D Velocity Reduction 10 % Indicative Results Good quality concrete

>10 % & < 20 % Minor concrete contamination or intrusion and questionable quality concrete > 20 % Defects exist, possible water/slurry contamination, soil intrusion and/or poor quality concrete Soil intrusion or other severe defect absorbed the signal (assumes good bond of the tubeconcrete interface) Water intrusion or water filled gravel intrusion with few or no fines present

No Signal

NS

No Signal received V = 4750 fps (1450 mps) to 5000 fps (1525 mps)

Water

4. Detail processed result: Data; Graph and Image:

III.

Appendix
1. Sonic Testing Filed Work Record Sheet 2 3 4 5 Pile Record Calibration Certificate Pile location and layout Photo records