MASS HAUL DIAGRAM Example Calculation The table below shows ground levels and formation levels for a proposed road construction. Embankments are to be built with side slopes of 1:2.5 and cuttings with slopes of 1:3.0. The embankment crest width and cutting base width is 13m. It may be assumed that the ground is horizontal across the section.
(a)
Construct a Mass Haul diagram for the project given the following: Bulking Factor = 0.8 Shrinkage Factor = 1.0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
Chainange (m)
3
1500
(b) A river breaks up the project at chainage 1160m. Calculate the volumes of waste material and borrow for this scenarios: (i) Material cannot be moved across the river
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
Fill
Cut
Cut
Fill
Fill
Chainange (m)
Fill
Cut
4
1500
River
Distance (m) Cut (m3) Fill (m3) Haul (m3) Borrow (m3) Waste (m3)
150
130
220
240
420
120
220
49,000 11,000
38,000
(b) A river breaks up the project at chainage 1160m. Calculate the volumes of waste material and borrow for this scenarios: (ii) A Bailey bridge is constructed allowing material to be transported across the river
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
Fill
Cut
Cut
Fill
Fill
Chainange (m)
Fill
Cut
6
1500
Distance (m) Cut (m3) Fill (m3) Haul (m3) Borrow (m3) Waste (m3)
150
130
220
240
540
220
49,000 49,000