Al Ain Municipal Solid Waste Sorting Station, Compost Plant and Plastic Recycling Plant
AN INTEGRATED WASTE MANAGEMENT FACILITY
in cooperation with
Contract Basis
Plant Location
Big Fraction
Manual Sorting
Manual Sorting
Compost Plant
Recyclable Materials
Sorting Process
Aluminium (UBC)
PET clear
HDPE/LDPE/PP
PET colored
8
Copyright The IuT Group
10
Time Schedule
Contract Signature: September 2010
Finalization of Financing:
Start of Detailed Design:
November 2010
October 2010
Start of Manufacturing:
Building Permit Obtained: Start of Civil Construction: Machinery Installation Start: T & C, Plant Start-Up: Official Inauguration:
December 2010
April 2011 April 2011 May 2011 September 2011 November 2011
11
Capacity:
2 lines, one for HDPE/PP, one for LDPE, each with a capacity of 25 tonnes per day
12
13
Feeding Area
14
The Process
The Process
The Process
The Process
The Process
Washing Process
19
The Process
Sink/Swim Separation
20
The Process
The Process
The Process
The Process
24
The Product
The Process
Drying/Storage Silos
Quality
Quality is designed to meet international standards, and will be ensured by regular laboratory and quality tests as part of a complete quality control management system
27
28
Summary
This Integrated Waste Management Facility achieves the following: Total material recovery from commingled waste stream, and therefore, diversion from landfill rate of up to 70%
Up to 85% of recovered materials are processed into useful products on site Integration of different processes on one site vastly reduces transportation and associated negative environmental impacts
29