Vous êtes sur la page 1sur 283

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

BOQ FOR PROPOSED FIRST FLOOR CONSTRUCTION OF DHANAMUTHU RECEPTION HALL FOR MRS. J. A. THANUJA NILMINI SUMMARY ITEM DESCRIPTION A B C D E G H J K L Q
Preliminaries Excavation and Earth Work Rubble Masonry Concrete Brick Work Doors, Windows & Partitions Roofer & Roof plumber Plasterer Painter & Decorator Pavior Electrical installation Plumber Miscellaneous Total for Building

AMOUNT Rs. Cts. 100,000.00 50,600.00 47,320.00 779,148.00 464,712.00 907,295.00 4,378,250.00 317,757.50 196,420.50 1,994,970.10 522,420.00 630,395.00 1,848,040.00 12,237,328.10

R S

Prepared by:

Eng. P A I Laknatha, BSc.Eng.,AMIE(SL), AMSSE

Page 1

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM A A-01 Preliminaries

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

Rs.
Breaking and exposing front side cantilever slab for slab extension, Demolishing of front porch roof and columns. Excess material should be cart away from the site without disturbing ongoing operations . Total carried to summary Item

Rs. Cts.
100,000.00

1.00

100,000.00

B - Excavation & Earth Work


Excavation for foundation. Excavation not exceeding 5ft depth from natural ground level in the following. Rate shall include for earth work support, ground improvement and dewatering as necessary Contractor should deploy the labour, machineries and tools. Earth Filling Selected imported soil should be free from any organic material filling under floors well rammed consolidated in 6 inch layers as per the drawing. Excavation for foundation. Filling under floors including spreading, watering and compacting in 6 inch layers with suitable material. Total carried to summary Note

B-01 B-02

Cu. Cu.

4.50 11.00

2,200.00 3,700.00

9,900.00 40,700.00

50,600.00

C C-01

Rubble Masonry
Random rubble masonry in 1:5 cement mortar Total carried to summary Cu.

2.60

18,200.00

47,320.00 47,320.00

Page 2

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM D Concrete

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

Rs.
Note

Rs. Cts.

Concrete is to be mixed in a concrete mixer. Rate for concrete items to include for mixing, hoisting, placing in position, compacting with mechanical vibrator and for curing. All concrete work shall comply to the specifications, filled in to formwork and well packed around reinforcement. Rate for concrete columns, wall shall include for kickers. Form work and reinforcement works are measured separately unless otherwise specified. Up to Ground level

D-01

Grade 15 concrete in 3 inch thick, 1:3:6 (40mm) mix for paving to the ground floor and screed . Grade 20 concrete in1:2:4 (20mm) mix in columns . Grade 20 concrete in 1:2:4 (20mm) mix for tie beams at backyard. Ground floor to 1 st floor

Cu.

0.30

23,910.00

7,173.00

D-02 D-03

Cu. Cu.

0.60 0.90

31,750.00 32,550.00

19,050.00 29,295.00

D-04 D-05

Grade 20 concrete in 1:2:4 (20mm) mix in columns & staircase. Grade 20 concrete in 1:2:4 (20mm) mix for slab & beams. 1 st floor to roof

Cu. Cu.

1.60 1.50

32,500.00 32,500.00

52,000.00 48,750.00

D-06 D-07 D-08

Grade 20 concrete in 1:2:4 (20mm) mix in columns Grade 20 concrete in 1:2:4 (20mm) mix for beams. 1:2:4 (20mm) concrete in 150mmx225mm lintel up to 1st floor including formwork and 2 Nos. of 10 mm toe steel R/F bars.

Cu. Cu. Lft.

2.40 2.10 70.00

35,750.00 35,750.00 320.00

85,800.00 75,075.00 22,400.00

Form Work
Rate for formwork shall include for necessary boarding supports, erecting, framing, removing, cleaning and wetting. Formwork is measured as the net contact surface. Formwork shall be plywood or steel shutter, G.I. pipe supporting and necessary props. All formwork shall be so constructed that no grout shall leak out during concreting. Note

Page 3

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM

DESCRIPTION
Up to Ground level Formwork for column shafts Ground floor to 1 st floor Formwork for column shafts, staircase Formwork for slab, & beams. 1 st floor to roof Formwork for column shafts Formwork for slab and beams.

UNIT

QTY.

RATE

AMOUNT

Rs.
D-09 D-10 D-11 D-12 D-13
ft2

Rs. Cts.
4,400.00 122,100.00 93,060.00 12,000.00 48,125.00

40.00 1,110.00 846.00 96.00 385.00

110.00 110.00 110.00 125.00 125.00

ft2 ft2 ft2 ft2 Note

Reinforcement
All reinforcement should be under recommendation of engineer and free from dust, rust and grease. Rate shall include for cutting, fabricating, placing in position including hangers, binding wire, spaces and waste. Rebending of bars shall not be attempted. Up to Ground level

D-14 D-15

D-16 D-17

Supplying and fixing of Tor steel reinforcement in columns stub & tie beams. Supplying and fixing of Mild steel reinforcement in columns & beams. Ground floor to 1 st floor Supplying and fixing of Tor steel reinforcement in columns slab, & beams. Supplying and fixing of Mild steel reinforcement in columns & beams. 1 st floor to roof Supplying and fixing of Tor steel reinforcement in columns & beams. Supplying and fixing of Mild steel reinforcement in columns slab, & beams. Total carried to summary

kg kg

242.00 24.00

130.00 130.00

31,460.00 3,120.00

kg kg

856.00 65.00

130.00 130.00

111,280.00 8,450.00

D-18 D-18

kg kg

60.00 6.00

85.00 85.00

5,100.00 510.00 779,148.00

Brick Work
Rates for masonry works shall include for forming provisions for plumbing and other electro mechanical works. Bricks/cement blocks in all brick work shall be in class 1 quality, acceptable to the consultant. Rate shall include for stiffeners unless otherwise measured separately. 1 st floor to roof Note

E-01

4" thick cement sand Cellular block wall (blocks confirming to S.L.S.855 and subject to the approval of the quality of the blocks) in cement and sand mortar 1:5 in ground floor. Total carried to summary

Sq.

53.60

8,670.00

464,712.00

464,712.00

Page 4

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM G

DESCRIPTION
Doors, Windows & Partitions All reinforcement should be under recommendation of engineer and free from dust, rust and grease. Aluminium alloy should confirm to- BS 1474:1972 Surface treatment shall confirm to BS 1615 and BS 3987, Anodized coating thickness should be 15 +/- 5 microns, Minimum section thickness 1.6mm door frame , 1.5 mm window frame and 1.2 mm partition with all accessories.

UNIT

QTY.

RATE

AMOUNT

Rs.
Note

Rs. Cts.

G-01

Supplying & fixing of tempered glass double swing front door with all accessories including the fixed glass panels besides as per the drawing type D1 Powder coated aluminium single sash butt hinged openable door with middle rail , panelling with two layers of 4mm thick aluminium composite panel on both side and glazed with 5mm thick tinted glass panes, neoprene and woold beading, gaskets, pop rivets, threaded bar with nut and approved quality lock, butt hinges, door handle with cap nut. As per the members , sizes and details given in Drawing (Type D2, D3 and D4) Powder coated aluminium sliding window with louvers on top consisting of 5mm thick glass panes , lock, roller, screws, gaskets, nut felt, pop rivets, cap, plastic guide etc. As per the members , sizes and details given in Drawing (Type FL, FL2, SD) Powder coated aluminium casement window and panels with and without louvers on top, consisting of 5mm thick glass panes, casement lock, screws, pop rivets, gaskets, door hinge, weather strip etc.As per the members, sizes and details given in Drawing (Type W1 and W3) Powder Coated aluminium double sash butt hinged openable door with middle rail and fully glazed with 5mm thick tinted glass panes, neoprene and woold beading, gaskets, pop rivets, threaded bar with nut and approved quality lock, butt hinges, door handle with cap nut. As per the members , sizes and details given in Drawing (Type DW) Powder coated aluminium fully glazed fixed frames with 5mm thick tinted glass panes, neoprene and woold beading, gaskets, pop rivets, threaded bar with nut and approved quality lock, butt hinges, door handle with cap nut. As per the members, sizes and details given in Drawing (Type DW)

ft2

132.50

875.00

115,937.50

G-02

ft2

356.50

825.00

294,112.50

G-03

ft2

572.00

550.00

314,600.00

G-04

ft2

114.00

730.00

83,220.00

G-05

ft2

32.00

885.00

28,320.00

G-05

ft2

86.00

730.00

62,780.00

G-06

Powder coated aluminium framed lovers, consisting of screws, pop rivets, etc. As per the members , sizes and details given in Drawing (Type L)

ft2

15.00

555.00

8,325.00

Total carried to summary Page 5

907,295.00

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM H H-01

DESCRIPTION
Roofer & Roof plumber Mild steel roof truss for Zn/Al roofing 80'-0" span , 15 pitch as per detail. Rate shall include for struts and ties, gusset plates, base plates, sole plates, mild steel rag bolts, purling cleats & etc.. fabricating, transporting , hoisting , fixing in position and applying two coats of Zinc Phosphate paint Other required mild steel sections including H irons, L irons, flat irons, steel plates according to the design and other fabricated items fabricating, transporting , hoisting , fixing in position and applying two coats of Zinc Phosphate paint Supply and fix zinc alum profile roofing sheet (minimum base metal thickness of 0.4mm) and minimum thickness of 0.47mm, laid on existing purlings with joints to be properly connected with an adequate side lap to ensure water tightness long the entire length and complete to working order. (Upstair roof and ground floor back yard lean roof) Supply and lay double sided 3mm thick aluminium foil heat reflecting material to underside of roof supported with Gauge 10, 2" x 2" GI mesh. Supply and fix proprietary coated zinc alum gutter (minimum base metal thickness of sheet 0.4mm and minimum total thickness 0.47mm) complete with end caps, running joints etc. All joints to be properly connected with an adequate side laps not less than 225mm length and with sealant to ensure water tightness along the entire length of the gutter and including angle iron gutter brackets 25x25x3mm at 450mm centers with an adequate slopes directed and including application of two coats of each anticorrosive paint and enamel paint to all steel surfaces to match the gutter fix in position.( Inner size of 150mm x 175mm ) Supply and fix proprietary coated zinc alum square down pipe (minimum base metal thickness of sheet 0.4mm and minimum total thickness 0.47mm) complete with necessary socket , elbow& bend. All joints to be properly connected and with sealant to ensure water tightness along the entire length. Down pipe brackets @ 1.0m c/c Total carried to summary

UNIT

QTY.

RATE

AMOUNT

Rs.
Nos.

Rs. Cts.
1,090,000.00

5.00

218,000.00

H-02

Item

1.00

500,000.00

500,000.00

H-03

Sqre.

105.00

16,750.00

1,758,750.00

H-04

Sqre.

105.00

6,370.00

668,850.00

H-05

Lft.

446.00

525.00

234,150.00

H-06

Lft.

275.00

460.00

126,500.00

4,378,250.00

J J-01

Plasterer 1 st floor to roof 15mm thick 1:1:5 lime cement plaster finished semi- Sqre. rough to external walls including all reveals and edges. 15mm thick 1:1:5 lime cement plaster finished Sqre. smooth to internal walls including all reveals and edges. Total carried to summary

22.30

3,650.00

81,395.00

J-02

49.50

4,775.00

236,362.50

317,757.50

Page 6

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM K

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

Rs. Painter & Decorator


The prices shall include for preparation of surface, cleaning down, use of wall fillers and primary paint coats to obtain neat surface., sand papering etc. and protecting of floors and fittings, removing and refixing of fittings, cleaning doors, windows, fittings etc. upon completion. One primer coat & two coats of weather shield paint on external faces. One primer coat & two coats of emulsion paint on internal faces. Total carried to summary Note

Rs. Cts.

K-01 K-02

Sqre. Sqre.

22.30 49.50

2,160.00 2,995.00

48,168.00 148,252.50 196,420.50

L L-01

Pavior Supply and lay 12"x12" heavy duty ceramic glazed floor tiles of approved quality and colour on 15mm thick 1:3 cement sand bedding and neat cement float internal area Supply and lay 12"x12" non skid (studded) heavy duty ceramic floor tiles of approved quality and colour on 15mm thick 1:3 cement sand bedding and neat cement slurry to toilets/ bathrooms/ balconies/ stair case. Supply and lay 12"X8" glazed ceramic wall tiles of approved colour to toilet walls up to 6 feet height on 12mm thick 1:3 cement/sand backing and a coat of neat cement slurry to toilets/ bath rooms. Total carried to summary Sqre.

70.20

20,850.00

1,463,670.00

L-02

Sqre.

13.35

22,770.00

303,979.50

L-03

Sqre.

9.62

23,630.00

227,320.60

1,994,970.10

Page 7

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM Q Q-01 Q-02 Q-03 Q-04 Q-06

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

Rs. Electrical Installation


60 Amp TP&N main switch Supply and fixing required no of 30 A MCBs Supplying and fixing 5 Amp socket out lets Supplying and fixing 15 Amp socket out lets 7" Diameter recess mounted anodized down lighter with aluminum reflector "Orange" Brand & Model No:YLI401 or approved equivalent. Exhaust or blower fan 12" dia. (K.D.K. or quivalent ) Provide an earth electrode copper plate 2'-0"x2'0"x1/8" in 3m deep. Rate to include connection to the main panel, sub main, earth clips, excavation etc. with 1'-0"x 1'-0"x 1'-0" earth pit including 4 1/2" brick work and 3" concrete slab. Total carried to summary Nos Item Nos Nos Nos

Rs. Cts.
8,840.00 9,000.00 57,000.00 24,250.00 218,880.00

1.00 1.00 30.00 10.00 144.00

8,840.00 9,000.00 1,900.00 2,425.00 1,520.00

Q-07 Q-08

Nos Nos

17.00 1.00

10,850.00 20,000.00

184,450.00 20,000.00

522,420.00

R - Plumber
R-01
Supply and fix white vitreous china floor standing wash basin and pedestal with overflow hole and single tap hole in center of "Rocell" brand & model "Intense" or approved equivalent complete to orking order inclusive of the 1 1/4" chromium plated waste outlet of "Rocell" brand & model "A706" and 11/4" chromium plated siphon cleanable bottale trap of "Rocell" brand & model "A186". Supply and fix white vitreous china floor standing close coupled semi back to wall water closet suite with wash down flushing with 6/3 liters dual lushing has horizontal outlet with vario drain bend and two lateral holes for bottom water connection , cistern with water inlet from rear of "Rocell" brand & model "Intense" or approved equivalent complete to working order inclusive of universal bend of "Rocell" brand & model "Vario Joint". Supply and fix ceramic urinal with flush valve of "Rocell" brand model DP70013 or approved equivalent complete to working order. Supply and fix mirror over wash basin completed. Supply and fix shower unit with bib tap Construction of septic tank & soakage pit as per detailed drawing. Total carried to summary No.

9.00

24,785.00

223,065.00

R-02

No.

4.00

31,690.00

126,760.00

R-03 R-04 R-05 R-06

No.

4.00 7.00 3.00 Allow

17,230.00 6,750.00 4,800.00 Sum

68,920.00 47,250.00 14,400.00 150,000.00 630,395.00

No. No. Item

Page 8

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

ITEM

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

Rs. S - Miscellaneous
S-1
Natural aluminium partition frame top and bottom with 4mm hick pvdf coated aluminium composite both side kept back to back ( Total thickness 8mm) with necessary pop rivots, gasket and GI channels & etc. work complete in order. Supply and installation of Concealed type gypsem board false ceiling of 600mm x 600mm suspended with galvanized hanger rods. Total carried to summary ft2

Rs. Cts.
359,040.00

192.00

1,870.00

S-2

Sqre.

74.45

20,000.00

1,489,000.00

1,848,040.00

Page 9

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

1.27 total
0.12 0.10

O/H Profit

0.02 Transport
0.03 Consultancy 1.00 BASIC

1700 Floor area sqft

7,198.43 Rate per sqft

Page 10

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

56,000.00

48.6

45.9

3,750

Page 11

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

16 0

4.8768 0 450 4.8768

0 #REF!

Page 12

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

800 800

2 0

0.6096 0 0.6096

1654.8

75 75 75

col 48

75

75 75

3,600 64.8 9 10.8 2.7432 0 0

Page 13

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

10,000

#REF!

#REF!

#REF!

Page 14

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

211

0.866025404

243.6418136

200 445.00

Page 15

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

235 260

1,650

1,650

1,800

Page 16

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 17

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 18

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 19

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 20

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 21

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 22

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 23

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 24

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 25

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 26

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 27

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 28

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 29

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 30

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 31

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 32

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 33

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 34

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 35

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 36

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 37

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 38

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 39

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 40

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 41

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 42

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 43

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 44

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 45

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 46

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 47

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 48

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 49

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 50

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 51

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 52

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 53

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 54

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 55

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 56

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 57

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 58

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 59

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 60

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 61

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 62

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 63

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 64

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 65

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 66

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 67

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 68

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 69

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 70

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 71

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 72

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 73

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 74

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 75

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 76

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 77

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 78

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 79

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 80

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 81

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 82

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 83

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 84

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 85

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 86

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 87

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 88

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 89

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 90

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 91

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 92

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 93

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 94

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 95

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 96

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 97

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 98

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 99

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 100

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 101

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 102

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 103

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 104

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 105

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 106

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 107

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 108

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 109

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 110

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 111

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 112

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 113

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 114

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 115

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 116

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 117

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 118

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 119

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 120

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 121

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 122

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 123

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 124

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 125

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 126

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 127

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 128

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 129

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 130

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 131

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 132

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 133

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 134

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 135

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 136

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 137

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 138

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 139

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 140

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 141

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 142

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 143

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 144

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 145

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 146

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 147

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 148

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 149

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 150

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 151

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 152

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 153

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 154

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 155

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 156

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 157

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 158

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 159

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 160

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 161

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 162

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 163

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 164

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 165

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 166

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 167

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 168

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 169

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 170

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 171

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 172

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 173

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 174

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 175

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 176

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 177

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 178

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 179

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 180

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 181

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 182

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 183

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 184

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 185

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 186

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 187

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 188

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 189

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 190

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 191

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 192

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 193

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 194

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 195

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 196

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 197

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 198

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 199

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 200

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 201

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 202

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 203

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 204

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 205

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 206

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 207

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 208

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 209

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 210

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 211

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 212

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 213

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 214

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 215

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 216

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 217

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 218

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 219

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 220

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 221

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 222

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 223

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 224

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 225

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 226

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 227

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 228

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 229

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 230

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 231

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 232

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 233

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 234

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 235

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 236

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 237

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 238

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 239

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 240

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 241

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 242

BOQ of Dhanamuthu Reception Hall

Design Forge Consortium

Page 243

C.L. lengths /ft. X Y Nos. of Footings Excavation / Cu. Walls Footings Total

Y 132 144.75 13 RRM Vol/ Cu X

9.69 2.145 11.83

6.23

Ground Floor Area / ft2. Area A 126 B 405 B 163 C 133 D 47 E 175 Varandah 129 1178 Vol Footing to Slab Column Conc. Vol /Cu. 0.981094 Tie Beams 1.556719 Column Conc. Plinth to Slab Vol /Cu. Stair Case / Cu.

Filling Under Floors / Cu. Area H A 126 B 405 B 163 C 133 D 47 E 175 Total

1 1 1 1 1 1

Vol/Cu. 1.26 4.05 1.63 1.33 0.47 1.75 10.49

2.945

0.665508 0.405 1.070508

(Area 13.5ft2)

Slab Vol / Cu. Beams / Cu.

4.43625 1.305 5.74125 0.987188

(Slab Area / ft2) 1183 Beam Area 619.44 1802.44

Col. FF to Roof/ Cu.

Form Col. Footing to Plinth/ft2.

97.5

Form Col. GF to Slab/ft2 Stair case/ ft2.

360.75 94.5 455.25 2400 342.6 142 1915.4 1436.55 ft2 ft2 ft2 ft2 ft3 opening/ft3 249.3375 7.875 Net / ft3 1417.913 59.15625 57.09375

Blind wall area/GF Opening in GF arches in GF Net wall Area GF GF wall 9" volume FF 9" thick wall CL length 4 1/2 wall CL length Balcony wall length External Plaster GF Area w/o openings FF Area w/o openingq Internal Plaster GF total FF total

185.25 ft 16.25 ft 65.25 ft opening area 347.56 322 opening 15% 462 411.75

---------> ---------> ---------> Net 1117.44 1201.75 Net 2618 2333.25

1667.25 ft3 67.03125 ft3 57.09375 ft3

1465 1523.75

3080 2745

2011.06.24
RR Wk Rubble sand cement u/s sk 1 0.45 2.6 21.2 10.6 1236 2944 695 100 150 30% 1,236.00 1,324.80 1,807.00 2,120.00 1,590.00 8,077.80 2,423.34 10,501.14 per cube per m3 price price 3,500.00 1,236.01 8,350.00 2,948.77

10,500.00 per cube per m3 price price 5,800.00 2,048.25

1:3:6 concrete metal sand cement u/s sk

1 0.56 4.5 28.5 3.5

2048 2944 695 100 150 30%

2,048.00 1,648.64 3,127.50 2,850.00 525.00 10,199.14 3,059.74 13,258.88

13250

1:2:4 concrete metal sand cement u/s sk

1 0.6 6 22.6 2.8

2048 2944 695 100 150 30%

2,048.00 1,766.40 4,170.00 2,260.00 420.00 10,664.40 3,199.32 13,863.72

Form Work 2.88 1,200.00 416.67 120 160 50 746.66667 14,000.00 933.33333 Ceiling(Exposed Rafter - excluding timber) sheet 1.078 timber GI nails 0.006 2x1/2 screw 5.3 primer 0.02 paint 0.04 moulding nail 0.025 w/prese u/s 5.5 sk 6 scaffold

Ceiling sheet timber GI nails 2x1/2 screw primer paint moulding nail w/prese u/s sk scaffold

1.078 0.013 0.006 2.1 5.3 0.02 0.04 1 0.025 0.084 2.75 3

250 38000 65 40 5 325 350 75 55 125 31.25 50

30%

269.50 494.00 0.39 84.00 26.50 6.50 14.00 75.00 1.38 10.50 85.94 150.00 50.00 1,267.70 380.31 1,648.01

DPC DPC Tar

0.5

75

37.50

sand cement u/s sk

0.002 0.242 2 1

850 385 31.25 50 30%

1.70 93.17 62.50 50.00 244.87 73.46 318.33 Say

325.00

External Plaster (per m2) Lime sand cement u/s sk

2.4 0.021 0.086 1.3 0.65

10 850 385 31.25 50 30%

24.00 17.85 33.11 40.63 32.50 148.09 44.43 192.51 Say

200.00

Internal Plaster (per m2) Lime sand cement u/s sk

3 0.021 0.086 1.25 1

5 850 385 31.25 50 30%

15.00 17.85 33.11 39.06 50.00 155.02 46.51 201.53 Say

205.00 260.00

Base Compound 25kg bucket Data per one bucket Compound Labour Sand paper etc.

20 m2

1 20

1450 25

30% Per 1 m2 Sofit Plaster (per m2) Lime sand cement u/s sk Scafolding

1,450.00 500.00 50.00 2,000.00 600.00 2,600.00 130.00

2.4 0.015 0.086 1.75 1.75

10 850 385 31.25 50

30%

24.00 12.75 33.11 54.69 87.50 15.00 227.05 68.11 295.16 Say

290.00

Skirting (per m) Coloured cement sand cement u/s sk

0.013 0.003 0.032 0.8 1

300 850 385 31.25 50 30%

3.90 2.55 12.32 25.00 50.00 93.77 28.13 121.90 Say

125.00

External Painting (per m2) Primer Weathershield Paint sk Brushes

0.097 0.223 1

300 400 50

30%

29.10 89.20 50.00 10.00 178.30 53.49 231.79 Say

235.00

Internal Painting (per m2) Primer Emulsion Paint sk Brushes

0.097 0.15 1

300 325 50

30%

29.10 48.75 50.00 10.00 137.85 41.36 179.21 Say

180.00

245.00

Al Doors Area

5.67

40,950.00 30%

7,222.22 2,166.67 9,388.89 9,129.63 1,825.93 10,955.56 8,666.67 2,600.00 11,266.67

Area

3.24

29,580.00 20%

Area

3.51

30,420.00 30%

Al Windows Area

3.51

22,500.00 30%

6,410.26 1,923.08 8,333.33 5,636.75 1,691.03 7,327.78 5,958.33 1,787.50

Area

2.34

13,190.00 30%

Area

1.92

11,440.00 30%

7,745.83 Al Partitions Area

7.245

23,350.00 30%

3,222.91 966.87 4,189.79 3,648.15 1,094.44 4,742.59

Area

8.64

31,520.00 30%

Plywood Door with Al Frame Al Frame Plywood Door

2.1 2.1

3,760.00 1,500.00 30%

1,790.48 714.29 2,504.76 751.43 3,256.19 25,824.00 7747.2 33,571.20

Sliding Gate

4,304.00 30%

Roof Steel Truss Corru. Asbestos

1997.5 85

120.00 225.00 30%

Per m2 Temporary Roof Timber frame Asbestos sheets

239,700.00 19,125.00 258,825.00 77,647.50 336,472.50 3,958.50

600

2.725

sample 1 area timber bill rate labour tiles colorcon scaffold other mater 585 146.25

0.906308 0.906308

120 120

600.00 225.00 30%

Per m2 Gutters (per m) labour,scaff. 30% 150.00 75.00 45.00 270.00 Say 150.00 50.00 45.00 245.00 Say

72,000.00 27,000.00 99,000.00 29,700.00 128,700.00 1,072.50

275.00

Down Pipes (per m) labour 30%

250.00

sample 2 - Asbestos area 0.906308 0.906308 timber bill rate labour Corru. Asb scaffold other mater / wood pres etc

Floor Tiling (per m2) 300 x 300 tiles Cement Sand u/s

11 0.2 0.017 0.5

80.00 385.00 850.00 250.00

880.00 77.00 14.45 125.00

Tiler

0.33

500.00 30%

165.00 1,261.45 378.44 1,639.89 Say

1,650.00

Step Tiling (per m2) 300 x 300 tiles Cement Sand u/s Tiler

11 0.2 0.017 0.5 0.4

125.00 385.00 850.00 250.00 500.00 30%

1,375.00 77.00 14.45 125.00 200.00 1,791.45 537.44 2,328.89 Say

2,325.00

Wall Tiling (per m2) 200 x 200 tiles Cement Sand u/s Tiler

25 0.2 0.017 0.5 0.33

40.00 385.00 850.00 250.00 500.00 30%

1,000.00 77.00 14.45 125.00 165.00 1,381.45 414.44 1,795.89 Say

1,800.00

Floor Rendering (per m2) Cement Sand Coloured cement u/s s tools

0.144 0.015 0.003 0.9 1.5

385.00 850.00 400.00 31.25 50.00

30%

55.44 12.75 1.20 28.13 75.00 2.58 175.09 52.53 227.62 Say

230.00

Pedestal Wash Basin WB S U/S Plumber

1 2 8 8

8000 50 31.25 50 30%

8000 100 250 400 8750 2625 11375 Say

11,400.00

Water Closet with Cistern WC Stop Cock Brass, 12mm U/S Plumber

1 1 8 8

12,000.00 500.00 31.25 50.00

12,000.00 500.00 250.00 400.00

Flexible hose

200.00 30%

200.00 13,350.00 4,005.00 17,355.00 Say

17,500.00

Kitchen Sink Sink + Tap Plumber u/s

1 5.5 5.5

3,700.00 50.00 31.25 30%

3,700.00 275.00 171.88 4,146.88 1,244.06 5,390.94 Say

5,500.00

20mm PVC Pipes 20mm PVC Pipes Plumber us Fittings Other expences

1 0.05 0.05

20.10 50.00 31.25

30%

20.10 2.50 1.56 5.00 1.00 30.16 9.05 39.21 Say

80.498 20.1245

40.00

25mm PVC Pipes 25mm PVC Pipes Plumber u/s Other expences

1 0.067 0.067

38.50 50.00 31.25

30%

38.50 3.35 2.09 2.00 45.94 13.78 59.73 Say

38.4395

60.00

32mm PVC Pipes 32mm PVC Pipes Plumber u/s Other expences

1 0.1 0.1

57.70 50.00 31.25

30%

57.70 5.00 3.13 2.00 67.83 20.35 88.17 Say

57.6565

89.00

50mm PVC Pipes 50mm PVC Pipes Plumber u/s Other expences

1 0.133 0.133

89.10 50.00 31.25

30%

89.10 6.65 4.16 2.00 101.91 30.57 132.48 Say

89.089

133.00

GI Hand/Guard Rail (per m) 30%

3,255.00 976.5 4,231.50 Say 4,438.50 1331.55 5,770.05 Say

4,250.00

GI Guard Fence (per m) (1.5m high)

200.00 35.00 40.00 275.00 2,959.00 3,254.90

30%

5,800.00

4438.5 1,375.00 127.79

GI pipe (per no) 1.5m high

250.00 75 325.00 Total cost for 15 nos (Fence lengh=32m) 3,750.00 Cost of GI pipes per m fence len 117.19 Say 30% PVC Coated fence (per m) GI pipe PVC Coated fence material labour 30%

120.00

120.00 333.00 699.40 1,152.40 345.72 1,498.12 Say

1,500.00

Flashing (per m) GI 24 BWG sheets Tinker Mason Usk Allow for cement sand & lead

0.60 0.50 0.25 1.25

328.00 50.00 50.00 31.25

30% Say

196.80 25.00 12.50 39.06 3.00 276.36 82.91 359.27 360.00

per cube per m3 price price 2,900.00 1,024.13

ling(Exposed Rafter - excluding timber) 250 269.50 38000 65 0.39 40 5 26.50 325 6.50 350 14.00 75 55 1.38 125 31.25 171.88 50 300.00 50.00 840.14 30% 252.04 1,092.18

220.1835

11 12.13716 18.3 20.19182

30

245.07 m2 200,000.00 816.09 425.00 9 270.00 20.00 10.00 1,541.09 30% 462.33 2,003.42

11 12.13716 18.3 20.19182

er mater / wood pres etc

245.07 m2 175,000.00 714.08 180.00 225.00 20.00 50.00 1,189.08 30% 356.72 1,545.80

per sqft per m2 per m

5,000.00 333.33 645.60 250.00

250.00 75 325.00

GF Concrete Columns Stair case Slab beams Vault Rm Reinforcements Column beams slab staircase roof beams vault Form Work Column beams slab staircase roof beams vault Brick Work 225mm Thick - m3 Plinth DPC Plaster External Plaster Internal Plaster Al Doors / Windows D1 D2 D3 (Plywood door/Al frame) D4 (Toilet door) 1 3 2 3 3.39 1.13 2.66 2.28

1st Flooor

2nd Floor 3.39 1.13 2.66 2.28 3.39 Say

6.07

Say

2,136.49 1,290.24 877.36 204.19 1,451.52 536.40 6,496.19 102.90 91.84 77.99 10.53 100.80 66.00 450.06 33.40 31.28 27 11.73 21.66 -

0 kg 194.74 Say

255.32 m2 Say 25

Say

100 150

100.00 150.00

3.24 2.43 2.43 1.575

3.24 7.29 4.86 4.725

150

20.12

Al Windows W1 W2 W3 W4 F1 W' FG (3nos) Partitions Turfing Front space Rear space 2 4 6 3 1 2.7 0.36 3.6 0.72 1.44 5.4 1.44 21.6 2.16 1.44 32.04 14.64 52.16 Openings 34.5 45 79.5

14.64

14.64

Tiling waiting post shop pm's room varandah

3 3 3.5 9

5.25 3.5 3 1.25

15.75 10.5 10.5 11.25 48.00

10

0.2

toilet walls

3 3 8.4 16.2 -1.5 131 21

3 1.2 1.5 1.5 2.1

9 3.60 12.60 24.30 (3.15)

12.60

33.75

Rendering Floor balcony

152

10

Floor Area Fdn C.L 1.609143 RR

144.9 32.2 0.135 0.10125 0.09 0.32625 0.45

8.4 27

m2 ft2 ft2 153.3 1650.107 1,650.00 15 9 83.20

55

vol vol

83.2 83.2

0.4 0.45

33.28 37.44

Exc

0.42375 6900

195

16.09143

495

Bk C.L Conc C.L Vault walls Column fdn Column

20.75 3 9.6 16 16

25.5 1.8 0.2 0.6 0.2

3.225 3 2.5 0.6 0.2

1.8 2.52 0.2 3.5

49.48 9.60 2.28 1.15 2.24

250

3.39 staircase slope length vol 5 5 3 0.15 3 3 6 3 66.56 66.56 3.39 2.66 1.80 1.2 1.2 0.25 0.225 1.8 1.5 3 0.2 0.2 130 130 90 100 0.15 0.15 1.2 0.225 0.125 0.125 0.125 0.2 0.2 440.96 346.11 162.00 0.90 0.54 0.45 0.15 0.68 1.13 1.13 2.66 2.66 440.96 346.11 162.00 -

2 29

10

slab - vault slab - gutter

beams roof beams R/F Column beams slab staircase

roof beams vault Formwork 28 Column beams slab 28 roof beams vault Brick work 225tk

2.66 2.28

125 175

332.80 399.00

332.80 399.00 1,680.87

3.5

6 26.624

28

34 26.624 soffit

26.624 48.6

26.624 48.6 101.85 10.375 8.5 3.225 20.75 25.5 3.225 49.475

2 3 1

0.675

33.40

225tk Upper

0 Ceiling Flat Eave Roof Gutter slab m3

153.3 49.2 17.8 6 3 30.1 13

-15.75 0.9

137.55 44.28 181.83

Gutter D/pipe

11.8 0.866025 242.5333 1.5 1 9 3 1 9 260.53 2 60.2 5 65

260.53

211 9 11.5 10 10 1 41.5


83

m3 m3

m m m3

m3 1.95

6.62

m3 m3 m3 m3 m3 m3 10.53 8.72

kg 58.75

m3

Openings Bk total Net Bk

11.73 33.40 21.66

52.16

BILL OF QUANTITIES FOR BALANCE WORKS FOR PROPOSED HOUSE FOR MR. J. M. V. U. S. JAYASEKARA AT ANDIAMBALAMA SUMMARY ITEM DESCRIPTION B C D E G H J K L Q
Excavation and Earth Work Rubble Masonry Concrete Brick Work Doors, Windows & Partitions Roofer & Roof plumber Plasterer Painter & Decorator Pavior Electrical installation Plumber Total for Building

AMOUNT Rs. Cts. 10,744.00 12,740.00 47,549.60 10,371.90 486,616.60 953,083.75 243,587.25 248,466.50 353,426.10 165,575.00 218,025.00 2,750,185.70

This BOQ consists of the following balance works items Ground floor Construction of garage and finishes Verandah finishes Finishes (tiling, plaster) Door and windows Electrical and sanitary works First Floor Roofs require to cover slab opening area Brick work to support that roof Windows of that area External plastring

Prepared by:

Eng. P A I Laknatha, BSc.Eng.,AMIE(SL), AMSSE

Page 266

ITEM

DESCRIPTION SUBSTRUCTURE WORKS

UNIT

QTY.

RATE

AMOUNT

Rs.
B B - Excavation & Earth Work
Excavation for foundation. Excavation not exceeding 5ft depth from natural ground level in the following. Rate shall include for earth work support, ground improvement and dewatering as necessary Contractor should deploy the labour, machineries and tools. Earth Filling Selected imported soil should be free from any organic material filling under floors well rammed consolidated in 6 inch layers as per the drawing. Excavation for foundation. Garage Area Filling under floors including spreading, watering and compacting in 6 inch layers with suitable material. Total carried to summary Note

Rs. Cts.

B-01 B-02

Cu. Cu.

1.52 2.00

2,200.00 3,700.00

3,344.00 7,400.00

10,744.00

C C-01

Rubble Masonry
Random rubble masonry in 1:5 cement mortar Total carried to summary Cu.

0.70

18,200.00

12,740.00 12,740.00

Concrete
Concrete is to be mixed in a concrete mixer. Rate for concrete items to include for mixing, hoisting, placing in position, compacting with mechanical vibrator and for curing. All concrete work shall comply to the specifications, filled in to formwork and well packed around reinforcement. Rate for concrete columns, wall shall include for kickers. Form work and reinforcement works are measured separately unless otherwise specified. Up to Ground level (Garage Area) Note

D-01

D-02 D-03 D-04

Grade 15 concrete in 2" and 3" thick, 1:3:6 (40mm) mix for paving to the ground floor and screed . Grade 20 concrete in1:2:4 (20mm) mix in columns footings. Grade 20 concrete in1:2:4 (20mm) mix in columns stubs. Grade 20 concrete in 1:2:4 (20mm) mix for tie beams

Cu.

0.61

23,910.00

14,585.10

Cu. Cu. Cu.

0.15 0.07 0.19

31,750.00 31,750.00 32,550.00

4,762.50 2,222.50 6,184.50

Form Work
Rate for formwork shall include for necessary boarding supports, erecting, framing, removing, cleaning and wetting. Page 267 Note

ITEM

DESCRIPTION
Formwork is measured as the net contact surface. Formwork shall be plywood or steel shutter, G.I. pipe supporting and necessary props. All formwork shall be so constructed that no grout shall leak out during concreting. Up to Ground level (Garage Area)

UNIT

QTY.

RATE

AMOUNT

Rs.

Rs. Cts.

D-05

Formwork for column shafts and tie beam

ft2

86.00

110.00

9,460.00

Reinforcement
All reinforcement should be under recommendation of engineer and free from dust, rust and grease. Rate shall include for cutting, fabricating, placing in position including hangers, binding wire, spaces and waste. Rebending of bars shall not be attempted. Up to Ground level (Garage Area) Note

D-06 D-07 D-08

Supplying and fixing of Tor steel reinforcement in columns stub and footings Supplying and fixing of Tor steel reinforcement in tie beams. Supplying and fixing of Mild steel reinforcement in columns & beams. Total carried to summary

kg kg kg

40.00 32.00 7.50

130.00 130.00 130.00

5,200.00 4,160.00 975.00 47,549.60

Brick Work
Rates for masonry works shall include for forming provisions for plumbing and other electro mechanical works. Bricks/cement blocks in all brick work shall be in class 1 quality, acceptable to the consultant. Rate shall include for stiffeners unless otherwise measured separately. Ground floor (Garage area) Note

E-01

Brick work in cement and sand 1:8 in super Structure in ground floor. ( 9" thick brick work) 1st floor to roof (Area required cover the voids) Brick work in cement and sand 1:8 in super Structure in ground floor. ( 9" thick brick work) Total carried to summary

Cu.

0.42

24,695.00

10,371.90

E-02

Cu.

8.91

24,695.00

220,032.45 10,371.90

G G-01

Doors, Windows & Partitions Ground Floor Supplying and fixing window frames with top louvers as per detailed drawings out of 4"x3" kempes or balou or any other approved timber and shutters 1" thick fitted with heavy quality brass fittings. Supply and fixing door frames out of 4"x3" kempes/ balou approved timber and plywood door shutters of 1 1/4" thick with heavy quality brass fitiings and Union locks Page 268 ft2

149.13

745.00

111,101.85

G-02

ft2

376.87

770.00

290,189.90

ITEM

DESCRIPTION
First Floor (only the front roof covering area)

UNIT

QTY.

RATE

AMOUNT

Rs.
G-03
Supplying and fixing window frames with top louvers as per detailed drawings out of 4"x3" kempes or balou or any other approved timber and shutters 1" thick fitted with heavy quality brass fittings. Total carried to summary Roofer & Roof plumber Roof covering with corrugated asbestos sheets. (Timber frame work and ridge covering measured separately) Supply and installation of tongued and grooved 3/4" x 6" lunumidella ceiling planks on top of rafters , with double sided aluminium foil fixed on top. Rate shall include for sand papering and smoothing one side of the planks , application of water based staining and two coats of water based sealant. Rate shall include for applying of wood preservative. Roofing with asbestos corrugated sheets on local Micro (Eucalyptus Microcoris) or Balau , Bitis, or Kempas timber frame work (Ridging measured separately).Comprising of 165mm x 45mm ridge plate , 94mm x 70mm wall plate , 94mm x 45mm rafters @ 30" c/c and 45mm x 45mm battens @ 3'0" c/c.Rate shall include for applying of wood preservative. Timber valance/barge board in GINISAPU timber finished size 9" x 3/4" thick fixed to roof frame with brass screws and applying of wood preservative. P.V.C. eaves gutter 4 1/2" square type fixed to valance board with P.V.C. brackets @ 1' - 6" c/c including necessary mitre joints , gutter joiners , running heads & end caps. P.V.C. down pipes 3 1/2" dia. fixed to wall with P.V.C. clips @ 4'-0" c/c including necessary sockets, bends, lbows. Total carried to summary Sqr. ft2

Rs. Cts.
85,324.85

114.53

745.00

486,616.60 15.55 15.55 6,710.00 33,400.00 104,340.50 519,370.00

H H-01 H-02

Sqr.

H-03

Sqr.

15.55

17,815.00

277,023.25

H-04

L.ft.

154.00

195.00

30,030.00

H-05

Lft.

96.00

180.00

17,280.00

H-06

Lft.

36.00

140.00

5,040.00

953,083.75

J J-01

Plasterer
Ground Floor to 1st Floor 15mm thick 1:1:5 lime cement plaster finished semi- Sqre. rough to external walls including all reveals and edges. 15mm thick 1:1:5 lime cement plaster finished Sqre. smooth to internal walls including all reveals and edges. 1 st floor to roof (Only roof covering area) 15mm thick 1:1:5 lime cement plaster finished semi- Sqre. rough to external walls including all reveals and edges.

26.43

3,650.00

96,469.50

J-02

24.14

4,775.00

115,268.50

J-03

3,650.00

Page 269

ITEM J-04

DESCRIPTION
15mm thick 1:1:5 lime cement plaster finished smooth to internal walls including all reveals and edges. Total carried to summary

UNIT
Sqre.

QTY. 6.67

RATE

AMOUNT

Rs.
4,775.00

Rs. Cts.
31,849.25

243,587.25
Note

Painter & Decorator


The prices shall include for preparation of surface, cleaning down, use of wall fillers and primary paint coats to obtain neat surface., sand papering etc. and protecting of floors and fittings, removing and refixing of fittings, cleaning doors, windows, fittings etc. upon completion. Application of plaster coatings of thickness not less than 2mm using "Joint compound powder / Skimcoat ", or approved equivalent to walls, slab, beam, column facings.Rate shall include for sand papering and surface preparation. One primer coat & two coats of weather shield paint on external faces. One primer coat & two coats of emulsion paint on internal faces. Painting soffit with two coats of emulsion paint. Sqr. 1995.00 Total carried to summary

K-01

Sqre.

34.70

3,480.00

120,756.00

K-02 K-03 K-04

Sqre. Sqre. Sqre.

15.90 24.14 10.56

2,160.00 2,995.00 1,995.00

34,344.00 72,299.30 21,067.20

248,466.50

L L-01

Pavior Supply and lay 12"x12" heavy duty ceramic glazed floor tiles of approved quality and colour on 15mm thick 1:3 cement sand bedding and neat cement float internal area Supply and lay 12"x12" non skid (studded) heavy duty ceramic floor tiles of approved quality and colour on 15mm thick 1:3 cement sand bedding and neat cement slurry to toilets/ bathrooms/ balconies/ stair case. Supply and lay 12"X8" glazed ceramic wall tiles of approved colour to toilet walls up to 6 feet height on 12mm thick 1:3 cement/sand backing and a coat of neat cement slurry to toilets/ bath rooms. Total carried to summary Sqre.

13.58

20,850.00

283,143.00

L-02

Sqre.

1.53

22,770.00

34,838.10

L-03

Sqre.

1.50

23,630.00

35,445.00

353,426.10
Nos Item Nos Nos Nos

Q Q-01 Q-02 Q-03 Q-04 Q-05

Electrical Installation
60 Amp TP&N main switch Supply and fixing required no of 30 A MCBs Supplying and fixing 5 Amp socket out lets Supplying and fixing 15 Amp socket out lets Light points wired through a 5 Amp three gang one way plate switch using 2x1/1.13 (2x1/044) P.V.C. insulated copper wire in fully concealed/surface P.V.C. conduits. Page 270

1.00 4.00 15.00 3.00 24.00

8,840.00 9,000.00 1,900.00 2,425.00 2,460.00

8,840.00 36,000.00 28,500.00 7,275.00 59,040.00

ITEM Q-06 Q-07


Pendent Lamp

DESCRIPTION

UNIT
Nos Nos

QTY. 24.00 1.00

RATE

AMOUNT

Rs.
455.00 15,000.00
Provide an earth electrode copper plate 2'-0"x2'0"x1/8" in 3m deep. Rate to include connection to the main panel, sub main, earth clips, excavation etc. with 1'-0"x 1'-0"x 1'-0" earth pit including 4 1/2" brick work and 3" concrete slab. Total carried to summary

Rs. Cts.
10,920.00 15,000.00

165,575.00
No.

R - Plumber
R-01
Supply and fix white vitreous china floor standing wash basin and pedestal with overflow hole and single tap hole in center of "Rocell" brand & model "Intense" or approved equivalent complete to orking order inclusive of the 1 1/4" chromium plated waste outlet of "Rocell" brand & model "A706" and 11/4" chromium plated siphon cleanable bottale trap of "Rocell" brand & model "A186". Supply and fix white vitreous china floor standing close coupled semi back to wall water closet suite with wash down flushing with 6/3 liters dual lushing has horizontal outlet with vario drain bend and two lateral holes for bottom water connection , cistern with water inlet from rear of "Rocell" brand & model "Intense" or approved equivalent complete to working order inclusive of universal bend of "Rocell" brand & model "Vario Joint". Supply and fix mirror over wash basin completed. Supply and fix shower unit with bib tap Construction of septic tank & soakage pit as per detailed drawing. Total carried to summary

1.00

24,785.00

24,785.00

R-02

No.

1.00

31,690.00

31,690.00

R-04 R-05 R-06

No. No. Item

1.00 1.00 1.00

6,750.00 4,800.00 150,000.00

6,750.00 4,800.00 150,000.00 218,025.00

Page 271

0.12 0.10

0.02
0.03 1.00

1700 Floor area sqft 1,617.76 Rate per sqft

Page 272

48.6

45.9

3,750

16 0

4.8768 0 450 4.8768

Page 273

800 0.6096

1654.8 1654.8

75 75 75

64.8

10.8

3,600

3,600 64.8 9 10.8 2.7432 0

10,000

#REF!

Page 274

10,000

211

0.866025404

243.6418136

200 445.00

Page 275

200 445.00

235 260

1,650

1,650

1,800

Page 276

Page 277

O/H Profit Transport Consultancy BASIC

Page 278

Page 279

Page 280

Page 281

Page 282

Page 283

Vous aimerez peut-être aussi