Figure 2-15 Completely installed TEC air conditioner on the IBBS cabinet
(1) Inside view oI the Iront door oI the IBBS cabinet (2) Outside view oI the Iront door oI the IBBS cabinet
2.6 Insta!!Ing thc Cab!cs nf thc IBB5
This topic describes how to install the cables oI the IBBS. The cables are RTN cables, 48 V
cables, external monitoring cables, and PGND cables.
IBBS
IBBS User Guide 2 IBBS Installation Guide
Issue 04(2007-09-20)
(2007-09-20)
Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
2-17
Cnntcxt
127(
The cables inside the IBBS cabinet are installed beIore the cabinet is delivered.
Table 2-2 lists the cables that need to be installed or prepared on site.
Table 2-2 Cables related to the IBBS cabinet
Cab!c
Namc
Crns
s-
5cctI
nna!
Arca
Cn!nr Rcmarks
RTN cable 35
mm
2
Black z II the cables delivered with the IBBS
are insuIIicient, they should be
prepared on site.
z The IBBS cabinet is supplied with 48
V power through the black RTN
cables.

48 V
cable
35
mm
2
Blue
External
monitorin
g cable
- Black The external monitoring cables include
door control cables, temperature sensor
cables, smoke sensor cables, and TEC
alarm cables.
PGND
cable
- Yellow
and
green
The PGND cables connect to the two-
hole grounding bar inside the IBBS
cabinet.

Connect one end oI the external monitoring cables (see 2 as shown in Figure 2-16) to the DC
PDB oI the IBBS. Connect the other end oI the external monitoring cables (see 1 as shown in
Figure 2-16) to the basic cabinet oI a base station.
2 IBBS Installation Guide
IBBS
IBBS User Guide
2-18 Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
Issue 04(2007-09-20)
(2007-09-20)
Figure 2-16 External monitoring cables oI the IBBS
(1) External monitoring cables to connect to the basic
cabinet oI a base station
(2) External monitoring cables to connect to the IBBS
(3) Smoke sensor cables (white and brown) (4) Temperature sensor cables (white and orange)
(5) TEC alarm cables (white and blue) (6) Door control cables (white and green)
&$87,21
When connecting cables to the wiring terminals on the batteries, you must correctly connect the
cables to the positive poles and negative poles, in compliance with instructions.
127(
The Iollowing description is an installation example Ior your reIerence where sixteen 12 V batteries, Iour
batteries in one group and Iour groups in the IBBS cabinet, are interconnected to provide -48V power
supply Ior a single basic cabinet.
The IBBS uses the MCB to control the power Ior cabinets. The IBBS is conIigured with one MCB by
deIault at delivery, two MCBs in Iull conIiguration. II the IBBS needs to provide power Ior two cabinets,
reIer to 2.6.1 Installing the MCBs of the IBBS.
IBBS
IBBS User Guide 2 IBBS Installation Guide
Issue 04(2007-09-20)
(2007-09-20)
Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
2-19
Prnccdurc
5tcp 1 Route the cables by reIerring to Cabling Specifications.
5tcp 2 Prepare the OT terminals Ior the 48 V cables and RTN cables. For details on how to prepare
the OT terminals, reIer to Assembling the OT Terminal and the Power Cable. II the OT
terminals are ready, skip this step and go to Step 3.
5tcp 3 Lead the 48 V cables, RTN cables, external monitoring cables, and PGND cables out oI the
IBBS cabinet Iront the bottom to the top through the cable holes. Figure 2-17 shows the mapping
between the cables and the cable holes at the bottom oI the cabinet.
Figure 2-17 Cable holes at the bottom oI the IBBS cabinet
(1) Cable hole Ior the RTN cable (2) Cable hole Ior the 48 V cable
(3) Cable hole Ior the PGND cable (4)(5) Reserved
(6) Cable hole Ior the IBBS external monitoring cable
127(
When the IBBS provides power supply Ior two cabinets, the cables between the two basic cabinets, that
is, the 48 V cables, RTN cables, and external monitoring cables can be led out through the corresponding
cable holes at the same time.
5tcp 4 Open the side cover oI the DC PDB, as shown in DC PDB of the IBBS. Then lead the 48 V
cables, RTN cables, and external monitoring cables into the DC PDB Irom the bottom to the top
through the cable holes. Connect the PGND cables to the two-hole grounding bar at the right
bottom oI the IBBS cabinet.
5tcp 5 Install power cables at the IBBS side.
Connect the 48 V power cable and RTN cable to the wiring nuts (positions 23 and 24
respectively) on the wiring bar, as shown in Figure 2-18.
2 IBBS Installation Guide
IBBS
IBBS User Guide
2-20 Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
Issue 04(2007-09-20)
(2007-09-20)
Figure 2-18 Connection positions oI power cables on the wiring bar oI the IBBS
127(
II the IBBS needs to provide power supply Ior two base stations, connect the 48 V cable and RTN cable
oI a second base station to the wiring nuts (positions 25 and 26 respectively), as shown in Figure 2-18.
5tcp 6 Install power cables at the side oI the main base station cabinet.
Connect the power cables to the corresponding terminals on the wiring bar in the battery case
oI the main base station cabinet.
127(
For the speciIic connection positions, reIer to the relative installation manual oI base stations.
5tcp 7 Install monitoring cables at the IBBS side.
Connect the monitoring cables to the corresponding terminals oI the wiring bar, as shown in
Figure 2-19.
IBBS
IBBS User Guide 2 IBBS Installation Guide
Issue 04(2007-09-20)
(2007-09-20)
Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
2-21
Figure 2-19 Connection positions oI monitoring cables on the wiring bar in the DC PDB oI the
IBBS
(1) Smoke sensor cable (white) (2) Smoke sensor cable (brown)
(3) Door control cable (white) (4) Door control cable (green)
(S1.1) Temperature sensor cable (white) (S1.2) Temperature sensor cable (orange)
(5) TEC alarm cable (white) (6) TEC alarm cable (blue)
5tcp 8 Install monitoring cables at the side oI the main base station cabinet.
1. Temperature sensor cable
Insert the 2PIN connector oI the monitoring cables (white and orange) oI the temperature
sensor into the BATTEM2 socket oI the NPMI/DPMI in the main cabinet. The position
oI the BATTEM2 socket on the NPMI is marked red in Figure 2-20.
Figure 2-20 Connection positions oI monitoring cables on the NPMI
2. TEC alarm cable
Insert the common 4PIN connector oI the monitoring cables (white and blue) oI the TEC
air conditioner into the JTD1 socket on the NPMI/DPMI oI the main cabinet. The position
oI the JTD1 socket is marked red in Figure 2-20.
3. Smoke sensor cable
2 IBBS Installation Guide
IBBS
IBBS User Guide
2-22 Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
Issue 04(2007-09-20)
(2007-09-20)
Connect the cord end terminals oI the monitoring cables (white and brown) oI the smoke
sensor in the IBBS cabinet to the smoke sensor in the main base station cabinet, as shown
in Figure 2-21.
Figure 2-21 Installing the Smoke sensor cable
4. Door control cable
Connect the cord end terminals oI the door control monitoring cables (white and green)
Irom the IBBS to the cascading sockets Ior the signal cables oI the door control sensor in
the main cabinet, as shown in Figure 2-22.
Figure 2-22 Installing the Door control cable
5tcp 9 Connect the PGND cables to the two-hole grounding bar at the right bottom oI the IBBS cabinet.
5tcp 10 Coat the Iollowing positions with silica gel Ior waterprooI protection: the positive pole and
negative pole on the batteries where the 48 V cables and RTN cables are connected, the two-
IBBS
IBBS User Guide 2 IBBS Installation Guide
Issue 04(2007-09-20)
(2007-09-20)
Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
2-23
hole grounding bar that the PGND cables are connected to, the wiring terminal that the external
monitoring cables are connected to, and the grounding position on the side plate oI the IBBS
cabinet.
5tcp 11 Bind the cables inside the IBBS cabinet.
5tcp 12 Fit on the side cover oI the DC PDB and close the Iront door oI the IBBS cabinet.
----End
2.6.1 Insta!!Ing thc MCBs nf thc IBB5
II the IBBS provides power Ior two cabinets, an additional miniature circuit breaker (MCB) is
required Ior the direct current power distribution box (DC PDB) to control the power supply Ior
a second cabinet.
Cnntcxt
Figure 2-23 shows the DC PDB.
2 IBBS Installation Guide
IBBS
IBBS User Guide
2-24 Huawei Proprietary and ConIidential
Copyright Huawei Technologies Co., Ltd
Issue 04(2007-09-20)