Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
Rev F01
Page 1 of 26
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
TECHNICAL REQUISITION FOR HSD ELECTRIC IMMERSION HEATERS
This cover page is a total record of all the revisions of this document identified by number and title. Each of the pages that follow this cover page in this document records only the latest revision for that page. This document has been prepared on behalf of and for the exclusive use of PTSC/TLJOC and is subject to and issue in accordance with the agreement between PTSC/TLJOC and MARINE ENGINEERING SERVICES PTE LTD (MESPL). MESPL accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 2 of 26
CONTENTS
........................................................................................................................................ 1 TECHNICAL DATA ........................................................................................... 3 SCOPE OF SUPPLY FOR EQUIPMENT AND MATERIAL ........................................4 ITEM LISTING.................................................................................................. 6 APPENDIX A - INSPECTION AND TEST REQUIREMENTS.......................................7 APPENDIX B - SUPPLIER DEVIATION FORM.......................................................8 APPENDIX C - VENDOR DATA REQUIREMENT LIST - VDRL ..................................9
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 3 of 26
TECHNICAL DATA
REFERENCE SPECIFICATION / DRAWING NUMBER GEN-A-TS-M-SP-0003 GEN-A-TS-E-SP-0011 GEN-A-TS-E-SP-0004 GEN-A-TS-I-SP-0003 GEN-A-TS-M-SP-0006 GEN-A-TS-P-SP-0001 GEN-A-TS-P-SP-0007 SPEC. /DWG. REV F01 F01 F01 G01 G01 G01 F01 Specification for Electric Heaters General Electrical Specification- Electrical Requirements for Packaged Equipment Electrical Equipment Specification - Power, Control & Earthing Cables General Instrument Specification for Package Equipment Specification for Pressure Vessels Piping Material Class Specification Painting & Protective Coating Specification Mechanical Datasheet for HSD Open Drain Tank Electric Immersion Heater Mechanical Datasheet for HSD Test Separator Electric Immersion Heaters Mechanical Datasheet for HSD Closed Drain Vessel Electric Immersion Heaters Mechanical Datasheet for HSD Test Separator Mechanical Datasheet for HSD Open Drain Tank Mechanical Datasheet for HSD Closed Drain Vessel Abbreviations And Legends 3 Piping & Instrumentation Diagram Test Separator Piping & Instrumentation Diagram Closed Drain Vessel. Piping & Instrumentation Diagram Open Drain Tank. HSD - Elec. Symbols and Legend HSD Equipment Layout Elevation - Looking South HSD Equipment Layout Elevation View - Looking West Inspection and Test Requirements Project Vendor Surveillance Plan for Bulk Material Specification General Quality Requirements Specification Vendor Data Requirement Specification Identification, Traceability, and Certification Requirement Specification Storage and Handling of Equipment and Materials Specification Master Vendor Data Requirement List (VDRL) Specification Equipment Protection and Preservation Project Vendor Surveillance Plan for Tagged Equipment SpecificationNew documents Vendor Data Requirement List SPECIFICATION / DRAWING TITLE
HSD-A-TS-M-DS-0015 HSD-A-TS-M-DS-0009 HSD-A-TS-M-DS-0010 HSD-A-TS-M-DS-0007 HSD-A-TS-M-DS-0018 HSD-A-TS-M-DS-0011 HSD-A-TS-F-DW-0102-01 to 05 HSD-A-TS-F-DW-0107-00 HSD-A-TS-F-DW-0201-00 HSD-A-TS-F-DW-0202-00 HSD-A-TS-E-DW-0002-00 HSD-A-TS-P-DW-1008 HSD-A-TS-P-DW-1007 (APPENDIX A) GEN-A-GE-Q-PR-0001 GEN-A-GE-Q-PR-0002 GEN-A-GE-Q-PR-0003 GEN-A-GE-Q-PR-0004 GEN-A-GE-Q-PR-0005 GEN-A-GE-Q-PR-0006 GEN-A-GE-Q-PR-0007 GEN-A-GE-Q-PR-0008 (APPENDIX C)
F01 F01 F01 G01 F01 G01 F04 F04 F04 F04 F04 F01 F01 F01 F01 F01 F01 F01 F01 F01 F01 -
The revision of the above document/s may be updated subjected to Company's requirement. Vendor is required to check/request for the latest copies from the Contractor.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 4 of 26
The following scope of supply covers the minimum technical requirements for the supply of: Open Drain Tank Electric Immersion Heater (02H-6120) (To be mounted on N4 of Open Drain Tank) Closed Drain Vessel El electric Immersion Heater (02H-6010A/B) (To be mounted on N8A/N8B of Closed Drain Vessel) Test Separator Electric Immersion Heater (02H-1031A/B) (To be mounted on N8/N9 of Test Separator) Conforming to all attached specifications, drawings, data sheets and documents as stated in Section 1.Technical Data. The Immersion Heater shall be supplied in separate packages for specific service applications which are detailed in the Project Datasheets. The VENDORs scope shall include design, materials procurement, fabrication, inspection, testing, painting, documentation and preparation for shipment for the supply of Electric Immersion Heater. Each of the Electric Immersion Heater package shall be complete with all items within the package limit specified on the P&ID, and comprise but not limited to the following equipment and requirements. ITEM QTY 2 1.0 1 2 1.1 1.2 1.3 1.4 DESCRIPTION Immersion Heater for Test Separator (02H-1031A/B) c/w Control Panel Immersion Heater for Open Drain Tank (02H-6120) c/w Control Panel Immersion Heater for Closed Drain Vessel (02H-6010A/B) c/w Control Panel Temperature sensing devices (RTD DIN PT100), 3 temperature elements (1 element per phase) and 1 temperature element per flange. Separate Terminal boxes for Electrical Power & Temperature Signals. Bolts, Nuts and Gaskets for Flange connection. Surface preparation and painting as per GEN-A-TS-P-SP-0007
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 5 of 26
ITEM 1.5 1.6 1.7 2.0 3.0 4.0 5.0 6.0 7.0 8.0
QTY
DESCRIPTION SS316 Nameplate / Tagging / Marking in according with Project Specification Eye bolts / Lifting Lugs for Lifting Purpose. At least one Earthing Boss located at base of tube sheet flange. Mechanical & Performance guarantee and warranty complete for the package and supplied items Complete inspection, QA/QC and testing requirements (e.g. FAT & NDT) as defined in this TR, datasheets & relevant Project Specifications.
1 Lot 1 Lot
Spare parts for start-up and commissioning (200% gaskets &10% bolting) Special tools for operation, installation and maintenance purposes. Preparation of packing, marking, preservation for transportation Complete vendor data and documentation including as built and final documents as per Package purchase requisition. Material Certification shall be in accordance with requirements of relevant Project specifications and datasheets. Third Party Certification. The criticality rating for Certification of this package is A2 as per Project Specification, GEN-A-GE-Q-PR-0002 General Quality Requirements Specification. Vendor shall strictly comply with these certification requirements. Optional Items
9.0
Priced list of recommend spare parts for 2 years operation (Separate optional quotation)
Together with the Tender, a list of deviations or exceptions to this Specification referenced Project Datasheets and Drawings. The VENDOR shall be responsible to submit all information requested, including a list of any exceptions and non-conformities to the specifications listed herein. In the absence of any exceptions, it will be construed that the VENDOR fully complies with this Specification. The scope of supply for Electric Immersion Heaters is further detailed in the Project Datasheets. The PURCHASER shall indicate the package envelope and interface points in the bid documents, and no changes shall be made unless by mutual agreement. The equipment shall be delivered in the minimum practical number of assemblies and to suit transportation and receipt at site Vendor shall duly complete and return all datasheets with their tender.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 6 of 26
ITEM LISTING
Technical Requisition No.: HSD-A-TS-M-TR-0018
THE SCOPE OF SUPPLY SHALL BE IN ACCORDANCE WITH THE ITEMS LISTED BELOW : ITEM No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 TAG No. 02H-6120 02H-6010 A/B 02H-1031 A/B DESCRIPTION Electric Immersion Heater for Open Drain Tank. Electric Immersion Heater for Closed Drain Vessel Electric Immersion Heater for Test Separator SUPPLIER TBC TBC TBC QTY 1 2 2
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 7 of 26
NOTES: 1. Inspection and testing requirements shall be compliant with the Specification for
Electric Immersion Heaters.
2. The items listed above are the minimum requirements for the ITR. Vendor shall
include these items inside their ITP. This shall be submitted as part of bidding documents.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 8 of 26
FACTORS AFFECTED: CODE COMPLIANCE MATERIAL WEIGHT MAINTENANCE DESIGN COST PERFORMANCE APPROVAL STATUS: BACK CHARGEABLE TO SUPPLIER ACCEPTED REQUISITION ENGINEER NAME: REVIEWED BY
PTSC (SIGN/DATE)
TLJOC (SIGN/DATE)
This form is intended to control post-order deviations and/or post-approval revisions and/or to request concessions. Specifications issued with P.O. and approved KEY SUPPLIER Data are treated as "FROZEN" by both parties, supplier and buyer. POST-ORDER DEVIATIONS OR POST-APPROVAL REVISIONS INITIATED BY SUPPLIER, NEED SPECIFIC APPROVAL. Under no circumstances vendor shall revise frozen documents/drawings without receipt of prior approval on this form. DISTRIBUTION: Please Tick () in Appropriate box
As defined in Project Execution Manual-Detailed Engineering.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 9 of 26
Notes: 1) Vendor shall be responsible for liaising with 3rd party Certifying Authority with regards to the requirement for certified documents, in order to achieve full certification of this package. Purchaser will not be indicating a full list of C requirements in this VDRL 2) Bidder shall refer to Master Vendor Data Requirement List (VDRL) Specification for submission of Data Books requirements.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 10 of 26
DATA CODE
REMARKS
R (Note 2)
C3
STRUCTURAL STEEL CALCULATIONS Calculations shall determine that the structure and any lifting aids are suitable for all phases of lifting, transportation, installation and operation without overstressing any member. This shall include fatigue calculations, if applicable.
A X weeks after PO
C28
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 11 of 26
DATA CODE
DATA DESCRIPTION/DEFINITION
REMARKS
R (Note 2)
D DRAWINGS D1 OUTLINE DRAWINGS Plan/elevation drawings with overall dimensions, connection dimensions and ratings, and required clearances for assembly, operation, and maintenance access. X 4 Q Typically w/ Quote A X weeks after PO
D3
D4
ASSEMBLY DRAWINGS Relative location and dimensions of components and subassemblies required for field assembly.
D6
SUPPORT LOADING DIAGRAM Identify/show distribution of loads and moments on support structures. Show maximum, design, and normal operating conditions.
D15
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01
6
Page 12 of 26
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 13 of 26
DATA CODE
DATA DESCRIPTION/DEFINITION
REMARKS
R (Note2)
E7
EQUIPMENT PERFORMANCE DATA EQUIPMENT PERFORMANCE CURVES AND DATA Show data sufficient to verify ratings and performance. This will include data for the entire operating range. This will include, for example, pressure vs. flow rate, efficiencies, temperatures, heat recovered and power consumption.
RECOMMENDED
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 14 of 26
REMARKS
DATA DESCRIPTION/DEFINITION
DATA SUBMITTALS A C
R (Note 2)
G GENERAL G1 VENDOR DATA SCHEDULE Itemized list of VENDOR data with document titles and numbers referenced to COMPANYS VDRL data item code numbers; include submittal dates/timing for issue. Preliminary List to be submitted with Proposal. X 4 Q Typically w/ Quote A X weeks after PO
G2
FABRICATION/PRODUCTION SCHEDULE
G3
ACKNOWLEDGEMENT OF PURCHASE ORDER VENDOR shall provide a signed acknowledgement copy of the formal Purchase Order and all Change Orders as a condition of payment.
1 R X weeks after PO
G4
BILL OF INSTALLATION/ASSEMBLY MATERIALS List of items, fasteners, instruments, valves and subassemblies (with quantities and material specifications) required for field assembly/ installation. Identify items supplied.
G6
EQUIPMENT WEIGHTS AND CENTER OF GRAVITY Empty, operating, shipping and hydrotest weight. The center of gravity shall also be defined as well as projected allowances. Estimated weight and max. not to exceed weight submitted with proposal
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 15 of 26
G7
COMPLETED ENGINEER'S DATA SHEETS (All COMPANY data sheets for equipment, drivers, auxiliary equipment, noise, and weight/ center of gravity as submitted by COMPANY.)
G8
COMPLETED VENDORS DATA SHEETS Detail characteristics of completed item (if not covered under G7 above).
G9 G11
CATALOG DATA ALLOWABLE NOZZLE LOADS Maximum allowable moments and forces externally imposed upon equipment nozzles as specified.
G12
BOLT / FASTENER AND GASKET SCHEDULES Bill of material for bolts / fasteners and gaskets.
A X weeks after PO
G13
ASSEMBLY/DISASSEMBLY SIZES AND WEIGHTS Overall dimensions/weights of main components to be moved in assembly/ disassembly for construction or major overhaul.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 16 of 26
G19
CONTROL SYSTEM INSTALLATION PLANNING GUIDE Provide an installation planning guide including recommendations and/or limits for the following: a) Floor loading b) Environmental limitation for temperature, humidity, corrosive gas Vapor and dust c) Fire protection facilities. d) Electric and magnetic fields e) Power requirements and power conditioning f) Unloading procedures and rigging g) Field wiring of process signals h) System power and system grounding i) Network cable routing and termination j) Card specifics and termination schematics VENDOR EXPERIENCE LIST VENDOR to provide equipment model number, time in service, user contact name and contact number for all equipment of similar size and rating.
G21
Q Typically w/ Quote
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 17 of 26
DATA CODE
DATA DESCRIPTION/DEFINITION
REMARKS
R (Note 2)
M1
M OPERATIONS AND MAINTENANCE DATA OPERATING INSTRUCTIONS Instructions for pre-commissioning, startup, normal operation, off-design operation, emergency operation, and shutdown.
12
A X weeks after PO
M2
MAINTENANCE AND RECOMMENDATIONS Recommended maintenance procedures and intervals, descriptions, grades, and alternate VENDOR designations. lubricant
12
A X weeks after PO
M3
PRICED, RECOMMENDED SPARE PARTS FOR STARTUP/ COMMISSIONING For commissioning spares and for special maintenance/ handling tools. Include wearing parts such as bushings, seals, gaskets which need replacement after startup, test and shutdown prior to production start. Include gaskets and other similar components replaced after line hydrotest.
M4
PRICED, RECOMMENDED SPARE PARTS FOR TWO (2) YEARS OPERATION MINIMUM SPECIFIED OPERATING SPARES
X X
4 4
M5
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 18 of 26
A X weeks after PO
M6
SPECIFIED CAPITAL SPARES X 4 Q Typically w/ Quote A X weeks after PO Q Typically w/ Quote A X weeks after PO
M7
RECOMMENDED CONSUMABLES FOR TWO (2) YEARS VENDOR recommendation for consumables such as lubrication oil filters, air filters, fuses, bulbs (LED), fuel filters, control oil filters, buffer (seal) gas filters, etc.
M8
M10
SPARE PARTS LIST AND INTERCHANGEABLITY VENDOR to submit for all spare parts and equipment components.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 19 of 26
P PROCEDURES P1 QUALITY CONTROL PROCEDURES VENDORS Quality Plan/Procedure shall be job specific and shall clearly identify all Quality Control activities performed by the VENDOR including all holds points and witness points for COMPANY to comment and indicate those activities to be witnessed by COMPANY Surveillance Representative. X 2 Q Typically w/ Quote A X weeks after PO
P2 P3
HYDROSTATIC OR PNEUMATIC TEST PROCEDURE NON-DESTRUCTIVE TEST PROCEDURES Provide procedures as applicable for radiographic, dye penetrant, magnetic particle, or ultrasonic testing.
A X weeks after PO C X weeks after Approval A X weeks after PO C X weeks after Approval
P5
FACTORY/FIELD ACCEPTANCE TEST PROCEDURE VENDOR and SUB-VENDOR procedure to determine that specified equipment components and total package operates according to purchase requirements. Including all major components to be tested and package testing.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 20 of 26
P6
Procedures used to test equipment or components for operational suitability under environmental conditions such as heat, dust, radiation, humidity, low temperature, vibration and other adverse factors.
P7
SURFACE PREPARATION AND PAINTING PROCEDURE Procedure used for cleaning and preparing surfaces for welding, corrosion protection, and painting.
P8
FIELD SUPPORT RECOMMENDATIONS Procedure for VENDORS recommendation equipment/skid to COMPANYS deck.
4 for supporting
P9
SHIPPING, HANDLING AND STORAGE PROCEDURES For equipment shipped in more than one piece, a schedule is to be submitted which identifies all the major components of the package for use as a Check List at the receiving point to ensure all items have been received. Copy of documents shall accompany shipment.
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 21 of 26
P10
INSTALLATION/ERECTION PROCEDURE Detailed description and procedures for installation of equipment to be supplied and to be used at the fabrication site. The following information shall be included: a.) Lifting points b.) Lifting weights c.) Shipping break points for panels and switchboard assemblies d.) Erection match markings e.) Fixing points f.) Leveling procedures g.) Alignment procedures h.) Erection fasteners summary list i.) Details of any special unpacking/handling requirements shall be stated.
P13
Q Typically w/ Quote
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 22 of 26
A X weeks after PO C X weeks after Approval R X weeks after PO
P18
LUBRICATION OIL SYSTEM FLUSHING PROCEDURE Detailed description of steps required for draining, flushing, cleaning, re-filing, and oil quantities required for complete flushing of the lubrication oil system, handling and disposal of all generated waste.
P19
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 23 of 26
P21 P22
MANUFACTURING PROCEDURE WEIGHT AND CENTER OF GRAVITY CONTROL Procedure for weight and center of gravity estimating, reporting and Control.
4 4
2 2
A X weeks after PO C X weeks after Approval A X weeks after PO C X weeks after Approval
RECOMMENDED
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 24 of 26
REMARKS
DATA SUBMITTALS A C
R (Note2)
R1 R5
MECHANICAL COMPLETION CERTIFICATE ELECTRICAL EQUIPMENT HEAT RUN TEST RECORDS Show temperature rise for no-load, one half, three-fourths , and full load Operation. HYDROSTATIC OR PNEUMATIC TEST CERTIFICATE
2 2
2 After Test
A X weeks after Test C X weeks after test R X weeks Before shipment C X weeks after test (R Not to exceed 1 weeks after testing) A X weeks after Test C X weeks after test (R Not to exceed 1 weeks after testing) C X weeks after Test (R Not to exceed 1 weeks after testing) A X weeks after PO C X weeks after Test (R Not to exceed 1 weeks after check)
R9
After Test
R11
After Test
R26
After check
R29
LIFTING EQUIPMENT TEST CERTIFICATES Required for all: a.) Hoists 4 2 As Required A X weeks after PO C X weeks after Test
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 25 of 26
R30
After Test
A X weeks after PO C X weeks after Approval (R-Not to exceed 1 weeks after testing) Q Typically w/ Quote A X weeks after PO C X weeks after Approval R X weeks after PO Q Typically w/ Quote A X weeks after PO C X weeks after Approval C X weeks after Test R X weeks after Test (R Not to exceed 1 weeks after testing)
R53
R54
R60
NON-CONFORMITY REPORTS
R66
After Test
DATA CODE
REMARKS
DATA DESCRIPTION/DEFINITION
R (Note 2)
DB DATA BOOKS
Project
HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev F01 Page 26 of 26
2
DD-1
FD-1
FD FABRICATION DATA FABRICATION DATA Fabrication Data shall compile all procedures (P), records (R) , certificates (R), and some required detail drawings (D). OM OPERATING AND MAINTENANCE MANUAL OPERATING AND MAINTENANCE MANUAL Operating and Maintenance Manual shall compile all drawings (D), equipment performance data (E), general document (G), operations and maintenance data (M), and some of required procedures (P).
OM-1