SELF INTRODUCTION
Name :
Designation
Qualification
Concerned Area :
O&M 2X 210 MW, IB Thermal , 9X135 MW, CPP & currently in IPP(4 X 600 MW), Sterlite Energy Limited, Odhisa.
SELF INTRODUCTION
Name :
Aadarsh
Associate Manager
Designation
Qualification
B.E. Mechanical Engg.( Gold Medalist), PG ( TPPE ), CWI, IPMA Level-D, Energy Manager
Concerned Area :
Project Management ,commissioning & PG Test of unit, IPP(4 X 600 MW), Sterlite Energy Limited, Odhisa.
10/30/2012
AADARSH
IBR is Indian Boiler Regulations, which was created in 15th September 1950 in exercise of the powers conferred by section 28 & 29 of the Indian Boilers Act. The Indian Boilers Act was formed in 1923, 23rd February to consolidate and amend the law relating to steam boilers. Steam Boilers that come under IBR are:Steam boiler: Steam boilers under IBR means any closed vessel exceeding 22.75 litres in capacity and which is used expressively for generating steam under pressure and includes any mounting or other fitting attached to such vessel which is wholly or partly under pressure when the steam is shut off. & NON IBR simply means any steam producing equipment lesser than 22.75 ltrs of water hold up capacity.
Steam pipes: IBR steam pipe means any pipe through which steam passes from a boiler to a prime mover or other user or both if pressure at which steam passes through such pipes exceeds 3.5 kg/cm2 above atmospheric pressure or such pipe exceeds 254 mm in internal diameter and includes in either case any connected fitting of a steam pipe.
10/30/2012 AADARSH 5
Boiler Specification Typical Boiler Specification Boiler Make & Year MCR(Maximum Continuous Rating) Rated Working Pressure Type of Boiler Fuel Fired : HBC & 2007 : 2060 TPH (F & A 100oC) :17.6 kg/cm2(g) : Water tube : Coal
BOILER TYPE: HG-2060/17.5-YM9 Model: HG-2060/17.5-YM9 ManufacturerThe China Harbin boilers Co. LTD Type: This boiler is subcritical, once reheat, assisted circulation, pulverized coal-fired boiler, with single furnace , corner tangential firing, balance ventilation, all-steel overhung construction and with dry-ash furnace.
Heating surface is any part of the boiler metal that has hot gases of combustion on one side and water on the other. Any part of the boiler metal that actually contributes to making steam is heating surface. The amount of heating surface of a boiler is expressed in square meters. The larger the heating surface a boiler has, the more efficient it becomes. For IPP : Water Wall Super heater Economizer Reheater
10/30/2012
AADARSH
Maximum continuous rating is the hourly evaporation that can be maintained for 24 hours. F & A means the amount of steam generated from water at 100C to saturated steam at 100 oC
10/30/2012
AADARSH
Difference between Tube & Pipe: The primary difference between pipe and tubing is how the size is designated. Pipe is designated by a "Nominal Pipe Size" based upon the ID (inside diameter) of the most common wall thickness. Tubing is designated by the measured OD (outside diameter)
Important Terminology of Boilers Blowdown - The drain connection including the pipe and the valve at the lowest practical part of a boiler, or at the normal water level in the case of a surface blowdown. Buckstay - A structural member placed against a furnace or boiler wall to limit the motion of the wall against furnace pressure. Burner - A device which combines fuel and air in proper proportions for combustion and which enables the fuel-air mixture to burn stably to give a specified flame size and shape Burner assembly - A burner that is factory-built as a single assembly or as two or more assemblies which include all parts necessary for its normal function when installed as intended
10/30/2012 AADARSH 8
Damper - A device for introducing a variable resistance of regulating the volumetric flow of gas or air. Design pressure - The pressure used in the design of a boiler for the purpose of determining the minimum permissible thickness or physical characteristics of the different parts of a boiler. Downcomer - A tube or pipe in a boiler or waterwall circulating system through which fluid flows downward between headers. Drum - A cylindrical shell closed at both ends, designed to withstand internal pressure Duct - A passage for air or gas flow. Economizer - A series of tubes located in the path of flue gases. Feedwater is pumped through these tubes on its way to the boiler in order to absorb waste heat from the flue gas. Evaporation ratio - Evaporation ratio means kilogram of steam generated per kilogram of fuel consumed.
10/30/2012 AADARSH 9
Flue gas - The gaseous products of combustion in the flue to the stack. Forced circulation - The circulation of water in a boiler by mechanical means external to the boiler. Furnace explosion - A violent combustion of dust or gas accumulations in a furnace or combustion chamber of a boiler. Furnace volume - The cubical contents of the furnace or combustion chamber Header - A distribution pipe supplying a number of smaller lines tapped off of it. A main receiving pipe supplying one or more main pipe lines and receiving a number of supply lines tapped into it Heating surface - That surface which is exposed to the heating medium for absorption and transfer of heat to the heat medium per American Boiler Manufacturers Association (ABMA) Natural circulation - The circulation of water in a boiler caused by differences in density; also referred to as thermal or thermally induced circulation.
10/30/2012 AADARSH 10
Oil burner - A burner that atomizes fuel oil and blows it into the combustion chamber in the form of a fine mist or vapor. Steam or mechanical motion plus air may be used as the operating medium. Oil gun - The assembly of parts in a burner which provides atomized fuel oil mixture to the furnace for burning. Safety valve - A valve that automatically opens when pressure attains the valve setting which is adjustable; used to prevent excessive pressure from building up in a boiler. Tempering air - Air at a lower temperature added to a stream of pre-heated air to modify its temperature Water hammer - A sudden increase in pressure of water due to an instantaneous conversion or momentum to pressure
10/30/2012
AADARSH
11
Boiler Purpose To produce steam (Main Steam and Reheat Steam) at rated pressure and temperature To Convert the heat of combustion of coal/oil/gas to thermal energy of steam Steam Parameters are decided by Turbine CycleRequirements Steam Parameters adopted by NTPC 200 MW: 157 bar MS Pressure, 540 deg C 500 MW: 179 bar MS Pressure, 540 deg c 660 MW: 246 bar MS Pressure, 545 deg C/563 Advanced Supercritical Parameter 310 bar MS Pressure, 610 deg C
10/30/2012
AADARSH
12
WELDING TECHNOLOGY
Click here
10/30/2012
AADARSH
13
CONTENTS
2. Summarize of welding technology 3. Erection sequence of Boiler 4. Boiler flow schematic 5. Boiler Pressure parts 6. Drum 7. Boiler circulating water pump 8. APH 9. Pulverisers system 10. ESP 11. Bag Filters 12. Commissioning of Boilers 13. Hydro test 14. Insulation test 15. Lime kerosene test 16. Furnace pressurization test 17. Refractory dry out procedure 18. Gas distribution test 19. Chemical cleaning of boiler 20. Hanger settings of boiler 21. Safety valve settings 22. Steam blowing 23. Normalization 24. Performance Guaranteed test of boilers 25. Operational parameters of boilers AADARSH 10/30/2012 26. Boiler assessment
14
Water Circuit: water & Boiler Circulating water Fuel Circuit: Combustion Air Circuit: Flue Gas Circuit: Steam Circuit: Condensate Circuit:
Feed
10/30/2012
AADARSH
35
10/30/2012
AADARSH
36
10/30/2012
AADARSH
37
Trajectory Plot of Gas From Each Burner of 500 MW Coal Fired Boiler
( Hiroya Shida, 1984 )
EXPLOSION
Ignition of an accumulated combustible mixture with in the combustion space of the Furnace or associated Boiler Passes, Ducts and Fans that convey the flue gases to the Stack. The intensity and magnitude of the explosion depends on both the relative quantity of combustible accumulated and the proportion of air mixer.
FIRE TRIANGLE
OXYGEN (air)
For combustion
FUEL (object i.e solid or liquid or gas etc. OXYGEN ( to assist combustion)
Oxygen for starting & self sustaining combustion Air contain approx 20.9% oxygen.
FIRE EXTINGUISHING TRIANGLE Removal of one or more of the factors of the triangle of fire is the basic principle of fire presentation
Starvation
Blanketing
Cooling
10/30/2012
AADARSH
45
Introduction
SH Capacity:-2060t/hr. SHO/L Pressure:-17.5 Mpa. S/H O/L Temp:-5400C. RH Capacity:-1741.6 t/hr. RH Inlet Pressure:-4.012 Mpa. RH Inlet Temp:-3340C. RH O/L Pressure:-3.81Mpa. RH O/L Temp:-5400C. Boiler Design Pressure:-19.95 Mpa. Operating Pressure:-19.0 Mpa. Hydro test pressure:-29.925 Mpa.
10/30/2012
Presented by Aadarsh
46
1.Steam Drum
10/30/2012
Presented by Aadarsh
47
10/30/2012
Presented by Aadarsh
48
1.Steam Drum 2.Downcomer 3.Front w. wall along with hdr upto 17 mtr <R.
2 3
17 Mtr
10/30/2012
Presented by Aadarsh
49
Boiler Erection Sequence 1.Steam Drum 2.Downcomer 3.Front w. wall along with hdr upto 17 mtr. 4.(RHS) Side water wall along with hdr upto ring hdr.
4
10/30/2012
Presented by Aadarsh
50
Boiler Erection Sequence 1.Steam Drum 2.Downcomer 3.Front w. wall along with hdr upto 17 mtr. 4.(RHS) Side water wall along with hdr upto ring hdr.
5
3 2
5.(LHS) Water wall up to 30 mtr. (For future approach for panel assembly)
10/30/2012
Presented by Aadarsh
51
3. Front w. wall along with hdr upto 17 mtr. 4. (RHS) Side water wall along with hdr upto ring hdr.
3 2 5
10/30/2012
Presented by Aadarsh
52
3. Front w. wall along with hdr upto 17 mtr. 4. (RHS) Side water wall along with hdr upto ring hdr.
3 2 5
5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side wall. 7. Screen tube hdr along with screen tube.
10/30/2012
Presented by Aadarsh
53
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr.
6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr.
10/30/2012
54
9 1
7
3 2 5
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR.
10/30/2012
Presented by Aadarsh
55
9 1
7
3 2 5
10FSH Coils
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil.
10/30/2012
Presented by Aadarsh
56
9 1
7
11
10 6 8
3. Front w. wall along with hdr upto 17 mtr. 4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr.
3 2 5
6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil.
10/30/2012
Presented by Aadarsh
57
9 1
1. Steam drum
11 10 6 8
2. Down comer 3. Front w. wall along with hdr upto 17 mtr. 4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube.
3 2 5
12
9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr. 12.Roof O/L Hdr along with BP Front wall.
10/30/2012
Presented by Aadarsh
58
9 1
7
11
10 6 8 12
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall.
3 2 5
7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr.
13 BP Rear Wall
12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall.
10/30/2012
Presented by Aadarsh
59
9 1
7
11 10 6 8 12 13
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall.
3 2 5
7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR.
14 ECO Inter.Hdr.
10.FSH Coil.
11.Roof I/L Hdr. 12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall. 14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr.
60
10/30/2012
9 1
7
11
10 6 8 12 13
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall.
3 2 5
7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR.
14. 14
10.FSH Coil. 11.Roof I/L Hdr. 12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall. 14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr.
14 .
10/30/2012
Presented by Aadarsh
15.BP Roof.
61
16
1. Steam drum 2. Down comer 3. Front w. wall along with hdr upto 17 mtr.
11 10
15
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr.
6 8 12 13
3 2 5
8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr.
14 14
12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall.
14
14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15.BP Roof. 16.LTSH O/L Hdr.
10/30/2012
Presented by Aadarsh
62
7
15 11 10 17 6 8 12 13
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube.
3 2 5
8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr.
14 14
12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall.
14
14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15.BP Roof. 16.LTSH O/L Hdr. 17.Ver.LTSH Panel, parallel crown plate.
10/30/2012
Presented by Aadarsh
63
18
7
11 10 15
17
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr.
6 8 12 13
3 2 5
8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr.
14 14
12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall.
14
14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15.BP Roof. 16.LTSH O/L Hdr. 17.Ver.LTSH Panel.
10/30/2012
Presented by Aadarsh
64
9
16
18
1. Steam drum 2. Down comer 3. Front w. wall along with hdr upto 17 mtr.
11 10
15 17 6 8 12 13
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil.
3 2 5
11.Roof I/L Hdr. 12.Roof O/L Hdr along with BP Front wall.
14 19 14 14
13.BP Rear wall. 14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15.BP Roof. 16.LTSH O/L Hdr. 17.Ver.LTSH Panel. 18.ECO O/L Hdr. 19.Eco.Hanger Tube along with Horz.LTSH Coil.
10/30/2012
Presented by Aadarsh
65
9
16
18
1. Steam drum 2. Down comer 3. Front w. wall along with hdr upto 17 mtr.
11 10
15 17 6 19 7 14 5 14 14 20 4 8 12 13
4. (RHS) Side water wall along with hdr upto ring hdr. 5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side water wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr. 9. I/L & O/L FSH HDR. 10.FSH Coil. 11.Roof I/L Hdr. 12.Roof O/L Hdr along with BP Front wall. 13.BP Rear wall. 14.ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15.BP Roof. 16.LTSH O/L Hdr. 17.Ver.LTSH Panel. 18.ECO O/L Hdr. 19.Eco.Hanger Tube along with Horz.LTSH Coil.
3 2
10/30/2012
Presented by Aadarsh
66
9
16
1. Steam drum 18 2. Down comer 3. Front w. wall along with hdr upto 17 mtr. 4. (RHS) Side water wall along with hdr upto ring hdr.
15 11 10
11
5. (LHS) Water wall up to 30 mtr. 6. LHS BP Side wall. 7. Hdr along with screen tube. 8. Back pass ext. wall along with ext. lower hdr.
12
6 17
6 19 3 2 5 14 14 8
20
9. I/L & O/L FSH HDR. 10. FSH Coil. 11. Roof I/L Hdr. 12. Roof O/L Hdr along with BP Front wall. 13. BP Rear wall. 14. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. 15. BP Roof. 16. LTSH O/L Hdr. 17. Ver.LTSH Panel. 18. ECO O/L Hdr.
21
19. Eco.Hanger Tube along with Horz.LTSH Coil. 20. ECO coil. & balance hanger tube erection. 21. ECO I/L Hdr after hopper comp & RHS BP Wall comp.
10/30/2012
Presented by Aadarsh
67
9
15
17
14
11 10
12 17
2 3
8
19
13
4&5
13 13
20
21
10/30/2012
Presented by Aadarsh
68
16 15
1. 2. 3. 4.
5.
11
10
12 17
6. 7. 8.
2 3
8 19
13
4&5
14 14
20
21
Steam drum Down comer Front w. wall along with hdr upto 17 mtr. (RHS) Side water wall along with hdr upto ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr.
10/30/2012
Presented by Aadarsh
69
15 14
1. 2. 3. 4.
5.
11
23
17
10
12
6. 7. 8.
2 3
8
19
13
4&5
13 13
20
21
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate.
10/30/2012
Presented by Aadarsh
70
22 7
18
16 15
1. 2. 3. 4.
5.
11
23
10 24 FRH COIL
12
6. 7. 8.
2 3
8 19
13
4&5
14 14
20
21
Steam drum Down comer Front w. wall along with hdr upto 17 mtr. (RHS) Side water wall along with hdr upto ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr.. FRH Hdr. FRH crown plate. FRH coil.
10/30/2012
Presented by Aadarsh
71
22 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
8 19
13
4&5
14 14
20
21
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr.
10/30/2012
Presented by Aadarsh
72
22 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
8 19
13
14 14
20
21
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr. Rear arch.
10/30/2012
Presented by Aadarsh
73
22 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
26
1 7
8 19
13
4&5
14 14
20
21
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Dr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr. Rear arch. Rear water wall.
27 Rear w.wall
10/30/2012 Presented by Aadarsh 74
22 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
26
8 19
13
4&5
27
14 14
20
21
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr. Rear arch. Rear water wall. MRH Hdr.
10/30/2012
Presented by Aadarsh
75
22 28 25 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
26
8 19
13
4&5
27
14 14
20
21
20. 21. 22. 23. 24. 25. 26. 27. 28. 29.
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr. Rear arch. Rear water wall. MRH Hdr. MRH Crown
10/30/2012
Presented by Aadarsh
76
22 29 28 25 7
18
16 15
1. 2. 3. 4.
5.
11
23
10
24
12
6. 7. 8.
2 3
30 MRH Coil
8 19
26
13
4&5
27
13 13
20
21
20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30.
Steam drum Down comer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS) Water wall up to 30 mtr. LHS BP Side water wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil. Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall. ECO.Intermediate hdr,LTSH I/L Hdr & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver.LTSH Panel. ECO O/L Hdr. Eco.Hanger Tube along with Horz.LTSH Coil. ECO coil. & balance hanger tube erection. ECO I/L Hdr. FRH Hdr. FRH crown plate. FRH coil. Hanger tube with hdr. Rear arch. Rear water wall. MRH Hdr. MRH Crown MRH Coil.
10/30/2012
Presented by Aadarsh
77
16
5.
15 6.
7.
11
23
10
24 30
12
8.
2 3
26
8 19
13 13.
14.
4&5
27
20.
14 14
20
21
21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
10/30/2012
Presented by Aadarsh
78
31
32 plate n hdr
22 28 29 25 7
18
4.
16
5.
15 6.
23
7.
11
24 30
10
12
8.
2 3
26
8 19
13 13.
14.
4&5
27
20.
20
21
21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
10/30/2012
Presented by Aadarsh
79
31
1
32 32 32 28 29 25
22 7
18
4.
16
5.
15 6.
23
7.
11
33 roof up to platen sup.htr 24 30
10
12
8.
2 3
8 19
26
13 13.
14.
4&5
27
20.
14 14 32. Div.Hdr,Platen Hdrs Rad.RH O/L Hdr 33. Roof up to platen Sup.Htr.
20
21
21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
10/30/2012
Presented by Aadarsh
80
31
1
32 32 32 28 29 33 25
22 7
18
4.
16
5.
15 6.
23
7.
11
24 30
10
12
8.
2 3
34 Div.Coil 34 platen Coil 26
8 19
13 13.
14.
4&5
27
20.
14 14 32. Div.Hdr,Platen Hdrs Rad.RH O/L Hdr 33. Roof up to platen Sup.Htr. 34. Platen Coil,Div.coil
20
21
21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
10/30/2012
Presented by Aadarsh
81
31
1
32 32 32 28 29 33 25
22 7
18
4.
16
5.
14 6.
23
34 24 30
7.
11
34
10
12
8.
2 3
26
8 19
13 13.
14.
4&5
27
14 14
20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
32. Div.Hdr,Platen Hdrs Rad.RH O/L Hdr 33. Roof up to platen Sup.Htr. 34. Platen Coil,Div.coil 35. LHS W.wall Comp & Suppt.for Spanel.
20
21
10/30/2012
Presented by Aadarsh
82
31
1
32 32 32 28 29 33
22 25 7
18
4.
HP CRH
MSP
11 2 3 IP LP
16
5.
15 6.
23
34 24 30
7.
10
12
8.
34
8 19
26
13 13.
14.
HR H
4&5
32. Div.Hdr,Platen Hdrs Rad.RH 27 O/L Hdr 33. Roof up to platen Sup.Htr. 35
14 14
20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
20
21
34. Platen Coil,Div.coil 35. LHS W.wall Comp & Suppt.for S-panel. 36. S-panel & Ring hdr work. Presented byerection Aadarsh
83
Steam Drum Downcomer Front w. wall along with hdr up to 17 mtr. (RHS) Side water wall along with hdr up to ring hdr. (LHS )Side water wall along with hdr up to 30 MTR. LHS BP Wall. Hdr along with screen tube. Back pass ext. wall along with ext. lower hdr. I/L & O/L FSH HDR. FSH Coil . Roof I/L Hdr. Roof O/L Hdr along with BP Front wall. BP Rear wall . ECO. Intermediate Hdr 4 no, LTSH I/L HDR & BP Ring Hdr. BP Roof. LTSH O/L Hdr. Ver. LTSH panel.
18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34.
Eco. O/l hdr. Eco Coil with balance hanger tube. Eco I/L Hdr. FRH crown plate. FRH COIL. Hanger tube with Hdr. Rear arch. Rear water wall. MRH Hdr. MRH CROWN. MRH coil. LINK PIPE for platen , FSH & ECO LINK to drum. Div. HDR, PLATEN HDRS & Rad. RH O/L HDR. ROOF up to platen super heater. Platen coil & Div.coil. LHS W. wall completion & Bottom support. S-Panel & Ring Hdr Erection work.
10/30/2012
Presented by Aadarsh
84
10/30/2012
AADARSH
85
BOILER DRUM
10/30/2012
AADARSH
86
10/30/2012
AADARSH
87
WORKING PRESSURE CALCULATION OF DRUM AS PER IBR: D1:- ID = 1749mm OD = 2103mm Th = 188mm / 177.4mm (Plate used)/(Actual) D2:- ID = 1778mm OD = 2074mm Th = 153mm / 148mm (Plate used)/(Actual) Design temperature: 360 C Design Pressure: 19.95Mpa Working Pressure: 19Mpa (As per Form III) Ligament efficiency e = 0.862 YS at 370 C at P/36 of IBR folder is 290 Mpa Working metal temp. : 370 C Hence, f = 290/ 1.5 = 193.33 Mpa
10/30/2012
AADARSH
88
Working Pressure =
10/30/2012
AADARSH
89
ECONOMISER
10/30/2012
AADARSH
90
STEEL H ECONOMISERS ADVANTAGES WHAT IS STEEL H HOW STEEL H IS PRODUCED SUPPLY OPTIONS FUELS/BOILERS CASE STUDIES
STEEL H EXTENDED SURFACE TUBE Named Steel H because the original fin resembled The capital letter
STEEL H is an extended fin tube on Machines designed and built in house to our own specification.
STEEL H ADVANTAGES
STEEL H PLATE FIN In Line Tube Arrangement with Straight Gas Passages Ensure Low Fouling and Sustained High Efficiency with Dirty Fuels More Effective Sootblowing Compact Size Low Pressure Loss Less Tubes and Weight Lower Boiler Costs Proven Heat Transfer Rates Double H Inherent Stiffness
Heating Surface [ m2 ]
100 50 15.46 0
PS CFS HF
32.4
Steel H
Double Stl H
Single steel H
Helical Fin
STEEL H DESIGN
GAS FLOW
20 35
15 20
20 30 30 35
30
15
15
30 35 30
20 30
Fin weld on sides of tube where maximum heat transfer takes place. Fin material not placed where dust can accumulate above and below the tube. Fin sizes optimised for efficient use of material.
20
20
35
35
30 20 15 10
30 20 5 10 15
STEEL H PRODUCTION
STEEL H PRODUCTION Fins are held in the correct position by Jaws. Current and forge pressure is applied to weld fins to tube. Tube is precisely indexed forward for next fin weld.
Weld Current
Weld Current
Forge Pressure
Forge Pressure
PRECISE INDEXING
10/30/2012
AADARSH
98
M.S
10/30/2012
AADARSH
100
SEPARATOR
S T O R A G E T A N K HPT
VERTICAL WW
305C, 49 Ksc
ECO JUNCTION HDR
G
LPT
C O N D E N S E R
LPT
IPT
ECONOMISER
ECO I/L
BWRP
FEED WATER
10/30/2012
AADARSH
FRS
101
10/30/2012
AADARSH
102
10/30/2012
AADARSH
103
Click Here
10/30/2012
AADARSH
104
Click Here
10/30/2012
AADARSH
105
Click Here
10/30/2012
AADARSH
106
10/30/2012
AADARSH
107
To meet statutory requirement of pollution control (< 50mg/Nm3 as per Gazette notification by MoEF dated 150mg/Nm3 at 19.05.93).
The byproduct- Fly ash can be utilized for applications like cement works, brick manufacturing etc.
Principle of operation
The ash particles move along the stream of flue gas
Our interest is to change their direction of travel so that they get separated from the stream of flue gas
How ?
Emitting electrodes sprays negative ions towards positive plate (corona discharge).
-
On reaching the collecting plate, the particles get electrically neutralized and remain there.
Construction
To achieve laminar flow at lower velocity the gas path is split in several Passes.
Perforated GD screen at the entry of each pass ensure uniform velocity distribution.
To achieve better collection efficiency several fields are provided in series in each pass.
Construction(hopper heaters)
A portion of the hopper is double walled. Heaters (4.5 kW) are placed between the walls to keep the ash warm so that it does not stick to the sides of the hopper. Total No of Hoppers for one boiler- 50
They get colder and help ash accumulation on them. This reduces the field voltage.
Construction
(ash level indicators )
Ash Level indicators are provided in each hopper for sensing hopper overfilled condition.
Control philosophy
To have a voltage just below the spark-over voltage for as long as possible. The controller measures current and calculates dI/dt . When this value crosses a limit a spark is sensed. Voltage is made zero for few milliseconds of pause time to allow ionized air to flow away. Voltage again rises at a fast rate to very near the spark over value (say 90%). Rate of rise then slows down. If a spark is sensed, the process repeats itself. If no spark is sensed, the voltage continues to rise till voltage/current limit is reached.
Controller (graph)
Controller(back corona)
All controllers use the above method of dynamic control of voltage.
However use of only this method is unable to tackle the BACK CORONA problem.
Modern controllers have micro-processor based computing facilities to take care of the back corona problem.
Controller(potential difference )
The neutralization of charged ash particles constitute a current.
+ V=IxR
+ + +
Controller(back corona)
The positive ions are repelled by the positive plate & they come out in a stream.
+
+ + + + +
+ + +
To reduce I, V has to be reduced which will reduce the main corona. Hence collection itself will be reduced.
The field behaves like a RC circuit. Once charged, the voltage decays only gradually through the collection current.
In intermittent charging, firing of the thyristors is skipped for several half cycles & voltage is allowed to decay. While the peak voltage remains same, the average voltage comes down drastically.
1:1
1:5 0
Base Charge
10/30/2012
AADARSH
135
CONTENTS
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. The purpose of boiler life assessment Life Evaluation by Inspection Preparations for Inspection Data requirement Inspection of high pressure parts. Sample tube inspection. Visual inspection for other parts of boiler . Water quality survey. Visual Inspection for aux Equipment high pressure parts Inspection details
Evaluate the present state and the condition of the boiler components in order To continue stable and reliable boiler operation Evaluate the remaining life for Superheater and Reheater by metallurgical inspection Evaluation of creep life and future inspection scheme by metallurgical inspection for water wall, economizer, Superheater and Reheater tubes Evaluation degree of creep damage for Superheater and Reheater by hardness test Evaluate the remaining life based on thickness Measurement for water wall, Evaluate the remaining life based on thickness thinning for economizer due to low Temperature Corrosion, Evaluate the remaining life based on thickness thinning for Superheater and Reheater tubes due to high Temperature Corrosion Confirm the cause of the inner scale generation Evaluate the remaining life based on check of metal structure ,inner scale ,etc for sample tube
DAMAG CAUSA
Clogging with
PHENOMENON
Swelling Metal structure
LIFE EVALUATION
Outside diameter and
INSPECTION ITEM
Metallurgical inspection for SH, RH
foreign material Deposition and growth of scale on Inner surface Long-term stress
FATIGUE Cycle thermal
change
header, Metallurgical inspection and NDT (UT) for main steam pipe line and high temperature RH pipe
Growth of crack
stress
and RH Tube
inspection (PT,MT)
CORROSION Cyclic thermal Interaction of Ultrasonic test Sample tube inspection Sample tube inspection for SH, RH
FATIGUE
and water wall Check of Burner Nozzle and Wind Box Damper
measurement of tube thickness for SH
CORROSION EROSION
Thickness
Annual thickness
thinning
measurement
,RH, Water Wall and Eco by UT Steam drum Boiler aux Eco Hanger tube by endoscope, etc
During inspection
Material requirement
New tubes Man hole packing insulation
Period of inspection
Two weeks
DATA REQUIREMENT
Boiler reference data
Steam temperature Maximum Steam flow Boiler design pressure Feed water temp Reheated inlet steam temperature Reheated outlet steam temperature Reheater design pressure Kind of fuel
0c
**Inspection item 1. 2. 3. 4. 5. 6. 7. 8. External visual inspection Internal visual inspection with endoscope UT for thickness measurements by UT MT and UT on circumferential welds MT on piping attachments Metallographic inspection by plastic replicas MT on nozzles welds of the coil tubes MT on nozzles welds to the shell of the inlet/outlet pipe
t = minimum required thickness. D = outside diameter of cylinder. e = thickness factor for expanded tube ends. P = maximum allowable working pressure. S = maximum allowable stress value at the design temperature of the metal.
DESIGN / OPERATING INFORMATION FOR CALCULATION OF REMAINING TIME BASED ON THICKNESS Design information
material type or grade Nominal outside diameter Designing pressure Design life Deign temperature Original nominal thickness Thickness measurements of water wall tubes furnace
Operating information
Maximum tube metal temperature Normal operating pressure Original measured minimum thickness Metal thinning rate
SAMPLE TUBE
Destructive test for the Sample tube For Water Wall ,SR and RH tubes Life diagnoses based on check of metal structure, thickness, inner scale, etc
Sample tube takes according to the result of hardness measurement
Investigation Items
Visual inspection Non destructive test Chemical analysis Measurement of the tube dimension Cross sectional microstructure observation Steam oxidation observation Creep rupture test Measurement of the inner scale thickness
Hardness measurement
Information
Material of Sample tube tube dimension
sample tubes
Optical micrograph
Optical micrograph of non-bluged zones tube wall side showing ferrite pearlite structure with no internal defects
normal microstructure ( good condition tube) Which shows a typical ferritic pearlitic structure
Check of laboratory analysis method for quality items Confirmation of water quality results at previous load operation Check of instrument condition on sampling rack used for water quality control Confirmation of PH value and iron/copper balance in the cycle
ECONOMIZER
NDE For headers
External visual inspection Internal visual inspection with endoscope Measurement of thickness by UT MT on nozzles welds of the coil tubes and headers attachments MT and UT on circumferential welds between header and conical pieces
STEAM DRUM
Before the NDT inspections, the internal parts of the drum shall be dismantled
NDE For steam drum
External visual inspection Internal visual inspection UT for shell thickness measurements UT for head thickness measurements MT and UT on circumferential and longitudinal welds MT on steam drum attachments (saddles and accessories) MT on nozzles welds
REHEATER
NDE For each one of the headers
External visual inspection Internal visual inspection with endoscope UT for thickness measurements UT for head thickness measurements MT on nozzles welds of the coil tubes MT on nozzles welds to the shell of the inlet/outlet pipe MT and UT on circumferential welds between header and heads/ piping MT on headers attachments Metallographic examination by plastic replicas
NDE For Coils
External visual inspection UT for thickness measurements Internal visual inspection with endoscope Hardness measurements Samples for destructive examinations
10/30/2012
AADARSH
167