Académique Documents
Professionnel Documents
Culture Documents
BPMDS'08
http://lamswww.epfl.ch/conference/bpmds08
Business processes have a life-cycle that comprises three phases, design, deployment, operation and evaluation. The design phase starts with requirements definition and ends with the implementation of the business process. In the deployment phase, the business process is tested under performance, compliance considerations etc. It is also verified for fulfilling the customers requirements. After successful testing, the business process is released to operation. In the operation and evaluation phase, the business process is measured and analyzed during operation to identify improvements. Each of the phases has one or more purposes. Examples for the purposes of the phases are given on the left. The design phase has the purpose to align the business process with the requirements of the business and to assure its compliance with legal rules etc. The deployment phase has the purpose to verify that the process fits the customers requirements to test its performance and to put it into production. In the operation & evaluation phase, evaluation serves the purpose to enhance and improve the process. Nevertheless the process has to be flexible while supporting the business goals. The BPMDS workshop 2008 is the 9th in a series of workshops designed according to the following principles: 1. A workshop should serve as a meeting place for researchers and practitioners in two fields: a. business development and b. business applications (software) development 2. Each workshop has its own, relatively narrow focus to facilitate meaningful discussions and brainstorming. During the previous BPMDS workshops, we discussed various issues that could be related to different, but isolated phases in the life-cycle of a business process. In the BMPDS08 workshop, we will focus on the interaction between two or more phases of the life-cycle, as well as the holistic view of the whole life-cycle. Furthermore, the relationship between the phases and their associated purposes shall be investigated. Therefore, we will accept only contributions covering two or more phases of the lifecycle, or process life-cycle management in general.
Examples of more concrete topics include, but are not limited to: Life-cycles for special types of business processes Process and information integration in business process life-cycles Processes for the management of business process life-cycles Software systems to support the business process life-cycle Metrics for business process life-cycles Business Activity Monitoring (BAM) Specific transitions in the BP life-cycle: - Design to deployment modeling, verification, alignment, organizational issues, etc. - Operation to redesign monitoring, mining, learning, etc.
Submissions: Prospective workshop participants are invited to submit a position paper related to one or more of the main topics.
The paper selection will be based upon the relevance of a paper to the main topics, as well as upon its quality and potential to generate relevant discussion. Papers should be emailed to Selmin.Nurcan@univ-paris1.fr.
Form: The aim of the workshop is discussions, rather than presentations. To this end, position papers of up to 2500 words are sought.
A position paper does not necessarily need to include answers to the problems described above. Position papers that raise relevant questions, or describe successful or unsuccessful practice, or describe experience will all be welcome. Short papers of up to 1000 words can also be submitted, and will be assigned a 10 minutes presentation. All papers will be published on our website before the workshop, so that everybody can learn about the problems that are important for other participants.
Expected Results: Accepted papers will be published in the CAiSE'08 workshops proceedings. Based on the discussions, a working document will be produced to summarize the results and outline the promising directions in the field. After the workshop, the workshop material together with a selection of the best papers will be considered for publishing in a special issue of an international journal.
Important dates
Submission deadline: February 15th 2008 Notification of acceptance: March 21st 2008 Camera-ready papers due: April 8th 2008
Organizers
Selmin Nurcan, University Paris 1 Panthon Sorbonne, France. Rainer Schmidt, Aalen University of Applied Sciences, Germany. Pnina Soffer, University of Haifa, Israel.