PROJECT SPECIFIC RISK ASSESSMENT AND MANAGEMENT PLAN

Risk Assessment for :- TESTING & COMMISSIONING OF CHILLERS Project :- DUCAB HV & EHV FACILITY Client :- DUCAB
Ref. Activity Element/ Description Significant Potential Hazards/Risks Involved Population at Risk Risk Classification
Likeli hood (L) Severity (S) Risk Rating (R)

Risk Assessment Ref.: MS-040/01

Rev 0

Risk Level Low / Medium / High

Action to be Taken to Reduce Risk

Residual Risks

Testing commissioning Chillers Access control Chillers area

and of Trench crossing and Poor access to the Chillers area leads to slip, trip and fall to the operatives cause minor injury. Unauthorised entry to the area leads to accident, damage of equipment. Unsafe and un calibrated instruments leads to electrical shock or mechanical hazard which leads to electrical shock injury, impact and property damage. Electrical shock hazard leads to burn injury and adversely cause trip and falls lead to major injury.

1-6 Operatives, Prevent unauthorised entry to chillers area 3 6 18(R3) M Ensure trenches are closed around the chillers area or provided appropriate trench crossing bridge.

to

Using Equipments

testing

6(R6)

Ensure that all the testing equipments are calibrated, certified and safe to use for the intended purpose.

Human Error. Require Close Supervision

Checking the electrical panel.

16(R3)

Ensure that all the operatives are competent to handle the system. Having proper PPE. Ensure that all the operatives, engaged in the job activities are briefed about the Job Specific Risk and the required precautionary measures that to be adhere prior commencement of the job. Ensure that all the operatives are competent to handle electrical supply and work with the electrical DBs.

Alignment of chillers

Poor alignment or balancing of the chillers in the foundation leads to vibration and noise cause irritation to the workers in and around. Poor method of balancing the plant leads to minor cut injuries to the operatives. 1-6

Ensure that the competent electrical supervisor shall be closely monitoring. 2 8 16(R3) M Ensure appropriate tools and methods are used for alignment. All the operatives are provided ear plug or ear muff.

Page 1 of 2

PROJECT SPECIFIC RISK ASSESSMENT AND MANAGEMENT PLAN


Risk Assessment for :- TESTING & COMMISSIONING OF CHILLERS Project :- DUCAB HV & EHV FACILITY Client :- DUCAB
Ref. Activity Element/ Description Significant Potential Hazards/Risks Involved Population at Risk Risk Classification
Likeli hood (L) Severity (S) Risk Rating (R)

Risk Assessment Ref.: MS-040/01

Rev 0

Risk Level Low / Medium / High


L

Action to be Taken to Reduce Risk

Residual Risks

Operatives, Hand tools Non insulated tools for electrical work leads to shock and minor injury to the operatives. Personal protective equipments. Absence of PPE may leads to head, foot, and hand injury in work place. Noise pollution leads to restlessness and irritation to the operatives in short term. Visitors/other contractor working around 3

6(R6)

Ensure that all the tools are appropriate and insulated.

Failure to use PPE L-Require Close Supervision

9(R5)

L Ensure ear plug/muff used by the operatives Ensure that required Personal Protective Equipment like Helmets, Shoes, coveralls, Hand Gloves and goggles.

Risk Classification Likelihood (L) : Continuous No. Exposed: 100 plus 50 to 100 25 to 50 15 to 25 5 to 15 1 to 5 Severity (S): Risk Rating: 6 6 6 6 6 6 Time: 5 hrs. plus 6 5 4 3 3 2 5 4 3 3 2 1 2 to 4 hrs. 4 3 2 2 1 1 .25 to 1 hr. 10 min. or less 3 3 2 1 1 1

Not Harmful (NH) = 1; Slightly Harmful (SH) = 2; Harmful (H) = 3; Extremely Harmful (EH) = 4; Multiple Casualties (M) = 5; Catastrophic (C) = 6 Determined as Likelihood x Severity