MINUTES OF MEETING

CONTRACT NUMBER Venue: PROJECT NUMBER 2013 IRPC TET site office MEETING NUMBER DATE PAGE

2013-MOM-HSE-036 Recorded By: Initiator:

May 22, 2013

Deaunphen R. Kanok P.

PROJECT: SUBJECT:

EBSM UPGRADING PROJECT 2013


Internal Weekly HSE Meeting # 36

MEETING DATE:

May 22, 2013

Attachment

Attendee List weekly HSE meeting #036 Picture of weekly HSE audit #036 (page 15-21) Picture of ABB instrument equipment at site (page 22)

ATTENDEES: COMPANY NAME

DISTRIBUTION TO: COMPANY NAME Somchai T. Anutin C. Pongsapak A. Nares N.

IRPC

Kanok P.

IRPC

TET

Deaunphen R. Kanakorn J.

Preerati N.

TET AS first ABB Ensure MACS TCC PTEC Suwasan P. Chatchai S. Nattapon D. Udorn P. Veerapong Th. CONTRACTOR

Worachart P. Aphisuk K. Taradol L./Chaiwit J. All disciplines

ABB ENSURE PTEC MACS TCC


QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 2 DATE DUE

Meeting started: 14.00 PM 0 Remind Items 1. Drainage water, Dewatering to IRPC/EBSM gutter must be treated before discharge.
2. Gutter protection (No blue sheet)

All contractors

3. Project & Company sticker 4. First aid kit & Log book 5. Need MS for construction equipment/machine mobilization & demobilization 6. Scan/take a picture inspection sticker 7. Violation and penalty (detail in item 2) 8. Rule and regulation of prohibited object (transparent bag) 9. Material storage need support 10. EBSM Main gate for vehicle & small gate for pedestrian 11. No flooding on EBSM road 12. Install sump at flooding area before start working 13. Fire extinguisher location & safety sign at Lay down area 14. No obstruction access to fire hydrant 15. TET induction training Every Monday, Wednesday & Friday 16. Specific training work at height, Lifting work, Hot work , confined space etc. 17. Tool & Equipment inspection by IRPC (3 month) 18. Electrical tool inspection by contractor (weekly) 19. Chemical substance & SDS 20. No material store on valve pit cover(03B&05) 21. Heavy equipment not allow to stand on gutter cover if no protection by steel plate 22. All contractor HSE, Site management & supervisor need to study and through understand about IRPC scaffolding

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 3 DATE DUE

procedure/manual 23. Need to fix plant gravel damage by backhoe (ASF) 24. EBSM Color code for lifting gear 25. Appointment letter HSE & Fire watch man 26. Safety Milestone Celebration 26.1 200,000 MH on November 22,2012 26.2 500,000 MH 26.3 900,000 1,000,000 MH 27. Modify scaffolding to inform IRPC(K.Rattasart) & get approve before execute 28. Evacuate Drill Monthly basis Every Wednesday 3 week of month 29. Daily report to TET Daily tool box talk, Site walkthrough checklist & Find n Fix 30. Gas detector need calibrate every 3 months 31. Lifting work Certificate (Supervisor, Operator, Signal man & Rigger) 32. PTW, what if, SDS must be in place at site 33. Lay down area need daily request form 34. Lifting plan need to have calculation of weight to outrigger 35. Dusty activity need to reduce dust by water spraying 36. Need wheel wash for vehicle if needed 37. Need copy of IRPC badge of D personnel 38. All vehicles need to park safe at lay down area 39. Mobile toilet in EBSM plant by ratio 1:50 and outside ratio is 20 person per 1 toilet 40. Holiday plan 41. Monthly Management Walkthrough 42. Additional Assembly Point 43. HSE booklet

All contractors

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 4 DATE DUE

44. To provide enough shelter/tent for all workers not allow to sleep in front of/beside EBSM plant 45. Avoid unsafe action to damage IRPC property 46. Aware car/motorcycle parking at IRPC scrap yard 47. Weekly tool box talk schedule by TET 48. Project Incentive Plan 49. Monthly Lay Down Area Audit & Meeting Every Wednesday 3th week of month 50. Safety net 51. Hard & Soft barricade 52. Co-sign PTW 53. WHAT IF 54. To avoid middle of EBSM plant 55. Special Housekeeping team 56. PTW box & company name 57. Picnic CUP 58. All incident/accident must be reported to TET immediately 59. No glass/plastic bottle inside EBSM plant 60. Keep scaffold tag in good condition 61. PTW coordinator need to know/understand work 62. Weekly HSE audit every Wednesday 10.00 am and meeting at 14.00 pm 63. Project Monthly Action Plan Drug & Alcohol test 64. HSE organization chart & Appointment Letter 65. Man basket certificate 66. Safety Meeting Tour 67. Parking at prohibited area 68. Qualification fire watch man 69. Road closure plan 70. Pig shooting & playing during working

All contractors

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 5 DATE DUE

71. Hook up during work at height 72. No electrician, no OT 73. Internal Milestone Celebration Plan 74. No Site Management , no work 75. Safety officer to work at site not only in the office 76. Update MP & MH related to PTW 77. Need male safety personnel to work at height 78. Scaffolding not touch the existing plant pipe 79. EBSM plant unplanned shut down 80. Install statistic board at lay down area 81. 824 & 825 (IRPC tool & equipment inspection) 82. Scaffolding tag rule : sign by authorized person (K.Rattasart) only 83. Cutting existing EBSM plant handrail (Ensure) 84. Motorcycle accident 85. Step on insulation jacket 86. Training PSSR before shut down 87. Hazard of drain and vent line 88. Proper steel plate for crane outrigger 89. Bicycle to park along fence. Not allow to ride middle of plant 90. To provide banksman/flagman for vehicle 91. Monthly Lay Down Area audit & meeting 92. PTW station 7.30 8.30 am 93. Safety is one team 94. G.5(EBSM) open for vehicle 95. RT work information board 96. Road at 03 B cracks (under pipe rack-pipe bridge line 18-19). 97. Escort man can ride a bicycle 98. Big housekeeping every Tuesday & Thursday

All contractors

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 6 DATE DUE

99. Fire protection Fire ball Reject FWM

Remaining item from previous 1.1 TET requested ABB to submit LOTO procedure and asked about IRPC procedure. LOTO ABB&IRPC

ABB was already submitted LOTO procedure to TET. TET waiting IRPC procedure to comply with. IRPC

LOTO
1.2 K.Pongsapak requested PTEC to provide project information board at Lay Down Area. 1.3 K.Pongsapak reminded about HSE booklet/handbook. - All to provide ( ABB=150, MACS=125, TCC=125, PTEC=300 & Dialog=300). Confirm price 25.50 bath/1 book. Delivery date before shut down (10June2013) 1.4 TET requested all to prepare scaffolding log book. 1.5 TET will set schedule for training safety personnel and fire watch warden soon. TET set meeting all safety and fire watch personnel every Monday. TET invited IRPC safety team to join for discussing about safety issue at shut down period. 1.6 TET waiting detail of lesson learn - IRPC about electrical shock on scaffolding so all need to be careful about avoid hanging electrical cable on scaffolding or else use S hook with the effective insulator. 1.7 TET informed about TET home office audit #02 results is all to improve about pressure cylinder storage. Chain was needed for cart. 1.8 TET requested all to submit the Safety certificate of

ABB(Done)

PTEC

ALL

TET TET,All contractors &IRPC

IRPC

ALL

ALL
QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 7 DATE DUE

Management and Supervisor level. 1.9 S-hook needed for electrical cable hanging. 1.10 ABB informed that all junction boxes and instrument equipment have already installed around EBSM plant. Remind all to be aware. (see attached picture page 22) ALL ALL

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 8 DATE DUE

HSE statistics IRPC KPI 1. ZERO recordable case 2. No fire accident 3. No Chemical spillage (over 100 liter) 4. No Property Damage (over 300,000 bath) 5. No complaint from community EBSM record Fatalities Days Away From Work Cases (DAFWC) Restricted Work Cases (RWC) Medical Treatment Injuries (MTI) First Aid Near Misses Damage Incidents Reportable Environmental Incidents Detail of incident
1. On March 14, 2012 Near-miss case (ENSURE) lifting stair (1.2 ton) and one of sling slip off hook of hiab truck at 6 meter height. 2. On June 2, 2012 - Property damage case (TBC) pile driller machine hit to fire hydrant hand wheel. 3. On June 19, 2012 Property damage case (TBC) tremie pipe stuck in drilling hole. 4. On January 19,2013 Near-miss case (AS First) smoke from combustible material cover oil sand. 5. On March 5,2013 Property damage (Dialog) 2 boxes fell down from forklift 6. On March 6,2013 Property damage (PTEC) found insulation jacket damage by PTEC workers 7. On April 29,2013 Property damage (TCC) chain of chain box damage during working adjustment structural line. 8. On May 18,2013 Near miss (PTEC) Pipe 10 hit to orifice
QM-GEN-18, Rev.0

=0 =0 =0 =0 =0

INFO

= 0 case = 0 case = 0 case = 0 case = 0 case = 3 case = 6 case = 0 case INFO

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 9 DATE DUE

existing line. 9. On May 20,2013 Property Damage (PTEC) Web sling 2 ton was torn by wrong method lifting.

Violation & Penalty 1. NCR issue


-

5 cases

To ASF about ASF safety manager leave without inform to TET To ENSURE about working without TET acknowledgement and safety officer has no safety glasses.

To ENSURE about outrigger plate To ASF about unsafe lifting work To TCC about lifting work not comply to risk assessment (what if)

2. Suspension
-

4 + 9 cases

TBC site engineer took cell phone in plant. ABB added lifting work in PTW after authorized personnel signed PTEC site engineer allow to work outside PTW approval PTEC worker smoked at lay down area First check ABB = 2 Ensure = 2 PTEC = 3 Second check Ensure = 2

3. Termination
-

2 cases

ASF crane operator intend to lift without extending outrigger. ASF safety officer (Professional level) no responsibility

4. Warning
-

14 cases

ABB S/V PTW violation Ensure Store keeper & user- grinding machine without guard MACS Hiab operator pressure cylinder transportation ABB Worker used a damage machine TCC S/V, Rigger, Operator & Safety Unsafe lifting 2 TCC & 3 PTEC not wearing safety glasses on Monday 20,2013

Man Hour Update 1 week (13-19 May 2012)

Previous

This Week

Cumulative

638,788

46,107

684,895

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 10 DATE DUE

Confined space record

Company

Confined space trained

Remark

ENSURE MACS

20 19

Safety Team Update


Company Safety Personnel FWM

ABB ENSURE MACS PTEC TCC Total


HOUSEKEEPING TEAM

3 5 5 8 4 25

5 4 2 14 5 30

Every Tuesday and Friday at 13.30 am all contractors need to provide a housekeeper for EBSM plant. ABB 3, Ensure 5, MACS 2, PTEC -5 and TCC 3.

Every working day for PTEC to take care EBSM smoking area in the morning and Ensure to take care in the afternoon

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 11 DATE DUE

Safety Tool Box Talk Topic No.


1 2 3 4 5 6

This week
Ready of body(health) Ready of mind Ready of tool & equipment Ready of system Ready of team Risk of falling object Work at height

Next week
Ready of body(health) Ready of mind Ready of tool & equipment Ready of system Ready of team Risk of falling object Work at height

Project TET-KPI = 0.19 Actual = 0

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 12 DATE DUE

General / Information 3.1 IRPC invited all safety personnel to join the meeting about EBSM plant turn around period on May 23, 2013 at 8.30 -12.00 am. 3.2 TET informed that PTEC need to move 4 tents between Dialog and ASF within this Friday (May 24, 2013). 3.3 TET reminded to all about OT request need to submit before 16.00 pm 3.4 About smoking area at lay down area need the good housekeeping and schedule to all contractors to take care by ABB - Monday, Dialog - Tuesday & Wednesday, MACS Thursday & Friday, TCC Saturday & Sunday. 3.5 TET reminded about no hand over anything between EBSM fence and outside. 3.6 IRPC reminded about hanging all bags along fence. 3.7 MACS informed about flushing and test work is ongoing and the pressure is not over 10 bar. 3.8 TET requested PTEC to provide 10 workers for housekeeping at height starting May 23, 2013 afternoon. 3.9 TET informed that about parking vehicle in front of lay down area is permitted by memo of K.nares to K.Rachin as attached. Info. Info. Info. Info. Info. Info. Info. Info. Info. To be recorded

Comment 4.1 Observed 2 empty drums obstruct the access to IRPC waste bin. 4.2 Observed 2 ABB workers walk across lifting barricade. 4.3 Observed TCC worker try to fix the hook of land yard by using welding scrap for pin. - To be replaced at once and tool box to all workers. 4.4 Observed ABB electrical cable tie off with scaffolding. 4.5 Observed PTEC welding area at 02 has no welding scrap container. Bad housekeeping.
QM-GEN-18, Rev.0

ABB

ASAP

ABB TCC

ASAP ASAP

ABB PTEC

May 23, 2013

ASAP

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 13 DATE DUE

4.6 Observed PTEC workers were sitting under scaffolding storage. Line of fire. 4.7 Observed Ensure hard barricade to protect the fire hydrant obstruct the access to fire hydrant in case of emergency. 4.8 Observed the waste is not segregated in bag and the unused material not remove. 4.9 Observed the under reactor unused material scatter all area. Ensure to remove ASAP. 4.10 Observed the argon pressure cylinder on cart need to have more chain to lock. 4.11 Observed the access to the plant fire extinguisher was blocked by scaffolding at area 05. PTEC need to move fire extinguisher to outside and noted that the fire extinguisher shelter was damage before relocate it as picture attached. 4.12 Observed PTEC 05 working area need to do housekeeping ASAP. 4.13 Observed TCC fire watch warden wearing safety shoe not meet standard. 4.14 Observed PTEC painting work need a container for all paint can. Good Observation - ABB The new workers wearing full PPE. - ABB Picnic cups were used by all workers for hygiene of all. EXELLENT!!!! - PTEC The fire ball protection is good. - PTEC The worker is wearing correct PPE during grinding work. - PTEC The S hook is shown up all area of electrical cable running. - MACS Very good practice for flushing work. 3 times whistle before working. The protection is Good. The air

PTEC

ASAP
May 23, 2013

Ensure

Ensure

ASAP

Ensure

ASAP
May 23, 2013

Ensure

PTEC

May 23, 2013

PTEC

ASAP
May 23, 2013

TCC

PTEC

May 23, 2013

ABB ABB

PTEC PTEC

PTEC

MACS

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 14 DATE DUE

compressor at connection point is double lock.

Meeting ended at 16.30 PM

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 15 DATE DUE

Picture of Weekly HSE audit # 036


4.1 Observed 2 empty drums obstruct the access to IRPC waste bin.

4.2 Observed 2 ABB workers walk across lifting barricade.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 16 DATE DUE

4.3 Observed TCC worker try to fix the hook of land yard by using welding scrap for pin.

4.4 Observed ABB electrical cable tie off with scaffolding.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 17 DATE DUE

4.5 Observed PTEC welding area at 02 has no welding scrap container. Bad housekeeping.

4.6 Observed PTEC workers were sitting under scaffolding storage. Line of fire.

4.7 Observed Ensure hard barricade to protect the fire hydrant obstruct the access to fire hydrant in case of emergency.

4.8 Observed the waste is not segregated in bag and the unused material not remove.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 18 DATE DUE

4.9 Observed the under reactor unused material scatter all area. Ensure to remove ASAP.

4.10 Observed the argon pressure cylinder on cart need to have more chain to lock.

4.11 Observed the access to the plant fire extinguisher was blocked by scaffolding at area 05. PTEC need to move fire extinguisher to outside and noted that the fire extinguisher shelter was damage before relocate it as picture attached.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 19 DATE DUE

4.12 Observed PTEC 05 working area need to do housekeeping ASAP.

4.13 Observed TCC fire watch warden wearing safety shoe not meet standard.

4.14 Observed PTEC painting work need a container for all paint can.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 20 DATE DUE

Good Practice

- ABB The new workers wearing full PPE.

- ABB Picnic cups were used by all workers for hygiene of all. EXELLENT!!!! Including the drinking water container is good for all worker hygiene.

- PTEC The fire ball protection is good.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 21 DATE DUE

- PTEC The worker is wearing correct PPE during grinding work.

- PTEC The S hook is shown up all area of electrical cable running.

- MACS Very good practice for flushing work. 3 times whistle before working. The protection is Good. The air compressor at connection point is double lock.

QM-GEN-18, Rev.0

MINUTES OF MEETING
CONTRACT NUMBER ITEM PROJECT NUMBER 2013 SUBJECT MEETING NUMBER 2013-MOM-HSE-036 DATE May 22, 2013 ACTION BY PAGE 22 DATE DUE

PICTURE OF ABB instrument equipment at site

QM-GEN-18, Rev.0