Vous êtes sur la page 1sur 2

CANADIAN NATURAL RESOURCES

LTD.
Activity ID

Activity Name

2013 U2-T/A
Turnaround - Stream
S
to Stream
Maintenance Wind
Window
Primary Upgrading
Plant 33 - DCU - Delayed
De
Coking Unit
DCU Elect/Instr
33-TCV-719B (WO:199043)
(WO:19
- Service valve

Data Date : 06-May-13

Original
Duration

Man-Hrs

Start

Finish

454

499

04-May-13 01 A

23-May-13 05

285

328

04-May-13 01 A

16-May-13 03

285

328

04-May-13 01 A

16-May-13 03

92

21

04-May-13 01 A

07-May-13 17

92

21

04-May-13 01 A

07-May-13 17

92

21

04-May-13 01 A

07-May-13 17

54

04-May-13 07 A

06-May-13 12

33TCV719B-BB05

33-TCV-719B : Remove TCV

04-May-13 07 A

04-May-13 09 A

33TCV719B-BB10

33-TCV-719B : In-service to inspect line and verify TCV

06-May-13 07

06-May-13 08

33TCV719B-BB15

33-TCV-719B : Install TCV

06-May-13 08

06-May-13 10

06-May-13 10

06-May-13 12

28

16

04-May-13 01 A

07-May-13 17

33TCV719B-BB20
33-TCV-719B : Install actuator and wizard controller
33-FV-707 (WO:317088)
(WO:3170
- Remove and increase valve trim size
33FV707-BB05

33-FV-707 : Disconnect valve

04-May-13 01 A

05-May-13 03 A

33FV707-BB10

33-FV-707 : Remove and replace valve

06-May-13 22

07-May-13 02

33FV707-BB15

33-FV-707 : Reconnect valve

07-May-13 15

07-May-13 17

235

307

06-May-13 09

16-May-13 03

147

47

07-May-13 01

13-May-13 04

147

47

07-May-13 01

13-May-13 04

Secondary Upgrading
Upgrad
Plant 41 - Naphtha Hydrotreating Unit
NHTU Elect/Instr

113

15

07-May-13 01

11-May-13 17

41FV241-BB05

41-FV-241 : Perform in-situ stroke test and tuning of valve to confirm proper
operation

07-May-13 01

07-May-13 03

41FV241-BB10

41-FV-241 : Troubleshoot, repair, calibrate and function test to confirm


proper operation (if repair is req'd)

11-May-13 05

11-May-13 08

41-FV-241 (WO:259011)
(WO:2590
- In-situ stroke-test and tune control valve

41FV241-BB15
41-FV-241 : Commission valve and confirm with MCR
41-XV-512 (WO:259020)
(WO:2590
- In-situ stroke-test and tune control valve

11-May-13 16

11-May-13 17

133

16

07-May-13 15

13-May-13 04

41XV512-BB05

41-XV-512 : Perform in-situ stroke test on valve and confirm proper


operation

07-May-13 15

07-May-13 17

41XV512-BB25

41-XV-512 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

11-May-13 05

11-May-13 08

41XV512-BB45
41-XV-512 : Commission control valve and confirm with MCR
41-XV-513 (WO:259021)
(WO:2590
- In-situ stroke-test and tune control valve

13-May-13 03

13-May-13 04

99

16

07-May-13 15

11-May-13 17

41XV513-BB05

41-XV-513 : Perform in-situ stroke test on valve and confirm proper


operation

07-May-13 15

07-May-13 17

41XV513-BB25

41-XV-513 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

11-May-13 05

11-May-13 08

41XV513-BB45

41-XV-513 : Commission control valve and confirm with MCR

Plant 42 - Distillate Hydrotreating Unit


DHTU Piping
42-FV-411 (WO:261527)
(WO:2615
- Repair hunting valve

11-May-13 16

11-May-13 17

217

48

07-May-13 02

16-May-13 03

217

48

07-May-13 02

16-May-13 03

217

16

07-May-13 02

16-May-13 03

42K1-BB11

42-K-1 : Decommission positioner

07-May-13 02

07-May-13 03

42K1-BB16

42-K-1 : Remove power at JB

07-May-13 03

07-May-13 03

42K1-BB21

42-K-1 : Remove old positioner & install new positioner

15-May-13 03

15-May-13 05

42K1-BB26

42-K-1 : Reinstate power to positioner

15-May-13 14

15-May-13 15

42K1-BB31

42-K-1 : Commission positioner

15-May-13 19

15-May-13 20

42K1-BB36

42-K-1 : Adjust booster if required

15-May-13 21

15-May-13 22

42K1-BB41

42-K-1 : Auto calibrate valve

16-May-13 02

16-May-13 03

16-May-13 03

16-May-13 03

38

16

14-May-13 14

16-May-13 03

42K1-BB46
42-K-1 : Verify valve travel & complete check list
42-XV-473 (WO:259032)
(WO:2590
- In-situ stroke-test and tune control valve
42XV473-BB05

42-XV-473 : Perform in-situ stroke test on valve and confirm proper


operation

14-May-13 14

14-May-13 16

42XV473-BB25

42-XV-473 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

15-May-13 14

15-May-13 17

42XV473-BB45
42-XV-473 : Commission control valve and confirm with MCR
42-XV-475 (WO:259033)
(WO:2590
- In-situ stroke-test and tune control valve

16-May-13 02

16-May-13 03

27

16

14-May-13 15

15-May-13 18

42XV475-BB05

42-XV-475 : Perform in-situ stroke test on valve and confirm proper


operation

14-May-13 15

14-May-13 17

42XV475-BB25

42-XV-475 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

15-May-13 14

15-May-13 17

42XV475-BB45

42-XV-475 : Commission control valve and confirm with MCR

Plant 43 - Gas Oil H


Hydrotreating Unit
GOHTU Elect/Instr
43-XV-430 (WO:259044)
(WO:2590
- In-situ stroke-test and tune control valve

15-May-13 17

15-May-13 18

32

32

12-May-13 11

13-May-13 19

32

32

12-May-13 11

13-May-13 19

30

16

12-May-13 11

13-May-13 17

43XV430-BB05

43-XV-430 : Perform in-situ stroke test on valve and confirm proper


operation

12-May-13 11

12-May-13 13

43XV430-BB25

43-XV-430 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

13-May-13 05

13-May-13 08

43XV430-BB45
43-XV-430 : Commission control valve and confirm with MCR
43-XV-433 (WO:259048)
(WO:2590
- In-situ stroke-test and tune control valve

13-May-13 16

13-May-13 17

30

16

12-May-13 13

13-May-13 19

43XV433-BB05

43-XV-433 : Perform in-situ stroke test on valve and confirm proper


operation

12-May-13 13

12-May-13 15

43XV433-BB25

43-XV-433 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

13-May-13 05

13-May-13 08

43XV433-BB45

43-XV-433 : Commission control valve and confirm with MCR

Plant 46 - Hydroge
Hydrogen Reformer Unit
HYD Elect/Instr
46-FV-87 (WO:259050)
(WO:25905 - In-situ stroke-test and tune control valve

13-May-13 18

13-May-13 19

168

180

06-May-13 09

13-May-13 09

168

180

06-May-13 09

13-May-13 09

15

11-May-13 17

11-May-13 23

46FV87-BB05

46-FV-87 : Perform in-situ stroke test on valve and confirm proper operation

11-May-13 17

11-May-13 19

46FV87-BB10

46-FV-87 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

11-May-13 19

11-May-13 22

46FV87-BB15
46-FV-87 : Commission control valve and confirm with MCR
46-FV-90 (WO:259051)
(WO:25905 - In-situ stroke-test and tune control valve

11-May-13 22

11-May-13 23

40

18

11-May-13 17

13-May-13 09

46FV90-BB05

46-FV-90 : Perform in-situ stroke test on valve and confirm proper operation

11-May-13 17

11-May-13 19

46FV90-BB10

46-FV-90 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

11-May-13 21

12-May-13 00

13-May-13 08

13-May-13 09

17

16

11-May-13 17

12-May-13 11

46FV90-BB15
46-FV-90 : Commission control valve and confirm with MCR
46 -LV-290 (WO:267007)
(WO:2670
- In-situ stroke-test and tune control valve

Page 1 of 2
(c) Primavera Systems, Inc.

CANADIAN NATURAL RESOURCES


LTD.
Activity ID

Activity Name

Data Date : 06-May-13

Original
Duration

Man-Hrs

Start

Finish

46LV290-BB05

46-LV-290 : Perform in-situ stroke test on valve and confirm proper


operation

11-May-13 17

11-May-13 19

46LV290-BB10

46-LV-290 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

12-May-13 01

12-May-13 04

46LV290-BB15
46-LV-290 : Commission control valve and confirm with MCR
46-PV-143 (WO:259055)
(WO:2590
- In-situ stroke-test and tune control valve

12-May-13 10

12-May-13 11

17

16

11-May-13 17

12-May-13 11

46PV143-BB05

46-PV-143 : Perform in-situ stroke test on valve and confirm proper


operation

11-May-13 17

11-May-13 19

46PV143-BB10

46-PV-143 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

12-May-13 00

12-May-13 03

46PV143-BB15
46-PV-143 : Commission control valve and confirm with MCR
46-PV-182B (WO:259056)
(WO:259
- In-situ stroke-test and tune control valve

12-May-13 10

12-May-13 11

17

16

06-May-13 09

07-May-13 02

46PV182B-BB05

46-PV-182B : Perform in-situ stroke test on valve and confirm proper


operation

06-May-13 09

06-May-13 11

46PV182B-BB10

46-PV-182B : Troubleshoot valve as required, perform calibration and


functional test to confirm proper operation

06-May-13 11

06-May-13 14

46PV182B-BB15
46-PV-182B : Commission control valve and confirm with MCR
46-TV-146 (WO:240677)
(WO:2406
- Replace actuator

07-May-13 01

07-May-13 02

114

49

07-May-13 18

12-May-13 12

46TV146-BB05

46-TV-146 : Disconnect electrical & instrument air

07-May-13 18

07-May-13 20

46TV146-BB10

46-TV-146 : Unbolt and remove actuator & transport to laydown (using 80T
- #4 crane)

12

07-May-13 20

07-May-13 23

46TV146-BB15

46-TV-146 : Transport new actuator to site

07-May-13 23

08-May-13 03

46TV146-BB30

46-TV-146 : Install new actuator and torque

15

08-May-13 03

08-May-13 08

46TV146-BB35

46-TV-146 : Reconnect electrical & instrument air

11-May-13 19

11-May-13 21

46TV146-BB40
46-TV-146 : Commission valve with new actuator
46-XV-91 (WO:259054)
(WO:25905 - In-situ stroke-test and tune control valve

12-May-13 10

12-May-13 12

17

38

11-May-13 16

12-May-13 09

46XV91-BB05

46-XV-91 : Perform in-situ stroke test on valve and confirm proper operation

11-May-13 16

11-May-13 20

46XV91-BB25

46-XV-91 : Troubleshoot, repair, perform calibration & functional test to


confirm proper operation (if repair was reqd)

24

11-May-13 20

12-May-13 04

46XV91-BB45
46-XV-91 : Commission control valve and confirm with MCR
46-FV-190A (WO:289534)
(WO:289
- Repair leak

12-May-13 07

12-May-13 09

11-May-13 21

11-May-13 23

46FV190A-BB05
46-FV-190A : Install tube fitting
46-FV-200A (WO:289532)
(WO:289
- Repair regulator connection leak

11-May-13 21

11-May-13 23

12-May-13 01

12-May-13 03

46FV200A-BB660
46-FV-200A : Install Fisher Regulator
46-XV-198 (WO:289525)
(WO:2895
- Repair leak at solenoid

12-May-13 01

12-May-13 03

12-May-13 01

12-May-13 03

46XV198-BB665

46-XV-198 : Install Tube Fitting

12-May-13 01

12-May-13 03

401

171

06-May-13 12

23-May-13 05

401

171

06-May-13 12

23-May-13 05

401

49

06-May-13 12

23-May-13 05

401

49

06-May-13 12

23-May-13 05

401

49

06-May-13 12

23-May-13 05

33-FV-707 (WO:317088)
(WO:3170
- Increase valve trim size

07-May-13 17

07-May-13 20

33FV707-CB05
33-FV-707 : Install insulation
33-TCV-719B (WO:199043)
(WO:19
- Service valve

07-May-13 17

07-May-13 20

401

43

06-May-13 12

23-May-13 05

Post Turnaround
Maintenance Wind
Window
Primary Upgrading
Plant 33 - DCU - Delayed
De
Coking Unit
DCU Elect/Instr

33TCV719B-CB09

33-TCV-719B : Install EHT

14

06-May-13 12

06-May-13 19

33TCV719B-CB13

33-TCV-719B : Re-install insulation

10

20

06-May-13 19

07-May-13 05

33TCV719B-CB17

33-TCV-719B : Remove scaffolding and de-mobilize material

23-May-13 02

23-May-13 05

259

59

12-May-13 03

22-May-13 22

259

59

12-May-13 03

22-May-13 22

259

59

12-May-13 03

22-May-13 22

259

19

12-May-13 03

22-May-13 22

12-May-13 03

12-May-13 05

15

22-May-13 17

22-May-13 22

251

19

12-May-13 11

22-May-13 22

12-May-13 11

12-May-13 13

15

22-May-13 17

22-May-13 22

250

21

12-May-13 12

22-May-13 22

Secondary Upgrading
Upgrad
Plant 46 - Hydroge
Hydrogen Reformer Unit
HYD Elect/Instr
46-FV-200A (WO:289532)
(WO:289
- Repair regulator connection leak
46FV200A-CB05

46-FV-200A : Re-install insulatioin

46FV200A-CB10
46-FV-200A : Remove scaffolding
46-PV-143 (WO:259055)
(WO:2590
- In-situ stroke-test and tune control valve
46PV143-CB05

46-PV-143 : Re-install insulatioin

46PV143-CB10
46-PV-143 : Remove scaffolding and de-mobilize material
46-TV-146 (WO:240677)
(WO:2406
- Replace actuator
46TV146-CB04

46-TV-146 : Re-install and reconnect EHT

12-May-13 12

12-May-13 14

46TV146-CB08

46-TV-146 : Re-install insulation

12-May-13 14

12-May-13 15

46TV146-CB12

46-TV-146 : Remove scaffolding and de-mobilize material

15

22-May-13 17

22-May-13 22

92

63

08-May-13 12

12-May-13 08

16

08-May-13 12

08-May-13 19

16

08-May-13 12

08-May-13 19

16

08-May-13 12

08-May-13 19

Services
Plant 72 - West Tan
Tank Farm
WTF Piping
72-FV-37 (WO:280995)
(WO:28099 - Replace globe valve
72FV37-CB04

72-FV-37 : Re-install and re-connect EHT

08-May-13 12

08-May-13 16

72FV37-CB08

72-FV-37 : Demobilize tools and clean-up area

08-May-13 12

08-May-13 13

72FV37-CB12

72-FV-37 : Re-install insulation

08-May-13 16

08-May-13 19

27

47

11-May-13 05

12-May-13 08

27

47

11-May-13 05

12-May-13 08

Plant 73 - East Tan


Tank Farm
ETF Piping

27

47

11-May-13 05

12-May-13 08

73TK1A-CB04

73-P-000027 : Re-install and re-connect EHT

11-May-13 05

11-May-13 08

73TK1A-CB08

73-P-000027 : Demobilize tools and clean-up area

11-May-13 05

11-May-13 08

73TK1A-CB12

73-P-000027 : Re-install insulation

11-May-13 08

11-May-13 12

73TK1A-CB16

73-P-000027 : Remove scaffolding and de-mobilize material

27

11-May-13 23

12-May-13 08

73-TK-1A (73-P-000027-16")
(73-P-0000
(WO:306635) - Instal l 16" valve

Page 2 of 2