Vous êtes sur la page 1sur 41

Petra Reinhardt, ABB Power Systems

Substation Automation Systems


Reference projects
ABB Group August 6, 2009 | Slide 1

SA for Al Reem Island 400/132/22kV S/Ss, Abu Dhabi

Customer: Transco (Abu Dhabi Transmission & Despatch Co.) Year of commissioning: 2007 - 2008

Customers need

Four new turnkey GIS S/Ss to power the new residential, commercial and business districts being built within the Al Reem Island mega-project Fulfillment of strict vendor prequalification criteria Turnkey implementation of SAS 670, IEC 61850-based solution with fully redundant operator workplaces and integrated LDC gateways REx 670 bay control and protection IEDs Proven automated control sequences

ABBs response

Customers benefits Uniform systems in all stations


Smooth transition to state-of-the-art technologies High functionality through a maximum level of IED integration and field-tested applications Enhanced operational efficiency and safety

ABB Group August 6, 2009 | Slide 2

SA Systems for three new 220/66/11kV S/Ss, Bahrain

Customer: Electricity and Water Authority (EWA) Year of commissioning: 2007

Customers need

Reliable turnkey implementation of three new GIS substations including all secondary equipment Most modern central control and monitoring as well as bay protection and control based on IEC 61850 SAS 690 advanced substation automation systems with verified implementation of IEC 61850 and proven functionality for high-quality operator support Fully redundant station level for highest availability Scalable REC 670 bay control units throughout

ABBs response

Customers benefits Optimal operational and maintenance efficiency


Easy access to all 3rd party protection IEDs Simplified on-line monitoring as well as maintenance access to each bay Openness for functional and hardware extensions

ABB Group August 6, 2009 | Slide 3

SA for M Station 400kV S/S, Dubai

Customer: DEWA (Dubai Electricity and Water Authority) Year of commissioning: 2008

Customers need

EPC contractor Hyundai Engineering & Construction Co. builds the new M station Reliable partner for SA to support the project from tender clarification to turnkey implementation SAS 690 IEC 61850-based system with fully redundant operator workplaces and independent embedded gateways REC 670 bay control devices Integration of 3rd party protection IEDs via IEC-103

ABBs response

Customers benefits Close cooperation resulting in optimized solution


On-time energization of this key node Guaranteed extensibility of fully IEC 61850 compliant Substation Configuration Description (SCD) through best-in-class engineering

ABB Group August 6, 2009 | Slide 4

SA Frame Contract III for 132/11 kV S/Ss, Dubai

Customer: Dubai Electricity & Water Authority (DEWA) Year of commissioning: 2009 2013 (up to 30 systems p.a.) ABB supplied a total of 100 SA systems under the frame contracts I & II between 2001 and 2008

Customers need Fast expansion of the 400/132/33/11kV grid with up to 30 identical new substations built each year State-of-the-art substation automation systems must interface with primary equipment from various OEMs ABBs response Turnkey SAS 690 SA systems with verified implementation of IEC 61850 Fully redundant station level working independently Separate Ethernet networks per voltage level and on 132kV for control, third party Main 1 & 2 IEDs Customers benefits Dependable operation through state-of-the-art yet well-proven, homologated technologies Maximum performance, availability and security Safeguarded investment and optimized life cycle cost through future-proof IEC 61850 based systems Strong local competence and support

ABB Group August 6, 2009 | Slide 5

SA for Az-Zour Emergency P/P 275 kV S/Ss, Kuwait

Customer: Alghanim International General Trading & Contracting Co. (AIGTC) Year of commissioning: 2008

Customers need Fast-track project due to critical network load Power plant and substation to be realized within only 18 months ABBs response First ever SA system in Kuwait SAS 670 with fully redundant operator workplaces REC 670 bay control units integrated into the Local Control Cubicles Customers benefits Proven technology to enable short delivery time Comprehensive customer training ensuring smooth transition to state-of-the-art technologies Involvement of local unit to enhance support to the utility in Kuwait (MEW)

ABB Group August 6, 2009 | Slide 6

SA for Sohar Industrial Area 220/132/33kV S/S, Oman

Customer: Oman Electricity Transmission Co. (OETC) Year of commissioning: 2006

Customers need

Main contractor Larsen & Toubro Oman is building the substation to power the new Sohar Industrial Port and Estate project Dependable turnkey implementation of most modern secondary systems

ABBs response SAS 670 IEC 61850-based solution with redundant station level

Separate decentralized Ethernet rings per voltage level, 1st REC 670 control IEDs installed in the Gulf Integration of 3rd party protection IEDs Strong supplier commitment Highly reliable supply of systems and services All-inclusive offer according to the specification Comprehensive fulfillment of the specification

Customers benefits

ABB Group August 6, 2009 | Slide 7

SA for SSPP 380/115kV S/S, Saudi Arabia

Customer: Royal Commission for Jubail & Yanbu Year of commissioning: 2008

Customers need

New substation to evacuate power from Southern Sector Power Plant and power new refinery Support for introduction of new technology

ABBs response SAS 650 IEC 61850-based SA solution in hot-standby configuration


Redundant communication gateways to three LDCs IED 670 for control and protection Integration of 3rd party Main 2 / backup prot. IEDs Highly reliable S/S with state-of-the-art technology Future-proof installation offering capability for functional extensions and station expansions Maximum performance and security Very competent after-sales service and support

Customers benefits

ABB Group August 6, 2009 | Slide 8

SA for SanJiang Digital 110kV substation, China

Customer: China Southern Power Grid Co., Ltd. (CSG) Year of commissioning: 2007

Customers need

IEC 61850-based digital substation Compatibility with ABB and 3rd party IEDs OCT/VT application IEC 61850 SA solution with redundant workplaces and independent gateways IED 670/REF 54x for protection and control Integration with product from local vendor which supports OCT/VT Compatibility with current installations Future migration capabilities with IEC 61850 Good performance of OCT/VT application

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 9

SA System for Maharanibagh 400kV GIS S/S, India

Customer: Powergrid Year of commissioning: 2007

Customers need

State-of-the-art substation automation system with integration of 3rd party Main 2 relay Very high system availability of 99.98%

ABBs response SAS 690 IEC 61850-based redundant solution with new GUI and independent redundant COM 581 industrial gateways

Ethernet switches with dual power supplies in a fault-tolerant dual ring configuration IED 670 for control and protection, GOOSE-based SW interlocks User-friendly system using most modern technology High system availability; control from station or NCC Reduced life cycle cost of future-proof system Very strong local competence and support

Customers benefits

ABB Group August 6, 2009 | Slide 10

SA for Siruseri 220kV S/S, India

Customer: TNEB Year of commissioning: 2007

Customers need IEC 61850-based Bay Control Units, Protection relays on IEC 60870-5-103 with DR upload and parameter setting Communication to remote control centre ABBs response SAS 610 IEC 61850-based solution with single workstation and integrated gateway GOOSE communication for interlocks Protection relays on SPA protocol to enable disturbance record upload and parameter setting Customers benefits Safe control from station or Load Dispatch Centre Complete data access for protection engineer Very strong local competence and support

ABB Group August 6, 2009 | Slide 11

SA for Holenarsipura 220kV S/S, India

Customer: KPTCL

Customers need

Substation automation system using IEC 61850 Communication to State Load Dispatch Centre SAS 670 IEC 61850-based redundant solution with new GUI and integrated gateways Ethernet switches with dual power supplies in a fault-tolerant ring configuration IED 670 for control and protection, REX 521 for backup protection, GOOSE-based SW interlocks Possibility to integrate 3rd party IEDs in future Safe control from station or LDC Reduced life cycle cost of future-proof system Very strong local competence and support

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 12

SA for Koldam TPS 400kV S/Y, India

Customer: NTPC

Customers need State-of-the-art substation automation system with very high availability

Future integration with generator protection

ABBs response SAS 670 redundant workstation with new GUI and Remote Operator Workstation Ethernet switches with dual power supplies in a fault tolerant ring configuration IED 670 for control and protection, GOOSEbased SW interlocks Customers benefits User-friendly system using latest technology Efficient control from switchyard control room or plant control room Possibility to integrate generator protection at a later stage
ABB Group August 6, 2009 | Slide 13

SA for five retrofit 150kV substations, Indonesia

Customer: PT Perusahan Listrik Negara (PT PLN) Year of commissioning: 2009

Customers need Rapid grid expansion & upgrade to transmit power from new steam power plants being built within the 10000MW Fast Track Program Introduction of IEC 61850 SA and protection for all new and retrofit substation projects ABBs response IEC 61850 solution SAS 635 with RTU 560 independent gateway to NCC and a station HMI Decentralized control, protection and monitoring 670 series IEDs for control and protection Customers benefits Smooth transition to state-of-the-art technologies Reduced operation and maintenance cost Sustainable migration strategy, open for selective refurbishment and future extension Support from competent local organization involved in project execution and commissioning

ABB Group August 6, 2009 | Slide 14

ECMS* for Gunjang Energy, 65MVA P/P, Korea

Customer: Gunjang Energy Year of commissioning: 2007 * ECMS = Electrical Equipment Control & Monitoring System

Customers need SA solution with field-proven IEC 61850 technology and applications Simple system structure with openness for easy future extension ABBs response SAS 670 IEC 61850 system with hotstandby operator workstation and an engineering workstation REC/RET670, REF/REM/RET54x for C&P New GUI of MicroSCADA Pro and field-proven applications for safe control and monitoring, optimal operator guidance Customers benefits Simple system architecture and high availability Extensibility of future-proof system Maintenance with system in full service Advanced technology supported by ABBs local & global sources

ABB Group August 6, 2009 | Slide 15

IEC 61850 Demo System for KEPRI, Korea

Customer: KEPRI / Seondo Year of commissioning: 2007

Customers need Demo IEC 61850 system for testing prior to application in KEPCOs substations Integration of IEDs having the same functions as protections in KEPCO S/Ss ABBs response SAS 610 IEC 61850 system with MicroSCADA Pro-based HMI for local control and monitoring RED/REB670 & REF541 for C&P Integration of 3rd party IEDs with IEC 61850 interface Customers benefits Piece of mind through thorough system testing Effective staff training on IEC 61850 for application, service and support Efficient deployment of tested systems

ABB Group August 6, 2009 | Slide 16

SA for NTC Fab3A 161/22/0.38kV S/Ss, Taiwan

Customer: NanYa Technology Corporation (NTC) Year of commissioning: 2007

Customers need

EPC contractor NanYa Switchgear Unit builds six (6) new Fab3A substations Reliable partner for SA to support the project from tender clarification to turnkey implementation SAS 670 IEC 61850-based system with fully redundant hot-standby station servers Various ABB IEDs (197x REX521, 66x REF541, 13x RET541, & 3x REB670) integrated in MicroSCADA Pro HMI with new GUI Integration of 3rd party meters & D-UPS, DC charger, MIMIC controllers via Modbus and PLCs via OPC connection

ABBs response

Customers benefits Close cooperation resulting in optimized solution

Safeguarded investment and optimized life cycle cost through future-proof IEC 61850 based systems Excellent local competence and support

ABB Group August 6, 2009 | Slide 17

Hoa Khan 220/110/22 kV Substation, Vietnam

Customer: Central Vietnam Power Project Management Board (CPPMB) Year of commissioning: 2007

Customers needs

Substation modernization with state-of-the-art technology Re-use of installed base of protection relays from various vendors Competitive project financing IEC 61850 solution SAS 670, RE_5xx protection and control IEDs Integration of 3rd party devices via IEC-103 and DNP3.0 Nordic Investment Bank NIB financing Improved project life cycle costs with less need of investment, and project financing Reduced operation and maintenance costs

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 18

SA for Juna Downs, Australia

Customer: Hamersley Iron Year of commissioning: 2008

Customers need Increased reliability and availability of its SA system Fault diagnostic and remote access to IEDs as well as easy maintenance ABBs response SAS 635 IEC 61850-based solution with robust RTU 560 gateway and MicroSCADA Pro-based station HMI Remote access to relay setting tool, DR upload and SOE via SA system IED 670 for set 1 and set 2 protection Customers benefits Simplified system layout through state-of-theart SA Reliable remote control access to substation Reduced spare parts

ABB Group August 6, 2009 | Slide 19

SA for Waneta 63/230kV Switching Station, Canada

Customer: Tech Cominco Year of commissioning: 2007

Customers need Replacement of electro-mechanical protection and accommodation of new 63/230kV station Compatibility with current ABB and 3rd party IEDs, and future-proof system ABBs response Various ABB IEDs (REX 500, REF 542+, IED 670s) and specified 3rd party IEDs integrated in SAS 690 with MicroSCADA HMI Hybrid MicroSCADA solution with ring structure for IEC 61850 system and star structure for LON communication Customers benefits Compatibility with current installations Extendibility of future-proof system Accommodation of specified 3rd party IEDs

ABB Group August 6, 2009 | Slide 20

Remote Terminal Units Replacement, USA

Customer: ConEdison New York City Year of commissioning: 2007 - 2010 (40 substations)

Customers need

Provision of real time information to operators at the Master stations Provision of accurate real time information to SCADA operator at Energy Control Center Advanced substation automation system including RTU 560 and MicroSCADA Pro-based station HMIs Highest information availability through fully redundant system Turnkey delivery incl. engineering and equipment, field installation, commissioning and training services Safe, secure operation of substations under normal and emergency conditions both locally and remotely Future migration capabilities using IEC 61850 24/7 local support and 5 years warranty

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 21

SA for six transmission substations, Brazil

Customer: Companhia de Transmisso de Energia Eltrica Paulista (CTEEP) Year of commissioning: 2007

Customers need Retrofit of old protection relays Connection to DR Analysis Center ABBs response IEC 61850 solution SAS 605 with RTU 560 station unit for connection to existing supervisory and control system IED 670 for control and protection Customers benefits Faster upload of disturbance records from remote substations High reliability of substation-proof equipment Open solution

Six Substations

ABB Group August 6, 2009 | Slide 22

SE Ribeiro Preto (440/138kV) SE Sumar (440/138kV) SE Capivara (440kV) SE Aparecida (230kV) SE Taubat (230kV) SE Santa Cabea (230/88kV)

SA for 138/6.6kV S/S at steel slabs plant, Brazil


Customers need

Customer: Companhia Siderrgica do Atlntico (CSA) Year of commissioning: 2007 Project in development

IEC 61850-based SA system using GOOSE messages for interlocking Protection of the first system with Peterson coil SAS 670 IEC 61850 system with MicroSCADA Pro HMI and hot-standby functionality IED 670 for protection and control including application for Peterson coil system Supervision of communication network between physically distributed electrical S/Ss using SNMP High availability of local control as well as communication network Integrated solution; less hardware and copper wiring Local engineering competence and support

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 23

SA for Soler 138/24kV & Mdanos 115/13.8kV S/Ss, Venezuela


Customer: ENELVEN / ENELCO Year of commissioning: 2008

Customers need

IEC 61850 shall be introduced and is key to the utilities strategy for SA throughout their grids Own technical resources are to be built up for use throughout the utilities installations Optimized IEC 61850-based SA solution Uniform architecture of SAS 630 single workstation and independent industrial gateway COM 581 High-quality operator interface with proven control and monitoring applications IED 670 for C&P, 3rd party tap changer controller Sustainable investment in open systems Enhanced efficiency with harmonized SA systems High system availability Optimized solution with field-tested applications Excellent local competence and support

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 24

SA for Awka 132kV S/S and Ikot Abasi 330kV S/Ss, Nigeria
Customer: Power Holding Company of Nigeria Plc (PHCN) Year of commissioning: 2008

Customers need Implementation of National Integrated Power Project (NIPP) spanning the whole of Nigeria Seven power stations, hundreds of kilometers of transmission lines and associated substations ABBs response SAS 630 IEC 61850-based solution with single workstation for control and monitoring Redundant communication gateways to three LDCs IED 670 for control and protection Customers benefits Fully harmonized solutions Sustainable investment into systems featuring full IEC 61850 interoperability Very competent after-sales service and support as well as training of O&M personnel

ABB Group August 6, 2009 | Slide 25

Retrofit of Hann 90/30kV S/S, Senegal

Customer: SENELEC (Socit dElectricit du Sngal) Year of commissioning: 2007

Customers need

Reinforcement of the national grid Turnkey retrofit of the most important 90/30kV S/S, 25-year-old Hann, by European main contractors SAS 670 IEC 61850-compliant SA system with redundant station level REx 316*4 based bay protection and control solutions Full integration of SA with SENELECs network control systems

ABBs response

Customers benefits Maximum availability of power supply


Very short transition time Improved stability of key node with 3x 80MW Higher supply quality for end users and industry Enhanced safety and supervision Long-term investment in secondary equipment

ABB Group August 6, 2009 | Slide 26

Retrofit of Dobrudja & Varna 400/220/110kV S/Ss, Bulgaria


Customer: Natsionalna Elektricheska Kompania (NEK EAD) Year of commissioning: 2007

Customers need

Partial refurbishment and extension of S/Ss Introduction of IEC 61850-based SA systems and integration of retained existing equipment

ABBs response Division of Work with NEK and loose supply of fully engineered SAS 670 SA system

Engineered REx 670 bay protection and control IEDs IEC 61850 compliant REB 500 busbar protection Integration of existing REL 5xx units with SPA/LON RTU 560 links to NCCs via TG80x and IEC-101 Sophisticated migration strategy with interoperability of fully IEC 61850 compliant solution Re-use of existing ABB protection Advanced functionality of IED 670 Selective refurbishment

Customers benefits

ABB Group August 6, 2009 | Slide 27

SAS Retrofit of 420 kV Substations Dasny and Krasikov, Czech Republic


Customer: CEPS, a.s. Year of commissioning: 2008

Customers needs

IEC 61850 based SA system Extra high degree of security and reliability as all substations are to be operated in unmanned mode Fully IEC 61850 compliant system incorporating ABBs global and local know-how and experience SAS 670 with redundant station computers/HMIs and integrated gateway functionality RE_670 for protection and control with new functions, e.g. logics for power system switching / phasing and voltage control, CB monitoring, etc. Compact system solution Safe operation with complex interlocking based on GOOSE messages Open communication with integrated 3rd party devices

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 28

Retrofit of Tullastrasse 110/20kV S/S, Germany

Customer: Municipal utility Stadtwerke Weinheim GmbH Year of commissioning: 2007

Customers need

Retrofit with minimal alterations to switchgear and extremely limited space Short time frame, minimal power interruption

ABBs response Migration to innovative and compact IEC 61850 based system during continuous operation

Simplified system structure through functional integration in few hardware components One REC 670 bay control unit for four switchgear bays RTU 560 with integrated HMI for local and remote operation Smooth transition to the most modern technologies Sustainable migration strategy with flexibility for selective modernization and future extension Constant revenues

Customers benefits

ABB Group August 6, 2009 | Slide 29

NICAP 2 Protection and Control Retrofit, Great Britain

Customer: National Grid Year of commissioning: 2007 2009 Over 20 Substations

Customers need

Safe, reliable replacement of ageing light current technology with integrated standard solutions Turnkey project implementation maintaining operational standards and statutory obligations Optimal solutions employing proven technology in pre-engineered and pre-tested standard bay solutions Leveraging global experience and competence Efficient project management and execution

ABBs response

Customers benefits Maximized power system availability and security


Strong local competence and support. Reduce operational maintenance costs Migration to IEC 61850 using low risk technology

ABB Group August 6, 2009 | Slide 30

SA Systems for SICAS project, Italy

Customer: Terna (Transmissione Elettricit Rete Nazionale S.p.A.) Year of commissioning: 2009 ____

Customers need

Frame agreements for turnkey SA & P systems with prequalification and homologation of 34 typical bays New & retrofit 100x 380/220/150kV S/Ss in 10 years

ABBs response Turnkey SA & P systems for new & retrofit S/Ss supporting customer philosophy and architecture

IEC 61850-compliant C&P solutions, hot stand-by station HMI, web access Standardized operator interface, functions and system layout, state-of-the-art automatic sequencer

Customers benefits Optimal operation and maintenance with homologated solutions throughout the grid

Speedy and efficient handling of large volume Future-proof investment into interoperable systems Efficient training and support through global experience and local presence

ABB Group August 6, 2009 | Slide 31

SA Systems for Six Distribution S/Ss, Portugal

Customer: EDP Distribuio, Portugal Year of commissioning: 2006

Customers need

Standardized communication protocol Future-proof technology Systems designed according to customers specifications Massive training of engineering teams Full attention to the new IEC 61850 projects One unique protocol for complete substation All suppliers with same protocol Standard engineering and testing processes Cost reduction

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 32

SA for Ochakovo 500/220/110kV S/S, Russia

Federal Grid System, Ochakovo Year of commissioning: 2008

Customers need Protection and substation automation system based on IEC 61850 ABBs response SA system with MicroSCADA Pro-based HMI Protection system based on IED 670 series (totally 306 cubicles) Customers benefits Savings in secondary wiring through the use of GOOSE-based functionality (e.g. blockings, interlocking, etc.) Ochakovo is the largest Substation Automation project world-wide to be based on the 670 series terminals

ABB Group August 6, 2009 | Slide 33

Indoor substations 145/46/6,6kV Rtsi & 145/11kV Luossavaara, Sweden


Customer: Vattenfall Eldistribution AB Year of commissioning: 2007

Customers needs

New substations when moving the city Kiruna due to extension of mine Protection and control based on IEC 61850 Indoor AIS based on URBANTM concept IEC 61850 solution SAS 605 with RTU 560 gateway IED 670, REF 543 and REX 521 terminals for protection and control

ABBs response

Customers benefits

Short delivery time Enhanced safety and supervision Small footprint of the substations

ABB Group August 6, 2009 | Slide 34

SA for Van Diepenburch 10/25kV S/S, The Netherlands


Customer: ENECO Year of commissioning: 2009

Customers need

Revamping of secondary installations of existing 10/25kV substation, based on IEC 61850 and GOOSE messages, as a pilot for all customers distribution substations Communication with network control center SAS635 based on MicroSCADA Pro, including ABB and third party IEDs Complete upgrade of the secondary installations to state-of-the-art technology Savings in wiring and enhanced operational safety owing to all interlocks, automatic controls and intertrips being based on IEC 61850 GOOSE messaging

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 35

Retrofit of Soazza 220/380kV S/S, Switzerland

Customer: OIM (Officine Idroelettriche di Mesolcina SA) Year of commissioning: 2007 2009 (baywise)

Customers need Retrofit of the primary as well as secondary equipment of this key node in energy transfer to Italy Four 380kV feeders shall be partly retrofitted and all nine 220kV feeders need complete retrofit ABBs response Baywise IEC 61850-compliant retrofit with ABBs control & protection solutions Incorporation of 3rd party Main 2 IEDs via IEC-103 Cooperation with 3rd party switchgear supplier 220kV Main 2 with REB 500sys station protection Customers benefits Reliable retrofit within critical time span Minimal service interruption Optimal life cycle management through future-proof system with IEC 61850 for control Smooth implementation ensured by experienced retrofit partner

ABB Group August 6, 2009 | Slide 36

Retrofit of Laufenburg 380kV S/S, Switzerland

Customer: ElektrizittsGesellschaft Laufenburg AG Year of commissioning: 2004 2006 (bay-wise)

Customers need

Refurbishment of 7 out of 17 feeders during two years without service interruption Future-proof concept with most modern technologies integrated with existing equipment Stepwise IEC 61850 compliant retrofit with ABBs control and protection solutions incorporating 3rd party Main 2 and station HMI Hybrid switchgear with outdoor GIS and AIS Efficient project management

ABBs response

Customers benefits Sustainable migration strategy, selective retrofit


Smooth transition to the most modern technologies Maximum operational safety, maintenance efficiency Constant revenues from uninterrupted service

ABB Group August 6, 2009 | Slide 37

2008, EGL Laufenburg 380kV Substation Retrofit

Request for Quotation for the extension of the SA-System based on the .SCD file of the installed base Bidding and project execution were made based on the existing .SCD file

ABB Group August 6, 2009 | Slide 38

Retrofit of Sils 380kV S/S, Switzerland

Customer: Kraftwerke Hinterrhein AG Year of commissioning: 2008 2009 (bay-wise)

Customers need

Complete migration of secondary equipment within ten months without service interruption Future-proof concept with most modern technologies integrating retained devices Stepwise IEC 61850 compliant retrofit with ABBs SA, control and protection solutions incorporating 3rd party Main 1 protection, counters and meters Combination of retained switchgear with new ABB circuit breakers Proficient project management Sustainable strategy and smooth migration Safeguarded investment through fully integrated system Minimal service interruption

ABBs response

Customers benefits

ABB Group August 6, 2009 | Slide 39

ABBs IEC 61850-compliant solutions around the globe

ABB Group August 6, 2009 | Slide 40

ABB Group August 6, 2009 | Slide 41

Vous aimerez peut-être aussi