Lupasteanu Radu 1. Calculation of an activity duration. 2. Resource consumption rate. 3. Project planning steps using CPM. 4.

Technology of construction the ground floor. 5. Definition of concrete class. 6. Definition of the total float for an activity. 7. Definition of the critical activity. 8. Significance of the resource rate. 9. Significance of the quality check list. 10. Technology of concreting the tower. 11. Concrete workability. 12. Technology of manual digging for pad foundation. 13. Criteria for crane selection. 14. Content of project planning. 15. Calculation of the unitary price for labour. 16. Bricklaying technology. 17. Indirect costs. 18. Resource histogram. 19. Earth compacting technology. 20. Technology sequence for constructing a current floor. 21. Definition of the total float. 22. Labour productivity factor. 23. Duration of an activity completion. 24. Definition of construction management. 25. Technological sequence for constructing a floor. 26. Resource allocation. 27. Earliest start time for an activity. 28. Bill of quantities. 29. Formwork for columns. 30. The use of bill of prices. 31. Resource allocation. 32. Technology of pouring concrete into slabs. 33. Quality control for constructing the slab. 34. Critical path definition. 35. Reduction of the total duration of the project. 36. Resource histogram. 37. Content of the bill of prices. 38. Activity terms. 39. Definition of concrete class. 40. The main parts of the bill of prices. 41. Calculation of labor unitary price. 42. Calculation of material unitary price. 43. Latest time for a node calculation and significance. 44. Formwork dimensioning for slabs. 45. Main structure of the bill of prices.

46. Main rules for constructing a network. 47. Calculation of the activity duration. 48. Technology for constructing a slab. 49. Critical Path Method main steps. 50. Technology for constructing the monolith reinforced column. 51. Complex design of earth digging and transporting. 52. Formwork technology for slabs. 53. Cost estimation. 54. Resource allocation. 55. Critical Path method. 56. Cost estimation. Paulet-Crainiceanu Fideliu 1. Seismic dependencies. 2. What is influencing the seismic forces. 3. In-plane shape of structures (favorable to seismic actions). 4. Simple static models for water towers. 5. Favorable/unfavorable shapes for structures. 6. Influence of the roof on the seismic forces. 7. On what is depending the seismic forces. 8. Large displacements / second order effects. 9. The role of concrete ??? underground. 10. Influence of torsional vibrations on the structural elements. 11. Favorable/unfavorable shapes for in-plane shapes of structures. 12. Stair design 13. FEM models for frame structures. 14. Steps in seismic calculation. 15. Steps in seismic calculation. 16. Load combination for special grouping. 17. Seismic calculation of framed structures. 18. Steps in seismic calculation. 19. Calculation of framed structures. 20. Use of seismic calculus results. 21. Stair calculus. 22. Calculus of attic. 23. Combination of loads. 24. How is taken into account the roof to seismic calculus. 25. Seismic forces calculation. 26. Use of modes of vibrations. 27. ULS and SLS check of buildings subjected to seismic loads. 28. Inelastic behavior of buildings. 29. Stairs calculation. 30. Girder calculus. 31. Elastic / inelastic spectrum. 32. Combination of loads.

33. Favorable / unfavorable shapes for the in-plane projection of buildings. 34. Spectrums for seismic force calculation. 35. Seismic spectrums. 36. Connections of frames in FEM model. 37. Calculation of mixed structures. 38. Steps in seismic calculation. 39. Earthquake calculation behaviour factor. 40. Influence of eccentricities on seismic response. 41. Inelastic behavior of structures. 42. Mains steps in seismic design. 43. Isolated foundation system. 44. Foundations under brick walls. 45. Technology of digging for foundations. 46. Chimney static calculation. 47. Structural system and seismic effect. 48. Roof structural system. 49. Roof influence on seismic behavior. 50. Seismic forces dependencies. 51. Dissipation of seismic energy. 52. Static scheme of roof elements. 53. Steps in seismic design. 54. In-plane stiffness distribution. 55. Seismic calculus steps. 56. Seismic forces dependencies. Mihai Petru 1. Why bent-up bars are used on girders. 2. Steps in R.C. designing. 3. Limitation of bending moment on rigid foundations. 4. Making-up of the RC columns. 5. Reinforcement systems in columns. 6. Why bent-up bars are used in slabs. 7. Plastic hinges development in RC structures. 8. Why columns have stirrups. 9. Wind influence on RC structures. 10. How circular columns are computed. 11. Why plates arent computed on shear force. 12. The minimum cross-section of RC columns. 13. Computation of RC walls. 14. Horizontal brace system for steel structures. 15. Structural stiffness on earthquake. 16. Steps in conceiving. 17. Minimum dimensions of RC columns. 18. Stiffened plate on precast elements. 19. RC walls on basement.

20. Computation of girders. 21. Computation of shear force on girders. 22. Short RC columns. 23. Stirrups on short columns. 24. Longitudinal bars for torsion. 25. Computation of RC columns. 26. Steps in the designing process of RC members. 27. Plastic hinges on RC structures. 28. Behavior of lamellar frames to earthquakes. 29. Bent-up bars on girders. 30. Design of masonry on earthquake. 31. Design of RC walls. 32. Stirrups on RC columns. 33. RC columns in seismic zones. 34. Making-up of reinforcement on plates. 35. Minimum reinforcement in RC walls. 36. Making-up f girders stirrups. 37. Making-up of slabs. 38. Analysis of RC frames. 39. Making-up of RC cages. 40. Rebars for basement walls. 41. Shear force on foundation. 42. Behavior of columns on earthquakes. 43. Making-up of columns stirrups. 44. Making-up of slabs. 45. Failure of columns on earthquake. 46. Making-up of girders. 47. Making-up of slabs. 48. Behavior of masonry on earthquakes. 49. Stirrups on columns. 50. Improving of RC structure behavior on earthquake. 51. Shear force on girders. 52. Plastic hinges on RC frames. 53. Bracing system on steel structures. 54. Making-up of columns. 55. Making-up of RC slabs with welded meshes. 56. Bond between materials in FEM. Oprisan Gabriel 1. Thermanl design of building envelope. 2. Main functions of exterior and interior walls. 3. What is a building envelope. 4. Is it possible to appear punching effect at the foundation level. 5. Main advantages of RC precast elements. 6. What type of actions do you consider at the roof level.

7. What is a building envelope. 8. How do you calculate the foundations. 9. Conceiving of the terrace roof. 10. Structural elements of the pitched roof. 11. What type of actions do you calculate at the roof level. 12. Pitched roof structural elements. 13. Structural design steps in case of a RC building. 14. Roof structure according to ISORAST system. 15. Pitched roof structure, main elements. 16. Vertical and horizontal actions on buildings. 17. Step design in your structural analysis. 18. Vertical and horizontal actions. 19. What is a building envelope. Methods to insulate a building structure. 20. Pitched roof elements. Chimney design, fire preservation of the roof elements. 21. Thermal design and terrace layers. 22. Making up of roof terrace. 23. Methods to prevent the heat losses in a building. 24. Which are the structural elements at the roof structure. Load combinations. 25. Thermal protection of building environment. 26. Thermal bridges in case of your structure. 27. Concrete class for RC columns, RC girders and RC slabs. 28. Partition walls and terrace layers. 29. Rood structure and its main parts. 30. Structural elements of a pitched roof. Main actions at the roof level. 31. Main advantages of precast elements. 32. What is a building envelope and the procedure to insulate a current house. 33. Timber element classes and structural members of a pitched roof. 34. Gusset plates and bracings. 35. Building envelope of an industrial building. 36. Step design in your FEM analysis of racks. Floor design. 37. Actions type horizontal and vertical directions. 38. Building envelope, roof terrace and protection of external walls. 39. Steps design in your FEM sandwich element. 40. What is a building envelope. Thermal design of your building. 41. Vertical and horizontal actions. Thermal design of walls and roof structure. 42. Purlin and rafter design. 43. Building envelope and thermal design. 44. Thermal design of the building envelope. 45. Building envelope. 46. Roof structure elements. 47. External walls. 48. Roof structural elements, roof covering solutions. 49. Roof structure design. 50. Roof structures and their structural members. 51. Roof structure and masonry walls. 52. Structural elements of the pitched roof and methods to fix the polystyrene panels.

53. Roof type and terrace layers. 54. Procedure for fixing the roof covering. 55. Snow load evaluation. 56. Terrace structure. Actions on buildings.