Vous êtes sur la page 1sur 18

DAFTAR HARGA SATUAN UPAH

No.

PEKERJA

(1)

(2)

SAT
(3)

Mandor

Hari

Kepala Tukang Kayu

Hari

Kepala Tukang Batu

Hari

Kepala Tukang Besi

Hari

Kepala Tukang Cat

Hari

Kepala Tukang Style Bali

Hari

Tukang Kayu

Hari

Tukang Batu

Hari

Tukang Besi

Hari

10

Tukang Kaca

Hari

11

Tukang Cat

Hari

12

Tukang Gali

Hari

13

Tukang Style Bali

Hari

14

Tukang Bongkar Begesting

Hari

15

Pekerja

Hari

DAFTAR SATUAN BAHAN BANGUNAN

No.

JENIS BAHAN BANGUNAN

(1)

(2)

SAT
(3)

Pasir Pasang

M3

Pasir Biasa

M3

Tanah Urug

M3

Batu Kali

M3

Batu Koral

M3

Kerikil Beton

m3

Batu Bata Standart

bh

Batu Bata Mesin Press (amplas halus)

bh
zak

Semen Tiga Roda 50 kg

10

Semen Gresik 50 kg

zak

11

Besi Beton 6 mm

btg

12

Besi Beton 8 mm

btg

13

Besi Beton 10 mm

btg

14

Besi Beton 12 mm

btg

15

Besi Beton 16 mm

btg

16

Besi Beton semua ukuran per kg

kg

16

Paku Kayu / Tripleks 1- 4 cm

kg

17

Paku Kayu / Tripleks 5 - 12 cm

kg

18

Paku Beton Baisa

kg

19

Kawat Beton

kg

20

Tripleks tebal 3 mm

Lbr

21

Tripleks tebal 4 mm

Lbr

22

Tripleks tebal 6 mm

Lbr

23

Tripleks tebal 9 mm

Lbr

24

Tripleks Tebal 12 mm

Lbr

25

Tripleks tebal 15 mm

Lbr

26

Tripleks tebal 18 mm

Lbr

27

Kaca Bening Tebal 3 mm

m2

28

Kaca Bening Tebal 5 mm

m2

29

Kaca Bening Tebal 8 mm

m2

30

Kaca Bening Tebal 10 mm

m2

31

Kaca Ryben Tebal 3 mm

m2

32

Kaca Ryben tebal 5 mm

m2

33

Kaca Ryben tebal 8 mm

m2

34

Kaca Ryben tebal 6 mm

m2

35

Fiber Semen flat elephant 122 x 244 tebal 4 mm

Lbr

36

Fiber Semen flat elephant 122 x 244 tebal 6 mm

Lbr

37

Fiber Semen flat elephant 122 x 244 tebal 8 mm

Lbr

38

Papan Gypsum Merk Elephant 120 x 240 tebal 9 mm

Lbr

39

Papan Gypsum Merk Jayaboard 120 x 240 tebal 9 mm

Lbr

40

List Gypsum

41

Reng 2 x 3 meranti

btg

42

Reng 3 x 4 meranti

btg

43

Reng 2 x 3 kamper

btg

44

Reng 3 x 4 kamper

btg

45

Kaso 4 x 6 meranti

btg

46

Kaso 5 x 7 meranti

btg

47

Kaso 4 x 6 kamper

btg

48

Kaso 5 x 7 kamper

btg

49

Galar 5 x 10 meranti

btg

50

Galar 5 x 10 kamper

btg

51

Kayu Sembarang

m3

52

Kayu Bekisting per m3

m3

53

Kayu meranti per m 3

m3

54

Kayu Kamper per m3

m3

55

Cat Tembok Interior Dulux 25 kg

klg

56

Cat Tembok Interior Catylac 25 kg

klg

57

Cat tembok Interior Metrolite 25 kg

klg

58

Cat Tembok Eksterior Dulux 25 kg

klg

59

Cat Kayu Dulux 1 kg

klg

60

Cat kayu Catylac 1kg

klg

61

Cat Kayu Glotex 1kg

klg

62

Ultran Politur

klg

63

Ultran Agua Politur

klg

64

Plamur

kg

65

Plamur Kayu

kg

66

Amplas

lbr

67

Kuas

bh

67
68

Water Proof Aqua Proof


Genteng Keramik Kanmuri Natural

klg
bh

69

Genteng Keramik Kanmuri Standart

bh

70

Genteng Keramik Kanmuri Exclusive

bh

71

Genteng Beton Morando berglazur

bh

72

Genteng Beton Morando Natural

bh

73

Genteng Ideal bergalzur

bh

74

Genteng Ideal natural

bh

75

Rabung Genteng Standart

bh

76

Asbes Jabesmen 150 x105

lbr

77

Seng gelombang tebal 0.20

m2

78

Seng gelombang tebal 0.30

m2

79

Keramik Lantai 20 x 20 Roman

m2

80

Keramik Lantai 30 x 30 Roman

m2

81

Keramik Lantai 40 x 40 Roman

m2

82

Keramik Dinding 20 x 20 Roman

m2

83

Keramika Dinding 20 x 25 Roman

m2

84

Batu Alam Artistik

m2

85

Paving Block Kelas I Type 4 persegi uk.10x20x8 cm

m2

86

Closet Duduk Sanremo Classic

bj

87

Closet Duduk Lexington

bh

88

Closet Duduk Projecta

bh

89

Wastafel Studio 3000 Lava & Pedestal

bh

90

Floor Drain (Stainless)

bh

91

Kran air standart

bh

92

Pipa PVC WAVIN 1/2 inch

btg

93

Pipa PVC WAVIN 3/4 inch

btg

94

Pipa PVC WAVIN 1 inch

btg

95

Pipa PVC WAVIN 2 inch

btg

96

Pipa PVC WAVIN 3 inch

btg

97

Pipa PVC WAVIN 4 inch

btg

98

Elbow PVC 1/2 inch

bh

99

Elbow PVC 3/4 inch

bh

100

Elbow PVC 1 inch

bh

101

Elbow PVC 2 inch

bh

102

Elbow PVC 3 inch

bh

103

Elbow PVC 4 inch

bh

104

Socket PVC 1/2 inch

bh

105

SocketPVC 3/4 inch

bh

106

Socket PVC 1 inch

bh

107

Socket PVC 2 inch

bh

108

Socket PVC 3 inch

bh

109

Socket PVC 4 inch

bh

110

Tee PVC 1/2 inch

bh

111

Tee PVC 3/4 inch

bh

112

Tee PVC 1 inch

bh

113

Tee PVC 2 inch

bh

114

Tee PVC 3 inch

bh

115

Tee PVC 4 inch

bh

116

Pipa GIV 1/2 inc

btg

117

Pipa GIV 3/4 inch

btg

118

Pipa GIV 1 inch

btg

119

Socket GIV 1/2 inch

bh

120

Socket GIV 3/4 inch

bh

121

Socket GIV 1 inch

bh

122

Elbow GIV 1/2 inch

bh

123

Elbow GIV 3/4 inch

bh

124

Elbow GIV 1 inch

bh

125

Tee GIV 1/2 inch

bh

126

Tee GIV 3/4 inch

bh

127

Tee GIV 1 inch

bh

128

Kunci Firo

bh

129

Kunci Yale

bh

130

Grendel Firo

bh

131

Grendel Yale

bh

132

Engsel Firo 4''

bh

133

Engsel Yale 4''

bh

134

Engsel Firo 3''

bh

135

Engsel Yale 3''

bh

136

Saklar Tunggal Broco

bh

137

Saklar Ganda Broco

bh

138

Stop Kontak Broco

bh

139

Fiting Lampu Bulat Broco

bh

140

Cable Listrik NYA 3 x 2.5

141

Cable TIC 3 x 35 + 1 N

142

Breaker Panel Fujitsu + 4 MCB Merlyn Geryn

set

143

Buis Beton 50 x100

bh

144

Buis Beton 30 x100

bh

145

Buis Beton 15 x 75

bh

146

Kansteen Standart lebar 50 cm

bh

147

Rumput Halus

m2

148

Pohon sejenis kembang kertas

bh

149

Pohon sejensi cempaka

bh

150

Pohon sejensi Cemara

bh

151

Pohon sejenis pangkas kuning

bh

152

Kusen Aluminium

153

Pipa Stainless Diameter 2 inch

btg

154

Pekerjaan Railing Besi Stainless

m2

HARGA UPAH
(Rp)
(4)
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
37,500.00
37,500.00
37,500.00
37,500.00

HARGA SATUAN
(Rp)
(4)
74,750.00
55,200.00
55,000.00
80,500.00
74,750.00
215,000.00
300.00
575.00
52,325.00
51,750.00
24,000.00
37,500.00
64,600.00
82,500.00
147,900.00
10,000.00
14,375.00
11,500.00
10,350.00
9,200.00

36,800.00
52,900.00
62,100.00
113,735.00
128,800.00
162,150.00
184,000.00
86,250.00
97,750.00
149,500.00
212,750.00
74,750.00
94,875.00
253,000.00
143,750.00
43,125.00
77,625.00
103,500.00
40,825.00
51,750.00
20,700.00
10,350.00
12,650.00
5,175.00
18,400.00
23,000.00
57,500.00
37,375.00
57,500.00
46,000.00
92,000.00
2,300,000.00
2,500,000.00
4,025,000.00
4,600,000.00
670,000.00
285,000.00
241,500.00
959,000.00
54,625.00
32,000.00
27,950.00
31,625.00
25,875.00
11,000.00
12,500.00
1,500.00
5,000.00
38,000.00
8,625.00

28,750.00
5,750.00
11,500.00
14,375.00
34,500.00
97,750.00
15,000.00
28,750.00
31,050.00
40,250.00
34,500.00
35,650.00
37,375.00
44,275.00
34,500.00
32,000.00
900.00
1,367,723.75
3,650,531.25
1,086,750.00
423,775.00
25,000.00
14,500.00
15,525.00
21,505.00
29,434.25
64,779.50
130,122.50
215,676.75
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
73,600.00
86,250.00
126,500.00

3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
304,750.00
126,500.00
28,750.00
17,250.00
40,250.00
23,000.00
28,750.00
17,250.00
15,000.00
17,500.00
15,000.00
20,000.00
2,875.00
56,500.00
201,250.00
80,000.00
45,000.00
25,000.00
18,000.00
15,000.00
17,250.00
75,000.00
125,000.00
15,000.00
280,000.00
759,000.00
634,800.00

III. TABEL ANALISA HARGA SATUAN


HARGA BAHAN

JUM HARGA

(Rp)
6

(Rp)
7

(Rp)
8

1
A

3
PEKERJAAN PERSIAPAN AWAL

1M2

Pek. Pembersihan awal lokasi


Pekerja
Kepala Tukang Kayu

0.02
0.001

37,500.00
65,000.00

Pasangan Bouwplank
Kayu Sembarang
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

0.003
0.15
0.02
0.001
0.022

2,300,000.00
11,500.00
55,000.00
65,000.00
37,500.00

1,100.00
65.00
825.00

10,615.00
6,900.00
1,725.00
1,100.00
65.00
825.00

0.75
0.01

37,500.00
65,000.00

28,775.00
28,125.00
650.00

28,775.00
28,125.00
650.00

0.25
0.003

37,500.00
65,000.00

9,570.00
9,375.00
195.00

9,570.00
9,375.00
195.00

1.2
0.3
0.01

55,000.00
37,500.00
65,000.00

1.1
0.3
0.01

55,200.00
37,500.00
65,000.00

0.25
0.01

37,500.00
65,000.00

1.1
0.3
0.01

55,200.00
37,500.00
65,000.00

1.1
0.3
0.8
0.05

80,500.00
55,200.00
37,500.00
65,000.00

1.1

80,500.00

M'

B
1

1M3

1M3

1M3

1M3

Pek. Galian tanah biasa


Tukang Gali
Kepala Tukang Kayu
Pek. Urugan tanah kembali
Pekerja
Kepala Tukang Kayu

Pek. Urugan tanah


Tanah Urug
Pekerja
Kepala Tukang Kayu

1M3

1M3

Pekerja
Kepala Tukang Batu

8,625.00
6,900.00
1,725.00

815.00
750.00
65.00

77,900.00
66,000.00
11,250.00
650.00

60,720.00
60,720.00

11,250.00
650.00

72,620.00
60,720.00
11,250.00
650.00

10,025.00
9,375.00
650.00

10,025.00
9,375.00
650.00

11,250.00
650.00

11,900.00

60,720.00
60,720.00

72,620.00
60,720.00
11,250.00
650.00

105,110.00
88,550.00
16,560.00

138,360.00
88,550.00
16,560.00
30,000.00
3,250.00

275,200.75
88,550.00

389,075.75
88,550.00

11,250.00
650.00

PEK. PASANGAN DAN PLESTERAN


1M3

Pek. Pasangan batu kosong


Batu Kali
Pasir Biasa

Pekerja
Kepala Tukang Batu
2

66,000.00
66,000.00

11,900.00

Pek. Urugan pasir


Pasir Biasa

11,900.00

Pek. Pemadatan dan perataan


Pekerja
Kepala Tukang Batu

815.00
750.00
65.00
1,990.00

Pek. Pasir Urug bawah Lantai


Pekerja
Kepala Tukang Kayu

PEK. TANAH DAN PASIR

Pasir Biasa

KOEF

HARGA UPAH

SAT

URAIAN

HARGA
SATUAN
(Rp)
5

No.

1M3

Pek. Pasangan Batu kali (1:4)


Batu Kali

33,250.00

30,000.00
3,250.00
113,875.00

No.

2.8
0.537
1.1
0.1
1.25

HARGA
SATUAN
(Rp)
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

650
3.2936
0.333
1.5
0.15
4

575.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas Bata merah (1:4)


Batu Bata Standart
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

500
1.6472
0.417
1.1
0.05
2

300.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Plesteran (1:3)


Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

0.1304
0.0194
0.066667
0.01
0.1

52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Plesteran Artistik


Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

0.35
0.25
0.5
0.045
0.5

52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Waterprofing
Water Proof Aqua Proof
Tukang Cat
Kepala Tukang Cat
Pekerja

1.1
0.225
0.0225
0.15

38,000.00
55,000.00
65,000.00
37,500.00

3.632
0.54
0.91
4
0.4
0.05

52,325.00
74,750.00
215,000.00
37,500.00
55,000.00
65,000.00

URAIAN

SAT

Semen Tiga Roda 50 kg


Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1M3

Pek. Pas Bata Artistik (1:2)


Batu Bata Mesin Press (amplas halus)
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

10

12

1M3

1M2

1M2

1M2

KOEF

HARGA UPAH
(Rp)

HARGA BAHAN
(Rp)
146,510.00
40,140.75

(Rp)
146,510.00
40,140.75
60,500.00
6,500.00
46,875.00

570,979.37
373,750.00
172,337.62
24,891.75

813,229.37
373,750.00
172,337.62
24,891.75
82,500.00
9,750.00
150,000.00

267,360.49
150,000.00
86,189.74
31,170.75

406,110.49
150,000.00
86,189.74
31,170.75
60,500.00
3,250.00
75,000.00

8,273.33
6,823.18
1,450.15

16,340.00
6,823.18
1,450.15
3,666.67
650.00
3,750.00

37,001.25
18,313.75
18,687.50

86,176.25
18,313.75
18,687.50
27,500.00
2,925.00
18,750.00

54,175.00
41,800.00
12,375.00

61,262.50
41,800.00
12,375.00
1,462.50
5,625.00

426,059.40
190,044.40
40,365.00
195,650.00

601,309.40
190,044.40
40,365.00
195,650.00
150,000.00
22,000.00
3,250.00

60,500.00
6,500.00
46,875.00

242,250.00

82,500.00
9,750.00
150,000.00

138,750.00

60,500.00
3,250.00
75,000.00

8,066.67

3,666.67
650.00
3,750.00

49,175.00

27,500.00
2,925.00
18,750.00

7,087.50

JUM HARGA

1,462.50
5,625.00

PEK. BETON

1M3

Pek. Beton rabat (1:3:5)


Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu

175,250.00

150,000.00
22,000.00
3,250.00

No.

SAT

1 M3

13

1 M3

1 M3

HARGA
SATUAN
(Rp)
Pek. Sloof Beton (Ukuran Standart 15/20 ; 15/25 ; 15/30 dan 20/30)
M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
6.512
52,325.00
Pasir Pasang
0.54
74,750.00
Kerikil Beton
0.75
215,000.00
Pekerja
4
37,500.00
Tukang Batu
0.75
55,000.00
Kepala Tukang Batu
0.05
65,000.00
Kg Pekerjaan besi
1.5
Besi Beton semua ukuran per kg
110
10,000.00
Kawat Beton
2
9,200.00
Tukang Besi
4.25
55,000.00
Kepala Tukang Besi
0.05
65,000.00
Pekerja
4
37,500.00
Pekerjaan Begisting
1
Kayu Bekisting per m3
0.125
2,500,000.00
Paku Kayu / Tripleks 5 - 12 cm
3.5
11,500.00
Tukang Kayu
3.5
55,000.00
Kepala Tukang Kayu
0.5
65,000.00
Pekerja
1.5
37,500.00
Tukang Bongkar Begesting
0.25
37,500.00
URAIAN

KOEF

HARGA UPAH

HARGA BAHAN

(Rp)
872,125.00

(Rp)
2,013,505.40
340,740.40
40,365.00
161,250.00

150,000.00
41,250.00
3,250.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00
312,500.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

Pek. Balok (Ukuran Standart 15/20 ; 15/25 ; 15/30 ; 20/25 ; 20/30)


M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
6.512
52,325.00
Pasir Pasang
0.54
74,750.00
Kerikil Beton
0.75
215,000.00
Pekerja
4.5
37,500.00
Tukang Batu
0.75
55,000.00
Kepala Tukang Batu
0.05
65,000.00
Kg Pekerjaan besi
1.5
Besi Beton semua ukuran per kg
110
10,000.00
Kawat Beton
2
9,200.00
Tukang Besi
4.25
55,000.00
Kepala Tukang Besi
0.05
65,000.00
Pekerja
4
37,500.00
Pekerjaan Begisting
1
Kayu Bekisting per m3
0.15
2,500,000.00
Paku Kayu / Tripleks 5 - 12 cm
3.5
11,500.00
Tukang Kayu
3.5
55,000.00
Kepala Tukang Kayu
0.5
65,000.00
Pekerja
1.5
37,500.00
Tukang Bongkar Begesting
0.25
37,500.00

890,875.00

Pek. Kolom Beton (Ukuran Standart 15/25 ; 15 / 30 ; 20/20 ; 25/25)


M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
6.512
52,325.00
Pasir Pasang
0.54
74,750.00
Kerikil Beton
0.75
215,000.00
Pekerja
4.5
37,500.00
Tukang Batu
0.75
55,000.00
Kepala Tukang Batu
0.05
65,000.00
Kg Pekerjaan besi
1.5
Besi Beton semua ukuran per kg
110
10,000.00
Kawat Beton
2
9,200.00
Tukang Besi
4
55,000.00
Kepala Tukang Besi
0.05
65,000.00

875,250.00

2,076,005.40
340,740.40
40,365.00
161,250.00

168,750.00
41,250.00
3,250.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

2,076,005.40
340,740.40
40,365.00
161,250.00

168,750.00
41,250.00
3,250.00
1,100,000.00
18,400.00
220,000.00
3,250.00

JUM HARGA
(Rp)
2,885,630.40
794,540.00
340,740.40
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00
2,141,500.00
312,500.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

2,966,880.40
794,540.00
340,740.40
40,365.00
161,250.00
168,750.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
233,750.00
3,250.00
150,000.00
2,141,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
9,375.00

2,951,255.40
794,540.00
340,740.40
40,365.00
161,250.00
168,750.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
220,000.00
3,250.00

No.

18

20

21

SAT

1 M3

1 M3

1 M3

URAIAN

KOEF

Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Tukang Bongkar Begesting

4
1
0.15
3.5
3.5
0.5
1.5
0.2

Pek. Pelat Lantai


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Tukang Bongkar Begesting

1
6.512
0.54
0.75
4.5
0.75
0.05
1.5
110
2
4.5
0.05
4
1
0.25
3.5
3.5
0.5
2
0.2

Pek. Pelat Tangga


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Tukang Bongkar Begesting

1
6.512
0.54
0.75
4
0.75
0.05
1.5
110
2
4
0.05
3
1
0.2
3.5
3.5
0.5
2
0.2

Pek. Pelat Pondasi Telapak


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg

1
6.512

HARGA
SATUAN
(Rp)
37,500.00
2,500,000.00
11,500.00
55,000.00
65,000.00
37,500.00
37,500.00

HARGA UPAH
(Rp)
150,000.00

10,000.00
9,200.00
55,000.00
65,000.00
37,500.00
2,500,000.00
11,500.00
55,000.00
65,000.00
37,500.00
37,500.00

192,500.00
32,500.00
56,250.00
7,500.00

10,000.00
9,200.00
55,000.00
65,000.00
37,500.00
2,500,000.00
11,500.00
55,000.00
65,000.00
37,500.00
37,500.00

168,750.00
41,250.00
3,250.00
1,100,000.00
18,400.00
247,500.00
3,250.00
150,000.00
625,000.00
40,250.00
192,500.00
32,500.00
75,000.00
7,500.00

2,201,005.40
340,740.40
40,365.00
161,250.00

150,000.00
41,250.00
3,250.00
1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
500,000.00
40,250.00
192,500.00
32,500.00
75,000.00
7,500.00

819,000.00
52,325.00

2,326,005.40
340,740.40
40,365.00
161,250.00

837,750.00
52,325.00
74,750.00
215,000.00
37,500.00
55,000.00
65,000.00

(Rp)

375,000.00
40,250.00

921,500.00
52,325.00
74,750.00
215,000.00
37,500.00
55,000.00
65,000.00

HARGA BAHAN

2,076,005.40
340,740.40

JUM HARGA
(Rp)
150,000.00
2,141,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
7,500.00

3,247,505.40
794,540.00
340,740.40
40,365.00
161,250.00
168,750.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
247,500.00
3,250.00
150,000.00
2,141,500.00
625,000.00
40,250.00
192,500.00
32,500.00
75,000.00
7,500.00

3,038,755.40
794,540.00
340,740.40
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
2,141,500.00
500,000.00
40,250.00
192,500.00
32,500.00
75,000.00
7,500.00

2,895,005.40
794,540.00
340,740.40

No.

SAT

URAIAN
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Tukang Bongkar Begesting

23

24

1 M3

1 M3

KOEF
0.54
0.75
4
0.75
0.05
1.5
110
2
4
0.05
3
1
0.15
3.5
3.5
0.5
1.5
0.2

HARGA
SATUAN
(Rp)
74,750.00
215,000.00
37,500.00
55,000.00
65,000.00
10,000.00
9,200.00
55,000.00
65,000.00
37,500.00
2,500,000.00
11,500.00
55,000.00
65,000.00
37,500.00
37,500.00

HARGA UPAH
(Rp)

1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
7,500.00

674,000.00

Pek. Listplank Beton dan Kanopi


M3 Pekerjaan Beton
Semen Tiga Roda 50 kg
Pasir Pasang
Kerikil Beton
Pekerja
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton semua ukuran per kg
Kawat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Bekisting per m3

863,250.00
52,325.00
74,750.00
215,000.00
37,500.00
55,000.00
65,000.00
10,000.00
9,200.00
55,000.00
65,000.00
37,500.00
2,500,000.00

(Rp)
40,365.00
161,250.00

150,000.00
41,250.00
3,250.00

Pek. Cor Beton Bertulang Menengah (Saluran dan Bak Kontrol)


M3 Pekerjaan Beton
1
Semen Tiga Roda 50 kg
6
52,325.00
Pasir Pasang
0.55
74,750.00
Kerikil Beton
0.75
215,000.00
Pekerja
3.5
37,500.00
Tukang Batu
0.5
55,000.00
Kepala Tukang Batu
0.05
65,000.00
Kg Pekerjaan besi
2.5
Besi Beton semua ukuran per kg
100
10,000.00
Kawat Beton
1.5
9,200.00
Tukang Besi
3.5
55,000.00
Kepala Tukang Besi
0.75
65,000.00
Pekerja
3
37,500.00
Pekerjaan Begisting
1
Kayu Bekisting per m3
0.1
2,500,000.00
Paku Kayu / Tripleks 5 - 12 cm
2
11,500.00
Tukang Kayu
1.5
55,000.00
Kepala Tukang Kayu
0.25
65,000.00
Pekerja
0.75
37,500.00
Mandor
0.05
65,000.00
Tukang Bongkar Begesting
0.75
37,500.00

1
6.512
0.54
0.75
4
0.75
0.05
1.5
110
2
3.5
0.05
3
1
0.2

HARGA BAHAN

1,803,112.50
313,950.00
41,112.50
161,250.00

131,250.00
27,500.00
3,250.00
1,000,000.00
13,800.00
192,500.00
48,750.00
112,500.00
250,000.00
23,000.00
82,500.00
16,250.00
28,125.00
3,250.00
28,125.00
2,195,255.40
340,740.40
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,100,000.00
18,400.00
192,500.00
3,250.00
112,500.00
500,000.00

JUM HARGA
(Rp)
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
220,000.00
3,250.00
112,500.00
2,141,500.00
375,000.00
40,250.00
192,500.00
32,500.00
56,250.00
7,500.00

2,477,112.50
794,540.00
313,950.00
41,112.50
161,250.00
131,250.00
27,500.00
3,250.00
1,226,500.00
1,000,000.00
13,800.00
192,500.00
48,750.00
112,500.00
2,141,500.00
250,000.00
23,000.00
82,500.00
16,250.00
28,125.00
3,250.00
28,125.00
3,058,505.40
794,540.00
340,740.40
40,365.00
161,250.00
150,000.00
41,250.00
3,250.00
1,226,500.00
1,100,000.00
18,400.00
192,500.00
3,250.00
112,500.00
2,141,500.00
500,000.00

No.

3
3
0.5
2
0.2
2

HARGA
SATUAN
(Rp)
11,500.00
55,000.00
65,000.00
37,500.00
65,000.00
37,500.00

Pek. Pas. Atap Genteng Pres


Genteng Keramik Kanmuri Natural
Tukang Batu
Kepala Tukang Batu
Pekerja

23
0.15
0.015
0.15

8,625.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Bubungan Genteng


Rabung Genteng Standart
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

4
0.338
0.032
0.2
0.02
0.4

15,000.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Usuk


Kayu meranti per m 3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

0.0105
0.1
0.0571
0.0057
0.0571

4,025,000.00
11,500.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Reng


Kayu meranti per m 3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

0.006
0.15
0.0428
0.0042
0.0428

4,025,000.00
11,500.00
55,000.00
65,000.00
37,500.00

1.1
24
2.4
8

4,025,000.00
55,000.00
65,000.00
37,500.00

0.025
0.07
0.5
0.08
0.2

4,025,000.00
11,500.00
55,000.00
65,000.00
37,500.00

1.1
20
2.5
10

4,600,000.00
55,000.00
65,000.00
37,500.00

URAIAN

SAT

Paku Kayu / Tripleks 5 - 12 cm


Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
E
1

HARGA UPAH
(Rp)

HARGA BAHAN

JUM HARGA

(Rp)
34,500.00

(Rp)
34,500.00
165,000.00
32,500.00
75,000.00
13,000.00
75,000.00

198,375.00
198,375.00

213,225.00
198,375.00
8,250.00
975.00
5,625.00

80,077.85
60,000.00
17,685.85
2,392.00

107,377.85
60,000.00
17,685.85
2,392.00
11,000.00
1,300.00
15,000.00

43,412.50
42,262.50
1,150.00

49,064.75
42,262.50
1,150.00
3,140.50
370.50
2,141.25

25,875.00
24,150.00
1,725.00

30,107.00
24,150.00
1,725.00
2,354.00
273.00
1,605.00

4,427,500.00
4,427,500.00

6,203,500.00
4,427,500.00
1,320,000.00
156,000.00
300,000.00

101,430.00
100,625.00
805.00

141,630.00
100,625.00
805.00
27,500.00
5,200.00
7,500.00

5,060,000.00
5,060,000.00

6,077,500.00
5,060,000.00
1,100,000.00
162,500.00
375,000.00

165,000.00
32,500.00
75,000.00
13,000.00
75,000.00

PEK. ATAP / KAP


1 M2

1 M'

1 M2

1 M2

1 M3

1 M2

Pek. Kuda-Kuda
Kayu meranti per m 3
Tukang Kayu
Kepala Tukang Kayu
Pekerja

Pek. Papan Ram (ListPlank)


Kayu meranti per m 3
Paku Kayu / Tripleks 5 - 12 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

14,850.00
8,250.00
975.00
5,625.00

27,300.00

11,000.00
1,300.00
15,000.00
5,652.25

3,140.50
370.50
2,141.25
4,232.00

2,354.00
273.00
1,605.00
1,776,000.00
1,320,000.00
156,000.00
300,000.00

40,200.00

27,500.00
5,200.00
7,500.00

PEK. KUSEN , DAUN PINTU DAN JENDELA

F
1

KOEF

1 M3

Pek. Kusen Biasa


Kayu Kamper per m3
Tukang Kayu
Kepala Tukang Kayu
Pekerja

1,637,500.00
1,100,000.00
162,500.00
375,000.00

No.

SAT

1 M2

1 M2

1 M1

1 M2

1 M2

G
1

URAIAN

KOEF

HARGA
SATUAN
(Rp)

Pek. Daun Pintu/Jendela Kaca


Kayu Kamper per m3
Kaca Bening Tebal 5 mm
Paku Kayu / Tripleks 1- 4 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

0.04
0.9
0.1
2
0.35
1.1

4,600,000.00
97,750.00
14,375.00
55,000.00
65,000.00
37,500.00

Pek. Jendela Kaca Mati


Kaca Bening Tebal 5 mm
Paku Kayu / Tripleks 1- 4 cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja

1.1
0.1
0.75
0.1
0.45

97,750.00
14,375.00
55,000.00
65,000.00
37,500.00

2
0.1
0.3
1.1
3
0.3

3,000.00
55,000.00
37,500.00
46,666.67
1,500.00
37,375.00

Pek. Pasang Kaca tebal 5mm Kusen Aluminium


Kaca Bening Tebal 5 mm
Tukang Kaca
Kusen Aluminium 50 x 100 mm
Tukang Besi
Pekerja

1.1
0.5
1.1
0.5
0.25

97,750.00
55,000.00
140,000.00
55,000.00
37,500.00

Pek. Daun Pintu/Jendela Panel


Kayu meranti per m 3
Tukang Kayu
Kepala Tukang Kayu
Pekerja

0.06
2.5
0.36
1

4,025,000.00
55,000.00
65,000.00
37,500.00

Pek. Pasang Kusen Aluminium


Fisher
Tukang Besi
Pekerja
Kusen Aluminium 50 x 100 mm
Paku Rivet
Kaso 4 x 6 kamper

HARGA UPAH

HARGA BAHAN

JUM HARGA

(Rp)

(Rp)

(Rp)

174,000.00

273,412.50
184,000.00
87,975.00
1,437.50

447,412.50
184,000.00
87,975.00
1,437.50
110,000.00
22,750.00
41,250.00

108,962.50
107,525.00
1,437.50

173,587.50
107,525.00
1,437.50
41,250.00
6,500.00
16,875.00

61,833.33
6,000.00

89,795.83
6,000.00
5,500.00
11,250.00
51,333.33
4,500.00
11,212.50

110,000.00
22,750.00
41,250.00

64,625.00

41,250.00
6,500.00
16,875.00
27,962.50
5,500.00
11,250.00
51,333.33
4,500.00
11,212.50

64,375.00

261,525.00
107,525.00

27,500.00
154,000.00
27,500.00
9,375.00
198,400.00

325,900.00
107,525.00
27,500.00
154,000.00
27,500.00
9,375.00

241,500.00
241,500.00

439,900.00
241,500.00
137,500.00
23,400.00
37,500.00

114,712.50
51,750.00
60,375.00
287.50
2,300.00

145,762.50
51,750.00
60,375.00
287.50
2,300.00
11,000.00
1,300.00
18,750.00

21,275.00
20,700.00
575.00

26,255.00
20,700.00
575.00
3,750.00
1,100.00
130.00

137,500.00
23,400.00
37,500.00

PEK. PLAFOND DAN LANTAI


1 M2

1 M'

Pek. Pas. Plafond Gypsum


Papan Gypsum Merk Jayaboard 120 x 240 tebal 9 1
mm
Kayu meranti per m 3
0.015
Paku Kayu / Tripleks 1- 4 cm
0.02
Paku Kayu / Tripleks 5 - 12 cm
0.2
Tukang Kayu
0.2
Kepala Tukang Kayu
0.02
Pekerja
0.5
Pek. List Plafoon Gypsum
List Gypsum
Paku Kayu / Tripleks 1- 4 cm
Pekerja
Tukang Kayu
Kepala Tukang Kayu

31,050.00
51,750.00
4,025,000.00
14,375.00
11,500.00
55,000.00
65,000.00
37,500.00

11,000.00
1,300.00
18,750.00
4,980.00

1.0000
0.0400
0.1
0.02
0.002

20,700.00
14,375.00
37,500.00
55,000.00
65,000.00

3,750.00
1,100.00
130.00

No.

SAT

1 M2

1 M2

1 M2

1 M2

1 M2

1 M2

H
1

URAIAN

KOEF

HARGA
SATUAN
(Rp)

Pek. Pas. Kramik 40/40


Keramik Lantai 40 x 40 Roman
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1
0.25
0.02
0.2
0.01
0.3

37,375.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Kramik 30/30


Keramik Lantai 30 x 30 Roman
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1
0.25
0.02
0.2
0.01
0.3

35,650.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Kramik 20/20


Keramik Dinding 20 x 20 Roman
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1
0.25
0.02
0.2
0.01
0.3

34,500.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Kramik dinding 20/25


Keramika Dinding 20 x 25 Roman
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1
0.25
0.02
0.25
0.01
0.2

34,500.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Batu Alam Penutup Dinding Artistik


Batu Alam Dinding Artistik
Semen Tiga Roda 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja

1
0.25
0.02
0.2
0.01
0.25

32,000.00
52,325.00
74,750.00
55,000.00
65,000.00
37,500.00

Pek. Pas. Paving Block


Paving Block Kelas I Type 4 persegi uk.10x20x8 cm 50
Tukang Batu
0.15
Kepala Tukang Batu
0.015
Pekerja
0.15

900.00
55,000.00
65,000.00
37,500.00

HARGA UPAH

HARGA BAHAN

(Rp)
22,900.00

(Rp)
51,951.25
37,375.00
13,081.25
1,495.00

(Rp)
74,851.25
37,375.00
13,081.25
1,495.00
11,000.00
650.00
11,250.00

50,226.25
35,650.00
13,081.25
1,495.00

73,126.25
35,650.00
13,081.25
1,495.00
11,000.00
650.00
11,250.00

49,076.25
34,500.00
13,081.25
1,495.00

71,976.25
34,500.00
13,081.25
1,495.00
11,000.00
650.00
11,250.00

49,076.25
34,500.00
13,081.25
1,495.00

70,976.25
34,500.00
13,081.25
1,495.00
13,750.00
650.00
7,500.00

46,576.25
32,000.00
13,081.25
1,495.00

67,601.25
32,000.00
13,081.25
1,495.00
11,000.00
650.00
9,375.00

45,000.00
45,000.00

59,850.00
45,000.00
8,250.00
975.00
5,625.00

251,650.00

257,862.50

247,900.00
2,750.00
750.00
250.00

247,900.00
2,750.00
750.00
250.00
2,750.00

11,000.00
650.00
11,250.00
22,900.00

11,000.00
650.00
11,250.00

22,900.00

11,000.00
650.00
11,250.00

21,900.00

13,750.00
650.00
7,500.00

21,025.00

11,000.00
650.00
9,375.00

14,850.00
8,250.00
975.00
5,625.00

JUM HARGA

PEK. PENGECATAN DAN POLITURAN


1 M2

Pek. Mengecat Tembok (interior) , 1x Plamir2x Mengecat


Cat Tembok Interior Dulux 25 kg
Plamur
Amplas
Kuas
Tukang Cat

6,212.50
0.37
0.25
0.50
0.05
0.05

670,000.00
11,000.00
1,500.00
5,000.00
55,000.00

2,750.00

No.

URAIAN

SAT

Kepala Tukang Cat


Pekerja
1

1 M2

1 M2

J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Pek. Mengecat Tembok (exterior) , 1x


Plamir-2x Mengecat
Cat Tembok Eksterior Dulux 25 kg
Amplas
Kuas
Tukang Cat
Kepala Tukang Cat
Pekerja

Pek. Mengecat Kayu, 1x Cat Dasar,1x


Plamur, 2x Cat Halus
Cat Kayu Dulux 1 kg
Plamur Kayu
Amplas
Ultran Politur
Kuas
Tukang Cat
Kepala Tukang Cat
Pekerja

KOEF
0.01
0.075

HARGA
SATUAN
(Rp)
65,000.00
37,500.00

HARGA UPAH
(Rp)
650.00
2,812.50
2%
6,212.50

0.37
0.50
0.05
0.05
0.01
0.075

670,000.00
1,500.00
5,000.00
55,000.00
65,000.00
37,500.00

54,625.00
12,500.00
1,500.00
31,625.00
5,000.00
55,000.00
65,000.00
37,500.00

JUM HARGA

(Rp)

(Rp)
650.00
2,812.50

98%
248,900.00

255,112.50

247,900.00
750.00
250.00

247,900.00
750.00
250.00
2,750.00
650.00
2,812.50

23,929.25

33,829.25

15,513.50
3,125.00
750.00
4,490.75
50.00

15,513.50
3,125.00
750.00
4,490.75
50.00
5,500.00
650.00
3,750.00

75,000.00
80,000.00
45,000.00
25,000.00
18,000.00
20,000.00
15,000.00
17,500.00
15,000.00
250,000.00
4,000.00
56,500.00
10,796.58
4,600.00
4,600.00
21,687.08
5,750.00
5,750.00
10,000.00
1,086,750.00
423,775.00
25,000.00
14,500.00
14,375.00
5,000.00
5,000.00
7,000.00
225,000.00
450,000.00
11,500.00
17,250.00

97,000.00
95,000.00
57,000.00
35,000.00
25,500.00
40,000.00
35,000.00
37,500.00
35,000.00
325,000.00
5,500.00
71,500.00
13,796.58
6,600.00
6,600.00
25,187.08
7,750.00
7,750.00
12,000.00
1,166,750.00
473,775.00
37,000.00
19,500.00
17,375.00
7,000.00
7,000.00
9,000.00
270,000.00
530,000.00
7,500.00
50,000.00
15,500.00
20,250.00

2,750.00
650.00
2,812.50

9,900.00
0.284
0.25
0.5
0.142
0.01
0.1
0.01
0.1

HARGA BAHAN

5,500.00
650.00
3,750.00

PEK. BORONGAN
ls
m
m
m
m
titik
titik
titik
titik
titik
m
m
m
bh
bh
m
bh
bh
bh
bh
bh
bh
bh
m
bh
bh
bh
set
bh
m3
ls
m2
m2

Pemasangan Rambu Pengaman


Pas. Buis Beton 50 x 100
Pas. Buis Beton 30 x 100
Pas. Buis Beton 10 x 75 cm
Pas. Kansteen Jalan
Pas. Instalasi Titik Lampu
Pas. Instalasi Stop Kontak
Pas. Saklar Ganda
Pas. Saklar Tunggal
Pas. MCB Box Breaker
Pas. Jaringan Kabel
Pas, Jaringan Kabel Tegangan Rendah
Pas. Pipa PVC 2"
Pas. Tee Pipa PVC 2"
Pas. Elbow Pipa PVC 2"
Pas. Pipa PVC 3"
Pas. Tee Pipa PVC 3"
Pas. Elbow Pipa PVC 3"
Pas. Reducer Pipa PVC 2 - 3"
Pas. Kloset Warna Duduk KIA
Pas. Shower Standart KIA
Pas. Floor Drain
Pas. Keran Air
Pas. Pipa Air Bersih 3/4"
Pas. Elbow Pipa Air Bersih 3/4"
Pas. Sokcket Pipa Air Bersih 3/4"
Pas. Tee Y Pipa Air Bersih 3/4"
Pas. Wastafel Cuci Stainless
Pas Wastafel Putih KIA ukuran 50 x 35 cm
Pembentuhan lahan landscaping
Pemangkasan dan perapihan pohon
Penanaman Rumput
Penanaman Kembang Kertas

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

22,000.00
15,000.00
12,000.00
10,000.00
7,500.00
20,000.00
20,000.00
20,000.00
20,000.00
75,000.00
1,500.00
15,000.00
3,000.00
2,000.00
2,000.00
3,500.00
2,000.00
2,000.00
2,000.00
80,000.00
50,000.00
12,000.00
5,000.00
3,000.00
2,000.00
2,000.00
2,000.00
45,000.00
80,000.00
7,500.00
50,000.00
4,000.00
3,000.00

No.

SAT

34
35
36
37
38
39
40

m2
m
m
titik
m
m2
m

URAIAN
Penanaman Pohon type Palem
Penanaman Cemara
Penanaman Pangkas Kuning
Pek. Penyambungan Listrik
Pek. Penyambungan Air
Pekerjaan pemasangan railing besi
Pekerjaan Pipa stainless

HARGA
SATUAN
(Rp)

KOEF
1
1
1
1
1
1
1

HARGA UPAH

HARGA BAHAN

(Rp)
20,000.00
20,000.00
1,500.00
250,000.00
150,000.00
42,500.00
12,000.00

(Rp)
75,000.00
100,000.00
8,000.00

634,800.00
86,250.00

JUM HARGA
(Rp)
95,000.00
120,000.00
9,500.00
250,000.00
150,000.00
677,300.00
98,250.00

Vous aimerez peut-être aussi