G O V E R N M E N T OF K E R A L A
PWD BUILDINGS SOUTH CIRCLE, THIRUVANANTHAPURAM
TENDER SCHEDULE Name of Work:- Labour Department - Construction of Labour Complex, Thiruvananthapuram - Phase II (Excluding lift portion) - Revised SOR 2010 sl. No Quantity Description of Work APPENDIX - A : BUILDING PROPER 1 15000 dm3 Chipping and removing portions 10 dm3 of existing R.C.C work carefully without damaging the remaining structure etc. complete 35500 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for column including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 4th floor 35500 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for column including cost and conveyance of all materials labour charges, all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 5TH FLOOR 35500 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for column including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 6TH FLOOR 37.36 Rupees Thirty Seven & Paise Thirty Six Only 56040 Unit Rate (In Rupees) in figures in words Amount (In Rs.)
2a
132.03 Rupees One Hundred Thirty Two & Paise Three Only
468707
133.54 Rupees One Hundred Thirty Three & Paise Fifty Four Only
474067
135.05 Rupees One Hundred Thirty Five & Paise Five Only
479428
Contractor
Superintending Engineer
Page 2
10000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for column including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for7thfoor 53000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for beams including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 4th floor 53000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stonefor beams including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 5th floor 53000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone for beams including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for6th floor
136.56 Rupees One Hundred Thirty Six & Paise Fifty Six Only
136560
3a
121.47 Rupees One Hundred Twenty One & Paise Forty Seven Only
643791
122.98 Rupees One Hundred Twenty Two & Paise Ninty Eight Only
651794
124.49 Rupees One Hundred Twenty Four & Paise Forty Nine Only
659797
Contractor
Superintending Engineer
Page 3
4000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stonefor beams including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for 7th floor 9000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for lintels and sunshade of4th floor 9000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for lintels and sunshade of 5th floor 9000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for lintels and sunshade of 6th floor
50400
4a
121.47 Rupees One Hundred Twenty One & Paise Forty Seven Only
109323
122.98 Rupees One Hundred Twenty Two & Paise Ninty Eight Only
110682
124.49 Rupees One Hundred Twenty Four & Paise Forty Nine Only
112041
Contractor
Superintending Engineer
Page 4
2000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for lintels and sunshade of7th floor 5000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for slopped/ vertical sunshade of 4th floor 5000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement forslopped/ vertical sunshade of5th floor 5000 dm3 Vibrated Cement Concrete M 20 10 dm3 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for slopped/ vertical sunshade of6th floor
25200
5a
131.49 Rupees One Hundred Thirty One & Paise Forty Nine Only
65745
One Thirty
66500
134.51 Rupees One Hundred Thirty Four & Paise Fifty One Only
67255
Contractor
Superintending Engineer
Page 5
6a
92500 dm3 Vibrated Cement Concrete M 20 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for roof slab of 4th floor 92500 dm3 Vibrated Cement Concrete M 20 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for roof slab of 5th floor 92500 dm3 Vibrated Cement Concrete M 20 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for roof slab of 6th floor 13000 dm3 Vibrated Cement Concrete M 20 using 20 mm nominal size hard granite broken stone including cost and conveyance of all materials labour charges , all formwork, watering curing etc complete but excluding cost and labour charges for reinforcement for roof slab of 7th floor 670 Qtl Providing reinforcement for RCC work bent tied and placed in position using TMT Steel including cost and conveyance of all materials labour charges etc complete.
10 dm3
113.36 Rupees One Hundred Thirteen & Paise Thirty Six Only
1048580
10 dm3
114.87 Rupees One Hundred Fourteen & Paise Eighty Seven Only
1062548
10 dm3
116.38 Rupees One Hundred Sixteen & Paise Thirty Eight Only
1076515
10 dm3
117.89 Rupees One Hundred Seventeen & Paise Eighty Nine Only
153257
1 Qtl
4613620
Contractor
Superintending Engineer
Page 6
8a
144 m3
Solid block masonry in cement mortar 1:6 using concrete solid blocks of size 40 X 20 X 20 cm including cost conveyance of all materials and labour charges scaffolding charges watering curing etc complete for 4th floor
1 m3
470880
144 m3
Solid block masonry in cement mortar 1:6 using concrete solid blocks of size 40 X 20 X 20 cm including cost conveyance of all materials and labour charges scaffolding charges watering curing etc complete for5th floor
1 m3
481104
144 m3
Solid block masonry in cement mortar 1:6 using concrete solid blocks of size 40 X 20 X 20 cm including cost conveyance of all materials and labour charges scaffolding charges watering curing etc complete for 6th floor
1 m3
491184
15 m3
Solid block masonry in cement mortar 1:6 using concrete solid blocks of size 40 X 20 X 20 cm including cost conveyance of all materials and labour charges scaffolding charges watering curing etc complete for7th floor
1 m3
52230
2964 dm3 Anjily wood planed and framed 10 dm3 work for doors and windows including cost conveyance of all materials and labour charges for all floors.
195920
Contractor
Superintending Engineer
Page 7
10
14815 dm2 Supplying and fixing Anjilywood 10 dm2 fully panelled shutters in two level to suit the door frames already fixed using Anjily wood frames of size100x35mm and panels of 12mm thick Baison panels of both side laminated including labour charges, cost and conveyance of all materials labour charges for fixing all fittings but exclusive of cost of fittings. 154 m2 Supplying and fixing Al: sliding windows of size 1.5x1.65m using Al: extruded section 4097 (three track) for bottom guide track,4096 for side and top and sliding shutter fabricated with 4148 and fitted with 4mm thick plain glass including all charges cost and conveyance of all materials and providing bearing wheels to the shutters locking arrangements etc complete. 1 m2
Three Twenty
474080
11
425348
12
91 m2
Supplying and fixing Al: sliding windows of size 1.1x1.65m using Al: extruded section 4095 for bottom guide track and 4096 for side and top and sliding shutter fabricated with4148 for vertical sides and 39x28x1.5mm (9777) for top and interlock section of 39x8.94x1.5mm (9778) for bottom and fitted with 4mm thick plain glass including all charges cost and conveyance of all materials and providing bearing wheels to the shutters locking arrangements etc complete.
1 m2
Three Twelve
274092
Contractor
Superintending Engineer
Page 8
13
250 m2
14
25 m2
Supplying and fixing APP modifed polyester reinforced bitumious 3mm thick over cement plastered surface etc as per specifications Supplying and fixing PVC Door made of approved std: frame of size 35x40x3.2mm to suit the door opening with shutters of 25mm thick to suit the door frame including cost and conveyance of all materials labour charges for fixing in position and fixing all fittings but excluding cost of fittings etc complete. charges etc complete.
1 m2
155750
1 m2
80425
15
5500 m2
16
2500 m2
Plastering with Cement mortar 10 m2 1:4,12mm thick one coat floated hard and trowelled smooth for inside and out side walls including all cost and conveyance of all materials and labour charges, watering curing etc complete. Plastering with Cement mortar 10 m2 1:3,6mm thick one coat floated hard and trowelled smooth the under sideof RCC slab including all cost and conveyance of all materials and labour charges, watering curing etc complete. Plastering with Cement mortar 10 m2 1:3,9mm thick two coats to the top of RCC slab including all cost and conveyance of all materials and labour charges, watering curing etc complete.
939950
319500
17
1000 m2
181700
Contractor
Superintending Engineer
Page 9
18
400 m2
Painting with Sy: enamal paint of 10 m2 suitable colour using approved quality paint, as directed by the Deptl: Officers at site, 2coats and including a priming coat to new wood work after rubbing and cleaning the surface using sand paper including all cost and conveyance of all materials and labour charges etc complete.
Eight Eighty
35320
19
8000 m2
White cement washing one coat 10 m2 to the newly plastered surface after cleaning including cost and conveyance of all materials and labour charges etc complete.
79200
20
4500 m2
21
3000 m2
22
375 m2
Painting with Ready mixed 10 m2 plastic emulsion paint two coats to the walls after cleaning the surface. Painting with Exterior or 10 m2 Emulsion paint (Apex or Excel) two coats to the walls after cleaning the surface. Dadoing walls with best glazed 1 m2 coloured tiles 7.5mm thick using cement mortar 1:3,12mm thick and pointing with coloured cement including cost and conveyance of all materials, labour charges etc complete. Paving with coloured ceramic flooring tiles 7.5mm thick using cement mortar 1:3,12mm thick and pointing with coloured cement including cost and conveyance of all materials, labour charges etc complete. 1 m2
296550
One Twenty
307200
438375
23
175 m2
123725
Contractor
Superintending Engineer
Page 10
24
2500 m2
25
3 Qtl
Flooring with best Virtified Tiles(60x60 cm ) of good quality in cement mortar 1:3, 12 mm thick and pointing with coloured cement to mach the tile etc.complete. Supplying, and fixing iron hold fast with screws using 300 x 63x 5 mm M S flat on required shape and fitted to doors with necessary screws including cost and conveyance of all materials labour charges etc complete .
1 m2
One Eighty
2702500
1 Qtl
22434
26a
150mm 10 Nos
375 Nos Supplying, and fixing 200mm Al: 10 Nos tower bolts. 65 Nos Supplying, and fixing 6lever 1 Nos mortise lock with handle and duplicate key. 177 Nos Supplying and fixing 100 mm 10 Nos butt hinges 60 Nos Supplying and fixing aluminium 10 Nos hookes and eyes 150 mm long 225 m Supplying and fabricating and fixing stainless steel handrail of height 1 m using the top rail with 50m dia stainless stell ppe end vertical 50mm dia,inside vertical 32mm dia 30 cmc/c including all welding charges, buffing charges, cost and conveyacne of all materials etc. complete 1m
27
294.00 Rupees Two Hundred Ninty Four Only 545.00 Rupees Five Hundred Forty Five Only 992.00 Rupees Nine Hundred Ninty Two Only 115.00 Rupees One Hundred Fifteen Only 264.00 Rupees Two Hundred Sixty Four Only 3155.00 Rupees Three Thousand One Hundred Fifty Five Only
14700
20438
64480
2036
1584
709875
Contractor
Superintending Engineer
Page 11
28
100 m
Supplying and fabricating and fixing stainless steel handrail of height .30cm height above RCC parapatte inserted 10cmin to parapatte using the top rail with 50mm dia stainless stell ppe end vertical 50mm dia,inside vertical 20mm dia 50 cmc/c including all welding charges, buffing charges, cost and conveyacne of all materials etc. complete
1m
111100
29
750 m2
Supplying and fixing 3mm thick aluminium composite panel of exterior grade for all types of ACP covering including cutting to suitable stage and servicing into the coloumns and sunshades, joints fitted with silicon scales including all labour charges, cost, conveyance, scaffolding and fabrication charge
1 m2
2251500
30
200 m2
31
17 Qtl
Supplying and laying ultra step tiles of approved quality over cement plastering 1:3, 12mm htick and adding pure cement grout for proper binding including pointing of joints cleaning etc. complete as per the direction of departemnt officers at site. Providing M.S. grills for windowsor compound gates including alllabour and hire charges for fabricatingand cost of materials and applyinga coat of iron primer etc.complete Fabricating and fixing PVC polyester powder coated aluminium grill 10mm thick fixed with aluminium section 50.2x 24.8x1.2mm , glazing clips etc as per specification for window openings
1 m2
225800
1 Qtl
168096
32
200 m2
1 m2
Four Eleven
802200
Contractor
Superintending Engineer
Page 12
33
200 m2
Do-do with 63.5x 38.1x 1.28 mm aluminium section for the sides of staicase supplying paving and polishing grey marble 16mmthick with machine cut edge laid ver a bed of cement mortar 1:5 20mm thick adding necessary cement grout for proper binding to slab including pointing joints with colour cement closing the voids ,polishing with machine three coatas including all cost of matarials and labour etc complet as per specification
1 m2
34
100 m2
1 m2
4359.00 Rupees Four Thousand Three Hundred Fifty Nine Only 1457.00 Rupees One Thousand Four Hundred Fifty Seven Only
871800
145700
35
36a
1800 dm2 Supplying and fitting anjili wood 10 fully glazed shutter to suit the door with ventilator frame already fixed inclusive of labour charges for fixing all fittings including all cost of materials and labour etc. complete as per specification. 50 Nos Engaging welder for removing 1 polycarbonate sheet structure from 3 the level and refixing the same to 6 the floor level 50 Nos Engaging to assist welder for 1 removing polycarbonate sheet structure from 3 the level and refixing the same to 6 the floor level. APPENDIX - B : WATER SUPPLY AND SANITARY ARRANGEMENTS 10 Nos Supplying and fixing white glazed 1 Orissa pan 580mm or nearest size with 'S' or 'P' trap as per standard specification including cutting and making good to the wall and floors etc complete.
dm2
54180
Nos
21500
Nos
15850
Nos
34730
Contractor
Superintending Engineer
Page 13
6 Nos Supplying and fixing European type white glazed earthen ware WC pan with trap and duroplastic seat cover (white) as per standard specification including cutting and making good to the wall and floors etc complete. 15 Nos Providing and fixing Lipped urinal of size 430x230x350mm or nearest size with fittings as per std: specification including cutting and making good to the wall and floors etc complete. 20 Nos Supplying and fixing white glazed earthen ware wash hand basin of 550x400mm size with CI brackets ,1no 15mm pillar tap, 1no 15mm PVC connection,1no angle valve,1no 32mm PVC waste etc including cutting and making good to the wall and floors etc complete. 20 Nos Supplying and fixing 450x300mm or nearest size bewelled edge coppered mirror with hard board or plastic sheet on the back including cost and conveyance of all materials labour charges etc complete. 20 Nos Supplying and fixing 600X20mm CP brass towel rail to wooden plug with brass screws including cost and conveyance of all materials labour charges etc complete.
1 Nos
19176
1 Nos
22155
1 Nos
50220
1 Nos
8180
1 Nos
5120
Contractor
Superintending Engineer
Page 14
200 m
Supplying, laying and jointing 110mm PVC pipe(4kgf/cm2) for down water pipe and waste line including cutting masonry of concrete floors sunshades etc wherever necessary fixing the pipe embedded in CM scafolding wherever necessary painting the exposed surface with sutable paint 2 coats and earth work excavation for trenches and refilling and making good to the walls cost and conveyance of all materials labour charges etc complete.
1m
Two Twelve
42400
25 Nos Supplying and fixing 110mm PVC single junction. 50 Nos Supplying and fixing 110mm PVC plain bend. 20 Nos Supplying and fixing 110mm PVC door bend. 10 Nos Supplying and fixing 110mm PVC ventcowl. 250 m Supplying, laying and jointing 63mm PVC pipe(4kgf/cm2) including cutting masonry of concrete floors sunshades etc wherever necessary fixing the pipe with iron clampas per specification 50 Nos Supplying and fixing 63mm PVC plain bend. 25 Nos Supplying and fixing 63mm PVC door elbow. 100 m Supplying, laying and jointing 32mm PVC pipe(12kgf/cm2) and fittings such as 'tees',bends, elbows etc including cutting masonry of concrete floors sunshades etc wherever necessary fixing the pipe with iron clampas per specification
1 Nos
1 Nos
10
1 Nos
11 12
1 Nos 1m
166.00 Rupees One Hundred Sixty Six Only 131.00 Rupees One Hundred Thirty One Only 155.00 Rupees One Hundred Fifty Five Only 71.00 Rupees Seventy One Only 107.00 Rupees One Hundred Seven Only
4150
6550
3100
710 26750
13 14 15
1 Nos 1 Nos 1m
28.00 Rupees Twenty Eight Only 73.00 Rupees Seventy Three Only 83.00 Rupees Eighty Three Only
Contractor
Superintending Engineer
Page 15
16
250 m
Supplying, laying and jointing 25mm PVC pipe(12kgf/cm2) and fittings such as 'tees',bends, elbows etc including cutting masonry of concrete floors sunshades etc wherever necessary fixing the pipe with iron clampas per specification Supplying, laying and jointing 20mm PVC pipe(12kgf/cm2) and fittings such as 'tees',bends, elbows etc including cutting masonry of concrete floors sunshades etc wherever necessary fixing the pipe with iron clampas per specification
1m
15750
17
50 m
1m
2250
18
5 Nos Making connection of GI distribution branches with GI main 50mm dia by providing and fixing GIU tee including exposing the main, cutting and threading the pipe etc complete. 20 Nos Supplying and fitting 15mm SDB tap of superior quality 5 Nos Supplying and fullway valve 20 m3 Supplying and fullway valve fitting 32mm
1 Nos
3475
19
1 Nos
20
1 Nos
21
fitting
25mm
1 m3
196.00 Rupees One Hundred Ninty Six Only 727.00 Rupees Seven Hundred Twenty Seven Only 509.00 Rupees Five Hundred Nine Only 337.00 Rupees Three Hundred Thirty Seven Only 24.00 Rupees Twenty Four Only
3920
3635
10180
22
fitting
20mm
1 Nos
3370
23
1 Nos
1200
Contractor
Superintending Engineer
Page 16
24
30000 Ltr
Supplying and fixing PVC water tank of standrd quality including cost and conveyance of all materials, labour charges etc complete. Estimate PAC
1 Ltr
138600
Deduct Cost of Departmental Materials Net PAC Rupees Two Crores Sixty Five Lakhs Seventy Seven Thousand Three Hundred Two Only Quoted rate of the Contractor I/We ..agree to execute the work at (1) Estimate Rate. (2).percent below estimate rate. (3).percent above estimate rate. (+) Strike out whichever is not applicable I/Wealso agrees to the tender excess/ deduction may be applied on the amount calculated at the rates given in the schedule attached with the tender/quotation notification.
Contractor
Superintending Engineer