Vous êtes sur la page 1sur 1

NOlES:

1. SlRUClURAL 1800X18Co()

ASS!:SEIIENT

Of ROOF

SLAB CARRYING lHE

WAST WUST BE:

DON!: BY A COIolPETENT ENGINEER BEFOR lHE ESTAlUSH US[ Of lHlS WAST TO

lHA T 1H LOADS ARE

SAFU Y TRANSFERD. 2. All <niCP.1E


VIQRI(

ARE 1:2:4.

'NlH Feu

= 25N/mm2.
WORK FOR BAS[ 14 DAYS lIAST IS

3. ALL <niCP.1E

ANCHOR WUST ATTAIN STRENGHT BEFOR lHE FUlLY

BUILT UP AND ANCHORD. ON S1lE WUST BE: TO 1l WAST WANU

4. crnSTRAINTS

i 2X4Yl201-200
TOP &. BOT.

COIlt./lHCA

lED

F AC1\JRES BEFORE ANY CHANGES ARE WADE ON lHlS DESIGN.

EXISITNG FLR. SLAB

CONCRETE

5.ALL BOLTS UUST BE: PRa>RlY T'oCHTEND 'NlH AND WASHERS. 6. UASTS HlCHER lHAN IotUST IX OIRCTlOIlS 12t.1 HEIGHT 2 HOS LOCKNUTS

TYPICAL R.C. DETAILS OF 18m


TRIANGULAR LAmCE
fvlAST

GU!Dt.'1l IN lHR AT 120 DEGREES

7. WANUFAC~JR"dlS

ACCPT NO UABI-

UTY FOR INSTA!J.A TlONS NOT SUPER \1SEO BY 1H C().lPANY.

\
MAST STUDS.

BASE OF 18m TRIANGULAR


600mm

LATTICE
-l

x'iOOmmx~

..,

Deep
wel9ht 18m

i CONCIL"TE
TRIANGUlA

BASE

mesh ~i.,,;iOfted {top&bott]. cone. around an angular tiap anchor

I I
MAST ASSEMBLY

MAST FRAME

LAma

GL06AC().l

ALCAITL

~A"fJF AClURERS
V

OJ 02

~
1tl.l~E

IRe

I~Q;-{Ill

BRC

c'ti.
ACCORD ENGlNERINC L ro.

OETAlLS Of lBU LATTICE WAST

TR\ANGLAR

Consulur-li!. DuUOI~~ ll.i.r.:J<i:IlSi:~.JiboblF''':~ ACCORD ENr:;:I1'lEf:RlNG Lm tAil<" CEnldtNOH/~~ lAlI")Tel-Ol-.o(1021~

~ tsS.

SCAlI: 1:331/ DR'_


ALC-AL IlJIo!9ER -004.9-00

$I!: 01

Vous aimerez peut-être aussi