Current Organization: Adhunik Power & Natural Resources Ltd Designation: Deputy Manager Civil Current CTC: 8.

.60L Pa Currently present @ Kolkata

MANOJ KUMAR VERMA


ADHUNIK POWER & NATURAL RESOURCES LTD FOR PROJECT 4X270 MW MPSTPP AT PADAMPUR, JAMSHEDPUR Cell: 09007477788; Res: 09331758610; Email: manoj3333@gmail.com, manoj3333@rediffmail.com

Deputy Manager Civil(Project Management and Engineering Coordination for Power Project 4X270 MW MPSTPP Padampur -Jamshedpur) Green field Experienced in 4 Thermal Power Plant.
A result-oriented Civil Engineering professional with above Eight years experience in civil construction, erection of large industrial plants, is aspiring to take charge of construction of a part area in a large Thermal Power Plant in the role of Deputy Manager Civil-Projects. Now doing Project Management and Civil Engineering Coordination for 4X270 MW MPSTPP Power Project Construction at Padampur (Jamshedpur).

PROFESSIONAL ATTRIBUTES

Currently holding the key responsibility of Deputy Manager-Civil (Project) in ADHUNIK POWER & NATURAL RESOURCES LTD, MEGA POWER PROJECT, AT PADAMPUR(JHARKHAND), a company which has earned professional appreciation in its MNC minded attention for establishing a large 4X270 MW IPP (INDIPENDENT POWER PROJECT) at JAMSHEDPUR, JHARKHAND. Have established excellent creditability in the professional circle for: Recently completed Project Management from IIT DELHI. In IIT KANPUR done the successful wind tunnel test for 275 mtr. High twin flue Chimney for 4X270 MW. Projects Management - keeping full control on multidisciplinary activities. Meticulous Project Planning, Implementation w.r.t. the stipulated parameters and strict time schedule adherence. Flawless construction knowledge in shuttering and staging design of any R.C.C. structure as per concrete load data. Typical objective oriented style of preparation and presentation of progress reports and MIS in Power Point programme to management. Proven administrative capability to handle all types of personnel and political issues related with any project of sizable dimension. Recognized for turning break-even projects into profitable projects through proper execution of customized, cost effective solutions. Proven track record of successful plan, design and execution of multiple Projects across various parts of Indian sub-continent in record time. Project Monitoring, Engineering Co-ordination with many Design consultant, Detailer, Vendors etc. and civil constructions of thermal power plants and associated services. Well proficient with latest construction methodologies, systems in compliance with the quality standards. Expertise in : Plotting the structure as per drawing and design. Pilling work with pile cap for coal handling plant. The drawing and design for excavation scheme of any type of foundation & specially in R.C.C shutering work etc.

Current Organization: Adhunik Power & Natural Resources Ltd Designation: Deputy Manager Civil Current CTC: 8.60L Pa Currently present @ Kolkata
The development and implementation of Project Management systems, ISO-TQM System. Organization Development, MIS Uniform Reporting system, etc. Swiftly ramping up projects with competent cross-functional skills and on time execution. Exemplary Relationship management, Effective Communication skills with the ability to network with project members, consultants, contractors, and statutory agencies with consummate ease. Adept in learning local language in a short period of time leading to excellent verbal and written communication skills with all concerned.

W O R K E X P ER I E N C E
ADHUNIK POWER & NATURAL RESOURCES LTD, 4X270 MW PADAMPUR, (JHARKHAND) Deputy Manager-Civil Project at Corporate office (Aug 2009 to Till date) Responsibilities:

Project Management & Engineering Co-ordination from HO, Overseeing and managing all construction related Design, Drawing & documentation works throughout at the Corporate office as a Co-ordinator with Designer, Consultant and many Vendors under guidance and directly reporting to Vice President of Projects. Liaisining with various departments and contractors in the organization in order to deliver the projects in time. Tendering, selection and appointment of various contractors for the Project taken up for execution. Successfully floating Tender for 2X270 MW Thermal Power Project- BTG & BOP Civil and Structural Packaged, 275 M high twin flue RCC Chimney Civil and Structural, Railway Siding Tori Civil, OHE and S&T, Railway Siding Birrajpur, Ash Pond etc. Organising Pre bid discussion, Offers collection, Organising Post bid discussion, Bringing at par to all vendors/Bidders and Final negotiation with the Superiors etc. Planning, controlling and directing all operations required for proper execution of any project, starting from Development to Administration to ultimate cash flow and allocation of fund according to necessity. Optimising best use of all available resources in the organization to achieve organizational objectives.

Select Achievements Identified critical activities for the project and gave topmost attention towards them to resolve them within scheduled time to avoid possible bottlenecks and delay in execution. Applied Quality Planning & Technology management criteria in the construction of the ongoing project, which led to substantial improvement in quality of all works and management satisfaction. TATA RYERSON LTD, RFL UNIT & SERVICE CENTRE, SINGUR NANO PROJECT (WEST BENGAL) Manager-Civil Project (30 APRIL 2008 to Aug 2009) Responsibilities:

All type of civil constructional activity, Billing, Planning, Quantity Surveying, Shuttering & Staging Design as per load and site condition etc. 3 nos RFL unit construction activity at Singur for NANO Plant. Pilling work done 121 no. For Equipment foundation. Planning and Monitoring for Execution of PEB Structures with safety and quality. Monolithic one pour casting of hole Equipment foundation in one time from Base Wall to top surface. Liaisining with various departments and contractors in the organization in order to deliver the projects in time. Tendering, selection and appointment of various contractors for the Project taken up for execution. Planning, controlling and directing all operations required for proper execution of any project, starting from Development to Administration to ultimate cash flow and allocation of fund according to necessity.

Current Organization: Adhunik Power & Natural Resources Ltd Designation: Deputy Manager Civil Current CTC: 8.60L Pa Currently present @ Kolkata

Select Achievements Organised a team for Soil investigation at Sanand (Gujarat).

Rectifying a running Steel Service Centre plant floor in a part work.

Jindal Power Ltd., 4X250 MW OP JINDAL STPP Raigarh,Tamnar (C.G)


Senior Engineer (19 Jul 2005 to 29 April 2008) Responsibilities: All type of civil constructional activity, Billing, Planing, Quantity Surveying, Shuttering & Staging Design as per load and site condition etc. . . . . . . . . . . ALL COAL HANDLING PLANT CONSTRUTION ACTIVITY AND MISC. CONSTRUCTION ACTIVITY. Construction of Dumper Unloading Hopper with making Excavation scheme for all type foundation. Tunnel 20rmt long below from 5mtr to NGL. Electrical control Room for all Coal Handling Plant. Transfers Tower 1, 2, 3&4 etc. Light Steel Structural Febrtn & Erecting of Truss & Purlene work for Conveyor and Transfer Tower etc. Conveyor Foundation & Pedestal 1, 2,3A,3B,4A, 4B,5 & 6 etc. Stacker Reclaimer both side Foundation and wall 548.5 rmt. To Big Work Shop Building (size-95mtr*20mtr) & Store Building (270mtr*20mtr) etc. Pilling Work with Pile cap of TP#3.

. Looking the whole activity & Development of Jindal Power Employees Colony 250 Flats G+1 and handed over within schedule. Shapoorji Pallonji & Co Ltd., 4X135 MW, Bharat alluminium & co ltd ,BALCO-Korba (C.G)
Assistant Engineer (Aug 2004 to Jul 2005)

Responsible for construction of: o Stacker reclaimer. o Fly ash silo two cell dia 12mtr, slab at - 5.5mtr, 11.5mtr (1.2mtr depth slab) & 22.5mtr etc. o Transfer tower 1 below 16 mtr, 2 below 14.5 mtr and conveyor etc. o Tunnel 30rmt long below from 6mtr to NGL. DM tank foundation. o Neutralisation pond with foundation of different equipment. o Make up water pump house with Crain girder rail. o Fire fighting pump house etc. o Execution work as per exact drawing and design.

Gannon Dunkerly & Co Ltd., 15MW, Ambuja Cement Captive power plant (C.G)
Junior Overseer (July 2003 to Aug 2004) Responsibilities: Responsible for construction of: Boiler foundation. P.A. & F.D. Fan foundation 15 Mtr. Dia Chimny Raft with 32 Dia. 48 nos Bolt. Neutralisation pond, guard pond, etc. Prepared and sent to the Management on regular basis Management Information System Reports.

Looked after site budgets. Monitored cash flow and their proper utilization on a regular manner .

Current Organization: Adhunik Power & Natural Resources Ltd Designation: Deputy Manager Civil Current CTC: 8.60L Pa Currently present @ Kolkata

EDUCATION

Diploma in Civil Engineering, from Rama Krishna Mission Shilpa Mandira (Belure Math) West Bengal, 2003, 73%, Excellent performance in project work. Degree in Civil -AMICE (I & II) from The Institution of Civil Engineers (INDIA) DELHI. Recently completed Project Management from IIT DELHI.

IT SKILLS

MS Project, Auto CADD, MS-Office: M.S. Word, Excel and Power Point & Internet surfing etc.

PERSONAL DETAILS

Date of Birth: 15 Dec 1983 Languages Known: Hindi, English and Bengali