Discharge Of Water

Volumn =
=

3.14 x 0.5' x 0.5' x


0.667'
=
4
0.294 x 6.24 = 1.835 Gallons

0.9175

Gallons/Sec

55.05

Gallons/Minutes

55.05 Gallons/Minutes at Source

1321.2 Gallons/ Day at Source

Anticipated Population =
=
Demand

=
=
=

35 x 8 x 1.34
375.20 Persons

Anticipated Population x 10 Gallons Per capita per day


375.20 x 10
3752 Gallons / Day

Design of Storage Tank =


Say

0.294 cft

1876 Gallons
2000 Gallons

Drinking Water Supply Scheme (Gravity Flow)


Design Criteria
a

Population

Total No of House Holds


Population per House Hold
@ 8 persons per house hold for

35
280

No
Persons

Projected Population @ 3% per annum

375

Persons

3752
3.1

Gallon/day
GPM (U.S)

1321
55.05

Gallons/day
GPM (US)

3752
1876
2000

Gallons
Gallons
Gallons

10 years as design period


b

Water Demand
Total water requirement @ 10 gpcd:

Available Water
Total Discharge of source

Storage Capicity
Total Water Demand
Taking Half Day Storage
Porposed Storage Tank

SUMMARY OF COST OF MATERIAL AND LABOUR


S/No
A
1
2
3
4
5
6
8
9
10
i
11
i
ii
iii
12
13
14

1
2

Items
Material Cost
Cement
Sand
Crush
Stone
Steel

Quantity

108.56
601.18
444.61
694.49
476

Delivery/Purforated/
36
Wash out/Over Flow,
2" dia GI pipes
2
2" dia GI Valve
2
1.5"dia GI Valve
Supply Main
550
1.5"dia GI pipe
Distribution System
850
1" dia GI pipe
250
0.75"dia GI pipe
400
0.5"dia GI pipe
2
Steel Manhole Cover
1
Tools & Equipments
1
Transpotation
Sub Total Cost of Material (A)
B) Labour Cost
Skilled Labour
40.97
Unskilled Labour
120.98
Sub Total Cost of Material (B)
Grand Total (A+B):

Unit

Rate (Rs.)

Cost (Rs.)

300
12
15
6
35

32568.0
7214.2
6669.2
4166.925
16660

65

2340

350
300

700
600

Rft

39

21450

Rft
Rft
Rft
No
L.S
L.S

30
23
17
500
3000
8000

25500
5750
6800
1000
3000
8000
142,418

Man Day
Man Day

350
150

14338
18146
32484
174902

Bags
Cft
Cft
Cft
Kg
Rft
No
No

Estimate of DWSS (Gravity Flow)

S/No

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
Bags

Sand in
Cft

Crush
in Cft

Stone
in Cft

Steel
Kg

in

Skilled
Unskilled
Labour Labour MenMen-days
days

Material
1
1.1

1.2

1.3

1.4
1.5
1.6

Labour

Cut Off Wall


Excavation
do
Total
P/L PCC (1:4:8) as in Foundation
P/L PCC (1:4:8) as in Bed
Total
Stone Masonry in (1:6) CSM
1st Step
2nd Step
Total
30% (1:6) CSM
Stone
P/L PCC (1:3:6) as in Coping
P/L Plaster in (1:3) CSM
P/L Pointing in (1:2) CSM
Sub Total of one Cut Off Wall
Unit Rate (Rs.)
Cost (Rs.)
Sub Total Cost of Cut Off Wall

13.25
4.75

2
2.75

2
0.5

1
1

13.25
4.75

2
2.75

0.5
0.5

1
1

13.25
13.25

13.25
9.5
14.5

2
1.25

1.25
-

1.5
2

0.166
2.166
2

1
1

1
1
1

53
6.53
59.53
13.25
6.53
19.78

Cft
Cft
Cft
Cft
Cft
Cft

39.75
33.125
72.88
21.86
51.01
2.75
20.58
29

Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft

0.73

1.87

9.37

18.75

3.85

28.86

0.34
0.26
0.07
6.40
300
1919.8

1.27
0.99
0.19
40.67
12
488.1

2.54
21.29
15
319.3

0.14

0.48

2.19

6.34

51.01

51.01
6
306.1

0.02
0.15
0.28
2.78
300
833.9

0.07
0.34
0.58
8.54
150
1281.2
5148

Estimate of DWSS (Gravity Flow)

S/No
2
2.1

2.2

2.3

2.4

2.5

2.6

Description

Length
in ft

Breadth
in ft

Depth/Ht
in ft

No of
Units

Quantity

Unit

Cement
Bags

Sand in
Cft

Total
P/L PCC (1:4:8) as in Foundation
Long Wall
Short Wall
Plinth
Bed
Total
Stone Masonry in (1:6) CSM
Long Wall 1st Step
2nd Step
3rd Step
Short Wall 1st Step
2nd Step
3rd Step
Total
30% (1:6) CSM
Stone
Shingle as in Bed
P/L PCC (1:2:4) as in Bed
P/L Plaster in (1:3) CSM
do
Total
P/L Pointing in (1:2) CSM
1st Step
2nd Step
1st Step
2nd Step
Total
P/L RCC (1:2:4) as in Slab
Decuction for manhole cover
Net Total
Sub Total of Storage Tank
Unit Rate (Rs.)
Cost (Rs.)
Sub Total Cost of one Storage Tank
Total Cost of 2 Tank
Grand Total

Stone
in Cft

Steel
Kg

in

Skilled
Unskilled
Labour Labour MenMen-days
days

Material

Storage Tank (2000 Gal)


Excavation
Long Wall
Short Wall
Plinth

Crush
in Cft

13.5
7.5
13.5

13.5
7.5
13.5
9

13
12
11.5
8
8
8

9
9
9
8

2.5
2.5
3

2.5
2.5
3
8

2
1.5
1.25
2
1.5
1.25

8
8
-

2
2
0.5

0.5
0.5
0.5
0.5

1.5
1.5
4.25
1.5
1.5
4.25

0.5
0.25
5
5

2
2
1

2
2
1
1

2
2
2
2
2
2

1
1
2
2

12
11.5
11
10.5

1.5
4.25
1.5
4.25

2
2
2
2

12.5
2

11.5
2

0.375
0.375

1
1

135
75
20.25
230.25

Cft
Cft
Cft
Cft

33.75
18.75
20.25
36
108.75

Cft
Cft
Cft
Cft
Cft

78
54
122.19
48
36
85
423.19
126.96
296.23
36
18
90
80
170

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft

36
98
33
89
256
53.91
1.50
52.41

Sft
Sft
Sft
Sft
Sft
Cft
Cft
Cft

Labour

2.84

10.31

51.53

103.06

0.77

2.65

22.34

167.58

12.71

36.80

3.17

7.92

36
15.84

0.13

0.44

2.18

8.18

1.22

2.83

0.66

1.64

2.51

5.12

0.37
17.70
350
6196

1.28
51.95
150
7792
44594
89187.8975
94336

296.23

238
9.22
47.88
300
14364

23.06
259.92
12
3119

46.12
201.02
15
3015

296.23
6
1777

238
35
8330