Comments on CHP Belt Conveyor specification Sl No Reference Volume/Section/ Part/ Section Clause no Comments from REPLY Reply

Discipline - Mechanical The specification shall cover scope of supply and services with terminal points, exclusions, list of applicable design codes and standards to be adopted, detailed technical specification/requirements of belt and conveyor components based on design codes, quality standards/requirements, data sheets to be furnished by bidder as per format enclosed with contract, testing and inspection, painting, packaging, forwarding etc. Specification for Electrical Equipments, Instrumentation and Controls as applicable. contractor to furnish detailed specification including all the above requirements for owner review. It is noted that the DBR drawings are proposed to be enclosed as part of this Ordering Specification. The scope and terminal points may be clearly defined in the Flow Diagram. The Equipments/ Auxiliaries in the scope may be highlighted in the MAIN EQUIPMENT TABLE for easy understanding by the Bidders. The approximate lengths of each conveyor shall be indicated in the Specification for reference, which may be taken directly from the latest DBR for CHP ANNEXURE-4. The zone of the conveyors (, velocity 2.0 m/s) for stone pick-up facility, along with the accessories like local platforms, walkways and chutes (as per the resolutions in the DBR meeting) shall be highlighted in the Specification Under EQUIPMENT DESCRIPTION, it is mentioned: - For the details, refer to CHP DBR. It is not expected that the full DBR for the CHP will form part of this specification. The relevant portions of the Approved CHP DBR should be inserted suitably in this Ordering Specification. Detailed Technical Specifications/ DATA SHEETS for the Auxiliaries (mentioned under Equipment Description) within the Bidders scope shall be enclosed with the Ordering Specification. The number, sizes, capacities, materials of construction and inspection/ testing for all these items shall be highlighted. The Suppliers QAPs shall be subject to owners review and approval. Management Procedure for Packing, Preservation & Identification should be enclosed with the ordering specifications Noted, contractor shall confirm Belt Conveyor ordering specification /all design parameters are inline with approved CHP DBR /drawings which is submitted to Bidder/ Supplier.

General

The scope of supply is already mentioned in ordering specification. For codes, refer to CHP DBR.

General

DBR drawing is already enclosed to ordering specification to bidders.

owner Noted.

General

noted

General

noted

Noted, However Please submit the final ordering specification for owner review. Noted, However Please submit the final ordering specification for owner review. Noted, However Please submit the final ordering specification for owner review.

Sl. No:2 and 3

noted

General

contractor shall confirm Belt Conveyor ordering The scope is clearly specification /all design mentioned in ordering parameters are inline with specification. approved DBR /drawings which is submitted to Bidder/ Supplier. already enclosed Noted.

General

Anx-III-A: 1 of 4

Engineering Resource Centre KSK Energy Ventures Limited

Annexure-III-A

Comments on CHP Belt Conveyor specification 8 General The specification for the Control and Instrumentation/ interlocks required for the operation of the System shall be included. noted owner Noted. Noted, However contractor shall confirm the approved DBR / calculation and all related drawings are furnished to the Bidders.

General

contractor has to furnish all design calculations for belt conveyor including power calculations at suitable stages for WCPL review. contractor to communicate to the bidder accordingly.

refer to DBR.

Anx-III-A: 2 of 4

Engineering Resource Centre KSK Energy Ventures Limited

Annexure-III-A

Comments on CHP Belt Conveyor specification 10 Design code Furnish the English version of design code DL/T5187-2004 for coal handling system as agreed by contractor, refer MOM dated 2009-10-22 & 14-11-2009. Detailed Technical Specifications/ DATA SHEETS for the Equipment should be enclosed with the Ordering Specification. The suggested equipment SPECIFICATION are ENCLOSED for the bidders ready reference) as Annexure-III-B. Noted, However Please furnish along with final ordering specification for owner review. Noted, However The main data is contractor shall confirm already mentioned in the approved CHP DBR / ordering specification drawings are furnished to and CHP DBR. the Bidders. later

11

General

Discipline -Electrical 1. Main Parameters: Conveyor drives: Motors rated below 200kW shall be LT Motors and Motors rated 200kW & above shall be HT Motors. Please revise accordingly. Please note that HT system is 11kV, 3P, ungrounded system and LT system is 415V, 3P, solided grounded system Motors shall comply IS-325 and shall be Contract Specification Cl. 4.14 of Electrical section (Annexure-E, Section 3-B - Vol.IISec.XVIII) Motor technical particulars should be mentioned in the specification. It is as per contract Cl. 4.14.04 of Electrical This will be as per section (V-II/S-XVIII). contract specification contractor to revise the Section VI M19 ordering specification to indicate the same. contractor to revise the ordering specification to indicate the same. Please add the specification descriptions & Data Sheets. contractor to revise the ordering specification to indicate the same. Please add the relevant specification descriptions

12

Drives

13

as per contract.

14

All Electrical Equipments and electrical systems shall be as per Electrical section (Annexure-E, Section 3-B - Vol.II-Sec.XVIII) of Contract Specification.

as per contract.

Discipline- C&I Following sentence shall be added: Each Conveyor shall be fitted with a centrifugal speed switch for as per the constract specification. use in the sequential starting and tripping interlock scheme and for ensuring that the drive motor shall be shutdown automatically in the event of belt slipping & breaking. Following sentence shall be added: All rotary equipment shall have local control stations which include Start PB, Stop PB, Start/Stop Indication and Local/Remote switch as a minimum owner Noted. contractor needs to revise the ordering specifcation to indicate the same.

15

Centrifugal speed switch

16

local control stations for rotary equipment

Not acceptable. contractor needs to provide as per agreed mom point No.Bmeet the requirement 25 of CHP DBR MOM of contract. dated 17/08/09 to 28/8/09 between owner & contractor.

Anx-III-A: 3 of 4

Engineering Resource Centre KSK Energy Ventures Limited

Annexure-III-A

17

Ingress protection

Comments on CHP Belt Conveyor specification Following sentences shall be added: a) All outdoor field mounted instruments shall have waterproof enclosures conforming to IP-65. All panels/cabinets shall have protection class IP-54 in as per contract. ventilated areas. b) Local JB/Local Control Panel/Local Control Station or any small enclosure shall be IP65 type or better All Field contacts shall be DPDT type rated to 5A@240 V AC, 0.5A@220 V DC. For HT motors following temperature element shall be provided for monitoring from PLC: i) Motor windings temperature. ii) Motor bearing temperature at DE & NDE ends.

owner Noted. contractor needs to revise the ordering specifcation to indicate the same.

18

General comment

as per contract.

owner Noted. contractor needs to revise the ordering specifcation to indicate the same. owner Noted. contractor needs to revise the ordering specifcation to indicate the same.

19

Temperature element

as per contract.