Académique Documents
Professionnel Documents
Culture Documents
A Navratna PSU
POWERGRID
One of the largest and best managed transmission utility in the World Youngest Navratna Public Sector Enterprise in Power Sector
Established in Oct 23,1989 by transfer of Assets and Personnel from different CPSUs
Commenced commercial operation from April 1, 1992 World's Leading Power Transmission Utility
82,354 Ckt. Km line
135 Substations as on March 31,2011
Grid Management
Telecom
Owns & operates Fibre Optic Cable Network Licenses NLDO, ISP & IP - 1
5000
4000
2697
3000 2000 1009 1000 1448 1229 1691 2041
0
2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11
50352
50000 43202 40319 40000 35417 in ` Crores 29015 24888
30000
20000
10000
0
2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11
6000
4000
2000
0
2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11
Organization Structure
Corporate Office
Regional HQs
Sub Stations
Site Offices
TL Office
3 Tiered Structure
Locations
Corporate Office - Gurgaon
Region Northern Region-I Northern Region-II Eastern Region-I Eastern Region-II North Eastern Region Western Region-I Western Region-II Southern Region-I Headquarter Delhi Jammu Patna Kolkata Shillong Nagpur Vadodara Secunderabad Geographical spread Delhi, UP, Rajasthan, Haryana, Uttaranchal J&K, HP, Punjab Bihar, Jharkhand West Bengal, Orissa, Sikkim Seven States of North East Maharashtra, Chhattisgarh, Goa MP, Gujarat, Daman, Diu, Dadra Nagar Haveli Andhra Pradesh
Southern Region-II
Bangalore
Evaluation
Mid Term Appraisal Final Appraisal
Absorption in the post of Engineer (Electrical) at E2A level on successful completion of training
Selection Modes
Campus Selection
Eligibility Criteria
Minimum Marks *
For General/OBC(NCL): 65% For SC/ST/PH: Pass Marks * Or Equivalent CGPA. CGPA shall be converted into percentage as per the formula provided by the Institute. In absence of such formula, the AICTE criteria (i.e. CGPA of 7.25 = 65% ) shall be followed. Shortlisting of candidates for campus interview shall be done on the basis of CGPA/ Percentage till sixth semester. Appointment of selected candidates shall be subject to their overall CGPA/ percentage in the final degree awarded by the institute. For General : 28 years
Maximum Age **
** As on 31st Dec 2011
For OBC (NCL) : 31 years For SC/ST For PH : 33 years : 5 years relaxation in age
Important Information
Appointment of selected candidates is subject to
Medical fitness as per POWERGRID Norms e.g. Candidates should not suffer from Colorblindness, Squint, refractive defects exceeding + 4 D. (for details, refer to Career section at www.powergridindia.com )
Posting:
On successful completion of the ET training program, the final posting can be anywhere in India, depending on functional requirement, performance of the ET during
Assignment related to Commercial, Engineering, Contracts & Materials, Load dispatch & Communication of Transmission System, System Operation, Telecom, etc. Co-ordination with internal and external stakeholders, etc. Any other related work assigned to individual from time to time.
POWERGRID Executive Trainee XVII Campus Selection
Compensation
During Training
Particulars
Monthly
Annual
Total
55108
661291
Compensation
PARTICULARS
DA @ 47.2
After Training
Per month 25640
12100 17410 22700 77860 18190 96060 1152800 80010 1232820
COMPENSATION SCHEME
Financial
Direct Indirect
Non Financial
Intangible
Accommodation Fixed Pay (Basic, DA) Performance Related Pay Medical reimbursements Long term and short term Advances Social security (gratuity, insurance, pension)
POWERGRID
One Nation. One Grid.