Vous êtes sur la page 1sur 7

Engr.

Maria Reza Nebril


Mechanical Engineer / HVAC Design Engineer/ Sales Processing Engineer

Summary
To obtain a position in a progressive manner where I can use my skills, good work ethics and experience to increase productivity, work quality and contribute to the overall success of the organization. Looking for a greater sense of purpose in my career and be connected to the larger impact of my work beyond the boundaries of my job description. Challenges may prove to be the best road to excellence. A highly motivated professional with extensive Mechanical Engineering experience on major Designing and Installation Projects in the HVAC, industrial and community sector, and a Sales Processing Skills who offers to a new employer: HVAC Design Engineer who Designs and calculates Heat load requirements for Heating, Ventilating and Air Conditioning (HVAC) for both split type & centralized air conditioning (duct design) & ventilating system. An Estimator An Experienced Installation Supervisor of the HVAC Quality Assurance/ Quality Control expertise, procedure and system; Technical problems-solving talents; Planning, organizing and coordinating proficiency; Possesses strong presentation skills and able to communicate professionally in written responses to emails, RFPs, and when submitting reports. Organized and analytical, able to eliminate sales obstacles through creative and adaptive approaches. Prepared for extensive travel. Computer Literate Highly trainable, fast learner, self-motivated and competent Safety Conscious friendly, team player and neat. Capable of driving and managing the technology evaluation stage of the sales process, Key technical advisory and product advocate Articulate in technology and product positioning to both business and technical users. Able to identify all technical issues of assigned accounts to assure complete customer satisfaction through all stages of the sales process. Able to establish and maintain strong relationships throughout the sales cycle.

Experience
Sales Processing Engineer at BRC International Ltd September 2010 - Present (2 years 10 months) Quotation Processing - create new inquiry no, ID, client data; review & upload requirements, documents and drawings to website, prepare cost sheet 1 & base quote;

Page1

Sales order processing - create Sales order no & upload PO and other document to website; prepare cost review, generate foundry PO & PO analysis; prepare Order Acknowledgement & input packing list to BIS. Provide technical aspect, such as weight calculation and machining difficulty. Co-ordinate with UK & Head Office with regards to issues and concerns on quotation processing and sales order processing. Mechanical Engineer/HVAC Design Engineer/Installation Supervisor/ Project Design Engineer/Estimator at Moredone Ventures, Inc. / Alenaire Cebu Incorporated May 2009 - April 2010 (1 year) Key Responsibilities: Design and calculate Heat load requirements for Heating, Ventilating and Air Conditioning (HVAC) for both split type & centralized air conditioning (duct design) & ventilating system.. Calculates Equipment Fan Head. Estimates Heating, Ventilating and Air-conditioning system. Do actual surveys and examinations to the place to be air conditioned. Do the evaluation and decide where to put the air conditioning units like indoor and outdoor units for split type system (air cooled and air Handling Unit (AHU) for water cooled and Fan Cool Unit (FCU) Supervise the HVAC installer/technician of the piping system, its proper location, sizing/dimension, proper insulation, proper hangers and support and other factors to be considered. Prepares cost variation based on old and new design drawing. Prepares chilled water piping and air duct schematic diagram. Supervise production of shop drawings, detail drawings, and key plan. Coordinate and discuss with other trade, problems that affect the work progress. Checks air flow and water flow rates of the system based on the design drawing versus Equipment schedule and balance air flow rates at the same time. Calculates air duct and chilled water pipe supports. Undertakes other duties and responsibilities assigned by management. Cooling load estimation of buildings. Prepares project implementation schedules. Designs, develops and implements new technologies and ideas for improvement of existing facilities and conditions. Develops logical system layout to conform to the standard practice. Undertakes designs, calculations, material specifications and scope of work and schedules to determine the capacity of a new facility. Prepares bill of materials and equipment for project proposals requisitions and purchase of the same. Supervises the implementation of approved projects including testing, balancing and commissioning.

Page2

Projects
The Supercat 36 2009 to 2010 Members:Engr. Maria Reza Nebril AHU Ducting 15.0TR ship Cebu City, PHILIPPINES The Supercat 38 2009 to 2010 Members:Engr. Maria Reza Nebril AHU Ducting 15.0TR ship Cebu City, PHILIPPINES ThreeSixty Pharmacy Members:Engr. Maria Reza Nebril 6 Branches in Cebu , Philippines Residences 2009 to 2010 Members:Engr. Maria Reza Nebril Albert Lim Residence Andre Borromeo Residence Arlo Sarmiento Residence Alegrado Residence Alex Medalla Residence Alice Liu Residence (1.5HP WM, 2.0HP WM & 2.0TR CM) Arlo Sarmiento Residence Armi Garcia Residence Ephoy Caballero Residence Eric Pcubas Residence Florante Labitan Residence Lacson Residence Jess Lagman Residence Jimmy Lao Residence Lacson Residence Jimmy Lao Residence Lopez residence in Amara, Cebu Carl Fernandez Residence (3.0TR FM) Dickson Tan Residence Dexter So Residence Dexter Maunes Residence - 3 units 1.0HP inverter wall mounted Alvin Roxas Residence (1.5HP WM)
Page3

Andre Borromeo Residence (2.5HP WM) Arlo Sarmiento Residence (2 Unit 2.0HP WM) David Green Residence (2.5HP WM & 1.0HP WM) Florante Labitan Residence (2.0HP WM & 3.0TR FM) Janice Chiu Residence (2.5HP WM & 1.0HP WM) Jerome Alcordo Residence (1.5HP WM & 3.0TR FM) Jessica Pahinado Residence (2.5HP WM & 1.5HP WM) John Go Residence (3.0TR FM) Karla Alegrado Residence (2.5HP WM) Lino Villegas Residence (4.0HP WM) Mariano Perdecis Residence (2.0HP WM, 2.5HP WM, 2.5HP Ccon & 1.5HP WM) Paterno Comendador Residence (1.0HP WM) Sony Lagon Residence (3.0TR FM) Buildings, Rooms & Offices 2009 to 2010 Members:Engr. Maria Reza Nebril Cebu City Government - Renovation (Chill Ducting) PROPOSED Supermarket of 4 Units 25 TR Ducting PROPOSED TWO-STOREY COMMERCIAL BUILDING in Mambaling, Cebu City Fitness First Ayala XMX Best Cebu Doctors Hospital Basic Graphics Billy Mondoedo/ Tinder Box Central Evangelical Free Church F2 Logistics Iben Ting Pharmacy Villarica Pawnshop Bright Smile Clinic C24- IT Park Cebu Shensie Diamond Interior GENSAN PROJECT - 4PCS 30HP Ducting Garcia Residence C24- IT Park Office (3.0TR CM) MOON CAF - Cybergate - owned by Stephen Ong Japan Intertrade Tinderbox TAGUM CITY HALL Vector BPO

Page4

Shagreen Collection Coast Pacific - panasonic cassette BMW Office (2.5HP WM) Bright Smile Clinic (1.0HP WM & 2.0HP WM) British Armour Office (2.5HP WM) Cebu City Government Office (1.5HP WM & 1.0HP WM) Cebu Doctors Hospital (2.5HP Cassette) Cebu Fortune Travel Office (2.5HP WM & 1.5HP WM) Chiba Marine Office (3.0TR FM) Conchology Office (1.0HP WM) Dermcare Clinic (1.0HP WM & 2.0HP WM) Diamond Interior Office (5.0TR CS, 2.0TR WM & 3.0TR CS) Dranix Dist. Office (3.0TR FM) F2 Logistics 2.5HP WM, 2.5HP & 3.0TR CS Fine Impression Office (5.0TR FM) Ford Alabang Office (1.5HP WM) Happy Rooster Office (2.5HP WM) Interior Craft Office (3.0TR FM) Japan Intertrade Office (5.0TR CS) Live To Sell Office (5.0TR FM & 2.0HP WM) Mactan Doctors Hospital Room (3.0TR CS, 2.0HP WM) Muntuerto Management Office (1.5HP WM, 3.0TR FM & relocation of unit) Philippine Veterans Bank Office (2.5HP WM & 3.0TR CM) Shagreen Collection Office (1.5HP WM & 2.0HP WM) Softwash Office (3.0TR FM) Southeast Asia Food Inc. Office (5.0TR FM) Sunburst SM (3.0HP Chilled Water) Wetland Beach Resort (3.0TR FM)

Skills & Expertise


HVAC Design Ventilation Project Management Supervisory Management Estimates Sales Order Processing Quotation Processing Designs Quotations Air Conditioning LEED
Page5

Commissioning

Education
Central Mindanao University BSME, Mechanical Engineering, 2001 - 2007 Activities and Societies: Philippine Society of Mechanical Engineers (PSME)- Regular member Mechanical Engineering Student Association (MESA), Secretary SEMINARS & TRAININGS ATTENDED: Software Engineering in Digital Economy Heating Ventilating and Air Conditioning Design Mechanical Engineers: Geared For A Stable & Greener Future Mandaue City Design of Hydro Electric Power Plant Programmable Logic Controller at Automation and Control Center On the job trainee in Busco Sugar Milling Inc.

Page6

Engr. Maria Reza Nebril


Mechanical Engineer / HVAC Design Engineer/ Sales Processing Engineer

Contact Engr. Maria Reza on LinkedIn

Page7

Vous aimerez peut-être aussi