PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL08) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer EXTERNAL WORKS The bidder is advised to visit the site before quoting the rates in order to get himself familiarize with the present site conditions SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 02 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Excavation material may be used as fill material if found suitable and approved by the Engineer (client's representative) 04 Approved fill material selected from excavated material including compaction as per spec. To Collection Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

2500

M3

03

9590

M3

Note
M price only SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION PAVING AND SURFACING 01 400x400x60mm thk .precast concrete ( beige color ) shotblasted with photocatalytic titanium dioxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail A1 on drawing XL301 QTY UNIT RATE AMOUNT SR

2065

M2

02

400x400x60mm thk .precast concrete ( grey color ) shotblasted with precast concrete (light grey color ) shotblasted with photocatalytic titanium dioxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail A2 on drawing XL301 400x400x40mm thk .precast concrete ( beige & brown color ) shotblasted with 200x200x30mm thk . Grey precast band,with photocatalytic titanium dioxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail A3 on drawing XL301 400x400x60mm thk .precast concrete ( beige & brown color ) shotblasted with 200x200x60mm thk . Dark Grey precast band with photocatalytic titanium dioxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail A4 on drawing XL301 400x400x30 mm thk. Polished granite paving ( dark & light colors ) with 200x200x30mm thk .dark color Granite band including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier, compacted subgrade as per detail B5 on drawing XL301 Asphalt pavement comprising 80mm thick bituminous wearing course, and granular base course including prime coat and compacted subgrade as per detail C on drawing XL301

718

M2

03

776

M2

04

1630

M2

05

115

M2

06

6554

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM CURBS AND EDGING 01 Precast concrete curb, 300X500X150 mm exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on compacted subgrade, as per detail 1 on drawing XL302 Handicapped ramps including fixing, finishing and the like as per drawings and specifications SUNDRIES 03 Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 4 on drawing XL302 and specification Precast concrete wheel stopper including fixings Tree/palm pit surround 05 Formation of cast iron tree / palm pits surround including concrete edge pavers and cement mortar setting bed as detail 2 on drawing XL302 Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing XL602 and as per specifications 06 07 08 09 10 11 12 Ref. type 1 ( DIRECTIONAL SIGN ) Ref. type 2 ( GRAND MOSQUE SIGN ) Ref. type 3 ( GRAND MOSQUE PARKING SIGN ) Ref. type 4 ( BOYS ELEMENTARY SCHOOL SIGN ) Ref. type 5 ( GIRLS ELEMENTARY SCHOOL SIGN ) Ref. type 6 ( SCHOOLS PARKING SIGN ) Ref. type 7 ( ADVERTISING PANEL ) DESCRIPTION QTY UNIT RATE AMOUNT SR

1450

02

M2

04

149

No.

42

No.

1 2 3 1 1 1 2

No. No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing XC-05 and as per specifications 01 02 03 04 05 Ref. type I-2 (ENTRY ) Ref. type R1-1 ( STOP ) Ref. type R2-1 (GIVE WAY ) Ref. type R5-1 ( ENTRY PROHIBTED ) Ref. type W11-1 ( PEDESTRAIN CROSSING ) Thermoplastic paint for traffic marking on pavement in parking and driveways including lane strips , studs , and the like complete as shown on drawing XC-04 and specification 06 07 08 09 10 11 12 13 14 15 Straight arrows Straight & curved arrows Curved arrows Handicapped marking on floor Parking lane marking White stop line Pedestrain crossing White edge line Direction separation lines ( passing permitted) Direction separation lines ( passing prohibited) 23 QTY UNIT RATE AMOUNT SR

1 2 5 1 4

No. No. No. No. No.

No. No. No. No. M M M M M M

4 6 5 853 37 43 1315 456 212

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION MISCELLANEOUS STRUCTURES Reinforced concrete ( ETS ROOM ) under ground with stairs including earthworks, concrete works, water proofing , doors , finishing and all associated work as per drawing CL08-S301 and spec. 01 ETS Room Pre cast concrete KIOSK , 1400 mm 1400 mm , 3000 mm height including earthworks, footings, steel plates, fixings, finishings, and all associated work as detail 3, drawing XL302 02 Pre cast concrete kiosk LANDSCAPING Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1, P2 on on drawing XL-401 03 P/Wf Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1, P2 on on drawing XL-401 04 05 T/Af T/Fm Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing XL-401 06 S/Hs QTY UNIT RATE AMOUNT SR

Item

No.

10

No.

36 32

No. No.

10

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM LANDSCAPING Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing XL-401 01 02 G/As G/Cgp Lawn planting, including soil planting mix, filter membrane and drainage layer all as per details and planting schedule as per detail P4, on drawing XL-401 03 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

315 606

No. No.

1496

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:01 Discharge valve room without basement floor including required earthworks, concrete works for the vacuum room masonry for the vacuum room and electromechanical works and all required works as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from tower chute to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Outdoor Load station. including required earthworks, concrete works, masonry and electromechanical works for the vacuum room and PAI service box and all required works as detailed on drawing no. STM - ITCCP2 - TD -013 and 014 Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from villas and playgrounds to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant 03 508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover and all required to complete the work. 04 RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016 To Collection SR 7 No. 360 M 1 No. QTY UNIT RATE AMOUNT SR

02

No.

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 04 75 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. Accesssories 05 06 Ground cleanout 100 mm dia, ref. GCO Glly trap, ref. GT Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 07 08 09 Inspection chamber, ref. (IC) 600x600mm Sedimentation chamber Slow down chamber 25 2 1 No No No 2 1 No No 37 215 665 265 M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15 - MECHANICAL MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 01 Sewer manhole, ref. (SMH) POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 04 50 mm dia. 63 mm dia. 100 mm dia. Reinforced concrete under ground water tank and pump room with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, sump pit, and submersible pump internal lining and water proofing, access ladders, pipework and valving, test main fold vent pipes, truck fill pipework with back flow preventer, ventilating fan and duct work within tank and pump room structure, and UPVC schedule 80 drainge pipe from submersible pump to the nearest sewer manhole and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 05 Potable & fire water tank 1 Item 110 60 435 M M M 11 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION POTABLE WATER SUPPLY SYSTEM Supply, installation and test Packaged type constant pressure booster potable water pumps, set of one duty and one stand by pump, including piping and valving network within pump chamber, complete with all controllers, accessories for automatic operateion and all associate works as per code standard and as described on drawings and specification 01 02 03 04 Ref. PWP- 3 CAP 150 GPM & 42.18 M TDH Ref. PWP- 5 CAP 75 GPM & 38.67 M TDH Ref. PWP- 6 CAP 75 GPM & 38.67 M TDH Ref. CP CAP 317 GPM & 6 M TDH Accessories 05 06 Water meter assembly 100 mm dia., ref. WMA Back flow preventer assembly, 100mm dia., ref. BFPA FIRE WATER UTILITIES Supply, installation and test Pipework, UPVC class 5 including fittings, trenching, back fill supports system and all associate works as per code standard 07 08 09 63 mm dia. 100 mm dia. 150 mm dia. Supply, installation and test Electrically driven horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 10 Ref. FP-1 CAP 750 GPM & 91.39 M TDH 1 No 8 160 110 M M M 1 1 No No 1 1 1 1 Set Set Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15 - MECHANICAL Supply, installation and test diesel driven horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 01 Ref. FP -2 CAP. 750 GPM & 91.39 MTDH Supply, installation and test Electrically driven peripheral turbine Jockey pump, including piping network and valving within pump chamber, complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 02 Ref. JP-1 CAP. 75 GPM & 100 MTDH IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 03 04 05 06 07 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 75 mm dia. 135 55 325 400 80 M M M M M 1 No 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15 - MECHANICAL IRRIGATION WATER INSTALLATION Accessories 01 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and installation bubbler for shrubs, ground cover and succulents Supply and installation bubbler for trees and palm tree Supply and installation spray lawn sprinkler Gate valve W/valve box 40 mm dia., Gate valve W/valve box 50 mm dia., Gate valve W/valve box 75 mm dia., Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 08 09 10 Ref. RCV 25mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 11 Proprietary tank units 1 Item 1 1 6 No. No. No. 1 No. QTY UNIT RATE AMOUNT SR

02

143

No.

03 04 05 06 07

254 30 2 1 5

No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15 - MECHANICAL Allow for the design, supply, construction, installation, development, testing and disinfection of water well including submersible deep water pump, pumps related equipment, piping cabling fitting, accessories as shown on drawings and specified in specifications 01 Deep water well 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Under ground pipe work Supply, install and test black steel pipe work including fittings thermal insulation, trench work , backfill flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 150 mm dia. 100 mm dia. 80 mm dia. ETS room pipe work Supply, install and test black steel pipe work including fittings thermal insulation, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 04 05 06 07 150 mm dia. 80 mm dia. 32 mm dia. 25 mm dia. QTY UNIT RATE AMOUNT SR

150 130 215

M M M

60 50 25 10

M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test reinforced concrete valve box including two valves as details on drawings and specifications 01 80mm dia., Supply and install heat exchanger including valves and short length piping as detailed on drawings and as per specifications 02 Ref. HEX-01 to 04, 300 KW capacity Supply, install, test and commission, variable speed chilled water centrifugal inline pumps unit including valves, flexible connections, Y-striners, mounting and fixing to pads (measured separately) as detailed on drawing and specifications 03 Ref. SCWP-01 to 04, 8 L/S capacity 25 m TDH Supply, install and commission, expansion tank as detailed on drawings and specifications 04 Ref. ET, 300 liter capacity QTY UNIT RATE AMOUNT SR

No.

No.

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and commission, air separator tank as detailed on drawings and specifications 01 Ref. AS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 02 Ref. FCU-02, 12.2 KW cooling capacity Supply, install, test and commission, of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including power cables, wiring and conduits and cable trays from the MCC to HVAC equipment, interlocks, earthing ...etc, all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 03 Ref. MCC- CWP Supply, install, test and commission automatic chemical dosing unit as detailed on drawings and specifications 04 Ref. ACDU QTY UNIT RATE AMOUNT SR

No.

No.

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 01 02 03 Electronic KWH meters M-bus master controller complete with software M-bus IP router MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in direct buried including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 06 07 08 4C-16mm2-CU/XLPE/STA/PVC / direct buried 4C-95mm2-CU/XLPE/STA/PVC/ direct buried 2(4C-185mm2-CU/XLPE/STA/PVC)/ direct buried 2(4C-300mm2-CU/XLPE/STA/PVC) / direct buried 3(4C-300mm2-CU/XLPE/STA/PVC) / direct buried To Collection 490 80 115 125 90 M M M M M SR 4 4 4 Note QTY UNIT RATE AMOUNT SR

No No No

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 Ref. EPP- IP54 Ref. EPP1- IP54 Ref. MCC ( supplied and installed by others ) OUTDOOR MAN/ HAND HOLE Supply, install, testing and commissioning reinforced concrete manholes and hand holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power and communication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 06 Power manhole (1800x1800x1800mm) ( Ref.PMH). Power hand hole (600x600x600mm) ( Ref.PHH). Communication hand hole (600x600x600mm) ( Ref.CHH). 1 5 7 No No No 1 1 1 No No No NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 Floor mounted ,Junction box, Disconnect switch, non-fused with pilot light, weatherproof,16A, 1P, 230V for waste collection & fuel pump Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for fuel pump ETS ROOM AND PUMP ROOM 04 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for EF-01,PWP-5,6 &CP-1 Disconnect switch, non-fused with pilot light, weatherproof, 32A, 1P, 230V for lift pump , sub pump & PWP-3 Disconnect switch, non-fused with pilot light, weatherproof,40A, 3P, 400V for MCC-CWP Disconnect switch, non-fused with pilot light, weatherproof,200A, 3P, 400V for fire pump & jockey pumps Disconnect switch, fused with pilot light, weatherproof, 20A, 1P, 230V for FCU-02 Single phase socket outlet , weatherproof , 10 A, 230V, grounding type Duplex socket outlet , weatherproof ,16 A,230V, grounding type To Collection 4 No 3 3 No. No QTY UNIT RATE AMOUNT SR

03

No

05

No

06

No

07

No

08

No

09

No

10

No. SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM AND PUMP ROOM 01 Single pole one-way switch weatherproof (13A) Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM AND PUMP ROOM 02 Lighting fixture outlets Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories. (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM AND PUMP ROOM 03 Ref, F1 To Collection 10 No SR 10 No 2 No. QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL DATA AND VOICE SYSTEM INSTALLATION Supply, install, testing and commissioning of telecommunication system comprising of data / telephone outlet including associated cable /wires, conducting, interfacing works& connection to be connected @ UB01 , shall make arrangement and required coordination with supervising engineer to complete the work as shown on drawings and as described in specification 01 Wall mounted telecommunication outlet, 1 ports, weatherproof, (one tel ) for ATM , ref. T01 FIRE ALARM SYSTEM Supply, install, testing and commissioning of fire detection /alarm system comprising of detectors, pull stations, modules including associated cable /wires, conducting, interfacing works& connection to be connected @ UB01 , shall make arrangement and required coordination with supervising engineer to complete the work as shown on drawings and as described in specification To suit fire alarm system network equipped with: ETS ROOM AND PUMP ROOM 02 03 Ceiling mounted optical smoke detector, Fire alarm interface unit 2 1 No No 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN TELECOMMUNICATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for data and telephone system to connect all buildings/floor distributers BD/FD to the primary/secondary active switch as shown on drawings. Item includes cables\ wires in conduits and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system MAIN FIRE ALARM SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for fire alarm system to connect all FACPs in all buildings with each other as shown on drawings. Item includes cables\ wires in conduits and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 02 To suit all network system 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 01 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible GROUNDING SYSTEM Supply, install, test and commissioning a grounding system for cluster comprising bare copper conductors for grounding all electrical and mechanical equipments in the cluster and all required works for connecting in one grounding system In addition to all earthwork, connections, clips, copper clad steel rods in ground test wells with cast iron covers situated around the building as required and all associated works as necessary to provide a complete grounding system, all as shown on drawing . Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 02 To suit grounding system for network of cluster 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 24 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) ITEM Collection Sheet - 1 Sheet - 2 Sheet - 3 Sheet - 4 Sheet - 5 Sheet - 6 Sheet - 7 Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11 Sheet - 12 Sheet - 13 Sheet - 14 Sheet - 15 Sheet - 16 Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 20 Sheet - 21 Sheet - 22 Sheet - 23 To Bill Summary SR DESCRIPTION QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 24 REVISED PAGE