PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL05) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer SITE DEVELOPMENT Earthworks, concrete works, water proofing, moisture protection for foundations works are measured in BOQ AP06 The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions Site clearance and demolitions 02 Demolish and clear away existing structures, pavings, electrical lighting, pavements or upstands, cut and plug or reroute existing service lines or utilities inside property line, clear site of rubbish or any impediments, loose top soil and as deemed necessary, for the total site cluster number 5 (CL05) area, approximately (23230m2), subject to engineer approval and as coordinated with public pension agency as shown on drawing CL05- XC-01 1 Item Note Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 01 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Note DESCRIPTION QTY UNIT RATE AMOUNT SR

Note

50

M3

02

11000

M3

Note
Work on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install precast concrete shotblasted pavers (beige color) size 400x400x60mm thk.with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no A1 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install precast concrete shotblasted pavers (beige, & brown color) size 400x400x60mm thk.with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A5 on drawing CL05-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install precast concrete shotblasted pavers (light grey & grey color) size 400x400x60mm thk.with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A6 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install precast concrete shotblasted pavers (beige & light beige color) size 400x400x60mm thk w./grey color granite band size 200x200x30mm thk including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. B3 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install polished granite paving dark &light colors,size 400x400x30mm thk w.\ granite band dark color, size 200x200x30mm including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane as per detail no. C2 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 To Collection QTY UNIT RATE AMOUNT SR

3438

M2

02

64

M2

03

1749

M2

04

649

M2

05

380

M2

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install concrete screed with epoxy coat finish including 100mm/50mm thick cast-in-place concrete slab with A193-WWF reinforcement mesh, polyethylene moisture barrier, compacted sub grade, 3mm water proofing membrane on R.C. slab as per detail no. D on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install 50mm thk rubber pavement green, blue , brown & red color including adhesive mixture,100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement smooth finish, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. E4 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install 80mm thick ( beige & grey) color, interlocking concrete pavers including 20mm thik cement ,mortar setting bed, compacted sand leveling course , compacted aggregate base course 150mm thick, cast in place concrete foundation, concrete edger compacted subgrade complete as per detail F8 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 Supply and install cast in place concrete paving with A193-WWF mesh reinforcement, smooth finish light grey color, 100mm thick w.\ brick edge band size 200x200x60mm thick including 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. G7 on drawing CL05-XL301 to suit required locations as shown on drawing CL05-XL101 EARTH MOUNT 05 Supply and formation of 500-1500 mm height earth mount including compacted sub base layer, 100 mmm thick layer of sand and gravel mix, and all required to complete and finish te work as shown on drawing CL05- XL101, and as per detail no. 5 on drawing CL05- XL302 and sections details (Softscape and planting soil mix are measured elsewhere)(area measured on plan) QTY UNIT RATE AMOUNT SR

12690

M2

02

120

M2

03

1507

M2

04

22

M2

166

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM CURBS AND EDGING 01 Supply and install precast concrete road curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on R.C. slab as per detail no.1 on drawing CL05-XL302 to suit required locations as shown on drawing CL05-XL101 Supply and install precast concrete mowing edge, size 200X100X65 mm including concrete base, 20mm thick cement mortar setting bed, cast in place concrete base on R.C. slab, as per detail no. 2 on drawing CL05-XL302 to suit required locations as shown on drawing CL05-XL101 SUNDRIES TENSILE STRUCTURE 03 Supply and install tensile staructure comprising columns, tent fabric, foundation, earthwork, and all required to compleet and fix the work as shown on drawing CL05- XL101 and as per detail no. 3 on drawing CL05- XL302, and section details and as per manufacturer's recommendations and subject to engineer's approoval to cover an area of 80 m2 . Contractor shall submitt shop drawings for approval before supply Wooden Shade Structure 04 Supply and install wooden shade staructure comprising 200200mm artificial wooden post, 100200 mm wooden beams , foundation, earthwork, and all required to compleet and fix the work as per deatail 6 on drawing XL302 and manufacturer's recommendations and subject to engineer's approoval to cover an area of 90 m2 . Contractor shall submitt shop drawings for approval before supply Wooden Bench 05 Supply and install wooden bench comprising concrete walls, reinforced concrete slab with A 193 W.W.F reinforcement mesh smooth finished including footings, waterproofing membrane, joint filler, 50x75 mm interior wooden rails, including earthworks, insulation, finishing, fixing, and all required to complete the work as per detail no.4 on drawing CL5- XL302 To Collection DESCRIPTION QTY UNIT RATE AMOUNT SR

2728

02

28

No.

No.

30

M2
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL05-XL601,602 and as per specifications 01 02 03 04 Ref. type 1 ( RESIDENTIAL SIGN ) Ref. type 2 ( DIRECTIONAL SIGN ) Ref. type 3 ( CENTRAL PLAZZA SIGN ) Ref. type 4 ( ADVERTISING PANEL ) QTY UNIT RATE AMOUNT SR

6 4 1 2

No. No. No. No.

Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL05-XC-05, CL05-XC-06 and as per specifications INFORMATIVE SIGNS 05 06 Ref. type I-1 ( PARKING ) Ref. type I-2 ( ENTRY ) REGULATORY SIGNS 07 08 09 10 Ref. type R2-1 (GIVE WAY ) Ref. type R5-1 ( ENTRY PROHIBTED ) Ref. type R 8-1 ( NO LEFT TURN ) Ref. type R 17-6 (MANDATORY MOVEMENT - L ) WARNING SIGNS 11 Ref. type W11-1 ( PEDESTRAIN CROSSING )

3 6

No. No.

9 11 2 1

No. No. No. No.

17

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION ROAD SIGNAGE & PAVEMENTMARKING Thermoplastic paint for traffic marking on drive way at basement/ground floor and ramps floor as per Manufacturer's standard as shown on details on drawing CL05-XC-06, to suit required locations as shown on drawing CL02-XC-05, as per specification and as per engineer's instructions pavement marking 01 02 03 04 05 06 07 08 09 10 11 Straight arrows Straight & curved arrows Curved arrows Handicapped marking on floor Parking lane marking White stop line Pedestrain crossing Lane marking White edge line Dotted ( give way line ) Speed control hump including cut & removal of existing wearing (0.05m) course & add a new course, tack coat and 0.10m of bituminous wearing course, ref. 10 detail G 42 QTY UNIT RATE AMOUNT SR

No. No. No. No. M M M M M M M

5 11 3 2170 70 122 910 810 1010 25

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM LANDSCAPING Trees including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1 on drawing CL05-XL-401 01 02 03 T/Af T/Fm T/Po DESCRIPTION QTY UNIT RATE AMOUNT SR

16 32 2

No. No. No.

Shrubs including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P3 on drawing CL05-XL-401 04 05 06 S/Hs S/Mc S/Pav

107 78 18

No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM LANDSCAPING Ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P2, on drawing CL05-XL-401 01 02 03 04 G/As G/Ggp G/Gr (Y) G/Cm (W) Lawn planting, including soil planting mix, filter membrane and drainage layer, screed sloped to drain all as per details and planting schedule as per detail P3 on drawing CL05-XL-401 05 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

1509 1725 493 565

No. No. No. No.

487

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 100 mm dia. 150 mm dia. 200 mm dia. Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 04 05 Inspection chamber, ref. (IC) 600x600mm Inspection chamber, ref. (STIC) 600x600mm WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 06 100 mm dia Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 07 Slow down chamber To Collection 5 No SR 50 M 4 6 No No 60 315 90 M M M QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION PLUMBING INSTALLATION Reinforced concrete under ground water tank and pump room with required capacity proprietary cast iron manhole covers and frames, including (concrete work & earthwork, water proofing) internal lining access ladders, pipework submersible pump, ventilating fans with exhaust and fresh air pipework, valves, vent pipes and truck fill pipework as detailed on drawings 01 Fire Water tank MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 02 03 Sewer manhole, ref. (MH) Sewer manhole, ref. (STMH) Fire WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for fire water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 04 100 mm dia. Supply, installation and test horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 05 06 Ref. FP1 CAP 75 KW electrically driven Ref. FP2 CAP 75 KW fuel diesel driven 1 1 No No 105 M 6 3 No. No. 1 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION FIRE WATER UTILITIES Supply, installation and test Electrically driven peripheral turbine Jockey pump, including piping network and valving within pump chamber, complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 01 Ref. JP CAP 5 KW IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 04 05 20 mm dia. 25 mm dia. 32 mm dia. 50 mm dia. Accessories 06 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and install bubbler for shrubs, ground cover and succulents Supply and installation bubbler for trees Supply and installation spray lawn sprinkler Gate valve W/valve box 25 mm dia., Gate valve W/valve box 32 mm dia., Gate valve W/valve box 50 mm dia., 1 No. 33 110 30 295 M M M M 1 No QTY UNIT RATE AMOUNT SR

07

770

No.

08 09 10 11 12

135 16 1 1 6

No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 01 02 03 04 Ref. RCV 20 mm dia. Ref. RCV 25 mm dia. Ref. RCV 32 mm dia. Ref. RCV 50mm dia. 1 1 1 6 No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM SITE DEVELOPMENT Collection Sheet -1 Sheet -2 Sheet -3 Sheet -4 Sheet -5 Sheet -6 Sheet -7 Sheet -8 Sheet -9 Sheet -10 Sheet -11 Sheet -12 Sheet -13 DESCRIPTION QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 2 - SITE WORK SITE GRADING All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 01 Excavation for foundations commencing from existing grade level Backfilling 02 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Approved fill material selected from excavated material including compaction as per specification section 02200 Soil treatment application for termite control 04 To subgrades of slabs and along periphery of building The work shall include all materials and equipments required to complete and finish the work according to specifications and code of practice Note QTY UNIT RATE AMOUNT SR

Note

73752

2300

03

price only

19170

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 2 - SITE WORK TRAFFIC MARKING DIMENSION Thermoplastic paint for traffic marking on parking pavement as detail 11 shown on drawing CL-GA-901 and specification 01 02 03 04 05 06 07 Straight arrows Turning arrows Parking lane marking Handicapped marking on floor NO ENTRY (text) EXIT (text) Lane numbers 78 No. QTY UNIT RATE AMOUNT SR

1 1465 19 3 3
142

No. M No. No. No.


No SR

To Collection Collection Sheet - 15 Sheet - 16

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Catch basins and side walks 40 Mpa a) Footings b) Columns and R.C. walls c) Floor and roof slabs, beams, girders, stairs d) Concrete topping or structural screed e) Slab on grade f) water tanks Water stops including junction accessories are not measured separately The cost of water stop items are to be included in the unit rates of the related concrete items QTY UNIT RATE AMOUNT SR

Note

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 3 - CONCRETE Plain insitu concrete, 20 Mpa, cement type V as per specifications section 03300 01 02 Screed, 50mm thick Blinding beds, 100mm thick QTY UNIT RATE AMOUNT SR

1057 2113

M M

Supply and placing Insitu reinforced concrete, 40 Mpa cement type V including formwork and steel reinforcements conforming to ASTMA615and A185 and all requiments to finish the work according to drawings as per specifications sections 03100, 03200 & 03300 , and code of practice in: 03 Raft foundation various thickening including depression areas, sump pits and elevators pits and electrical cables trench Retaining walls Reinforced concrete for tanks

14300

04 05

855 521

M M3

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK Supply and placing of Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 and all requirements to finish the work according to the drawings,as per specifications sections 03100, 03200 & 03300,and code of practice 01 02 03 04 05 06 07 08 Columns Shear wall Beams Suspended flat slabs, 300mm thickening including drop panel Suspended flat slabs, 350mm thickening including drop panel Suspended flat slabs, 380mm thickening including drop panel Ramps Stairs including landings PRECAST CONCRETE Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 21 on drawing CL-GA-901 and specification 09 Precast concrete wheel stopper including fixings 477 424 71 2718 1531 2565 70 84 M M M M M M M M QTY UNIT RATE AMOUNT SR

375

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK Sundries 01 Allow for reinforced concrete equipment pads including upstand surrounds and anti-vibration accessories as required 150mm thick raised slabs, Handicapped`s ramps and curbs to suit required areas as per detail 10,14, 20 on drawing CL-GA-901 Reinforced concrete electrical cable trench including all associated works 17 M QTY UNIT RATE AMOUNT SR

02

645

03

48

To Collection Collection Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 20

SR

To Bill Summary

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 4 - MASONRY UNIT MASONRY Supply and fix concrete masonry blocks in courses with cement lime mortar including concrete lintels over openings , horizontal and vertical reinforcement, fixings, fillers, sealants and grout to complete the work according to specifications and drawings 01 02 03 04 05 15 mm thick wall, one hour fire rated 200 mm thick wall 200 mm thick wall, one hour fire rated 200 mm thick wall, two hours fire rated 300 mm thick wall, one hour fire rated QTY UNIT RATE AMOUNT SR

42 37 308 487 21

M M M M M

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DIVISION 5 - METALS Expansion joint Supply and install expansion joint cover including extruded aluminum assembles, fillets, accessories, fixing and sealants as per drawing CL-GA-902 and according to specifications 01 02 03 04 05 06 Floor to floor cover as per detail no. 1a Wall to wall cover as per detail no. 1b Wall to wall cover as per detail no. 1e Floor to wall cover as per detail no. 1d Ceiling to ceiling cover as per detail no. 1j Wall to ceiling cover as per detail no. 1h Steel cover as per details on drawings 07 08 To suit electrical cable trench To suit sump pits at basement Supply and install 30mm depth panted galvanized cast iron gratings including 40x40mm steel angle, medium gauge galvanized gutter slope to drain and all required for fixing and finisheng as per detail no.9 on drawing CL-GA-901 and specificatons 09 To suit required locations 2300 1450 1705 750 1200 400 M M M M M M DESCRIPTION QTY UNIT RATE AMOUNT SR

68 7

M2 No

24

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 7 - THERMAL AND MOISTURE PROTECTION Water proofing and moisture protection as per specification section 07100 01 Membrane waterproofing as per specifications to suit base slab and retainig walls Protection board to suit base slab and retainig walls 30800 M
2

QTY

UNIT

RATE

AMOUNT SR

02

2380

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 8-DOORS AND WINDOWS DOOR SETS Supply and install all doors to suit masonry openings and approved samples including fixings, decorations, frames, architrave, hardwares and saddles and all required to complete and finish the work as detailed on drawing CL-GA-801 and according to specifications and code of practice TYPE B : 44mm thick painted hollow metal insulated door including door grill (where required) 01 02 Type B1, single leaf door, size 900x2150mm and 45 min. fire rated Type B6, double leaves door, leaf size 950x2150mm and 45 min. fire rated 44mm thk. fully louvered painted hollow metal door. motorized adjustable louvers panel working upon signal from fire alarm system for generator . 03 Type C1, double leaves door, leaf size 950x2400mm and 45 min. fire rated Type C2, double leaves door, leaf size 1050x2400mm and 45 min. fire rated WINDOWS 24 mm thick double tempered glazed sliding window tinted outside clear inside , on powder coated aluminum frame including all hardware, fixtures, packings, sealants, weather strippings and the like as described drawing CL-GA-801 to suit opening and as per specification 05 Ref. W02 QTY UNIT RATE AMOUNT SR

Note

7 6

No. No.

No.

04

No.

No

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of bounding materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per ID drawing and specification 01 02 03 Epoxy paint on cement screed. , ref. EC Anti carbonation protection epoxy coating for pavement. , ref. AEC 8mm thk. heavy duty multi component epoxy screed with polyurethane base on concrete screed for car ramps,supported with linear metal strip for non sliding. , ref.HES Multi component epoxy coating on concrete screed for drive way & turns. , ref. MEC Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds 05 06 Cement plaster to suit walls Paint on cement plaster ,ref. W01 Finishings : ceilings 07 08 Cement plaster to suit ceiling Paint on cement plaster, ref.C01 QTY UNIT RATE AMOUNT SR

368 4302 352

M M M

04

8105

7630 7630

M M

15950 15950

M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 9 - FINISHES EXTERNAL FINISHES Finishing : walls including metal angle beads and lathing at junctions of differing backgrounds 01 02 Cement plaster to suit external surface External Paint on cement plaster to suit external surface QTY UNIT RATE AMOUNT SR

66 66

M2 M2

To Collection Collection Sheet - 25 Sheet - 26

SR

To Bill Summary

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES CORNER & COLUMN GUARD Corner guards install at 600 high from finish floor heavy duty rubber guard bumper, including all associated works, as per detail 18 shown on drawing CL-GA-901 and as specification 01 To suit column location as required 63 No QTY UNIT RATE AMOUNT SR

ALUMINUM LOUVERS SCREEN Supply and install fixed anodized aluminum sand trap louvers panels on anodized aluminum frames including finishes and all associated works to complete and fix the works as per details on drawing CL-GA-802 and specification 02 03 04 05 06 07 Ref. L03, size 3200x2500mm to suit required locations Ref. L06, size 2300x2500mm to suit required locations Ref. L07, size 700x450mm to suit required locations Ref. L08, size 700x400mm to suit required locations Ref. L09, size 2500x5000mm to suit required locations Ref. L10, size 1500x1500mm to suit required locations 2 2 2 6 1 3 No No No No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES SIGNAGE Manufacturer's standard indoor signs, letters and plaques including fixings, finishes, accessories complete as per interior design drawings CL05-i901 to CL05-i907 and all required materials and equipments to complete and finish the works according to specifications, drawings and code of practice 01 02 03 04 05 06 07 Ref. type S01 Ref. type S02 Ref. type S09 Ref. type S10 Ref. type S11 Ref. type S12 Ref. type S13 18 4 20 30 21 17 3 No No No No No No No SR QTY UNIT RATE AMOUNT SR

To Collection

Collection Sheet - 27 Sheet - 28

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM QTY UNIT RATE AMOUNT SR

Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:-

01

Discharge valve room with basement floor including all required works as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste from tower chute to pipe networks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Discharge valve room without basement floor including required earthworks, concrete works for the vacuum room masonry for the vacuum room and electromechanical works and all required works as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from tower chute to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant

14

No.

02

No.

03

508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover steel rungs and all required to complete the work.

1070

04

RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016

29

No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 40 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 01 02 03 04 32 mm dia 50 mm dia 100 mm dia 150 mm dia Accessories 05 06 07 08 09 Area drain 150mm dia., ref. AD Floor drain, 50 mm dia., ref. (FD) Parking drain, 150mm dia., ref. PD Cleanout, 75 mm dia., ref. (CO) Cleanout, 100 mm dia., ref. (CO) 21 22 57 36 138 No. No. No. No. No. 150 210 490 940 M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Accessories 01 02 03 04 Floor cleanout 100mm dia., ref. (FCO) Floor cleanout 150mm dia., ref. (FCO) Gully trap, ref. GT Trench drain outlet, 100mm dia., ref. TDO Reinforced concrete gray water tank with required capacity and proprietary medium duty cast iron manhole cover and frame, including sump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 05 Gray water tank Packaged type variable speed discharge pressure system Gray water lift pumps, including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 06 07 Gray water lift pumps CAP. 5 KW Gray water lift pumps CAP. 6 KW Reinforced concrete sump pit including internal lining, proprietary galvanized steel manhole cover and frame, guide bar, lifting chain and all associated works, valves pipework within sump pit chamber as detailed on drawings (concrete work & earthwork, waterproofing measured elsewhere) 08 Sump pit 7 No. 5 5 Set Set 10 No 41 22 16 3 No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Submersible pumps (one duty and one stand-by) including associated valves, pipework, valves controllers and accessories within sump pit chamber as described on drawings (sump pit measured separately) 01 02 Ref. SP1 capacity 1.5 HP Ref. SP2 capacity 2 HP Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 03 Packaged water treatment unit. Cap. 58 m3/day POTABLE WATER INSTALLATION Supply, installation and test pipework, plypropylene for potable water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 04 05 06 07 08 20 mm dia. 25 mm dia. 50 mm dia. 63 mm dia. 100 mm dia. 835 205 685 165 485 M M M M M 9 No. 5 2 Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS NON-POTABLE WATER INSTALLATION Supply, installation and test pipework, plypropylene for non-potable water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 01 02 03 04 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. Accessories 05 06 07 08 09 10 Water meter assembly 63mm dia., Isolating valve, 50 mm dia, ref. (IV) Isolating valve, 75 mm dia, ref. (IV) Isolating valve, 100 mm dia, ref. (IV) IV & CV assembly 100 mm dia., Hose bib 20mm dia., ref. (HB) 14 33 28 1 7 51 No. No. No. No. No. No. 1585 80 610 505 M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS Packaged type duplex unit discharge pressure system potable water lift pumps, (one duty & one stand by) including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing and specification section 15453 01 02 Potable water pump CAP. 7.17 KW Circulating potable water pump CAP. 0.5 HP Reinforced concrete under ground water tank and pump room with required capacity and proprietary cast iron manhole covers and frames, including internal lining access ladders, pipework submersible pump, ventilating fans with exhaust and fresh air pipework, valves, vent pipes and truck fill pipework as detailed on drawings (concrete work & earthwork, water proofing measured elsewhere) 03 Potable Water tank 6 No. 6 6 Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, installation and test Pipework, UPVC class 5 including fittings, trenching, back fill supports system and all associate works as per code standard 01 02 03 04 05 06 07 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. Accessories 08 09 10 11 12 13 14 Pendent sprinkler head Upright sprinkler head Side wall sprinkler head 100mm Fire departement valve , ref. FDV Floor control valve assembly 100mm dia., ref. FCVA Floor control valve assembly 150mm dia., ref. FCVA Fire department connection, 2 way fire department inlet connection type with gate and check valve 100mm dia. Fire department connection, 2 way fire department inlet connection type with gate and check valve 150mm dia. 126 1239 14 31 3 7 No No No No No No 3155 405 745 405 1725 795 60 M M M M M M M QTY UNIT RATE AMOUNT SR

No

15

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, install, testing and commissioning proprietary integrated fire hose reel and fire extinguisher cabinet the work shall include but not limited to fire extinguisher, hose reel nozzle, fixings, isolating valve 40 mm dia., trims and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 Ref. FHC Supply, install, testing and commissioning portable multipurpose fire extinguisher the work shall include but not limited to fixing to wall, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 Ref. PFE Ref. CO2 CO2 system Supply, install and test CO2 cylinders including pipe work, black steel seamless for CO2 fittings, supports valves, regulators, sleeves, as shown on drawings and as per specification 04 05 06 07 08 09 10 CO2 cylinders CAP 45 KG Control panel Remote manual release Abort switch Alarm bell 4-port nozzle Ioization detector To Collection 38 14 14 14 14 14 14 3 33 No No 18 No QTY UNIT RATE AMOUNT SR

No. No. No. No. No. No. No.


SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 01 Proprietary tank units CAP. 3800 Lit. 3 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Collection Sheet -29 Sheet -30 Sheet -31 Sheet -32 Sheet -33 Sheet -34 Sheet -35 Sheet -36 Sheet -37

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test black steel pipework including fittings thermal insulation, flexible connections and accessories as per required drawings and specification sections15050 to 15140 ,15510 01 02 03 04 05 06 07 08 09 10 11 15 mm dia. 20 mm dia. 25 mm dia. 32 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. 250 mm dia. 350 mm dia. 400 mm dia. 450 mm dia. QTY UNIT RATE AMOUNT SR

265 70 20 200 810 505 270 120 55 465 15

M M M M M M M M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply and install valve / BTU meter Butterfly valve 01 Ref. MBFV 400 mm dia., Isolating valve 02 32mm dia., Check valve 03 32mm dia., BTU meter 04 32mm dia., Supply and install heat exchanger including valves and short length piping as detailed on drawings and as per specifications 05 Ref. HEX-01 to 05, 1960 KW capacity Supply, install, test and commission, variable speed chilled water centrifugal inline pumps unit including valves, flexible connections, Y-striners, mounting and fixing to pads (measured separately) as detailed on drawing and specifications 06 Ref. CWP-01 to 05, 52.0 L/S capacity 45 m TDH QTY UNIT RATE AMOUNT SR

No.

34

No.

17

No.

17

No.

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and commission, expansion tank as detailed on drawings and specifications 01 Ref. ET, 1200 liter capacity Supply, install and commission, air separator tank as detailed on drawings and specifications 02 Ref. AS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 03 04 05 06 Ref. FCU-02, 17.1 KW cooling capacity Ref. FCU-03, 3.1 KW cooling capacity Ref. FCU-04, 4.3 KW cooling capacity Ref. FCU-05, 5.3 KW cooling capacity Supply, install, test and commission DX-ducted split unit including control, pipes and fixing as per drawing and specifications 07 Ref. RAC-01, 3.51 KW nominal coollling capacity Supply, install, test and commission, DX-ducted split unit including control, pipes and fixing as per drawings and specifications section 15781 08 Ref. FCU-01/ACCU-01 , 4 KW capacity Supply, install, test and commission automatic chemical dosing unit as detailed on drawings and specifications 09 Ref. ACDU To Collection QTY UNIT RATE AMOUNT SR

No.

No.

2 13 13 4

No. No. No. No.

51

No.

No.

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Ventilating fans as details on drawings and specifications, section 15860 01 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and CAP. Ref. EF- 01, 85 LPS capacity Ref. EF- 02, 60 LPS capacity Ref. EF- 03, 1600 LPS capacity Ref. EF- 04, 160 LPS capacity Ref. EF- 05, 105 LPS capacity Ref. EF- 06, 50 LPS capacity Ref. BIF-01, 3600 LPS capacity Supply, install, test and commission, Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 09 10 11 Ref. SD1 Ref. SD2 Ref. SD3 QTY UNIT RATE AMOUNT SR

No.

02 03 04 05 06 07 08

3 3 3 3 3 18 24

No. No. No. No. No. No. No.

26 28 616

No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, supply air register as detailed on drawings and specification 01 Ref. SR 1 / RR1 Supply, install, test and commission, Return round louver face ceiling diffusers as detailed on drawing and specification 02 03 04 Ref. RD1 Ref. RD2 Ref. RD3 Supply, install, test and commission, door grill as detalied and specificaitons 05 06 Ref. DG1 Ref. DG3 Supply, install and test motorized door louver as detailed on drawing and specification QTY UNIT RATE AMOUNT SR

No.

26 28 6

No. No. No.

18 2

No. No.

7
07 size 950 x 2200 mm Supply and install Galvanized steel sheet rectangular ductwork, including supports and volume damper , and bill mouth opening as per drawings and specification 08 Various gauges Supply and install Duct insulation 09 Thermal semi-rigid insulation to rectangular ductwork Supply, install and test generator exhaust ductwork with canvass connection 10 To suit generator room To Collection

No.

985

Kg

250

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including power cables, wiring and conduits and cable trays from the MCC to HVAC equipment, interlocks, earthing ...etc, all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 01 Ref. MCC- CWP QTY UNIT RATE AMOUNT SR

No.

To Collection Collection Sheet - 38 Sheet - 39 Sheet - 40 Sheet - 41 Sheet - 42 Sheet - 43

SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION MVSWGR (medium voltage switchgear) Supply , install , testing and commissioning 13.8 KV, 3 phase, 60 Hz,SF6 MVSWGR with 3 cells (1 inputs +2 outputs) including all associated works to complete installation as per drawings and specifications. The contractor shall prepare sketches and details for approval from SEC and shall make arrangement and required coordination with supervising engineer to complete the work 01 M.V Switchgear unit ref (MVSWGR/CL-5) RING MAIN UNIT Only installation, testing and commissioning for 13.8 KV, 3 phase, 60 Hz SF6 ring main unit including all associated works for complete installation as per drawings and specifications and required coordination (supply will be by client) 02 Ring main unit RMU1,2,3.4 1 No QTY UNIT RATE AMOUNT SR

No

MEDIUM AND LOW VOLTAGE DISTRIBUTION Supply installation, testing and commissioning of the following equipment including all accessories and necessary works required for installation as shown on the drawings E-701,E201 and as described in specifications section 16461,16124and and by making arrangiement with supervising engineer to achieve the work to the best possible and specifications 03 Dry type transformers , 1000 KVA, 13.8 KV ,400/230V , 3PH, 60HZ, ref (TR 1,2,4-CL5) Dry type transformers, 1600 KVA, 13.8 KV ,400/230V , 3PH, 60HZ, ref (TR 3-CL5)

3 1

No. No.

04

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION Supply , install and test medium voltage copper Cables 15KV/ XLPE/STA/PVC, between medium voltage equipments as shown on drawings and coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ PVC, cables route from RMU up to transformers Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ PVC, cables 20 M QTY UNIT RATE AMOUNT SR

02

485

Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller complete with soft ware and bus IP router, including digital electrical KWH meters, 1 pair twisted cable # 22 AWG type to TCP/IP net work and all associated works required as shown on drawing E-501--E520 and as described in specifications section 16211 To suit Building Smart Metering System with multi -electronic meter (MEM) and main bus and IP router as required to form a complete and fully operative system to link all project buildings with the existing data center at phase 1 03 04 05 Electronic KWH meters M-bus master controller complete with software M-bus IP router 17 17 17

Note

No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply and install an Emergency Power Generating Sets including Generator Control Panel (GCP). In addition to circuit breakers, pads, supports, controls and daily diesel fuel storage tank, including all necessary equipment, accessories and associated works, as shown on drawings E-701,E201 as described in specifications section 16231, and by making arrangiement with supervising engineer to achieve the work to the best possible and specifications 01 02 Ref. (G1,G3) 550 KVA, 3 phase 4 wire ,400/230V , 60 Hz. Ref. (G2) 600 KVA, 3 phase 4 wire ,400/230V , 60 Hz. supply , install, testing and commissioning multicore copper cable ( XLPE/PVC -1000/600V) in cable tray or cable trench (measured elsewhere) including junction boxes, connection for feeders and various power loads as shown on drawings E-701 and as per specification section 16126 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 03 04 05 06 07 08 09 10 11 12 13 (4 C-10 mm ) + 10 mm G/ cable tray (4 C-16 mm ) + 16 mm G /cable trench (4 C-25 mm ) + 16 mm G/ cable tray 4 C-35 mm + 16mm G/ cable tray 4 C-50 mm + 25mm G/ cable tray&cable trench 4 C-70 mm + 35mm G/ cable tray 4 C-95 mm + 50mm G/ cable tray&cable trench 4 C-185 mm + 95 mm G/ cable tray&cable trench 4 C-240 mm + 120 mm G/ cable tray&cable trench 2(4C-150mm2) + 150 mm G/ cable tray 2(4C-240mm2)/ cable trench To Collection QTY UNIT RATE AMOUNT SR

2 1

No. No.

115 20 345 200 665 60 265 320 785 875 15

M M M M M M M M M M M
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL supply , install, testing and commissioning multicore copper cable ( XLPE/PVC -1000/600V) in cable tray or cable trench (measured elsewhere) including junction boxes, connection for feeders and various power loads as shown on drawings E-701 and as per specification section 16126 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 3(4X1C-630mm2)/ cable trench The length of cables including the cluster-5 cables and cables in the first floor for AP03 & AP04 & AP06 according to No. for each AP in site Supply , install , power distribution heavy duty galvanized steel cable trays with cover including fixings, supports and all accessories as shown on drawingsE201--E220 and coordination & integration with other systems shall be conducted during work execution as per technical specifications section 16050 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 02 03 04 05 05 06 07 08 09 10 11 Cable tray 200 mm width Cable tray 200 mm width for emergency cables Cable tray 300 mm width Cable tray 400 mm width Cable tray 400 mm width for emergency cables Cable tray 400 mm width double layers Cable tray 600 mm width Cable tray 600 mm width double layers Cable tray 800 mm width Cable tray 1000 mm width Covered cable tray 300 mm width for optical fiber cables and primary and secondary networks. To Collection QTY UNIT RATE AMOUNT SR

35

M Note

152 540 222 263 50 50 29 25 30 37 1955

M M M M M M M M M M M
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER supply and install reinforced concrete Man / Holes connected via duct banks, complete with man / hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for duct banks, conduits for M.V cables in duct banks, tapes, all as required to suit locations as shown on drawings drawings E201--E220and as all accessories and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16180 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 Power Man Holes (180018001800 )Ref. MH for power including UPVC conduit Power Hand Hole (900900900 ) Ref. HH including UPVC conduit QTY UNIT RATE AMOUNT SR

No

02

No

03

Comm, Hand Hole (600600600 ) Ref. CHH including UPVC conduit

No

Site work 04 05 Power Man Hole Ref. PHH for power including UPVC conduit Power Hand Hole (900900900 ) Ref. HH including UPVC conduit

4 3

No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and , other functional units and all associated works as required and shown on drawings E 701,E704 , E201--E220 and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16442,16410,16415 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Ref. MDP-P1 Ref. MDP-P2 Ref. MDP-P3 QTY UNIT RATE AMOUNT SR

1 1 1 1 1 1 1 12 12 2 2 3 3 1 1 12

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

Ref. MDP-P4 Ref. Ref. EMDP-P1 EMDP-P2

Ref. EMDP-P3 Ref. DP31 Ref. DP32 Ref. DP41 Ref. DP42 Ref. DP61 Ref. DP62 Ref. DPSB1 Ref. DPSB2 Ref. EDPS3

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and , other functional units and all associated works as required and shown on drawings E 701,E704 , E201--E220 and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16442,16410,16415 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 02 03 04 05 06 07 09 10 11 12 13 14 15 16 17 Ref. Ref. EDPSB1 EDPSB2 with interlock and ATS built in QTY UNIT RATE AMOUNT SR

1 1 1 1 1 1 1 1 1 12 2 3 1 1 12 2

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

Ref. EPMSB1A Ref. Ref. EPMSB2B EPMSB2A with interlock and ATS built in

Ref. EPMSB2B Ref. EDPSB3A Ref. Ref. Ref. EPSB1 EPSB2 EPSC

Ref. EPSC1 Ref. EPSE Ref. PPSB1 Ref. PPSB2 Ref. PPSC Ref. PPSC1

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and , other functional units and all associated works as required and shown on drawings E 701,E704 , E201--E220 and coordination & integration with other systems shall be conducted during work execution as per technical specificationssection 16442,16410,16415 and by making arrangement with supervising engineer to achieve the work to the best possible specifications 01 02 03 Ref. Ref. Ref. PPSE SLP1A SLPE QTY UNIT RATE AMOUNT SR

3 1 6

No. No. No.

Pump room 04 Ref. EPP (IP 54 )

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approvement ) comprising cables, conduits, fittings, connections, from the outlets to Panelboards feeder associated works as required to suit the locations shown on drawings E201--E220 Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 02 03 Junction box ceiling mounted Junction box, wall mounted Disconnect switch,non-fused and with pilot light16A, 1P, 230V ,weatherproof for waste collection equipment Above false ceiling disconnect 20A, 1P, 230V for FCU-03.04,05 Disconnect switch,non-fusedand with pilot light 20A, 1P, 230V ,weatherproof for SP-01,02,03,04,05,06&fuel pumps Disconnect switch,non-fused and with pilot light 20A, 1P, 230V for BD3,4,6&FDB1,2,FD3G,FD4G,FD6G&FACP&A/P switcher Disconnect switch, fused and with pilot light 20A, 1P, 230V , for RAC& RAC-01&FCU-02 Disconnect switch, non-fused and with pilot light 20A, 3P, 380V ,weatherproof for gray& potabole pumps Above false ceiling disconnect 20A, 3P, 400V for BIF-01 Note QTY UNIT RATE AMOUNT SR

34 77 14 33 10 57

No. No. No. No. No. No.

04 05

06

07

54 16 24

No. No. No.

08

09

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

52 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approvement ) comprising cables, conduits, fittings, connections, from the outlets to Panelboards feeder associated works as required to suit the locations shown on drawings E201--E220 Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Disconnect switch, fused and with pilot light ,32A, 1P, 230V for FCU-01 Disconnect switch, non-fused and with pilot light ,50A, 3P,400V for PEF-01 Disconnect switch, non-fused and with pilot light ,500A, 3P,400V weatherproof for jocky pump, MCC-CWP Circuit breaker 200A for fire alarm panel (magnetic trip only) Motor switch with built -in over load protection (tumbler switch) For exhust fan outlet Single socket outlet, 10A, 230V, grounding type Single socket outlet, 13A, 230V, grounding type, weatherproof Single socket outlet, 16A, 230V, grounding type, EF Single socket outlet, 16A, 230V, grounding type, EF Duplex socket outlet, 16A, 230V, grounding type QTY UNIT RATE AMOUNT SR

No.

02

No.

03

No.

04 05 06 07 08 09 10 11

1 32 34 256 102 34 34 8

No. No No. No No No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

53 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approvement ) comprising cables, conduits, fittings, connections, from the outlets to Panelboards feeder associated works as required to suit the locations shown on drawings E201--E220 Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 02 03 Single pole one-way ,one gang switch (13A) Single pole one-way ,two gang switch (13A) Push button switch Site work 04 Junction box ,floor mounted for site Pump rooms 05 06 Junction box ceiling mounted Disconnect switch, non-fused and with pilot light 20A, 1P,230V weatherproof for sub. pump Disconnect switch, non-fused ,200A, 3P,400V, weatherproof for fire& jockey pump, Motor switch with built-in over load protection (tumbler switch), weatherproof Single socket outlet, 13A, 230V, grounding type, weatherproof Single pole one-way ,one gang switch (13A), weatherproof QTY UNIT RATE AMOUNT SR

108 20 55

No. No. No.

No.

1 1

No. No.

07

No.

08

No

09 10

1 1

No No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

54 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panelboards and associated works as required to suit the locations shown on drawings E101--E120 .Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16050 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Lighting fixer outlet Pump room 02 Lighting fixer outlet QTY UNIT RATE AMOUNT SR

1588

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

55 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnishe with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings E101--E120 ,GE-E01,GE-E01 and Coordination with other disciplines shall be conducted during work execution as per technical specifications, section 16500 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 Type EX ( wall mounted, single sided) Type EX ( ceiling mounted, single sided) Type F1 Type F1E Type F2 Type F2E Type F7E Type F8E Type NE Type WL3 Type WL4 Type WL4E Type FT1 flixible tube LED cove light Pump room 14 Type F1E To Collection QTY UNIT RATE AMOUNT SR

71 47 522 142 308 96 130 112 20 55 8 41 998

No. No. No. No. No. No. No. No. No. No. No. No. M.

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

56 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL GROUNDING SYSTEM Supply, installation , test and commissioning of a grounding system comprising bare copper conductor to bond the building's distribution boards and HVAC equipments to the main ear thing grid of the building. Including necessary earthwork, buried galvanized steel foundations strips surrounding the building phosphor bronze test joints & triangular counter poise and all associated works to suit grounding resistivity required as shown on drawings E301--E310 and as described in specifications16452,16453 by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Complete building grounding system network to suit ground resistivity as shown on drawings and specification To suit grounding system for low current system equipment as shown on drawings and specification 03 To suit grounding system for Pump room as shown on drawings and specification QTY UNIT RATE AMOUNT SR

Item

02

Item

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

57 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL TELECOMMUNICATION SYSTEM Supply, installation, testing and commissioning of telecommunication system commporising of server, Building distributor with core switch,floor distribution, data/telephone outlets including cable / wires and conduits as shown on drawings E- 501--E520 ,E801and as described in specification section 16715,16720 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications To suit system network equipped with: 01 Building distributor ,ref ( BD3,BD4,BD6) contains main optical data patch panel (F.O.P.P) Floor distribution includes( fiber optical patch panel F.O.P.P , data switch CAT6 a 1 36 RJ 45 ports and UTP P.P CAT6 a 1 36 ports and blank ),ref FDB1 with UPS 1.5 KVA and connected with power supply Floor distribution includes( fiber optical patch panel F.O.P.P , data switch CAT6 a 1 48 RJ 45 ports and UTP P.P CAT6 a 1248 ports and blank ),ref FDB2 with and connected with power supply Floor distribution includes( fiber optical patch panel F.O.P.P , data switch CAT6 a 1 24 RJ 45 ports and UTP P.P CAT6 a 2 24 ports and blank ),ref FD3G,FD4G ,FD6G with and connected with power supply Wall mounted telecommunication outlet 1 port (1data ) , ref. (T0) Ceiling mounted telecommunication outlet 1 port (1data ) , ref. (T0) Wall mounted telecommunication outlet 1 port for intercome system Wall mounted telecommunication outlet 1 port (1 Tel ) at 1500 mm A.F.F.L , ref. (T01) QTY UNIT RATE AMOUNT SR

No

02

No

03

.No

04

17 .No

05 06

27 77

.No .No

07

17

No.

08

38

.No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

58 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL TELECOMMUNICATION SYSTEM Supply, installation, testing and commissioning of telecommunication system commporising of server, Building distributor with core switch,floor distribution, data/telephone outlets including cable / wires and conduits as shown on drawings E- 501--E520 ,E801and as described in specification section 16715,16720 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 Wall mounted telecommunication outlet 2 port ( 1data , 1Tel.) , ref. (T02) Wall mounted telecommunication outlet 3 port ( 2data , 1Tel.) , ref. (T04) Primary and secondary activ switch ( NIC) Telecommunicationsystem network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system Pump room 05 Wall mounted telecommunication outlet 1 port (1 Tel ) at 1500 mm A.F.F.L , ref. (T01) 1 QTY UNIT RATE AMOUNT SR

15

No.

02

17

No.

03 04

2
1

No.
Item

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

59 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL VOICE EVACUATION SYSTEM
Supply, install , testing and commissioning of voice evacuation system comprising of voice evacuation speakers including associated cable wires, earthing for equipment and conducting, interfacing with other systems as shown on drawings E401--E404,E-801and .Coordination, integration with other disciplines shall be conducted during work execution as per technical section 16721 and drawings and by making arrangiement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

To suit system network equipped with: 01 Master control panel for voice evacuation system with master mic control ,96 switch control .integrated fire phone conneted with power supply with battary back up ( 3 hours continual operation) Distribution panel for voice evacuation system with ( 3 amplifier 100 watt) and conneted with emergency power supplyof (CL-03) Distribution panel for voice evacuation system with ( `2 amplifier 100 watt) and conneted with emergency power supply of (AP-05) 2 watt, voice evacuation speakers, wall mounted 2 watt, voice evacuation speakers, ceiling mounted Voice evacuation systemnetwork including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system

No.

02

No.

03

17

No.

04 05 06

48 48
1

No. No.
Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

60 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARME SYSTEM Supply, installation, testing and commissioning of fire detection/alarm system comprising of Modular analogue addressable fire alarm system with back up battary, sounders detectors, control, alarm bell, pull stations, modules including associated cable wires and conduiting, interfacing as shown on drawings E-401--E420,E801and as described in specifications 16721 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications To suit system network equipped with: 01 Master analouge musicable fire alarm control panel , ref.FACP with TCP-IP interface and power supply unit and auto dialer connected to civil defense authority located at (CL06-B03) Master analouge addressable fire alarm control panel , ref.FACP 3 loops ) with TCP-IP interface, power supply unit and auto dialer connected to civil defense authority at ground floor of (AP-031) Master analouge addressable fire alarm control panel , ref.FACP 3 loops withTCP-IP interface, power supply unit and auto dialer connected to civil defense authority at ground floor of (AP-04) Master analouge addressable fire alarm control panel , ref.FACP 3loops withTCP-IP interface, power supply unit and auto dialer connected to civil defense authority at ground floor of (AP-06) Optical smoke detector Ceiling mounted Ceiling mounted multi sensor (CO, heat, smoke) Fire alarm manual call station Fire alarm bill Fire alarm interface unit pull boxesfor fire alarm system QTY UNIT RATE AMOUNT SR

No.

02

12

No.

03

No.

04

No.

05 06 07 08 09 10

97 207 58 55 31
28

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

61 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARME SYSTEM Supply, installation, testing and commissioning of fire detection/alarm system comprising of Modular analogue addressable fire alarm system with back up battary, sounders detectors, control, alarm bell, pull stations, modules including associated cable wires and conduiting, interfacing as shown on drawings and as described in specifications and by making arrangiement with supervising engineer to achieve the work to the best possible specifications 01 02 03 Fire man s telephone jack Fire fighting telephone panel (FFT) Fire alarm system network including conduits, wiring, connections, and all required accessories to form a complete and fully operative system Pump rooms 04 Optical smoke detector Ceiling mounted QTY UNIT RATE AMOUNT SR

45 17
1

No. No.
Item

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

62 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL AUDIO VIDIO INTERCOM SYSTEM Supply, installation, testing and commissioning of fire detection/alarm system comprising of Modular analogue addressable fire alarm system with back up battary, sounders detectors, control, alarm bell, pull stations, modules including associated cable wires and conduiting, interfacing as shown on drawings E-401--E420,E801and as described in specifications 16721 and by making arrangiement with supervising engineer to achieve the work to the best possible specifications To suit audio video intercom system network equipped with: 01 02 03 04 05 06 07 Outdoor Intercom station with camera( 48 lines ) for AP-01 type Outdoor Intercom station with camera ( 32 lines ) for AP-02 type Outdoor Intercom station with camera ( 28 lines ) for AP-02 type Electrical door loock power supply unit Network controller Audio video intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system QTY UNIT RATE AMOUNT SR

24 2 3 27 27 1
1

No. No. No. No. No. No.


Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

63 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL SECURITY SYSTEMS ( ACCESS CONTROL&CCTV IP ) Supply , installation testing and commisioning of audio video intercom system comprising of outdoor Intercom station with camera , electrical door lock , power supply , cables and conduits and associated works as required to suit the locations shown on drawingsE-601--E620 and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications section 16760 and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 Intelligent security controler ( ISC) Reader interface module ,ref (RIM) with power supply Double reader interface module ,ref (DRIM) with power supply Access control push button ,ref (PB) Access control card reader,ref (CR) magnetic door contact electromagnetic lock for one side door electromagnetic lock for double side door Outdoor ,wall mounted IP CCD DAY / night camera ceiling mounted Indoor IP CCD DAY / night camera Ceiling mounted Indoor IP fixed dome camera Outdoor motion sensor with time delay security system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system QTY UNIT RATE AMOUNT SR

18 18 60 83 138 123 41 42 35 14 29 34
1

No. No. No. No. No. No. No. No. No. No. No. No.
Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

64 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 01 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

65 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM SITE DEVELOPMENT Collection Sheet -44 Sheet -45 Sheet -46 Sheet -47 Sheet -48 Sheet - 49 Sheet - 50 Sheet - 51 Sheet - 52 Sheet - 53 Sheet - 54 Sheet - 55 Sheet - 56 Sheet - 57 Sheet - 58 Sheet - 59 Sheet - 60 Sheet - 61 Sheet - 62 Sheet - 63 Sheet - 64 Sheet - 65 To Bill Summary SR DESCRIPTION QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

66 / 67 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL05) ITEM DESCRIPTION AMOUNT S.R.

BILL SUMMARY Sheet - 14 Sheet - 16 Sheet - 20 Sheet - 21 Sheet - 22 Sheet - 23 Sheet - 24 Sheet - 26 Sheet - 28 Sheet - 29 Sheet - 37 Sheet - 43 Sheet - 66 SITE DEVELOPMENT SITEWORK CONCRETE MASONRY METALS THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES CONVEYING SYSTEMS PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

67 / 67 REVISED PAGE

Date: MAY 2012