Tighten your spare parts control and cut project capital expenditure
The Supplier sends the electronic E-SPIR data to the Purchaser with the following information;
Relevant drawings Parts list of Equipment Maintenance Instruction Manuals
The Purchaser imports the E-SPIR data received from the Supplier.
New E-SPIR
If available, the inventory database can be imported, whereby the system will identify duplicate spare parts.
Matching Duplicates
Import E-SPIR data Select duplicate item and click Match Compare data on spare parts screen
Read & print logfile created during import for possible duplicate items
Review of the logfile can also be done at a later stage (slide 15)
Complete Advice
All E-SPIRs received are collected in one file. It lists spare parts like a BOM, indicating the equipment and interchangeability of spare parts within projects.
Commissioning
Initial
Normal
Equipment Classification
High
(Vital)
Medium
(Essential)
Low
(Auxiliary)
Equipment in primary operations for which standby capacity is built in, or spare units are readily available
Equipment can be temporarily kept out of operation without having any serious effect.
After matching the interchangeability of spare parts within one project is shown on the Advice Screen Common spare parts to various projects can be found on the Find screens Progress and budget control in project report
Database I
Database II
1. The Find option It excludes spare parts imported from the inventory
2. The Manage Spare Parts screen shows all spare parts in the database The Spare Parts can be found on Spare Part no Equipment & tag no Description Manufacturers name
ADVISOR
Material Groups
Material Groups (optional field) are used for Vendor management and registration in purchasing systems Different Vendors can be linked to each Material Group
Advisor E-SPIRs can be transferred between parties with all data and at any status with any symbol colour Prices can be adjusted at the moment of export
The Review specialist or Company returns the E-SPIRs to Contractor. To keep an audit trail on changes, Contractor sets up a new database for E-SPIRs returned. E-SPIR data can be used for uploads to operational systems for ordering or cataloguing. For this purpose multiple SPIRs can be exported. SAP CMT Pacer Maximo
Inventory items
Project A Contractor
Project B Contractor
Project B Supplier 3
For more information on the E-SPIR Advisor program, please refer to Contacts on the E-SPIR website
Thank You