Vous êtes sur la page 1sur 214

No.

I
A
1
2
3
4
5
6
7
8
9
10
11
12

Descripcin
REPARACIONES:
FACHADA
Paete
Muros elevados
Recubrimiento
Losa de entrada
Colocacin de fino
Zabaleta
Paete de losa
Hierros en huecos de ventanas
Revestimiento de placas de vinil
en muros
Demolicin y bote de piso
existente
Torta de piso
Suministro y colocacin piso de
alto trnsito

Cant.

Ud.

Precio

49.83
25.00
49.83
1.58
13.12
10.50
13.12
155.52

M2
M2
M2
M3
M2
ML
M2
M2

246.86
955.70
1,074.60
14,327.43
295.22
99.95
286.47
3,277.04

144.52

M2

1,080.99

5.80

M2

3,439.09

1.58

M3

6,407.55

17.40

M2

1,155.31

7.00
75.00
101.88
4.50
3.00
12.10
55.12
6.61

Uds
Uds
M2
M3
Uds
M2
M2
M3

328.12
103.54
62.12
367.98
560.40
46.59
46.59
367.98

1.00

P.A.

124.25

5.10
8.50

ML
ML

84.90
84.90

20.00
20.00

Uds
Uds

103.54
103.54

20.00

Uds

5,698.00

20.00

Uds

4,440.00

Sub total
A
1
2
3
4
5
6
7
8
9
10
11

Desmontes y Demoliciones:
Desmonte puertas de cristal
Desmonte puertas de madera
Demolicin cermica en baos
Bote material demolido
Desmonte puerta de tola
Demolicin meseta de marmolito
Demolicin piso de granito
Bote material demolido
Desmonte de ventanas (sala de
partos) (1.15 M2)
Desmonte de gabinetes de pared
Desmonte de gabinetes de piso
Subtotal:

B
1
2
3
4

Instalaciones Sanitarias:
Desmonte de inodoros
Desmonte de lavamanos
Suministro y colocacin inodoros
taino
Suministro
y
colocacin
lavamanos Lucerna

5
6
7
8

Suministro y colocacin duchas


Suministro y colocacin llave de
paso "
Suministro y colocacin desage
de piso
Suministro y colocacin fregadero
doble de acero inoxidable.

20.00

Uds

2,545.38

20.00

Uds

457.45

20.00

Uds

140.30

2.00

Uds

5,154.53

73.00

Uds

6,194.38

2.00

Uds

12,801.73

22.60

P2

248.50

3.96

M2

7,429.75

6.29

M2

7,429.75

5.00

Uds

4,460.73

15.44

M2

7,429.75

3.48

M2

7,542.32

Subtotal:

C
1
2
3
4

6
7

9
10

Portage:
Suministro y colocacin puerta
sencilla de polimetal.
Suministro y colocacin puerta
doble de polimetal.
Colocacin
cristal
fijo
en
laboratorio
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de emergencia) (1uds).
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de ciruga) (2uds).
Suministro y colocacin puerta
sencilla de polimetal en baos
Suministro y colocacin puerta de
aluminio y vidrio (en rea de
ciruga) (3uds).
Suministro y colocacin puerta de
aluminio y vidrio con boomper
(en rea de quirfano) (1uds).
Suministro y colocacin puerta de
tola
Suministro y colocacin puerta de
hierro
Subtotal:

3.36
3.36

M2
M2

3,613.39
3,573.26

D
1

2
3
4
5

Instalacin Elctrica:
Suministro y colocacin lmparas
fluorescente de 3x32w T8 con
balastro electrnico
Globos de 8" completos con
bombillo de bajo consumo.
Salida tomacorriente 110v
Salida interruptor sencillo
Salida interruptor doble

70.00

Uds

2,764.02

25.00

Uds

644.25

40.00
20.00
10.00

Uds
Uds
Uds

1,176.05
1,143.18
1,322.97

9.00

Uds

#########

2.00

Uds

#########

2.00

Uds

#########

305.00

M2

619.44

93.47

M2

5,451.06

12.00

Ud

#########

1.00

Uds

#########

Subtotal.
E
1

Climatizacin:
Suministro y colocacin A/A Split
de 24000 BTU marca Lennox
(quirfano
y
oficina
administrativa).
Suministro y colocacin A/A Split
de 24000 BTU marca Lennox (en
emergencias)
Suministro y colocacin A/A Split
de 36000 BTU marca Lennox
(quirfano y sala de partos).

Subtotal:
F
1

2
3

Plafn.
Suministro y colocacin plafn
PVC en (consultorios, reas
administrativas).
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Suministro y colocacin de
Cortinas
Antibacteriales,
resistentes al fuego y resistentes a
las manchas
Subtotal:

G
1

rea de Ciruga:
Suministro
y
colocacin
lavamanos quirrgico doble con
accionador.

3
4
5

6
6

Revestimiento en muros de
material vinilico aseptico, con
juntas sanitarias y electrosoldado.
(incluye todo lo necesario para su
correcta instalacin)
Aplicacin pintura acrilica en
techos
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Piso de vinyl aseptico, incluye
juntas sanitarias y electrosoldado
(incluye todo lo necesario para su
correcta instalacin)
Auto nivelante para pisos
Redondeo de esquinas

146.25

M2

4,955.51

55.12

M2

110.52

55.12

M2

5,451.06

55.12

M2

5,574.95

55.12
42.20

M2
ML

1,486.65
103.54

1.13
2.00

M2
Uds

2,543.68
309.72

82.17

M2

881.64

5.10

PL

2,374.51

8.50

PL

2,374.51

1.00

Uds

4,824.48

1.00

Uds

5,154.53

5.00
90.72
57.04
57.04
91.80

Uds
M2
M2
M2
M2

155.03
881.64
110.52
164.94
142.95

Subtotal:
H
1
2

Sala de Partos:
Vidrio fijo
Tapa caja de breaker
Subtotal:

I
1
2

6
7
8
9
10

Cocina:
Colocacin cermica en muros
Suministro y colocacin gabinete
de pared en roble tintado color
caoba
Suministro y colocacin gabinete
de piso en roble tintado color
caoba
Suministro y colocacin fregadero
sencillo de acero inoxidable
Suministro y colocacin fregadero
doble de acero inoxidable
Parrilla para desages
Cermica de muros
Pintura acrlica de techo
Pulido de piso
Pintura semigloss

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Puerta de polimetal sencilla


Puerta de polimetal doble
Ventanas correderas de aluminio y
vidrio
Ventanas salomnicas
Demolicin pandereta de madera
Lmpara 4x40W
Interruptores dobles
Interruptores sencillos
Globos
Tomacorriente de 110 V
Gabinete de piso de roble
Gabinete de pared de roble
Tope de marmolito
Anaqueles
Pintura de mantenimiento en
puerta de hierro
Limpieza desage de pisos
Extractor de 24"x24"
Demolicin para abrir huecos
Paete
Cantos

3.00
1.00

Uds
Uds

6,194.38
#########

3.87

P2

246.31

24.96
1.00
6.00
3.00
1.00
1.00
7.00
23.29
13.12
6.63
5.00

P2
P.A.
Uds
Uds
Uds
Uds
Uds
PL
PL
M2
Uds

215.52
517.70
3,013.87
219.50
79.92
644.25
65.22
2,374.51
2,374.51
309.72
3,500.00

4.62

M2

117.35

3.00
2.00
0.36
0.60
2.40

Uds
Uds
M2
M2
ML

235.32
#########
56.48
246.86
82.68

34.20

M2

1,103.43

24.80

M2

891.86

15.00
280.00
81.00
5.00
59.25
18.50
5.05

Uds
M2
M2
Uds
M2
M2
M3

155.03
110.52
619.44
407.80
62.12
62.12
367.98

62.40

M2

1,103.43

18.50

M2

891.86

5.00
5.00

Uds
Uds

219.50
79.92

Subtotal:
J
1
2
3
4
5
6
7
8
9
10
11
12
13

Habitaciones
Mdicos
Residentes:
Suministro y colocacin cermica
en muros de baos.
Suministro y colocacin cermica
en pisos
Parrilla para desages
Pintura acrlica de muros
Plafn en PVC
Rotulacin
Demolicin cermica de muros
Demolicin cermica de piso
Bote de material
Suministro y colocacin cermica
de muros
Suministro y colocacin cermica
de pisos
Interruptores dobles
Interruptores sencillos

14
15
16
17
18
19
20
21
22

Globos
Lmparas 2 x4
Tomacorriente 110 V
Salida de data
Suministro y colocacin puerta
sencilla de polimetal
Suministro y colocacin puerta
doble de polimetal
Pintura de mantenimiento en
hierro
Suministro y colocacin ventanas
de celosas de cristal
Pulido de piso

10.00
5.00
15.00
5.00

Uds
Uds
Uds
Uds

644.25
2,822.03
65.22
678.63

15.00

Uds

6,194.38

5.00

Uds

#########

29.40

M2

117.35

316.34

P2

236.40

81.00

M2

164.94

M3
M3

414.16
103.54

M3

9,657.14

M3

#########

M3

#########

M3

#########

M2
M2

897.06
722.74

ML

222.70

M2

3,573.26

M2

1,013.15

M2
M2
M2

117.35
246.86
82.68

M2

110.52

M2

512.60

Subtotal:
K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Reparacin de Verja:
Excavacin a mano
187.30
Relleno de reposicin
100.96
Hormign armado zapata de
37.86
muros
Hormign armado viga NP
9.46
(0.15x0.20)m
Hormign armado viga de amarre
9.46
(0.15 x 0.20)m
Hormign
en
columnas
5.76
(0.13x0.20x0.20)m
Colocacin bloques de 6" BNP
249.20
Colocacin bloques de 6" SNP
1,104.25
Suministro y colocacin alambre
315.50
trinchera
Puerta de hierro con rieles
21.00
Suministro y colocacin puerta
2.50
peatonal en malla ciclnica.
Pintura mantenimiento en hierro
13.10
Paete en muros
2,203.50
Cantos en verja
650.00
Aplicacin pintura acrlica en
2,203.50
muros
Reparacin de aceras interiores
50.00
Subtotal:

Revestimiento:

1
2

Paete en muros
Cermica en muros

101.88
106.32

M2
M2

246.86
1,103.43

2,911.64
5,540.25
1,757.00

M2
M2
M2

110.52
110.52
110.52

Subtotal:

M
1
2
3

Pintura:
Acrlica en muros exteriores
Acrlica en muros interiores
Acrlica en techos
Subtotal:

II
I
A
1
2
3

CONSTRUCCION CONSULTORIOS Y SALON MULTIUSOS:


Primer Nivel:
Preliminares:
Limpieza del solar
1.00
P.A.
2,588.50
Replanteo con charrancha
1.00
P.A.
5,736.12
Caseta de materiales
1.00
P.A.
#########
Subtotal:

B
1
2
3
4

Movimiento de tierras:
Excavacin a mano
Relleno material de mina
Relleno de reposicin
Bote

408.53
117.50
6.47
31.35

M3
M3
M3
M3

414.16
1,085.65
103.54
367.98

20.44
35.96
15.17

M3
M3
M3

9,657.14
9,657.14
#########

28.78

M3

5,361.60

1.75
20.99
28.78

M3
M3
M3

#########
#########
#########

Subtotal:
C
1
2
3
4
5
6
7

Hormign Armado:
Zapata de muros
Zapata de columnas
Columnas
Losa de piso con
electrosoldada
Dinteles
Vigas
Losa
Subtotal:

malla

D
1
2

Colocacin de bloques:
De 6" BNP
De 6" SNP

267.83
377.39

M2
M2

897.06
722.74

825.28
475.91
349.57
239.88
58.40
434.94
199.81

M2
M2
M2
M2
ML
ML
M2

67.03
246.86
246.86
246.86
326.15
82.68
1,103.43

239.83

M2

1,085.27

275.69
38.18

ML
M2

123.04
1,103.43

475.71
239.83
349.57

M2
M2
M2

142.95
110.52
110.52

9.00
2.00
4.00

Uds.
Uds.
Uds.

6,194.38
7,659.99
4,296.91

Subtotal:
E
1
2
3
4
5
6
7

Terminacin de superficie:
Fraguache
Paete de muros interiores
Paete de muros exteriores
Paete de techo
Alto relieve en ventanas
Cantos
Revestimiento de cermica
Subtotal:

F
1

2
3

Colocacin de piso:
Suministro y colocacin de pisos
de granito fondo blanco (incluye
pulido y brillado)
Zcalos
Cermica en baos
Subtotal:

G
1
2
3

Pintura:
Semigloss interior
Acrlica de techo
Acrlica exterior
Subtotal:

H
1
2
3

Puertas:
De polimetal sencilla
De tola
Polimetal en baos
Subtotal:

I
1

Ventanas:
Suministro y colocacin
ventanas aluminio

de

222.30

P2

215.52

Subtotal:
K
1
2
3
4
5
6
7
8
9
10
11

Instalacin Sanitaria:
Suministro e instalacin de
inodoros
Suministro e instalacin de
lavamanos
Suministro e instalacin de ducha
Desage de piso
Suministro e instalacin de
orinales
Caja de inspeccin
Tubera de arrastre de 4" PVC
Tubera de agua potable de 3/4"
PVC
Pileta
Ventilacin de 3"
Drenaje empotrado para unidades
de aire acondicionado en tubera
3/4" PVC

7.00

Ud

5,698.00

10.00

Ud

4,440.00

1.00
5.00

Ud
Ud

2,545.38
140.30

2.00

Ud

4,736.00

8.00
175.13

Ud
PL

5,489.50
52.35

172.13

PL

44.47

1.00
5.00

Ud
Ud

4,196.45
1,499.11

6.00

Ud

259.61

31.00

Ud

977.48

31.00

Ud

2,677.28

4.00
14.00
2.00
1.00
1.00
1.00
23.00
6.00

Ud
Ud
Ud
Ud
Ud
Ud
Ud
Ud

1,621.73
1,143.18
1,215.05
657.33
678.63
657.33
1,176.05
1,896.50

1.00

Ud

4,603.75

1.00

Ud

1,081.62

1.00

Ud

#########

Subtotal:
L
1
2

3
4
5
6
7
8
9
10
11
12
13

Instalacin Elctrica
Salida de techo
Suministro e instalacin de
lmpara de 4x32W T8, balastro
electrnico
Salida cenitales con globo
Salida para interruptor simple
Salida interruptor tres vas
Salida de telfono
Salida de data
Salida de tv
Salida tomacorriente 120V
Salida tomacorriente 220V
Suministro e instalacin de
abanico de techo KDK
Salida para control de abanico
Panel de distribucin de 30
circuitos

14

Alimentadores de panel de
distribucin con: 2#4THW para
fase 1#6 para neutro 1#10THW
para tierra en PVC 1 1/2" SDR-26
@ 100PL

100.00

PL

203.62

85.00
3.33
7.40
16.00
239.83

P2
M3
M2
Uds.
M2

309.72
22,091.46
1,119.06
1,462.42
619.44

20.66

M2

3,277.04

Ud

#########

Subtotal:
M
1
2
3
4
5
6

Miscelneos:
Tope de marmolito
Hormign rampa de escalera
Descanso de escalera
Escalones
Plafn PVC
Protectores de hierro en ventanas

Suministro y colocacin de
Cortinas
Antibacteriales,
resistentes al fuego y resistentes a
las manchas
Counter de granito en informacin

8
9
10
11
12
13

Acera perimetral
Pasamanos de escalera
Meseta de marmolito
Letrero identificativo
Suministro y colocacin Letrero
c/letras colgante c/luces Led

10.00

68.86

P2

361.34

40.05
28.00
72.95
1.00

M2
ML
P2
PA

512.60
3,066.60
309.72
15,485.96

1.00

P.A

55,749.46

10.31
25.10
0.14
49.00

M3
M3
M3
M3

22,099.51
22,099.51
22,266.38
14,327.43

62.16
274.54

M2
M2

746.15
722.74

Subtotal:
II
A
1
2
3
4

Segundo Nivel
Hormign Armado
Columnas
Vigas
Dinteles
Losa
Subtotal:

B
1
2

Colocacin de bloques:
De 4" SNP
De 6" SNP

Subtotal:
C
1
2
3
4
b
1
2

Terminacin de superficie:
Fraguache
Paete de muros interiores
Paete de muros exteriores
Paete de techo
Alto relieve en ventanas
Cantos
Revestimiento de cermica

626.65
290.73
306.60
201.50
30.00
50.00
45.60

M2
M2
M2
M2
ML
ML
M2

67.03
246.86
246.86
246.86
326.15
82.68
1,103.43

170.80

M2

1,085.27

10.51
52.90
12.20

ML
M2
ML

123.04
833.98
126.72

223.70
52.90

M2
ML

295.22
99.95

231.86

M2

412.96

6.00

Ud

140.30

290.73
430.92
201.50

M2
M2
M2

Subtotal:
D
1

2
3
4

Colocacin de piso:
Suministro y colocacin de pisos
de granito fondo blanco (incluye
pulido y brillado)
Zcalos de granito
Adoquines
Zcalos de adoquines
Subtotal:

E
1
2
3

Terminacin de techo:
Fino de techo
Zabaleta
Impermeabilizante
tipo
lona
asfltica de 4.50 mm con refuerzo
de
polister
libre
de
mantenimiento
(sujeto
a
presentacin de factura y garanta)
Desage de techo de 3"
Subtotal:

F
1
2
3

Pintura:
Semigloss interior
Acrlica exterior
Acrlica techo
Subtotal :

Puertas y ventanas:

142.95
110.52
110.52

Puerta Doble de aluminio y vidrio

2
3

Puerta Polimetal
Ventanas correderas de cristal
(1.40 x 1.10)
Protectores en ventanas

1.00

Ud

12,555.00

3.00

Ud

6,194.38

165.70

P2

246.31

165.70

P2

294.23

64.78
223.70
1.00

M2
M2
Ud

512.60
619.44
3,174.20

1.00
2.00
2.00
3.00
22.30
22.30
2.00

Ud
Ud
Ud
Ud
PL
ML
Ud

4,196.45
4,440.00
5,698.00
140.30
52.35
44.47
1,499.11

18.00

Ud

2,677.28

19.00
3.00
2.00
2.00
7.00

Ud
Ud
Ud
Ud
Ud

977.48
977.48
1,322.97
1,215.05
1,185.49

2.00

Ud

2,024.71

1.00

Ud

678.63

1.00

Ud

4,969.42

Subtotal :
H
1
2
3

Miscelneos:
Acera perimetral
Plafn PVC
Podio (roble)
Subtotal :

I
1
2
3
4
5
6
7

Instalacin sanitaria:
Pileta
Lavamanos
Inodoros
Desage de piso
Tubera de 4" drenaje
Tubera de 3/4" presin
Ventilacin 3"
Subtotal :

J
1
2
3
4
5
6
7
8
9

Instalacin Elctrica:
Lmpara de 4x32W T8 balastro
electrnico
Salida de luz cenital
Salida de pared luz cenital
Salida interruptor doble
Salida interruptor tres vas
Salida tomacorriente 120V
Salida tomacorriente 220V para
aire acondicionado
Salida de data
Panel de distribucin de 16
circuitos

10

11

Alimentadores elctricos de panel


de distribucin con 2#8 THW para
fase, 1#10 THW para neutro, 1#12
THW para tierra en PVC
1"SDR 26@ 100PL
Suministro e instalacin aire
acondicionado tipo piso - techo de
60,000 BTU

100.00

PL

90.18

2.00

Ud

91,002.66

Subtotal :
III
A
1
2
3
4
5
6
7
8

Reparacin Emergencia Existente


Demolicin y Desmonte::
Demolicin de cermica
Bote de cermica demolida
Desmonte de inodoro
Desmonte de lavamanos
Desmonte de puertas de pino
(sencilla)
Desmonte de puertas de pino
doble
Desmonte de puerta de cristal y
aluminio
Desmonte de ventanas

109.42
6.84
24.00
18.00

Mts2
Mts3
Uds
Uds

62.12
367.98
103.54
103.54

76.00

Uds

103.54

11.00

Uds

103.54

4.00

Uds

200.00

154.64

mt2

56.48

4.00
2.00

Uds
Uds

5,698.00
4,440.00

1.00

ud

4,440.00

9.93
1.00
1.00

Mts2
ud
ud

1,098.01
5,698.00
66.71

Subtotal:
B
1
2

Sala de Internamiento de
Mujeres.
Inodoro
Lavamanos
Subtotal:

C
1

Incubadora
Lavamanos.
Subtotal:

D
1
2
3

Sala Medico de Servicio:


Cermica
Inodoro
Rejilla de sifn

Subtotal:
E
1
2
3
4
5
6

Baos de Servicios:
Cermica
Lavamanos
Inodoro
Orinales
Rejilla desage de piso
Rejilla en ducha

49.52
4.00
5.00
1.00
2.00
2.00

Mts2
Uds
Uds
Uds
Uds
Uds

1,098.01
4,440.00
5,698.00
4,736.00
66.71
45.00

1.00
1.00

Uds
Uds

5,698.00
45.00

1.00
1.00
1.00
1.00

Uds
Uds
Uds
Uds

5,698.00
4,440.00
66.71
2,545.38

1.00
1.00

Uds
Uds

5,698.00
4,440.00

1.00
1.00
2.00
1.00
1.00

Uds
Uds
Uds
Uds
Uds

5,698.00
4,440.00
66.71
2,545.38
1,500.00

Subtotal:
F
1
2

Dormitorio de Enfermera
Inodoro
Rejilla en ducha
Subtotal:

Dormitorio Medico Emergencia:

1
2
3
4

Inodoro
Lavamanos
Rejilla de piso
Ducha con mezcladora
Subtotal:

H
1
2

Vestidor de Enfermeras:
Inodoro
Lavamanos
Subtotal:

I
1
2
3
4
5

Sala de Internamiento PostParto:


Inodoro
Lavamanos
Rejillas
Duchas
Mezcladora
Subtotal:

Sala de Alto Riesgo

1
2
3
4
5

Inodoro
Lavamanos
Duchas
Mezcladoras
Rejillas

1.00
1.00
1.00
1.00
2.00

Uds
Uds
Uds
Uds
Uds

5,698.00
4,440.00
2,545.38
1,500.00
66.71

3.00
3.00
3.00
2.00
2.00
0.90
2.81

Uds
Uds
Uds
Uds
Uds
Mts2
Mts2

5,698.00
4,440.00
66.71
2,545.38
1,500.00
881.64
881.64

1.00
1.00
1.00

Uds
Uds
Uds

5,698.00
4,440.00
66.71

Sala de Ciruga y Parto (Vestidor Medico):


Inodoro
1.00
Lavamanos
1.00
Rejilla
1.00
Duchas
1.00

Uds
Uds
Uds
Uds

5,698.00
4,440.00
66.71
2,545.38

1.00
1.00
2.00

Uds
Uds
Uds

5,698.00
4,440.00
66.71

1.00

Uds

5,698.00

Subtotal:
K
1
2
3
4
5
6
7

Sala
de
Internamiento
Hombres:
Inodoro
Lavamanos
Rejillas
Duchas
Mezcladoras
Cermica en pared
Cermica en piso de pileta
Subtotal:

L
1
2
3

Estacin Enfermera:
Inodoro
Lavamanos
Rejilla de piso
Subtotal:

M
1
2
3
4

Subtotal:
N
1
2
3

Pre-Parto:
Inodoro
Lavamanos
Rejillas
Subtotal:

Rayos X
Inodoro

2
3

Lavamanos
Colocar desage de piso (incluye
cermica, piezas y M. O.)

1.00

Uds

4,440.00

1.00

P.A

1,000.00

1.00

Uds

4,440.00

71.00
11.00
1,663.93
8.00

Uds
Uds
P2
Uds

6,194.38
12,801.73
215.52
6,194.38

10.76

P2

246.31

1.00

Uds

25,520.00

0.84

Uds

25,520.00

9.04

P2

246.31

1.00

Uds

6,194.38

3.56

Mts2

246.31

1.00

Uds

25,520.00

Subtotal:
O
1

Vacuna:
Lavamanos.
Subtotal:

P
1
2
3
4
5
6

7
8

Portage General:
De polimetal sencilla
Doble de polimetal
Ventanas salomnicas
Puerta en bao servicios
Ventana interior en cristal
corredera
Puerta doble de aluminio y vidrio
con
compres
en
pasillo
mayordoma
Puerta doble de aluminio y vidrio
con compres en pasillo cocina
Ventana corredera en cristal rea
vacuna
Subtotal:

Q
1

Sala de Incubadoras:
Puerta sencilla en polimetal con
hueco en cristal
Subtotal:

R
1

Personal y Farmacia:
Ventana en cristal
Subtotal:

S
1

Almacn de Medicamento:
Puerta dobles en cristal y aluminio
con compres
Subtotal:

T
1
2
3

Sala de Ciruga:
Puerta doble en cristal y aluminio
con compres
Puerta sencillo en polimetal
Puerta sencilla polimetal con
hueco en cristal (0.30 x 0.40)

4.00

Uds

25,520.00

7.00

Uds

6,194.38

1.00

Uds

6,194.38

7.40

P.L

2,374.51

3.05

Mts2

367.98

1.04

Mts2

897.06

4.84

Mts2

817.33

1.52

Mts2

155.31

1.00

Uds

5,313.00

26.67
4.00
6.00
44.32
3.00

mt2
Uds
Uds
Mts2
Uds

1,098.01
5,698.00
4,440.00
1,053.53
3,928.18

0.63
0.23
4.88
6.18
6.18
9.20
0.55
9.20

Mts3
Mts3
Mts2
Mts2
Mts2
Mts2
Mts3
Mts2

414.16
9,657.14
897.06
67.03
246.86
286.47
14,327.43
295.22

Subtotal:
U
1
2
3
4
5

rea de Recepcin:
Gabinete de piso de roble
Demolicin y bote pandereta
playwood en rea servicio social
Cerrar hueco rea vacuna (block
6")
Cerrar hueco pasillo medico
servicio (block 4")
Abrir hueco salida al patio pasillo
medico servicio (block6") (1.32 x
1.15)
Puerta en tola (1.32 x 1.15)
Subtotal:

V
1
2
3
4
5

rea de Consulta
Cermica en Bao de Consulta
Inodoro en Bao de Consulta
Lavamanos en bao de consulta
Divisin sheetrock rea consulta
Extractores 10'' X 10''
Subtotal:

rea de Mayordoma Interna:

1
2
3
4
5
6
7
8

Excavacin zapata muro


Zapata de muro block 6"
Muros block 6"
Fraguache
Paete en muro
Paete techo
Hormign en losa e=0.10
Fino

9
10
11
12
13
14
15
16
17
18
19
20
21

Zabaleta
Pintura acrlica muros y losa
Impermeabilizante acrlico
Puerta polimetal (1.00 x 2.10)
Ventana (1.00 x 1.02)
Hormign armado columna
Hormign armado en dintel
Cantos
Luces cenitales
Interruptor simple
cerrar hueco en cocina block 6"
Abrir hueco en cocina block 6"
Revestimiento cermica en cocina

22
23

Gabinete de piso en cocina


Gabinete de pared en cocina

13.20
10.78
9.20
1.00
1.02
0.21
0.09
16.20
1.00
1.00
3.78
3.78

ML
Mts2
Mts2
Uds
Mts2
Mts3
Mts3
ML
Uds
Uds
Mts2
Mts2

99.95
110.52
191.10
6,194.38
246.31
22,099.51
30,329.47
82.68
977.48
1,143.18
897.06
155.31

9.10

Mts2

1,098.01

7.50
5.00

PL
PL

2,374.51
2,374.51

1.00

Uds

5,289.07

1.08

Mts3

4,186.30

34.22

P2

309.72

25.82

P2

309.72

6.40
1.00
1.00
1.00

ML
Uds
Uds
Uds

82.68
14,906.66
9,565.00
34,000.00

1.00

Uds

111,171.96

Subtotal:
X
1
2
3

rea de Lavado:
Lavado doble de granito
Base
de
hormign
incineradora
Meseta en marmolito

para

Subtotal:
Y
1

Almacn:
Meseta marmolite
Subtotal:

Z
1
2
3
4
5

Miscelneos:
Cantos
Bomba para cisterna 3HP
Tanque de 120gls
Bomba sumergible 3HP
Inversor en rea administracin
5kw
12
bateras
(Incluye
Instalacin)
Subtotal:

A-1

Sealizacin Exterior:

1
2
3
4
5
6

Emergencia
Parqueo
Parqueo mdicos
Morgue
rea servicios
Rotulacin Interior 4" x 14"

1.00
1.00
1.00
1.00
1.00
49.00

Uds
P.A.
P.A.
Uds
Uds
Uds

950.00
5,000.00
3,000.00
325.00
325.00
407.80

574.51

Mts2

3,869.00

919.71

Pl

115.00

Mts3

414.16

Mts3

9,657.14

Mts3
Mts3
Mts3
Mts2
Mts2
Mts2
ML
Uds
Mts2
Mts2
ML
Uds

22,099.51
22,099.51
14,327.43
67.03
286.47
295.22
99.95
140.30
155.31
2,582.40
82.68
12,801.73

Mts2

620.46

Mts2

920.33

ML
Mts2
Mts2
Mts2
Mts2
Uds

123.04
110.52
110.52
110.52
722.74
977.48

Subtotal:
B-2
1

rea de Quirfano:
Recubrimiento asptico en vinil
en muros (el acrobin incluye
recubrimiento de sheetrock)
Zcalos en vinil
Subtotal:

D-2
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Parte Exterior
rea para Mayordoma Patio Exterior:
Excavacin zapata de columna
6.90
Hormign armado zapata de
2.16
columna
Hormign armado columnas
0.82
Hormign armado vigas
1.76
Hormign armado losa
4.29
Fraguache
42.97
Paete en losa y columnas
42.97
Fino
35.77
Zabaleta
24.12
Desage de 3"
2.00
Abrir hueco ventana
3.60
Ventanas salomnica
3.60
Cantos
62.52
Puerta polimetal doble
1.00
Losa de piso con malla
35.70
electrosoldada
Piso de granito fdo gris incluye
35.70
pulido y brillado
Zcalos
22.35
Pintura acrlica interior
63.45
Pintura acrlica exterior
57.62
Pintura acrlica losa
35.75
Antepecho
4.82
Salida luces cenitales
1.00

23
24
25

Toma corriente
Interruptor sencillo
Mano de Obra Elctrica

3.00
1.00
1.00

Uds
Uds
P.A.

1,185.49
1,143.18
1,000.00

Subtotal:
E-2
I
1
2
3

Construccin Verja Perimetral con Malla y Muros de 6":


Movimiento de Tierra:
Excavacin a mano
24.98
Mts3
Bote de material sobrante
41.47
Mts3
Relleno reposicin
13.32
Mts3

414.16
367.98
103.54

Subtotal:
II
1
2
3
4

Hormign Armado:
Zapata muros
Zapata columnas
Columnas de amarre
Viga amarre

9.99
1.15
3.07
5.57

Mts3
Mts3
Mts3
Mts3

9,657.14
9,657.14
22,099.51
22,099.51

434.68

Mts2

897.06

408.54
408.54
200.90

Mts2
Mts2
ML

67.03
246.86
82.68

408.54

Mts2

110.52

397.70

ML

222.70

1.00

P.A

5,000.00

1.00

P.A

3,000.00

Subtotal:
III
1

Colocacin de block:
Bloques de 6"
Subtotal:

IV
1
2
3

Terminacin Superficie:
Fragua che
Paete
Cantos
Subtotal:

V
1

Pintura:
Acrlica en muros
Subtotal:

VI
1
2
3

Varios:
Alambre trinchera incluyendo
paete a reparar
Reparacin de verja con malla
(381,63mt)
Verja con malla

4
5

Puertas con malla lado lateral


derecho, izquierdo y parte frontal
Pao fijo con malla

1.00

P.A

16,875.00

1.00

P.A

3,240.00

3.32
2.88
1.48
5.66

Mts3
Mts3
Mts2
Mts3

414.16
367.98
103.54
1,085.65

1.11
0.30
0.35
0.67
37.70

Mts3
Mts3
Mts3
Mts3
Mts2

9,657.14
9,657.14
22,099.51
22,099.51
623.52

49.20
49.20
12.30

Mts2
Mts2
ML

67.03
246.86
82.68

44.80
18.20

Mts2
Mts2

142.95
110.52

32.00

Mts2

897.06

Subtotal:
C

Gasebo para Basura: (Posterior)

I
1
2
3
4

Movimiento de Tierra:
Excavacin a mano
Bote material sobrante
Relleno de reposicin
Relleno compactado
Subtotal:

II
1
2
3
4
5

Hormign Armado en:


Zapata de muros
Zapata de columnas
Columnas
Viga de amarre
Piso frotado
Subtotal:

III
1
2
3

Terminacin Superficie:
Fragua che
Paete
Cantos
Subtotal:

IV
1
2

Pintura:
Semigloss interior
Acrlica exterior
Subtotal:

V
1

Muros de Block:
Colocacin de bloques de 6"
Subtotal:

VI
1
2

Portaje:
De tola (1.20x 2.00)
De tola (1.00x 2.00)

1.00
1.00

Uds
Uds

8,400.00
7,000.00

54.30

Mts2

512.60

4.83
4.83
4.83
8.28
1.68
1.00
49.70

Mts2
Mts2
Mts2
Mts2
Mts2
Uds
ML

897.06
246.86
110.52
620.46
155.31
7,000.00
100.00

1.00
1.00
1.00

P.A
P.A
P.A

3,000.00
3,613.39
10,000.00

231.47
125.64
112.34
198.92
537.99

Mts3
Mts3
Mts3
Mts3
Mts3

414.16
103.54
1,085.65
82.83
367.98

Subtotal:
VII
1

Rampa:
Acera
perimetral
gazebo
incluyendo parte exterior existente

Subtotal:
VIII
1
2
3
4
5
6
7

Morgue (Rampa para camilla):


Muro de block 6"
Paete
Pintura
Acera con malla (ancho 1.20)
Abrir hueco para puerta
Puerta en tola
Reparacin de contenes
Subtotal:

XXXII
A
1
2
3

Construccin
Emergencia
Peditrica:
Preliminares
Limpieza del solar
Replanteo con terrancha
Caseta de materiales
Subtotal:

B
1
2
3
4
5

Movimiento de Tierra:
Excavacin a mano
Relleno de reposicin
Relleno compactado
Extraccin capa vegetal
Bote de material inservible
Subtotal:

Hormign Armado:

1
2
3
4
5
6
7
8
9

Zapata de muro
Zapata de columna
Columnas BNP
Losa de piso con
electrosoldada e=0.10
Viga de amarre BNP
Columnas SNP
Dinteles
Vigas SNP
Losa SNP

malla

22.81
48.32
2.07

Mts3
Mts3
Mts3

9,657.14
9,657.14
22,099.51

322.35

Mts3

620.46

5.07
12.73
0.50
30.64
43.23

Mts3
Mts3
Mts3
Mts3
Mts3

22,099.51
22,099.51
30,329.47
22,099.51
14,327.43

118.27
407.59

Mts2
Mts2

817.33
746.15

827.96
654.41

Mts2
Mts2

67.03
246.86

289.83

Mts2

246.86

322.55

M2

619.44

726.16
40.20

ML
Mts2

Subtotal:
D
1
2

Colocacin de Block:
De 0.15 BNP
De 0.15 SNP
Subtotal:

E
1
2
3
4
5
6

Terminacin de Superficie:
Fraguache
Paete interior en muros
Paete exterior en muros, incluye
vuelos y antepecho
Falso cielo (plafon aseptico tipo
clean room liso o similar)
Cantos
Revestimiento cermica en baos

82.68
1,103.43

Subtotal:
F
1

Terminacin de Pisos:
Piso de vinyl aseptico, incluye
juntas sanitarias y electrosoldado
(incluye todo lo necesario para su
correcta instalacin)
Auto nivelante para pisos

322.35

M2

4,955.51

322.35

M2

1,486.65

Subtotal:
G
1
2
3

Terminacin de Techo:
Fino
Zabaleta
Impermeabilizante acrlico

332.12
92.20
413.11

Mts2
ML
Mts2

295.22
99.95
191.10

4
5

Desages de 3"
Gotero colgante

11.00
92.80

Uds
ML

140.30
148.36

Subtotal:
H
1

2
3

Pintura:
Pintura wall flex en interior
(revestimiento formulado a base
de copolmeros acrlicos en
emulsin, aditivos, pigmentos y
cargas minerales que al secar
forma
una
membrana
impermeable o texturada elstica)
Acrlica
exterior
incluyendo
antepecho
Mantenimiento en hierro

654.41

M2

1,100.00

289.83

Mts2

113.94

40.60

Mts2

134.08

1.00

Uds

22,680.00

13.00

Uds

6,194.38

4.00

Uds

6,194.38

385.85

P2

210.00

1.00
3.00
13.00
2.00
13.78

Uds
Uds
Uds
Uds
PL

4,736.00
5,698.00
4,440.00
140.30
1,499.11

9.00

Uds

5,489.50

295.86
172.04

PL
PL

62.62
50.00

1.00

Uds

53,579.59

1.00

Uds

60,000.00

Subtotal:
I
1
2
3
4

Portaje:
Doble de aluminio y vidrio (2.40 x
2.10)
De polimetal
De polimetal en baos (1.20 x
0.70)
Ventana en Celosas de aluminio
Subtotal:

J
1
2
3
4
5
6
7
8
9
10

Instalacin Sanitaria:
Orinales
Inodoros
Lavamanos
Desages de piso
Ventilacin 3" PVC
Cmara de inspeccin (0.70 x
0.70)
Tubera de drenaje 4" pvc
Tubera de drenaje 2" pvc
Cmara sptica (2.50 x 1.50 x
2.00)
Filtrante 8" pvc (sujeto a
presentacin de factura)

11
12
13
14
15

Tuberas y piezas
Papelera
Mano de obra plomero
Tubera "
Tubera "

1.00
3.00
1.00
273.88
129.89

P.A
Uds
P.A
PL
PL

3,000.00
850.00
15,000.00
97.37
66.10

26.00
34.00
14.00
3.00
3.00
3.00

Uds
Uds
Uds
Uds
Uds
Uds

2,677.28
1,185.49
1,143.18
4,603.75
927.21
657.33

1.00

Uds

5,231.39

11.00

Uds

678.63

1.00

P.A

3,678.00

1.00

P.A

4,000.00

86.50
40.60

Mts2
Mts2

512.60
3,277.04

Subtotal:
K
1
2
3
4
5
6
7

Instalacin Elctrica:
lmparas fluorescentes 4 x 40w
Salida TC-110v
Salida Interruptor simple
Abanicos sala de espera
Salida control para abanicos
Salida para antena TV
Panel de distribucin de 6/12 circ.

Salida de data en consultorios y


archivo
Acometida elctrica compuesta
por dos cables #4 por fase, 2
cables cuatro, 1 ocho neutro y un
#10 tierra, a una distancia de
30pie en tubera pvc 1
Mano de obra

10

Subtotal:
L
1
2
3

Miscelneos:
Acera perimetral
Protectores en hierro
Revestimiento en muros de
material vinilico aseptico, con
juntas sanitarias y electrosoldado.
(incluye todo lo necesario para su
correcta instalacin)
Limpieza final

377.41

M2

4,955.51

1.00

P.A

10,000.00

2.00

Uds

30,798.00

Subtotal:
XXXIII
1

rea de Administracin
Counter de 87'' tope color marrn
oscuro y base de metal

Counter de 72'' tope Haya base


Gris oscuro

2.00

Uds

22,295.20

Subtotal:

XXXV
A
1
2

Caseta Para Manifold, Bomba de Vacio y Compresor de Aire (4,60x3,0Mts, h=2,80 Mts)
Preliminares:
Limpieza del solar (30 Mts29
1.00
P.A.
1,000.00
Replanteo con charrancha (13,80
1.00
P.A.
1,032.40
mts2)
Subtotal:

B
1
2
3
4

Movimiento de Tierra:
Excavacin a mano
Relleno de reposicin
Relleno compactado
Bote de material sobrante

6.07
3.65
3.45
4.56

Mts3
Mts3
Mts3
Mts3

414.16
103.54
1,085.65
367.98

2.28
0.60
0.04
1.66

Mts3
Mts3
Mts3
Mts3

9,611.32
9,657.14
22,099.51
5,361.60

0.50
0.17
0.30
2.04
0.68

Mts3
Mts3
Mts3
Mts3
Mts3

22,099.51
30,329.47
22,099.51
14,327.43
22,099.51

9.12
37.06
4.00
6.08

Mts2
Mts2
Mts2
Mts2

1,016.64
918.88
1,158.91
722.74

Subtotal:
C
1
2
3
4

Hormign Armado BNP en:


Zapata de muros de 8"
Zapata de columna
Columnas (0.20 x 0.30)
Losa de piso con malla
Subtotal:

D
1
2
3
4
5

Hormign Armado SNP en:


Columnas
Dinteles
Vigas
Losa
Viga de amarre a nivel de piso
Subtotal:

E
1
2
3
4

Colocacin de Block:
De 8" BNP
De 8" SNP
Calados
De 6" en antepecho

Subtotal:
F
1
2
3
4
5
6
7

Terminacin de Superficie:
Fraguache en muros y losa
Paete interior en muros
Paete exterior en muros
Paete en antepecho
Paete en losa
Cantos
Paete en antepecho

95.92
41.06
41.06
12.06
13.80
50.60
30.40

Mts2
Mts2
Mts2
Mts2
Mts2
Mts2
Mts2

67.03
246.86
246.86
246.86
286.47
82.68
246.86

13.80

Mts2

164.94

13.80
15.20
19.88
3.00

Mts2
ML
Mt2
Uds

295.22
99.95
191.10
140.30

41.06
53.12
13.80
3.15

Mts2
Mts2
Mts2
Mts2

142.95
110.52
110.52
117.35

3.15

Mts2

117.35

3.15

Mts2

3,613.39

3.15

Mts2

3,277.04

Subtotal:
G
1

Terminacin de Pisos:
Pulido y Brillado
Subtotal:

H
1
2
3
4

Terminacin de Techo:
Fino
Zabaleta
Impermeabilizante acrlico
Desage de 3" PVC
Subtotal:

I
1
2
3
4
5

Pintura:
Semigloss en muros interiores
Acrlica exterior
Acrlica en techo
mantenimiento en puerta de tola
Mantenimiento en puerta de hierro

Subtotal:
J
1
2

Portage:
De tola (1.50 x 2.10)
De hierro con barras de " (1.50 x
2.10)
Subtotal:

K
1
2
3

Instalacin Elctrica:
Salidas de techo con lmparas 2 x
4w
Interruptor doble
Lmparas tipo secador en reas
exteriores

2.00

Uds

977.48

1.00

Uds

1,322.97

2.00

Uds

5,158.71

4.00

p2

3,277.04

15.20
15.00
1.00

Mts2
Mts2
P.A

512.60
512.60
2,000.00

Subtotal:
L
1
2
3
4

Miscelneos:
Protectores de hierro en ventanas
de block colados.
Acera perimetral
Acera de acceso a caseta
Limpieza final
Subtotal:

XXXVI

A
1
2

Construccin Morgue:
Preliminares:
Limpieza del solar
Replanteo

1.00
1.00

P.A
P.A

800.00
1,500.00

12.33
1.44
10.40

Mts3
Mts3
Mts3

414.16
414.16
103.54

2.47
0.43
0.82
0.82
0.32
3.56

Mts3
Mts3
Mts3
Mts3
Mts3
Mts3

9,657.14
9,657.14
22,099.51
22,099.51
30,329.47
14,327.43

0.34

Mts3

22,099.51

Subtotal
B
1
2
3

Excavaciones:
Excavacin zapata de muros
Excavacin zapata de columna
Relleno de reposicin
Subtotal

C
1
2
3
4
5
6
7

Hormign Armado en:


H.A en zapata de muros
H.A. en zapata de columna
H.A. en viga de amarre BNP
H.A. en viga de amarre SNP
H.A en dintel
H.A en losa
H.A en columnas 3.80 x 0.15 x
0.15 x 4
Subtotal

D
1
2

Colocacin de Block:
Muros de 6" BNP
Muros de 6" SNP

21.91
61.10

ML
M2

897.06
722.74

122.20
122.20
122.20
42.92
26.16

Mts2
Mts2
Mts2
Mts2
Mts2

246.86
246.86
67.03
82.68
246.86

14.32
28.63
28.63
47.72
29.65
23.65
33.32
4.00

Mts2
Mts2
ML
ML
Mts2
ML
Mts2
Uds

722.74
246.86
67.03
82.68
295.22
99.95
191.10
140.30

27.89
26.32

Mts2
ML

920.33
123.04

Ventanas y Puertas:
Ventanas salomnica aluminio
AA
Puerta de polimetal (2.10 x 1.00)

11.81

P2

282.20

2.00

Uds

6,194.38

Protectores de hierro en ventanas


y puertas

7.80

Mts2

3,277.04

Subtotal
E
1
2
2
3
4

Terminacin de Superficie:
Paete liso en muros exteriores
Paete liso en muros interiores
Fraguache
Cantos
Paete liso en techo
Subtotal:

F
1
2
3
4
5
6
7
8

Terminacin de Techos:
Muros de antepechos 6"
Paete en antepecho
Fraguache en antepecho
Cantos en antepecho
Fino de techo
Zabaleta
Impermeabilizante acrlico
Desages de techo
Subtotal:

G
1
2

Pisos:
Pisos de granito 0.30 x 0.30mts
Zcalos
Subtotal:

H
1
2
3

Subtotal.
I

Instalacin Sanitaria:

Suministro de lavamanos (incl.


tuberas y pieza)
Desage de piso (incl. tuberas y
piezas)
Registro para agua potable
(registro completo - tuberas y
piezas)
Llaves de chorro (incl. Tubera y
piezas)
Alimentacin agua potable

2.00

Uds

4,440.00

2.00

Uds

140.30

2.00

Uds

2,771.67

3.00

Uds

567.82

1.00

P.A

1,000.00

63.36
64.50
26.16

Mts2
Mts2
Mts2

110.52
142.95
110.52

2.00
3.00
2.00

Uds
Uds
Uds

2,677.28
1,185.49
1,322.97

3.00

Uds

5,158.71

L
1
2
3
4

Construccin de Meseta para Morgue (3ud)


Piso pulido
1.41
Muro bloques de 6"
11.37
Hormign en base
0.75
Fraguache en muros ext. E interior
24.99

Mts2
Mts2
Mts3

645.51
897.06
5,361.60

Mts2

67.03

Paete en muro exterior e interior


(incluyendo vuelo en losa)

24.99

Mts2

246.86

2
3

4
5

Subtotal:
J
1
2
3

Pintura:
Exterior acrlica
Interior semi gloss
Acrlica en techo
Subtotal:

K
1
2
3
4

Instalacin Elctrica:
Lmpara 2 x 40
Tomacorriente 110v
Interruptor dobles
Lmpara tipo secador (para el rea
exterior)
Subtotal:

6
7

Cantos
Revestimiento de cermica en losa

16.80

ML

82.68

9.48

Mts2

1,103.43

8
9

Pintura acrlica
Desage de 2" PVC en meseta

17.46
6.00

Mts2
Uds

110.52
962.39

Subtotal:

M
1
2

Miscelneos:
Acera perimetral
Limpieza final

23.86
1.00

Mts
PA

512.60
1,100.00

7.00
7.00
7.00
7.00
7.00
14.00

Uds.
Uds.
Uds.
Uds.
Uds.
Uds.

5,063.00
5,063.00
3,640.00
5,900.00
22,600.00
2,145.00

1.00

Uds.

34,450.00

4.00
2.00
2.00

Uds.
Uds.
Uds.

5,063.00
5,063.00
3,640.00

2.00

Uds.

5,900.00

2.00
4.00

Uds.
Uds.

22,600.00
2,145.00

2.00

Uds.

34,450.00

1.00

Uds.

139,750.00

1.00
1.00
1.00

UD
UD
UD

5,063.00
5,063.00
3,640.00

1.00

UD

5,900.00

1.00
2.00

UD
UD

22,600.00
2,145.00

1.00

UD

34,450.00

Subtotal:
Sistema Central De Gases Medicinales

1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07

Salas de Pediatra
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-8 P.T.O. Diss 02
Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)

2.00
2.01
2.02
2.03
2.04

Quirfanos
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02

2.05
2.06
2.07
2.08

Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
Alarma de dos gases

3.00
3.01
3.02
3.03
3.04

Salas de Parto
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02

3.05
3.06
3.04

Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)

4.00

Sala de Pre-Parto

4.01
4.02

Salida de pared Oxigeno


Flowmeter 0-15 P.T.O. Diss 02

3.00

UD

5,063.00

3.00

Uds.

5,900.00

4.03
4.04

Adaptadores
Caja de vlvula de un gas (O2)

3.00
1.00

Uds.
UD

2,145.00
27,500.00

5.00
5.01
5.02
5.03
5.04

Sala Post-Quirrgica
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02

4.00
4.00
4.00

UD
UD
UD

5,063.00
5,063.00
3,640.00

4.00

UD

5,900.00

5.05
5.06
5.07

Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)

4.00
8.00

UD
UD

22,600.00
2,145.00

1.00

UD

34,450.00

6.00
6.01
6.02

Nebulizacin
Salida de pared Oxigeno
Flowmeter 0-15 P.T.O. Diss 02

2.00

UD

5,063.00

2.00

Uds.

4,705.40

6.03

Adaptadores

4.00

Uds.

2,145.00

7.00
7.01
7.02
7.03
7.04

Emergencia
Salida de pared Oxigeno
Salida de pared Vaco
Slide bracket
Flowmeter 0-15 P.T.O. Diss 02

7.00
7.00
7.00

UD
UD
UD

5,063.00
5,063.00
3,640.00

7.00

Uds.

5,900.00

7.05
7.06
7.07

Regulador de Vacio
Adaptadores
Caja de vlvula de dos gases
(O2/Vac)
Alarma de dos gases (O2/Vac)

7.00
14.00

Uds.
Uds.

22,600.00
2,145.00

1.00

UD

34,450.00

1.00

UD

139,750.00

1.00

UD

360,000.00

1.00

UD

#########

7.08

8.00
8.01

8.02

10.00

Equipos
Manifol de oxigeno, header bar,
6x6 (sujeto a presentacin de
factura)
Bomba de vacio 3 HP dplex,
220 V, 3 Ph, 60 Hz, Modelo
D500BT2V (sujeto a presentacin
de factura)
Miscelneos de Instalacin

10.01

Tubera rgida de cobre de 1 1/8"

10.02
10.03
10.04
10.05
10.06

Tubera rgida de cobre de 7/8"


Tubera rgida de cobre de 3/4"
Tubera rgida de cobre de 5/8"
Tubera rgida de cobre de 1/2"
Miscelneos de Instalacin (tee,
codos, niples, coupling, etc.)
(sujeto a desglose en cubicacin)

10.07
10.08
10.09

10.10
10.11
10.12

Suministro
de
Sistema
de
soportera
Suministro de Sealizacin
Suministro de otros accesorios e
insumos (plata, tubos pvc, O2,
etc.)
Ejecucin de Prueba
Mano de Obra de Instalacin
Limpieza continua y final

200.00

P.L.

370.00

240.00
320.00
280.00
400.00

P.L.
P.L.
P.L.
P.L.

260.00
205.00
170.00
125.00

1.00

PA

179,760.00

1.00

PA

120,000.00

1.00

PA

30,000.00

1.00

PA

65,000.00

1.00
1.00
1.00

PA
PA
PA

45,000.00
#########
75,000.00

Uds.

15,599.58

Uds.

5,310.00

Subtotal:

1.00

2.00

Sistema de Control de Acceso Empleados


Sistema de Control de Acceso
1.00
Empleados, Incluye:
Reloj Biomtrico
Nueva generacin de sensor:
totalmente sellado, aprueba de
polvo, agua y rayones
Pantalla LCD 128x64
Formas de identificacin: Id,
Clave ID + Huella digital
Capacidad de registro: 50000
USB + Puerto USB (memorias
USB)
Batera recargable para
emergencias o portabilidad
Hasta 2000 huellas digitales
Idiomas: Ingles, Espaol,
Portugus y Francs
Instalacin, configuracin y
1.00
entrenamiento
Subtotal Sistema de Control Acceso Empleados
Sistema de Cmaras De Seguridad

1.00

2.00

3.00

4.00

Suministro y colocacin DVR


independiente con 1TB H 2.64
HD y 8 cmaras de seguridad al
libre que ofrecen todo lo necesario
para el sistema de vigilancia
Cmara de vigilancia de visin
nocturna para interiores y
exteriores
Instalacin y configuracin de
cmaras de seguridad por pie
(incluye cableado, terminales y
conexin elctrica)
Configuracin de acceso remoto
va web o dispositivo mvil

3.00

Uds.

18,242.87

10.00

Uds.

1,576.75

1,640.00

PL

26.89

1.00

P.A.

35,920.10

30.00

Uds.

5,086.29

30.00
30.00

Uds.
Uds.

302.76
1,816.53

102.00

Uds.

7,298.35

102.00

Uds.

1,054.20

15.00

Uds.

7,703.80

1.00

P.A

290,255.19

Subtotal Sistema de Cmaras De Seguridad

1.00

2.00
3.00
4.00

6.00

7.00
8.00

Sistema Contra Incendios


Suministro y colocacin de
extintores de 20 Lbs. con qumico
seco
Sealizacin
Base para extintor
Suministro e instalacin Detector
de humo tipo fotoelctrico modelo
SIGA-PS
Base estndar para detectores para
detectores modelo SIGA-SB
Estacin manual de alarma del
tipo simple modelo SIGA-270P
Mano de obra
Subtotal
Incendio:

Sistema

Contra

II

Construccin Divisiones Muros de 6" y Baos Nuevos:

A
1

Preliminares:
Replanteo con hilo y cal
Subtotal:

1.00

P.A

3,078.87

B
1

Movimiento de Tierra:
Excavacin zapata de muros de 6"

2
3

Bote material excavado


Relleno de reposicin

33.08

M3

414.16

46.31
16.54

M3
M3

367.98
103.54

8.27
22.05

M3
M3

9,657.14
22,099.51

1.46

M3

22,099.51

1.10

M3

5,361.60

5.85

M3

22,099.51

22.05

M3

22,099.51

0.99

M3

30,329.47

1.31

M3

14,327.43

73.50
207.91

M2
M2

897.06
722.74

7.44

M2

722.74

412.82

M2

67.03

412.82

M2

246.86

78.91

M2

1,103.43

263.88
7.07

ML
M2

82.68
246.86

Subtotal:
C
1
2
3
4
5
6
7
8

Hormign Armado
Zapata de muros
Viga de amarre (0.15x0.20)mt
Pichones de columnas de amarre
(0.15x00.20)mt BNP
Losa de piso con malla e=0.10mt
(baos)
Columnas
de
amarre
(0.15x0.20)MT SNP
Viga de amarre (0.15x0.20)mt
SNP
Dinteles (0.15x0.20)mt
Losa de techo e=0.12mt baos
nuevos
Subtotal:

D
1
2
3

Construccin de Muros:
Colocacin block de 6" BNP
Colocacin block de 6" SNP
Colocacin block de 6" SNP en
antepecho
Subtotal:

E
1
2
3
4
5

Terminacin de Superficie:
Fraguache en muros nuevos y
losas
Paete en muro y techos
Revestimiento de cermica en
muros
Construccin cantos
Paete en antepecho
Subtotal:

F
1

Terminacin de Pisos:
Suministro y colocacin piso de
granito fondo blanco (0.50x0.50)
alto transito
Suministro y colocacin cermica
de piso antirresbaladiza en baos
Suministro y colocacin zcalos
de granito

29.40

M2

920.33

57.84

M2

891.86

79.20

ML

123.04

10.95
18.60

M2
ML

295.22
99.95

2.00

Uds

1,120.15

21.18

M2

412.96

161.51
10.95

M2
M2

142.95
110.52

10.00

Uds

12,801.73

12.00

Uds

6,194.38

34.43

P2

215.52

11.00

Uds

5,698.00

11.00

Uds

5,180.00

Subtotal:
G
1
2
3
4

Terminacin de Superficie:
Fino de techo plano
Zabaleta
Desage 3" PVC con bajante
h=3.00mt
Aplicacin impermeabilizante tipo
lona asfltica granulada de
4.00kg/m con refuerzo de
polister.
Subtotal:

Aplicacin de Pintura:
Semigloss en muros
Acrlica en techos
Subtotal:

I
1
2
3

Puertas y Ventanas:
Suministro y colocacin puerta de
polimetal doble
Suministro y colocacin puerta de
polimetal sencilla
Suministro y colocacin ventana
salomnica de aluminio doble A
Subtotal:

J
1
2

Instalacin Sanitaria:
Suministro y colocacin inodoros
Suministro
y
colocacin
lavamanos con pedestal

3
4

5
6
7
8
9
10
11
12
13

14

15

16

Suministro y colocacin duchas


Suministro y colocacin piletas
revestida de cermica (incluye
desage y llave chorro)
Suministro y colocacin desages
de pisos 2"
Suministro y colocacin llave
chorro
Suministro y colocacin juego de
accesorios porcelana
Suministro y colocacin tubos
para cortinas
Construccin
cmara
de
inspeccin
Suministro y colocacin tubera
para drenaje 4" PVC
Suministro y colocacin tubera
para drenaje 3" PVC
Suministro y colocacin tubera
para drenaje 2" PVC
Suministro y colocacin tubera de
presin para agua potable 1"
PVC
Suministro y colocacin tubera de
presin para agua potable 1"
PVC
Suministro y colocacin tubera de
presin para agua potable 3/4"
PVC
Piezas y tuberas especiales

11.00

Uds

4,673.60

11.00

Uds

4,196.45

23.00

Uds

962.39

1.00

Uds

567.82

11.00

Uds

1,850.00

11.00

Uds

412.96

7.00

Uds

5,489.50

109.55

PL

52.35

54.78

PL

71.47

76.00

PL

41.28

102.00

PL

55.59

51.00

PL

47.65

57.00

PL

44.47

1.00

P.A

3,500.00

27.00

Uds

977.48

13.00

Uds

2,764.02

14.00

Uds

644.25

22.00

Uds

927.21

34.00

Uds

1,176.05

Subtotal:
X
1
2

3
4
5

INSTALACIONES
ELECTRICAS:
Salida de techos
Suministro y colocacin lmparas
fluorescente 3x32w T8 con
balastro elctrico
Suministro y colocacin globos 8"
Salidas interruptor simple
Salidas
tomacorriente
aterrizados

120v

6
7

10

11
12

13

14

Salidas
tomacorriente
220v
aterrizados para A/A
Drenajes empotrados con tubo
PVC-3/4"-SDR-26 para unidades
de aires acondicionados.
Ductos de PVC-2" empotrados
para paso de tuberas de cobre de
unidades de A/C
Suministro y colocacin A/A Split
de 12000 BTU marca Lennox.
Panel de 24 circuitos de
distribucin para iluminacin y
tomacorriente 120v
Panel de 24 circuitos de
distribucin para A/C
Alimentadores elctricos de panel
de distribucin de iluminacin y
tomacorrientes con 2#4 THHN
para fase, 1#6 THHN para neutro,
1#10 THHN para tierra en PVC
1"-SDR-26
Alimentadores elctricos de panel
de distribucin de A/C con 2#2
THHN para fase, 1#4 THHN para
neutro, 1#10 THHN para tierra en
PVC 1"-SDR-26
Registros
10x10x4
comunicacin elctrica

para

14.00

Uds

1,896.50

14.00

Uds

266.43

14.00

Uds

217.31

14.00

Uds

23,690.09

1.00

Uds

8,233.81

1.00

Uds

7,975.43

100.00

PL

244.56

100.00

PL

308.14

4.00

Uds

350.00

Subtotal:
COUNTER:
Counter (3.04 x 0.80 x 1.20)mt en
melanina, perfil de aluminio en
"U" y rodapi en aluminio, tope en
silestone (sujeto a presentacin de
factura)
Subtotal:

2.00

Uds

#########

CUADROS Y LAMINAS (Sujetos a Presentacin de Facturas):


Laminas impresas en canvas
6.00
Uds
2,559.31
18x24 full color moldura 2.25"
Cuadros impresos en canvas
5.00
Uds
4,346.33
24x30 full color moldura 4"
Cuadro full color montura 4"
9.00
Uds
6,735.02
Cuadros impresos en canvas
5.00
Uds
9,491.89
34x46 full color moldura 4"
Directorio
1.00
Uds
#########
Mural informativo
1.00
Uds
#########
Subtotal:
Jardinera (Sujeto a Presentacin de Factura):
Reflexa
1.00
Palo de Brasil
3.00
Trepadoras
2.00
Palma rafia
2.00
Arallanes
2.00
Plantas pequeas
12.00
Tarros de fibra de vidrio 37,5"
2.00
Tarros de fibra de vidrio 20"
6.00
Maceteros rectangulares
7.00
Maceteros pequeos
12.00
Arreglo floral orqudeas
1.00
Arreglo floral con anturios y
6.00
bromelia
Saco de guajaca
1.00
Spray para plantas
1.00

Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds

3,342.39
1,400.19
1,174.35
8,130.13
9,033.48
271.00
#########
4,516.74
1,174.35
451.67
3,252.05

Uds

1,264.69

Uds
Uds

4,336.07
1,147.73

Subtotal:
RUTA DE EVACUACION
Diseo y rotulacin de las rutas de
evacuacin (sujeto a presentacin
de factura)
Subtotal:

1.00 P.A.

#########

APLICACION: DRY-COOL / CHILLED BEAMS / CWP (PLANTA AGUA HELADA)


EQUIPOS MAYORES

SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15
HP HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL
DE FILTRACION 60/95%.
PANEL DESCONECTIVO
ELECTRICO NEMA 3R
INSTALADOS. PANEL DE
CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS
INSTALADOS EN FABRICA.
SET DE COMPRESORES
SCROLL DE CAPACIDAD
VARIABLE. VARIADOR DE
FRECUENCIA PARA MOTOR
VENTILADOR AIRE DE
SUMINISTRO. CURVA DE
INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN
EN OBRA HACIA ABAJO Y-O
HORIZONTAL.ESTA PARTIDA
INCLUYE LOS CHILLED

UD

1,350,133.81

SISTEMA DE DISTRIBUCION
CHILLED BEAMS ACTIVO
(A BASE DE VIGAS FRIAS),
SUSPENDIDAS EN PLAFON
UNIVERSAL, DIFUSOR DE
AIRE LINEAL DE DOS VIAS
PARA PROVEER 75 F/ 55% HR
Y 4 CAH, 25 DB, EN 40
HABITACIONES Y SUS
AREAS DE APOYO, CONTROL
INDIVIDUAL DE
TEMPERATURA Y HUMEDAD
ZONAL, CONTROL
TEMPERATURA DE ROCIO
PARA EVITAR
CONDENSACION EN EN
CUARTO. TODO EL SISTEMA
INSTALADO DE ACUERDO A
LOS PLANOS Y
ESPECIFICACIONES ANEXOS.
ESTA PARTIDA INCLUYE LOS
CHILLED BEAMS, SU
UBICACION (MANO DE OBRA
Y MATERIALES)

1.00

PA

36,031.96

PLANTA DE AGUA HELADA


DE 50 TONR, ROOF TOP DE
PAQUETE QUE INTEGRA
CHILLER SCROLL ENFRIADO
POR AIRE DE CAPACIDAD
VARIABLE DE 10@100%, SET
DE BOMBA DUAL
CENTRIFUGAS VERTICALES
EN LINEA, DESAIREADOR
AUTOMATICO, TANQUE DE
ESPANSION, VALVULAS DE
CONTROL Y SERVICIO,
PANELES ELECTRICOS Y
CONTROL DIGITAL. TODO
MONTADO SOBRE FRAME
COMUN DE ACERO, Y
HOUSING METALICO,
SISTEMAS IEM
BALANCEADOS Y
PROBADOS EN FABRICA.
VOLTAJE DE OPERACION
408/3 60. ESTA PARTIDA
INCLUYE LOS CHILLED
BEAMS Y SU UBICACION
(MANO DE OBRA Y
MATERIALES)
SET VENTILADOR DE
EXTRACCION DUAL
MONTADO SOBRE FRAME
COMUN, TIPO CENTRIFUGO
Y CONFIGURACION DE
DOMO DE TIRO VERTICAL
CON CURVA DE
INSTALACION EN TECHO.
CADA VENTILADOR 2880
CFM @ 1 PULG DE H20.
480/3/60 , DESCONETIVO
NEMA 3R. UNO STAND-BY.
ESTA PARTIDA INCLUYE LA
MANO DE OBRA Y
MATERIALES PARA SU
UBICACION.

1.00

UD

1,235,138.19

1.00

UD

76,663.75

INSTALACIONES MECANICAS
SISTEMA DE CONDUCTOS
DE AIRE PARA SUMINISTRO
Y EXTRACCION
CONSTRUIDOS EN ZINC
GALVANIDADO, AISLADOS
CON FIBRA DE VIDRIO, Y
DUCTOS FLEXIBLES
TERMINALES DE ALUMINIO
CON BRIDAS DE SEGURIDAD
PARA EVITAR FUGAS Y
CONDENSACION EN
PLENUM, SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS.
ESTA PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.

1.00

PA

140,550.21

SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO
Y CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE
AGUA HELADA,
CONSTRUIDAS EN TUBERIAS
DE COBRE Y AISLADAS
TERMICAMENTE CON
CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE
ALUMINIO EN EL AMBIENTE
EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS

SISTEMA DIGITAL
DIRECTO (DDC) PARA
CONTROL DE
TEMPERATURA, HUMEDAD
DENTRO DE LAS SALAS DE
CIRUGIA DE ACUERDO A
LAS ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.

1.00

PA

140,550.21

1.00

PA

340,727.78

10

SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRYCOOL, CWP, VE, PANELES
DDC) ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.
OBRAS CIVILES MENORES
PARA UBICACION DE
EQUIPOS IN SITU E
INSTALACION DE SISTEMAS
MECANICOS DE ACUERDO A
ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION
TRANSPORTE PESADO,
IZADO Y MONTACARGA
PARA UBICACION DE
EQUIPOS MAYORES EN
OBRA Y/O IN SITU
MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA

1.00

PA

85,181.94

1.00

PA

51,109.17

1.00

PA

42,590.97

1.00

PA

46,850.07

PA

34,072.78

ENTREGA Y PUESTA EN OPERACION


PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS
MAYORES, SISTEMA DE
1.00
CONDUCCION DE AIRE,
SISTEMA HIDRONICO Y
SISTEMA DDC.

11

12

LIMPIEZA,
DESCONTAMINACION
BLOQUE HABITACIONES
PARA PUESTA EN
OPERACION. INCLUYE
EVACUACION DURANTE 72
HRS DE LA EDIFICACION A
PRESION, HEPA-VACUUM Y
LIMPIEZA HUMED DE
SUPERFICIES Y CONTENIDO,
DESCONTAMINACION TOTAL
A BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE
TODO EL SISTEMA HVAC
(DUCTOS, DRY-COOL)

COMISIONAMIENTO DEL
SISTEMA HVAC DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.

1.00

PA

34,072.78

1.00

PA

34,072.78

UD

1.00

UD

APLICACION: UPS - IPS BARRA REFERENCIA


PARA SUIT OPERACIONES
& UCI
EQUIPOS MAYORES
1

Breaker 175 A desde panel


existente, 2 polos, 120/240 V,

Unidad UPS de 40 KVA, 1 fase,


120/240 V, con transferencia y bypass externo con baterias de ciclo
profundo de gelatida @ 48 voltios,
autonomia de 30 min a plena
carga.

Panel de distribucin principal


regulado, con barras de 175A, 1
fase , 120/240 v, 4h, con:
a) 1-175A, 2 polos, main breaker
b) 4-40A, 2polos, breaker
c) 1-30A, 2 polos, breaker

Set DE 3 Paneles aislados (IPS)


integrados en housing comun para
rea de cirugia, 8 KVA, 1 fase,
120/240 V Nema 1, 4h, N/S, con 8
brakers dobles termomagneticos
20 amp, monitor de falla, panel
anuciacion y barra de tierra

1 Panel aislados (IPS) para rea


de uci, de 6 KVA, 1 fase, 120/240
V Nema 1, 4h, N/S, con 8 brakers
dobles termomagneticos 20 amp,
monitor de falla, panel anuciacion
y barra de tierra

1Panel aislado (IPS) para rea de


recuperacin, de 4 KVA, 1 fase,
120/240 V Nema 1, 4h, N/S, con 8
brakers dobles termomagneticos
20 amp, monitor de falla, panel
anuciacion y barra de tierra

1.00

UD

1.00

UD

1.00

UD

1.00

UD

100.00

UD

INSTALACIONES ELECTRICAS
7

Alimentador AL1 desde fuente


existente al Enclosed con breaker
de 150A, formado por: 2 THHN
1/0 y 1 THNN 4, en 2" EMT

10

11

12

Alimentador AL2 a UPS desde


Enclosed breaker,formado por: 2
THHN 1/0, 1 THHN 2 y 1 THHN
4, en 2" EMT + BX

50.00

Pie

Alimentador AL3 desde UPS


hasta Panel Principal regulado,
formado por: 2 THHN 1/0, 1
THHN 2 y 1 THHN 4, en 2"
EMT,

15.00

PIE

Alimentador AL4 desde Panel


Principal regulado a Paneles
aislados (IPS), de 6 KVA,
formado por: 2 THHN 8 y 2
THHN 10, en 1" EMT

180.00

PIE

Alimentador AL5 desde Panel


Principal regulado a Panel aislado
(IPS), de 4 KVA, formado por: 4
THHN 10, en 3/4" EMT

Sistema de tierra fsica


compuesto por:
a) anillado en el entorno de la
edificacin cubierta, usando
conductor desnudo de cobre
mnimo No. 2, con conexiones a
la estructura edificacin en varios
puntos,
b aterizaje de placas en piso de
tres salas de cirugia conectado
atraves de barra de refererencias
en cada una de las salas
c) anillo de barra de refrencia de
tierras ubicadas en salas de
cirugia, recuperacion y
operaciones interonectadas a pozo
de tierra de 5 ohmios o menor.

20.00

1.00

PA

13

14

15

16

17

18

Un Pozo de tierra a capa fretica


con resistencia electrica menor o
igual @ 5 ohms, usando ultrafill y
varilla de tierra 3/4" x 10 pie con
cable 32R.

1.00

UD

1.00

PA

1.00

PA

TRANSPORTE PESADO,
IZADO Y MONTACARGA
PARA UBICACION DE
EQUIPOS MAYORES EN
OBRA Y/O IN SITU

1.00

PA

MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA

1.00

PA

Mano de obra Instalacin


equipos mayores e
instalaciones electricas
relacionadas de acuerdo
aespecificaciones y planos

1.00

PA

5 Barras de tierra de referencia


comn del sistema, con derivacin
para cada elemento del
equipamento medico y edificacion
segun especificaciones anexas

OBRAS CIVILES MENORES


PARA UBICACION DE
EQUIPOS IN SITU E
INSTALACION DE SISTEMAS
MECANICOS DE ACUERDO A
ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION

ENTREGA Y PUESTA EN OPERACION

19

20

PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS
MAYORES Y TODAS LAS
INSTALACIONES PARA
PUESTA EN OPERACION DE
ACUERDO A
ESPECIFICACIONES ANEXAS

COMISIONAMIENTO DEL
SISTEMA ELECTRICO DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
APLICACION: DRY-COOL /
FLUJO LAMINAR / CWP
(PLANTA AGUA HELADA)
PARA SUITE OPERACIONES
& UCI
EQUIPOS MAYORES

1.00

PA

1.00

PA

SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15
HP HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL
DE FILTRACION 60/95%.
PANEL DESCONECTIVO
ELECTRICO NEMA 3R
INSTALADOS. PANEL DE
CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS
INSTALADOS EN FABRICA.
SET DE COMPRESORES
SCROLL DE CAPACIDAD
VARIABLE. VARIADOR DE
FRECUENCIA PARA MOTOR
VENTILADOR AIRE DE
SUMINISTRO. CURVA DE
INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN
EN OBRA HACIA ABAJO Y-O
HORIZONTAL.

1.00

UD

#########

SISTEMA DE FLUJO
LAMINAR (> 100 FPM) PARA
PRODUCIR 15 CAMBIOS POR
HORA EN SALA DE
OPERACIONES, MONTADO
SOBRE TB UNIVERSAL DE
ESTRUCTURA DE ALUMINIO
ELECTROSOLDADO EN
FABRICA. CON UN AREA DE
2.80 X 2.80 M. SET DE
DIFUSORES DE SUMINISTRO
DE 24" X 24" TBAR CON
FILTRO HEPA 99.9997%.
DAMPER DE MARIPOSA Y
PLATO DE DIFUSION
INTEGRADOS. CUELLO DE
SUMINISTRO DE INCLUYE
ADEMAS SET DE REJILLAS
DE RETORNO CONSTRUIDAS
EN SS, CON FILTRO 60% Y
DAMPER DE HOJAS
OPUESRAS INCLUIDO

SET VENTILADOR DE
EXTRACCION DUAL TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO
DE TIRO VERTICAL
MONTADO SOBRE FRAME
COMUN CON CURVA DE
INATALACION EN TECHO.
CADA VENTILADOR 3000
CFM @ 1 PULG DE H20.
480/3/60 INCLUYE
DESCONETIVO NEMA 3R.
UNO STAND-BY

1.00

UD

298,136.80

1.00

UD

85,181.94

MANEJADORA DE AIRE DE
TECHO DE 1500 CFM @ 2"
H2O, VENTILADOR
CENTRIFUGO , DOBLE
PARED, FILTRACION 60/95%,
COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60

MANEJADORA DE AIRE DE
TECHO DE 1000 CFM @ 2"
H2O, VENTILADOR
CENTRIFUGO , DOBLE
PARED, FILTRACION 60/95%,
COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60

1.00

UD

259,166.06

1.00

UD

352,227.34

1.00

PA

157,700.00

INSTALACIONES IEM
4

SISTEMA DE CONDUCTOS
DE AIRE PARA SUMINISTRO
Y EXTRACCION
CONSTRUIDOS EN ZINC
GALVANIDADO, AISLADOS
CON FIBRA DE VIDRIO, Y
DUCTOS FLEXIBLES
TERMINALES SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS.
ESTA PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.

SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO
Y CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE
AGUA HELADA,
CONSTRUIDAS EN TUBERIAS
DE COBRE Y AISLADAS
TERMICAMENTE CON
CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE
ALUMINIO EN EL AMBIENTE
EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS

SISTEMA DE CONTROLES
DIGITALES PARA
MONITOREO Y CONTROL
INDIVIDUAL DE
TEMPERATURA, HUMEDAD,
CAMBIOS DE AIRE,
PRESSURIZACION Y NIVEL
DE POLUCION DENTRO DE
LAS SALAS DE CIRUGIA, UCI
Y DIFERENTES ZONAS DEL
AREA COMUN DE APOYO DE
LA SUIT, DE ACUERDO A
LAS ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION.

1.00

PA

136,291.11

1.00

PA

373,500.00

SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRYCOOL, VE, AHU`S, PANELES
DDC) ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.

1.00

PA

83,000.00

1.00

PA

49,800.00

TRANSPORTE PESADO
PARA IZADO Y
MONTACARGA PARA
UBICACION DE EQUIPOS
MAYORES EN OBRA Y/O IN
SITU

1.00

PA

45,650.00

MISCELANEOS PARA
MATERIALES Y SERVICIOS
EN OBRA

1.00

PA

37,350.00

OBRAS CIVILES MENORES


PARA UBICACION DE
EQUIPOS IN SITU E
INSTALACION DE SISTEMAS
MECANICOS DE ACUERDO A
ESPECIFICACIONES Y
PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE
OBRA PARA SU
INSTALACION

ENTREGA Y PUESTA EN OPERACION

10

11

12

PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS
MAYORES, SISTEMA DE
CONDUCCION DE AIRE,
SISTEMA HIDRONICO Y
SISTEMA DDC, SEGUN
ESPECIFICACIONES ANEXAS

LIMPIEZA,
DESCONTAMINACION SUIT
OPERACIONES Y UCI PARA
PUESTA EN OPERACION.
INCLUYE EVACUACION
DURANTE 72 HRS DE LA
EDIFICACION A PRESION,
HEPA-VACUUM Y LIMPIEZA
HUMED DE SUPERFICIES Y
CONTENIDO,
DESCONTAMINACION TOTAL
A BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE
TODO EL SISTEMA HVAC
(DUCTOS, AHU, DRY-COOL)

COMISIONAMIENTO DEL
SISTEMA HVAC DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
Subtotal:

1.00

PA

41,500.00

1.00

PA

46,850.07

1.00

PA

34,072.78

TOTAL

12,301.07
23,892.51
53,547.11
22,637.34
3,873.35
1,049.44
3,758.43
509,644.58
156,225.00
19,946.73
10,123.93
20,102.47
837,101.98

2,296.83
7,765.50
6,329.19
1,655.92
1,681.20
563.78
2,568.21
2,432.36
124.25
433.00
721.67
26,571.90

2,070.80
2,070.80
113,960.00
88,800.00

50,907.51
9,149.07
2,806.06
10,309.07

280,073.31

452,190.03
25,603.45
5,616.01

29,421.82

46,733.14

22,303.67
114,715.37

26,247.29

12,140.99
12,006.16
746,977.93

193,481.17
16,106.17
47,042.04
22,863.52
13,229.69
292,722.59

352,506.14

78,334.70

117,502.06

548,342.89

188,928.71
509,510.39

198,220.29

896,659.39

101,174.94

724,742.93

6,092.13
300,462.31

307,291.00
81,944.27
4,369.39
1,526,076.97

2,874.35
619.44
3,493.79

72,444.61
12,110.02

20,183.37

4,824.48

5,154.53
775.13
79,982.66
6,304.34
9,408.13
13,122.56

18,583.15
12,801.73
954.10
5,379.39
517.70
18,083.21
658.50
79.92
644.25
456.54
55,297.68
31,153.62
2,053.44
17,500.00
542.14
705.96
30,900.00
20.33
148.12
198.42
420,988.03

37,737.16
22,118.08
2,325.38
30,946.96
50,174.51
2,038.98
3,680.85
1,149.29
1,858.30
68,853.77
16,499.38
1,097.49
399.60

6,442.47
14,110.17
978.31
3,393.13
92,915.76
64,008.64
3,449.95
74,784.10
13,360.08
512,322.35

77,572.17
10,453.40
365,619.37
209,061.35
209,061.35
127,293.17
223,546.26
798,080.72
70,263.30
75,038.47
2,532.87
1,537.22
543,957.55
53,739.45
243,541.49
25,630.21
3,036,928.35

25,150.17
117,316.23
142,466.40

321,808.55
612,335.25
194,192.15
1,128,335.95

2,588.50
5,736.12
11,257.20
19,581.82

169,196.78
127,563.69
669.90
11,536.21
308,966.58

197,391.97
347,270.80
335,249.55
154,306.85
53,076.57
463,868.68
412,343.47
1,963,507.88

240,258.41
272,753.17
513,011.58

55,322.40
117,483.47
86,295.09
59,216.94
19,047.22
35,959.13
220,475.51
593,799.76

260,280.51
33,921.86
42,128.80
336,331.17

68,001.47
26,507.17
38,636.17
133,144.81

55,749.46
15,319.99
17,187.64
88,257.08

47,910.23

47,910.23

39,886.00
44,400.00
2,545.38
701.51
9,472.00
43,916.03
9,167.36
7,655.05
4,196.45
7,495.57
1,557.66

170,993.00

30,301.93
82,995.68
6,486.91
16,004.46
2,430.10
657.33
678.63
657.33
27,049.17
11,379.02
4,603.75
1,081.62
13,466.71

20,362.00

218,154.64

26,327.37
73,564.56
8,281.04
23,398.72
148,559.91
67,703.56

160,000.00

24,883.25
20,529.80
85,864.80
22,594.02
15,485.96
55,749.46
732,942.45

227,845.93
554,697.67
3,117.29
702,044.13
1,487,705.02

46,380.44
198,419.82

244,800.26

42,007.29
71,769.81
75,687.49
49,742.43
9,784.53
4,133.80
50,316.22
303,441.57

185,364.26
1,293.19
44,117.59
1,545.98
232,321.02

66,041.78
5,287.19

95,748.66

841.82
167,919.45

41,559.08
47,627.36
22,270.76
111,457.20

12,555.00
18,583.15
40,814.43
48,754.45
120,707.03

33,206.50
138,568.37
3,174.20
174,949.07

4,196.45
8,880.00
11,396.00
420.91
1,167.32
991.74
2,998.23
30,050.64

48,191.04
18,572.15
2,932.44
2,645.94
2,430.10
8,298.45
4,049.42
678.63
4,969.42

9,018.00

182,005.33

283,790.91

6,797.61
2,516.99
2,484.96
1,863.72
7,869.04
1,138.94
800.00
8,733.50
32,204.76

22,792.00
8,880.00
31,672.00

4,440.00
4,440.00

10,903.20
5,698.00
66.71

16,667.91

54,373.27
17,760.00
28,490.00
4,736.00
133.42
90.00
105,582.69

5,698.00
45.00
5,743.00

5,698.00
4,440.00
66.71
2,545.38
12,750.08

5,698.00
4,440.00
10,138.00

5,698.00
4,440.00
133.42
2,545.38
1,500.00
14,316.79

5,698.00
4,440.00
2,545.38
1,500.00
133.42
14,316.79

17,094.00
13,320.00
200.13
5,090.75
3,000.00
793.48
2,477.42
41,975.77

5,698.00
4,440.00
66.71
10,204.71

5,698.00
4,440.00
66.71
2,545.38
12,750.08

5,698.00
4,440.00
133.42
10,271.42

5,698.00

4,440.00
1,000.00
11,138.00

4,440.00
4,440.00

439,801.27
140,819.00
358,611.16
49,555.07
2,650.29
25,520.00
21,436.80
2,226.64
1,040,620.22

6,194.38
6,194.38

876.86
876.86

25,520.00
25,520.00

102,080.00
43,360.69
6,194.38
151,635.07

17,571.40
1,122.34
932.94
3,955.88
236.07
5,313.00
29,131.63

29,283.83
22,792.00
26,640.00
46,692.44
11,784.54
137,192.81

260.92
2,221.14
4,377.63
414.27
1,525.60
2,635.48
7,880.09
2,716.07

1,319.30
1,191.46
1,758.16
6,194.38
251.24
4,640.90
2,729.65
1,339.35
977.48
1,143.18
3,390.87
587.07
9,991.86
17,808.85
11,872.57
87,227.52

5,289.07
4,521.20
10,598.59
20,408.86

7,996.95
7,996.95

529.13
14,906.66
9,565.00
34,000.00
111,171.96

170,172.75

950.00
5,000.00
3,000.00
325.00
325.00
19,982.05
29,582.05

2,222,779.19
105,766.65
2,328,545.84

2,857.70
20,859.43
18,121.60
38,895.14
61,464.68
2,880.48
12,309.42
10,560.19
2,410.72
280.61
559.12
9,296.64
5,168.91
12,801.73
22,150.36
32,855.84
2,750.02
7,012.80
6,368.44
3,951.26
3,483.59
977.48

3,556.48
1,143.18
1,000.00
283,715.79

10,345.72
15,260.18
1,379.15
26,985.05

96,474.84
11,105.71
67,845.49
123,094.26
298,520.31

389,932.14
389,932.14

27,386.36
100,852.47
16,609.62
144,848.45

45,153.82
45,153.82

88,569.62
5,000.00
3,000.00

16,875.00
3,240.00
116,684.62

1,375.84
1,059.79
153.24
6,144.77
8,733.63

10,719.43
2,897.14
7,734.83
14,806.67
23,506.70
59,664.77

3,298.11
12,145.55
1,016.92
16,460.57

6,404.04
2,011.55
8,415.59

28,705.78
28,705.78

8,400.00
7,000.00
15,400.00

27,834.41

27,834.41

4,332.78
1,192.34
533.83
5,137.40
260.92
7,000.00
4,970.00
23,427.27

3,000.00
3,613.39
10,000.00
16,613.39

95,865.62
13,008.77
121,961.74
16,476.94
197,970.18
445,283.25

220,279.39
466,633.07
45,745.98
200,004.75
112,044.51
281,326.74
15,164.73
677,128.94
619,374.85
2,637,702.97

96,665.60
304,121.68
400,787.28

55,502.05
161,548.11
71,547.64
199,799.86
60,036.06
44,357.72
592,791.42

1,597,407.76
479,222.33
2,076,630.08

98,050.05
9,215.10
78,947.21

1,543.33
13,767.46
201,523.15

719,851.00

33,023.23
5,443.82
758,318.05

22,680.00
80,526.99
24,777.54
81,028.50
209,013.03

4,736.00
17,094.00
57,720.00
280.61
20,657.79
49,405.53
18,526.35
8,602.00
53,579.59
60,000.00

3,000.00
2,550.00
15,000.00
26,668.48
8,585.95
346,406.30

69,609.28
40,306.75
16,004.46
13,811.25
2,781.63
1,971.99
5,231.39
7,464.88

3,678.00

4,000.00
164,859.63

44,340.26
133,047.65

1,870,257.98

10,000.00
2,057,645.89

61,596.00

44,590.40
106,186.40

e (4,60x3,0Mts, h=2,80 Mts)


1,000.00
1,032.40
2,032.40

2,513.95
377.92
3,745.49
1,677.99
8,315.35

21,913.80
5,794.28
883.98
8,900.26
37,492.33

11,049.75
5,156.01
6,629.85
29,227.96
15,027.67
67,091.24

9,271.80
34,053.87
4,635.64
4,394.23

52,355.54

6,429.97
10,136.10
10,136.10
2,977.14
3,953.22
4,183.41
7,504.57
45,320.51

2,276.16
2,276.16

4,074.10
1,519.19
3,799.16
420.91
9,813.36

5,869.42
5,871.08
1,525.24
369.64
369.64
14,005.02

11,382.18
10,322.66
21,704.84

1,954.96
1,322.97
10,317.42
13,595.35

13,108.14
7,791.58
7,689.06
2,000.00
30,588.79

800.00
1,500.00
2,300.00

5,106.59
596.39
1,076.82
6,779.80

23,853.14
4,152.57
18,121.60
18,121.60
9,705.43
51,005.65
7,513.83
132,473.82

19,654.49
44,159.14
63,813.63

30,166.38
30,166.38
8,191.64
3,548.46
6,457.88
78,530.73

10,349.57
7,067.62
1,919.20
3,945.30
8,753.41
2,363.74
6,367.60
561.21
41,327.67

25,668.05
3,238.51
28,906.55

3,332.82
12,388.77
25,560.88
41,282.47

8,880.00
280.61
5,543.34
1,703.46
1,000.00
17,407.40

7,002.85
9,220.10
2,891.33
19,114.29

5,354.56
3,556.48
2,645.94
15,476.13
27,033.10

910.17
10,199.52
4,021.20
1,675.20
6,169.05
1,388.96
10,460.48
1,929.76
5,774.34

42,528.68

12,230.74
1,100.00
13,330.74

35,441.00
35,441.00
25,480.00
41,300.00
158,200.00
30,030.00
34,450.00

20,252.00
10,126.00
7,280.00
11,800.00
45,200.00
8,580.00
68,900.00
139,750.00

5,063.00
5,063.00
3,640.00
5,900.00
22,600.00
4,290.00
34,450.00

15,189.00
17,700.00
6,435.00
27,500.00

20,252.00
20,252.00
14,560.00
23,600.00
90,400.00
17,160.00
34,450.00

10,126.00
9,410.80
8,580.00

35,441.00
35,441.00
25,480.00
41,300.00
158,200.00
30,030.00
34,450.00
139,750.00

360,000.00

1,190,875.00

74,000.00
62,400.00
65,600.00
47,600.00
50,000.00
179,760.00

120,000.00
30,000.00
65,000.00
45,000.00
1,317,000.00
75,000.00

5,251,177.80

15,599.58

5,310.00
20,909.58

54,728.62

15,767.49

44,097.56

35,920.10
150,513.76

152,588.57
9,082.65
54,495.92
744,431.49

107,528.76
115,557.06
290,255.19
1,473,939.63

3,078.87
3,078.87

13,700.41
17,041.21
1,712.55
32,454.17

79,864.56
487,294.16
32,265.28
5,897.76
129,282.13
487,294.16
30,026.17
18,768.93
1,270,693.16

65,933.59
150,263.95
5,377.15
221,574.69

27,673.26
101,909.03
87,071.33
21,816.56
1,745.31
240,215.49

27,057.75

51,585.07
9,745.05
88,387.87

3,232.71
1,859.01
2,240.30

8,746.47

16,078.50

23,087.42
1,210.25
24,297.67

128,017.27
74,332.61
7,420.37
209,770.25

62,678.00
56,980.00

51,409.61
46,160.92
22,134.98
567.82
20,350.00
4,542.55
38,426.52
5,734.51
3,915.33
3,137.28
5,670.24

2,430.10

2,534.93
3,500.00
330,172.79

26,392.00
35,932.22
9,019.46
20,398.62
39,985.73

26,551.05

3,730.09

3,042.29

331,661.28

8,233.81
7,975.43

24,456.00

30,814.00

1,400.00
569,591.98

369,086.32

369,086.32

15,355.84
21,731.66
60,615.16
47,459.43
25,144.07
12,572.03
182,878.19

3,342.39
4,200.57
2,348.70
16,260.26
18,066.95
3,252.05
29,986.87
27,100.43
8,220.46
5,420.09
3,252.05
7,588.12
4,336.07
1,147.73
134,522.74

153,943.27
153,943.27

PLANTA AGUA HELADA)

1,350,133.81

36,031.96

1,235,138.19

76,663.75

140,550.21

140,550.21

340,727.78

85,181.94

51,109.17

42,590.97

46,850.07

34,072.78

34,072.78

34,072.78

924,224.09

298,136.80

85,181.94

259,166.06

352,227.34

157,700.00

136,291.11

373,500.00

83,000.00

49,800.00

45,650.00

37,350.00

41,500.00

46,850.07

34,072.78

6,572,396.58

No
I
A
1
2
3
4
5
6
7
8
9
10
11
12

Descripcion
Area Exterior:
FACHADA
Paete
Muros elevados
Recubrimiento
Losa de entrada
Colocain de fino
Zabaleta
Paete de losa
Hierros en huecos de ventanas
Revestimiento de placas de vinil en
muros
Demolicin y bote de piso existente
Torta de piso
Suministro y colocacin piso de alto
trnsito

Cantidades

Und

Precios

49.83
25.00
49.83
1.58
13.12
10.50
13.12
155.52

M2
M2
M2
M3
M2
ML
M2
M2

246.86
955.70
1,074.60
14,327.43
295.22
99.95
286.47
3,066.60

144.52
5.80
1.58

M2
M2
M3

1,080.99
3,439.09
5,361.60

M2

1,119.06

17.40

Sub total
A
1
1.1
1.2
1
1.4
1.5

Construccin Estacionamiento:
Movimiento de tierra:
Corte de material e = 0.20 m
Bote de material
Relleno de mina compactado
Excavacin para construccin de
canaleta (20 ML)
Bote de escombros demolicin de
acera

313.79
440.81
470.69

M3
M3
M3

128.29
367.98
1,085.65

4.80

M3

326.97

18.15

M3

367.98

1,568.96
1,568.96

M2
M2

96.85
488.29

118.90

ML

615.62

32.00

M2

6,604.27

449.10

ML

191.10

Subtotal
2
2.1
2.2

Asfalto:
Imprimacin del area
Carpeta asfaltica 2"
Subtotal:

3
3.1
3.2
3.3

Acera y Contenes
Reparacin de contenes
Encache de canaleta para desague de
parqueos
Pintura amarrillo trafico en contenes
y lineas del parqueo

3.4
3.5
3.6
3.7
3.8

Demolicin de acera en mal estado


Construccin de aceras con malla
electrosoldada
Reparacin menores en aceras
Suministro y colocacin adoquines en
acera entrada peatonal
Construccin contenes nuevos

129.63

M2

77.66

129.63
1.00

M2
P.A.

620.46
15,000.00

21.76
230.20

M2
ML

833.98
599.85

83.30
33.32
66.64

ML
M2
M2

299.81
897.06
246.86

83.30
166.60

ML
ML

1,100.00
99.95

66.64

M2

74.46

94.50

ML

222.70

2.00

Uds

9,549.68

1.00

Uds

1,951.23

120.00
48.00
96.00

ML
M2
M2

24.85
897.06
246.86

120.00
240.00

ML
ML

1,100.00
99.95

96.00

M2

74.46

120.00

ML

222.70

Subtotal:
B
B-1
1
2
3
4
5
6
7
8
9

Reparacin Verja Perimetral


Parte Frontal
Desmonte y bote malla ciclonica
(incluye puertas en malla 3 Ud)
Muro de bloques de 6"
Paete en muro
Suministro y colocacin malla
ciclonica de 6'
Zabaleta en malla
Pintura acrilica en muro de verja
(muro de malla)
Suministro y colocacin alambre
trinchera
Suministro y colocacin puertas en
malla ciclonica vehicular (4.90 ML)
Suministro y colocacin puertas en
malla ciclonica peatonal (1.40 ML)
Subtotal:

B-2
1
2
3
4
5
6
7

Lateral derecho e izquierdo:


Desmonte y bote de malla ciclonica
en mal estado
Muro de bloques de 6"
Paete en muro
Suministro y colocacin malla
ciclonica de 6'
Zabaleta en malla
Pintura acrilica en muro de verja
(muro de malla)
Suministro y colocacin alambre
trinchera

Subtotal:
B-3
1
2
3
4
5
6
7

Trasero
Desmonte y bote de malla ciclonica
en mal estado
Muro de bloques de 6"
Paete en muro
Suministro y colocacin malla
ciclonica de 6'
Zabaleta en malla
Pintura acrilica en muro de verja
(muro de malla)
Suministro y colocacin alambre
trinchera

94.50
37.80
75.60

ML
M2
M2

24.85
897.06
246.86

94.50
189.00

ML
ML

1,100.00
99.95

75.60

M2

74.46

94.50

ML

222.70

72.90
486.05
1.00
1.00
4.00

M3
M2
P.A.
P.A.
P.A.

307.89
102.63
5,161.99
15,000.00
325.21

119.00

PL

44.47

10.00

Ud

5,325.84

3,500.00

PL

31.63

2.00

Ud

3,592.01

51.29
6.67

M2
M3

77.66
367.98

Subtotal:
C
1
2
3
4
3
4

Jardineria:
Suministro y colocacin tierra negra
Suministro y colocacin grama
Siembra de arboles
Limpieza y bote en patios interiores
Llave chorro para jardineras
Tubos de 3/4" de presin PVC para
llaves chorro, jardineras (incluye
excavacin y tapado)
Subtotal:

D
1
2

Iluminacin Exterior:
Suministro y colocacin lmpara tipo
secador (incluy. tubo en hierro 4" x
4" de 20')
Alambre vinyl para tubos de lmparas

Subtotal:
E
1
2
3

Tendedero:
Soporte para tendedero
Demolicin piso en mal estado en
area de tendedero
Bote de material demolido

Construccin piso pulido con malla


electrosoldada en area de tendedero
e=0.10 m

5.13

M3

6,435.10

163.55

P2

285.00

2.00
1.00
1.00

Ud
Ud
Ud

5,000.00
32,167.02
5,161.99

1.00

P.A

55,749.46

1.00
1.00

Ud
PA

17,241.04
15,485.96

1.00

Uds

1,035.40

1.00

Uds

1,035.40

1.00

Uds

877.54

1.00
549.77

Uds
M2

877.54
5.32

549.77

M2

412.96

549.77

M2

65.39

Subtotal:
F
1

Pasarela:
Baranda de hierro en pasarela en
barras de 1/2" con pasamanos
Subtotal:

G
1
2
3
4
5
6

Rotulacin
Asta para bandera
Tarja de bronce
Base para tarja
Suministro y colc. Letrero c/letras
colgante c/luces Led (sujeto a
presentacion de factura)
Letrero en bronce (EMERGENCIA
12")
Letrero identificativo en obra
Subtotal:

II

Cuerpo I

A
1

Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Desmonte
y
reinstalacin
de
compresores A/C
Suministro y colocacion base para
tinaco
Suministro y colocacion base para
A/C
Limpieza del area a tratar
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Desmonte aluzinc en antepecho
(incluye el bote)

2
3
4
5
6

Subtotal:

B
1
2
3

4
6
7
8

10

11

13
14
15
16
17
18
19
20

Reparaciones y suministro de ventanas, puertas y gabinetes:


33.78
M2
Desmonte de ventanas de aluminio
Suministro y colocacin de ventanas
correderas de aluminio y vidrio
363.42
P2
Suministro
y
colocacin
de
protectores en hierro barras cuadradas
de 1/2"
427.66
P2
Suministro y colocacin de puerta de
hierro barras cuadradas de 1/2" en
entrada principal
32.28
P2
1.00
P.A.
Desmonte de gabinetes
8.58
M2
Desmonte de plywood
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla (1 x 2.10)
1.00
Ud
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla (1.23 x 2.40)
1.00
Ud
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (1.2 x 2.34) en
emergencia
1.00
Ud
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (1.2 x 2.10) en
emergencia
1.00
Ud
Suministro y colocacin puerta de
polimetal sencilla
9.00
Ud
Suministro y colocacin puerta de
polimetal doble
1.00
Ud
Divisiones de madera en despensa (3
tramos de 1.20 x 0.45)
3.00
Ud
Suministro e instalacin vidrio fijo en
hueco
47.02
P2
Suministro y colocacin de gabinete
de piso en odontologia
6.89
PL
Suministro y colocacin de gabinete
de piso en vacuna
5.74
PL
Suministro y colocacin de gabinete
de piso en laboratorio
24.93
PL
Suministro y colocacin de gabinete
de pared en vacuna
5.74
PL

56.48
246.31

294.23

304.56
232.97
25.00

14,525.83

20,419.17

19,249.17

17,431.00
6,194.38
24,777.54
361.34
215.52
2,374.51
2,374.51
2,374.51
2,374.51

21

Suministro y colocacin de gabinete


de pared en laboratorio

26.90

PL

2,374.51

15.00

Ud

407.80

8.50

M2

619.44

1.50

M2

1,474.63

15.49

P2

307.89

15.06

P2

307.89

80.92

P2

307.89

4.00
8.00
1.00
4.00
8.00

Ud
Ud
Ud
Ud
Ud

103.54
103.54
232.97
5,698.00
4,440.00

2.00

Ud

4,824.48

1.00
3.00

Ud
Ud

46,307.09
962.39

2.00
1.00

Ud
Ud

1,909.94
66.71

Subtotal:
C
1

Rotulacin
Letreros en acrilico para sealizacin

Subtotal:
D
2
3
4
5
6

Instalacin Varias:
Suministro e instalacin plafond PVC
en direccin
Suministro e instalacin plycem en
direccin
Suministro e instalacin meseta de
marmolite en odontologa
Suministro e instalacin meseta de
marmolite en vacunas
Suministro e instalacin meseta de
marmolite en laboratorio
Subtotal:

E
1
2
3
4
5
6
7
8
9
10

Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de fregadero
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin fregadero
sencillo
Suministro e instalacin lavamanos
quirurgico pequeo en area de
emergencia
Desague de piso de 2"
Suministro y colocacin accesorios
de baos
Rejilla de piso
Subtotal:

Instalacin Electrica:

1
2
3
4
5
6
7

9
10
11
12
13

Suministro e instalacin globo de 8"


Accesorio para interruptor sencillo
Accesorio para interruptor doble
Accesorio para tomacorriente 110 V

7.00
21.00
3.00

Ud
Ud
Ud

644.25
102.00
148.31

27.00

Ud

36.34

2.00
3.00

Ud
Ud

85.41
55.59

3.00

Ud

23,690.09

1.00

Ud

29,303.66

3.00
1.00

Ud
Ud

39,167.35
3,599.97

7.00
5.00

Ud
Ud

4,603.75
678.63

1.00

P.A.

4,576.51

2.86

M2

897.06

17.05
2.95

M2
M2

246.86
134.08

68.92
1.00

M2
P.A.

881.64
5,161.99

25.00

M2

1,148.48

Accesorio para tomacorriente 220 V


Accesorio para salida de data
Suministro
e
instalacin
aire
acondicionado 12,000 BTU en
direccion y odontologia
Suministro
e
instalacin
aire
acondicionado 18,000 BTU en
administracion
Suministro
e
instalacin
aire
acondicionado 24,000 BTU en
laboratorio y emergencias
Extractor de aire acondicionado
Suministro e instalacin abanico de
techo KDK con luz en consultorios
Salida de Data nueva
Reparacin alambrado general del
hospital
Subtotal:

G
1

Muros de Bloques
De 6" para cerrar hueco
Subtotal:

H
1
2
3
4

Terminacin de superficie:
Paete
Pintura mantenimiento en hierros
Suministro y colocacin ceramica de
muros
Reparacin general paete muros
Subtotal:

I
1

Terminacin de pisos:
Suministro y colocacin pisos de
granito (incluye pulido y brillado)

Subtotal:

III

Cuerpo II

A
1

Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Suministro y colocacion base para
tinaco
Limpieza del area a tratar
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.

2
3
4

2.00

Uds

1,035.40

2.00
275.28

Uds
M2

877.54
5.32

275.28

M2

412.96

48.92

M2

56.48

526.38
25.00
1.00

P2
Ud
P.A.

246.31
103.54
232.97

2.00

Ud

25,912.35

2.00

Ud

17,431.00

4.00

Ud

17,431.00

2.00

Ud

13,073.25

1.00

Ud

13,073.25

Subtotal:
B
1
2
4
5
6

10

Reparaciones y suministro de
ventanas y puertas:
Desmonte de ventanas de aluminio
Suministro y colocacin de ventanas
correderas de aluminio y vidrio
Desmonte de puerta madera y vidrio
Desmonte de gabinetes
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
doble con bumper (1.8 x 2.10)
entrada zona quirurgica.
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
doble con bumper (1.2 x 2.10) en sala
de partos
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (1.2 x 2.10)
salida medico a quirofano
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla con bumper (0.90 x 2.10)
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
sencilla (0.90 x 2.10)

11
12
13
14
15
16
17

Suministro e instalacin vidrio fijo en


hueco
Puerta de polimetal sencilla
Puerta de polimetal doble
Suministro y colocacin de gabinete
de piso en enfermeria
Suministro y colocacin de gabinete
de piso en esterilizacin
Suministro y colocacin de gabinete
de pared en enfermeria
Suministro y colocacin de gabinete
de pared en esterilizacin

85.76
12.00
3.00

P2
Ud
Ud

215.52
6,194.38
24,777.54

6.72

PL

2,374.51

8.60

PL

2,374.51

6.72

PL

2,374.51

8.60

PL

2,374.51

6.00
5.00

Ud
Ud

103.54
103.54

1.00

Ud

4,824.48

1.00
5.00
4.00

Ud
Ud
Ud

5,154.53
5,698.00
4,440.00

2.00

Ud

2,545.38

2.00

Ud

101,174.94

5.00

Ud

1,909.94

4.00
5.00
1.00

Ud
Ud
P.A.

361.34
66.71
5,643.17

20.00
19.00
3.00

Ud
Ud
Ud

644.25
102.00
148.31

7.00

Ud

36.34

Subtotal:
E
1
2
3
4
5
6
7
8
10
11
12
13

Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Suministro e instalacin fregadero
sencillo
Suministro e instalacin fregadero
doble
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin ducha
completa
Suministro e instalacin lavamanos
quirurgico doble en acero inoxidable
con accionador de rodilla
Suministro y colocacin accesorios
de baos
Suministro y colocacin tubo para
cortina
Rejilla de piso
Acometida de agua para autoclave
Subtotal:

F
1
2
3
4

Instalacin Electrica:
Suministro e instalacin globo
Accesorio para interruptor sencillo
Accesorio para interruptor doble
Accesorio para tomacorriente 110 V

5
6
7
8

Accesorio para tomacorriente 220 V


Suministro e instalacin abanico de
techo
Tapa caja de breaker
Tapa ciega

1.00

Ud

85.41

2.00
2.00
3.00

Ud
Ud
Ud

309.72
27.58

6.56
3.74

M2
M2

155.31
897.06

137.09
10.28
18.77
3.68

M2
M3
M2
M2

62.12
367.98
246.86
134.08

137.09
1.00

M2
P.A.

881.64
5,000.00

12.00
100.80

M2
ML

920.33
103.54

5.80

M3

367.98

27.11
15.00

P2
Ud

309.72
407.80

Subtotal:
G
1
2

Muros de Bloques
Demolicin muro en quirofano
De 6" para cerrar hueco
Subtotal:

H
1
2
3
4
5
6

Terminacin de superficie:
Demolicin ceramica de pared en
baos
Bote material demolido
Paete
Pintura mantenimiento en hierros
Suministro y colocacin ceramica de
muros
Reparacin general paete muros
Subtotal:

I
1
2

Terminacin de pisos:
Suministro y colocacin pisos de
granito
Redondeo de esquinas
Subtotal:

D
1
2
3

Miscelaneos
Bote de material escombros
Suministro e instalacin meseta de
marmolite en esterilizacin
Rotulos
Subtotal:

IV

Cuerpo III

A
1
2
3

Reparaciones de techo:
Desmonte y reinstalacin de tinaco
Suministro y colocacion base para
tinaco
Suministro
y
aplicacin
de
impermeabiliazante acrilico
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.

2.00

Uds

1,035.40

1.00

Uds

877.54

63.64

M2

191.10

378.73

M2

412.96

M2
M2

3,277.04
56.48

P2
Ud
P.A.
Ud
Ud

246.31
103.54
232.97
6,194.38
24,777.54

Ud

11,430.00

Ud

17,274.90

M2

2,580.99

Pl

2,374.51

Pl
Ud

2,374.51
407.80

M2

77.66

Subtotal:
B
1
2
3
4
5
6
7
8
9
10
11
12
13

Reparaciones y suministro de ventanas y puertas:


Suministro y colocacin de puerta de
hierro barras cuadradas de 1/2" en
entrada principal
35.85
37.92
Desmonte de ventanas de aluminio
Suministro y colocacin de ventanas
correderas de aluminio y vidrio
407.97
21.00
Desmonte de puerta
1.00
Demonte de gabinete
16.00
Puerta de polimetal sencilla
4.00
Puerta de polimetal doble
Puerta de polimetal en closet (1.20 x
3)
3.00
Suministro y colocacin de puerta de
aluminio y vidrio martillado claro
doble con bomper (1.20 x 2.10)
1.00
Puerta de tola (solamente pintura de
mantenimiento en hierro)
15.00
Suministro y colocacin gabinete de
piso
21.32
Suministro y colocacin gabinete de
pared
21.32
12.00
Suministro y colocacin de rotulos
Subtotal:

C
1

Demoliciones:
Demolicin de piso pulido en mal
estado en area de imgenes, farmacia,
administracin y lavanderia
211.20

2
2

Demolicin de ceramica en muros


Bote de material demolido

123.44
27.46

M2
M3

62.12
367.98

241.20
179.50

M2
ML

920.33
123.04

34.10

M2

643.51

9.00
9.00
1.00
9.00
9.00

Ud
Ud
Ud
Ud
Ud

103.54
103.54
232.97
5,698.00
4,440.00

2.00
9.00
9.00
9.00

Ud
Ud
Ud
Ud

5,154.53
2,545.38
1,909.94
361.34

9.00
11.00

Ud
Ud

412.96
66.71

10.00
28.00
2.00

Ud
Ud
Ud

644.25
102.00
148.31

30.00

Ud

36.34

2.00
3.00

Ud
Ud

85.41
27.58

Subtotal:
D
1
2
3

Terminacin de pisos:
Suministro y colocacin piso de
granito fondo blanco alto transito de
0.40 x 0.40 (incluye pulido y brillado)
Zocalos de granito
Construccin piso pulido e=0.10 m
en terraza interior
Subtotal:

E
1
2
3
4
5
6
7
8
9
10
11

Instalacin Sanitaria:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de fregadero
Suministro e instalacin inodoro
Suministro e instalacin lavamanos
Suministro e instalacin fregadero
doble
Ducha
Juego de accesorios de baos
Cortina
Suministro y colocacin tubo para
cortina
Rejilla de piso
Subtotal:

F
1
2
3
4
5
6

Instalacin Electrica:
Suministro e instalacin globo
Accesorio para interruptor sencillo
Accesorio para interruptor doble
Accesorio para tomacorriente 110 V
Accesorio para tomacorriente 220 V
Accesorio para salida de tapa ciega

8
9
10
11

Suministro
e
instalacin
aire
acondicionado 12,000 BTU farmacia
y administracin
Suministro
e
instalacin
aire
acondicionado 18,000 BTU en rayos
x
Tapa para caja de breaker
Suministro e instalacin abanico de
techo
Suministro e instalacin lmparas
3x32W

2.00

Ud

23,690.09

1.00
1.00

Ud
Ud

29,303.66
309.72

8.00

Ud

4,603.75

32.00

Ud

2,677.28

3.00

M2

897.06

6.00
1.00

M2
P.A.

246.86
5,000.00

196.60

M2

881.64

72.31
7.58
10.43
11.63

P2
M2
P2
M2

361.34
69.03
309.72
62.12

11.63

M2

881.64

72.64

P2

215.52

1.00

Uds

4,824.48

1.00

P.A

1,500.00

Subtotal:
G
1

Muros de Bloques
De 6" para cerrar hueco
Subtotal:

H
1
2
3

Terminacin de superficie:
Paete
Reparacin general de muros paete
Suministro y colocacin ceramica de
muros
Subtotal:

I
1
2
3
4
5
6
7
8

Cocina
Suministro y colocacin de tope de
granito en cocina
Demolicion meseta de ceramica
Construccion meseta de marmolite
Demolicion ceramica de muros
Suministro y colocacion ceramica de
muros
Suministro y colocacion ventana
salomonica de aluminio AA
Suministro y colocacion fregadero
sencillo de acero inoxidable (incluye
mezcladora)
Cierre de hueco en muros de block 6"

Subtotal:

CASETA PLANTA DE EMERGENCIA (4.80 x 6.00) Mts., h=3.00 Mts.

1.a)

PRELIMINARES:
Replanteo

1.00

P.A.

1,032.40

13.50
17.55
4.20
9.86

M3
M3
M3
M3

326.97
367.98
209.48
1,085.65

3.50

M3

9,657.14

4.46
1.08
0.80
3.65
3.15

M3
M3
M3
M3
M3

14,327.43
22,099.51
22,266.38
22,099.51
9,657.14

20.32

M2

897.06

77.62

M2

722.74

41.62

M2

286.47

155.24
113.70

M2
ML

246.86
82.68

41.62

M2

67.03

Subtotal :
1.a)
b)
c)
d)

MOVIMIENTO DE TIERRA:
Excavacin
Bote Material
Relleno de Reposicin
Relleno Prov. de Mina
Subtotal :

2.a)
b)
c)
e)
f)
g)

HORMIGON ARMADO EN:


Zapata de Muro 0.20 Mts
Losa en Techo y Vuelo Plano, e=0.12
Mts.
Viga de Amarre (0.20 x 0.20) Mts
Dintel
Columnas
Zapata de columnas
Subtotal :

3.a)
b)

MUROS DE BLOQUES:
De 0.15 Mts BNP con 3/8" a
0.80Mts
De 0.15 Mts SNP con 3/8" a
0.80Mts
Subtotal :

4.a)
b)
c)
d)

TERMINACION DE SUPERFICIE:
Paete de Mezcla Liso en Techo,
vuelos, vigas y columnas
Paete de Mezcla Liso en Muros
exteriores e interiores
Cantos
Fraguache de techo, vuelos
columnas

Subtotal :
5.a)

PISOS:
Piso de H.A. pulido con malla
electrosoldada e=0.10m

2.88

M3

6,435.10

37.44

M2

295.22

51.92
21.60
2.00

M2
ML
ud

412.96
99.95
1,622.34

199.68

M2

142.95

28.80

M2

176.97

2.60

M2

3,613.39

2.00
1.00
2.00

UD
UD
UD

977.48
1,143.18
36.34

21.60

mt2

512.60

Subtotal :
6.a)
b)
c)
d)

TERMINACION DE TECHOS:
Fino de Mezcla en Techo plano
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Zabaleta de Mezcla
Desague de techo 4"
Subtotal :

7.a)
b)

PINTURA:
Semigloss en Muros y techos
Mantenimiento (color gris perla) en
piso
Subtotal :

8.a)

PORTAJE:
Puerta acustica confeccionada en
Tola (2.40 x 2,00) Mts.
Subtotal :

9.-

INSTALACION ELECTRICA:
a) Salida de Luz Cenital con bombillo
bajo consumo
b) Salida de Interruptor Sencillo
c) Tomacoriente 110v

Subtotal :
10.a)

VARIOS
Acera perimetral (ancho=1.00m)

b)

c)

Instalacion aislamiento acustico en


paredes y techo con capa de 2" de
fibra acustica R-8, protegidas con
malla de fibra de vidrio blanca y
fijada con clavos galvanizados con
adhesivos monaco 22-15
Limpieza Final

93.60
1.00

M2
P.A.

3,757.76
2,588.50

1.00
1.00

P.A
P.A

1,522.04
3,613.39

28.12

M3

326.97

12.96
28.25
22.08
61.62

M3
M3
M3
M3

326.97
103.54
1,085.65
367.98

4.69
3.46
0.81

M3
M3
M3

9,657.14
9,657.14
22,099.51

7.36
2.25

M3
M3

5,361.60
22,099.51

1.82
2.85
1.43
5.29

M3
M3
M3
M3

22,099.51
22,099.51
22,099.51
22,099.51

Subtotal :
VI

Construccion de Morgue:

A
1.00
2.00

Preliminares
Limpieza del solar
Replanteo con charrancha.
Subtotal

B
1.00
2.00
3.00
4.00
5.00

Movimiento de tierra
Excavacion a mano zapata de muros
de 6"
Excavacion a mano zapata de
columnas C1
Relleno de reposicion
Relleno compactado e=0.30mt
Bote de material excavado.
Subtotal

C
1.00
2.00
3.00
4.00
5.00

Hormign Armado BNP:


Zapata de muros de 6"
Zapata de columnas
Pichones de columnas
Losa de piso con malla e=0.10mt
hormign simple
Viga de amarre
Subtotal

D
1.00
2.00
3.00
4.00

Hormign Armado SNP:


Columnas
Vigas V1
Vigas V2
Vigas V3

5.00
6.00
7.00
8.00

Dintel
Hormigon en rampa de acceso
e=0.15m
Losa e=0.14 y vuelos
Hormigon simple para soporte de
meseta de fregadero e=0.10m

0.44

M3

22,266.38

10.13
12.89

M3
M3

5,002.59
14,327.43

3.10

M2

951.99

65.49
126.98

M2
M2

897.06
722.74

92.07

M2

67.03

253.96
92.07

M2
M2

67.03
286.47

253.96
165.80

M2
ML

246.86
82.68

73.58

M2

920.33

48.88

ML

123.04

92.07
17.80

M2
ML

295.22
99.95

103.64

M2

412.96

6.00

Uds

1,674.90

Subtotal
E
1.00
2.00

Construccion de Muros
Colocacion bloques de 6" BNP
Colocacion bloques de 6" SNP
Subtotal

F
1.00
2.00
3.00
4.00
5.00

Terminacin de Superficie
Fragucahe en losa y vuelos
Fraguache en muros interiores y
exteriores
Paete en losa y vuelos
Paete en muros interiores y
exteriores
Cantos
Subtotal

G
1.00
2.00

Terminacion de Pisos:
Suministro y colocacion de pisos de
granito fondo blanco de (0.40x0.40)m
Suministro y colocacion zocalos de
granito fondo blanco (0.07x0.40)ml
Subtotal:

H
1.00
2.00
3.00

4.00

Terminacion de Techos:
Fino de techos
Zabaletas
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Desague 4" PVC con bajante
h=3.00m

5.00
6.00
7.00
8.00

Goteros colgantes
Antepecho en block de 6"
Paete en antepecho
Cantos en antepecho

17.80
7.12
16.91
35.60

ML
M2
M2
ML

148.36
722.74
246.86
82.68

92.07
106.32
126.48

M2
M2
M2

74.46
74.46
142.95

1.00

Uds

24,777.54

1.00

Uds

12,878.12

1.00

Uds

134,467.69

103.30

P2

215.52

57.00

PL

49.32

19.00
4.00

PL
Uds

47.65
567.82

57.00

PL

71.47

2.00
3.00

Uds
Uds

5,489.50
1,674.90

Subtotal:
I
1.00
2.00
3.00

Pintura:
Acrilica en techos y vuelos
Acrilica en muros exteriores
Semigloss en muros interiores
Subtotal:

J
1.00
2.00
3.00
4.00

Portage:
Suministro y colocacion puerta de
polimetal doble
Suministro y colocacion puerta
enrrollable de (1.62x2.20)m
Suministro y colocacin puerta doble
en acero inoxidable (batiente)
Suministro y colocacion ventana
salomonica de aluminio AA
Subtotal:

K
1.00

2.00
3.00
4.00

5.00
6.00

Instalacion Sanitaria:
Suministro y colocacion tuberia PVC
de 1" presion para agua potable
(inclye excavacion, asiento de arena y
tapado)
Suministro y colocacion tuberia PVC
de " presion (inclye excavacion,
asiento de arena y tapado)
Llave de paso de " de bola
Suministro y colocacion tuberia 3"
PVC drenaje para aguas negras
(incluye excavacion, asiento de arena
y tapado).
Construccion camara de inspeccion
(registros)
Desagues 4" PVC

Suministro y colocacion fregadero


7.00 doble de acero inoxidable con
mezcladora
Construccion meseta para cadaveres
8.00 revestida en ceramica con desague y
llave chorro.
9.00 Acometida agua potable
10.00 Acometida agua negras

1.00

Uds

5,154.53

3.00
1.00
1.00

Uds
P.A
P.A

5,161.99
4,645.79
6,710.58

14.00

Uds

977.48

12.00
2.00
2.00
1.00
2.00

Uds
Uds
Uds
Uds
Uds

2,764.02
977.48
1,143.18
4,969.42
2,507.01

1.00
7.00
1.00
3.00
1.00
1.00

Uds
Uds
Uds
Uds
Uds
Uds

8,775.38
1,176.05
1,176.05
1,836.99
5,161.99
5,177.00

35.44

M2

512.60

9.60
44.76
1.00

M2
P2
P.A

3,277.04
309.72
1,035.40

Subtotal:
L
1.00

Instalacion Electrica:
Salida de techos
Lampara 3x32w T8 con balastro
2.00
electronico
3.00 Salida luz de pared (aplique)
4.00 Salida interruptor simple
5.00 Panel de distribucion de 16 circuitos
6.00 Registros electricos
Conexin de panel con planta
7.00
electrica
8.00 Salida TC-110v
9.00 Salida TC-110v doble altura
10.00 Salida TC-220v
11.00 Miscelaneos electricos
12.00 Mano de obra electricista
Subtotal:
M
1.00
2.00
3.00
4.00

Miscelaneos:
Construccion
acera
perimetral
e=0.10mt
Protectores de hierro en ventanas en
barras cuadradas de "
Tope de marmolite
Limpieza continua y final
Subtotal:

VII
A
1.00

Construccion Caseta para Basura:

Preliminares:
Limpieza del solar

1.00

P.A

507.35

2.00

Replanteo con charrancha

1.00

P.A

1,032.40

21.90
16.43
32.85
9.90

M3
M3
M3
M3

326.97
103.54
367.98
1,085.65

5.48
0.40
1.46
3.30

M3
M3
M3
M3

9,657.14
22,099.51
22,099.51
6,435.10

0.80
1.46

M3
M3

22,099.51
22,099.51

4.96

M3

17,653.93

54.75
54.48
18.52

M2
M2
M2

1,016.64
918.88
1,268.48

41.33
146.00
41.33
146.00
113.54

M2
M2
M2
M2
ML

67.03
67.03
286.47
246.86
82.68

Subtotal:
B
1.00
2.00
3.00
4.00

Movimiento de Tierra:
Excavacion a mano zapata de muros
de 8"
Relleno de reposicion
Bote material excavado
Relleno compactado e=0.30mt
Subtotal:

C
1.00
2.00
3.00
4.00

Hormigon Armado BNP en:


Zapata de muros
Columnas de amarre
Viga de amarre
Losa de piso e=0.10mt (pulido)
Subtotal:

D
1.00
2.00
3.00

Hormigon Armado SNP en:


Columnas de amarre
Vigas de amarre
Losa de techo y vuelos e=0.12mt
(inclinada)
Subtotal:

E
1.00
2.00
3.00

Construccion de Muros
Colocacion bloques de 8" BNP
Colocacion bloques de 8" SNP
Colcoacion bloques calados SNP
Subtotal:

F
1.00
2.00
3.00
4.00
5.00

Terminacion de Superficie:
Fraguache en losas y vuelos
Fraguache en muros
Paete en losa y vuelos
Paete en muros
Cantos

Subtotal:
G
1.00
2.00
3.00

Terminacion de Techos:
Fino de techo
Suministro
y
colocacin
de
impermeabilizante tipo lona asfaltica
de 4.00 KG/M granulada con
refuerzo de poliester.
Goteros colgantes

41.34

M2

295.22

41.34
29.00

M2
ML

412.96
148.36

66.50
92.80
41.34

M2
M2
M2

74.46
176.97
176.97

4.00

Uds

14,670.37

4.00
1.00

Uds
P.A

516.20
528.05

Subtotal:
I
1.00
2.00
3.00

Pintura:
Acrilica exterior en muros
Mantenimiento en muros interiores
Mantenimiento en techo
Subtotal:

J
1.00

Portaje:
Suministro y colocacion puerta de
tola (2.03x 2.00)mt (4 uds).
Subtotal:

K
1.00
2.00

Miscelaneos:
Letrero identificativo (clasificacion
de basura).
Limpieza continua y final
Subtotal:

VIII
1
2
3
4
5

Cisterna:
Suministro e instalacin bomba para
cisterna marca mayer o red jacket de
2 HP
Suministro y colocacin tapa de
aluminio para cisterna
Tuberias y piezas
Sustitucin de tuberas agua potable
desde cisterna a la edificacin
(cuerpos I, II y III)
Reparaciones menores en cisterna
(resane, zabaleta, entre otros)

1.00

Uds

14,918.76

1.00
1.00

Uds
P.A.

3,613.39
191.10

1.00

P.A.

10,323.97

1.00

P.A.

5,161.99

Subtotal:
IX
1
2

6
7
8
9
10

11

Alta tensin:
Traslado de planta (uso de grua)
Suministro y colocacin de caja de
breaker trifasica de 30 circuitos
(cuerpos I, II y III)
Suministro y colocacin cablera a
caja de breaker cuerpo I de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Suministro y colocacin cablera a
caja de breaker cuerpo II de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Suministro y colocacin cablera a
caja de breaker cuerpo III de 3 lineas
(#2 THW, 1linea # 4 THW, 1 Linea
#10 THW)
Movilizacin de transformadores
desde caseta vieja a caseta nueva (3
Ud)
Portico estructura metalica en angular
2"x2"x1/4"
Estructura para interconexion alta
tension MT-316
Alambre THHN #3/0 (para vigote
del banco)
Soporte para cut-Out y apartarrayos

1.00

P.A.

14,927.72

3.00

Uds

13,903.00

1.00

P.A.

28,146.25

1.00

P.A.

26,473.76

1.00

P.A.

25,049.06

1.00

p.a.

10,599.57

1.00

P.A.

12,698.49

1.00

Uds

32,004.32

120.00

pl

58.77

1.00

Uds

1,445.36

45.00

PL

1,507.13

ALIMENTADORES:
a) Alimetadores desde transformador
a Main breakers de 800 amp. 3 en
caseta de planta compuesto por:
3 # 2/0 THHN por fase
2 # 2/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
pvc3" SDR-26

12

b) Alimentador desde Main breakers


a Transfer switch automatico de 800
amp 3 compuesto por:
25.00

PL

1,513.56

30.00

PL

1,269.42

30.00

PL

1,269.42

30.00

PL

1,269.42

288.80

PL

439.99

3 # 2/0 THHN por fase


2 # 2/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
pvc3" SDR-26

13

c) Alimentador desde Generador de


75KW @ Main Breaker de proteccion
de 800 amp. Compuesto por:
3 # 1/0 THHN por fase
2 # 1/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
EMT 3"

14

15

16

d) Alimenador desde main breakers


de proteccion de planta a transfer
switch automatico de 800 amp 3
compuesto por:
3 # 1/0 THHN por fase
2 # 1/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
EMT 3"
e) Alimentador desde transfer switch
automatico a panel board principal de
800 amp 3 en caseta de planta
compuesto por:
3 # 1/0 THHN por fase
2 # 1/0 THHN por neutro
1 # 2 THHN por tierra, en tuberia
EMT 3"
Alimentadores
de
paneles
de
distribucion internos:
f) Alimentador desde panel board de
800 amp 3 @ panel de distribucion
#1 de 30 circuitos en cuerpo I,
compuesto por:
3 # 1/0 THW por fase
1 # 1/0 THW por neutro

1 # 6 THW para tierra, en tuberia


pvc2" SDR-26

17

18

19

20

21
22
23

g) Alimentador desde panel board en


caseta de planta a panel de
distribucion de 30 circuitos 3 en
cuerpo II compuesto por:
3 # 1/0 THW por fase
1 # 1/0 THW por neutro
1 # 6 THW para tierra, en tuberia
pvc2" SDR-26
h) Alimentador desde panel board en
caseta de planta a panel de
distribucion de 30 circuitos 3 en
cuerpo III compuesto por:
3 # 1/0 THW por fase
1 # 1/0 THW por neutro
1 # 6 THW para tierra, en tuberia
pvc2" SDR-26
i) Alimetador desde panel board en
caseta de planta a panel de
distribucion de 24 circuitos en
lavanderia compuesto por:
3 # 1/0 THW por fase
1 # 1/0 THW por neutro
1 # 6 THW para tierra, en tuberia
pvc2" SDR-26
j)
Acometida
para
Cisterna
compuesta por:
2 # 10 THW para fase
1 # 12 THW para neutro
1 # 12 THW para tierra, en PVC
SDR-26 = 18uds.
Equipos:
Encloused breakers de 800 amp 3
Transfer automatico 800 amp 3, 4H,
120/208V (Nema-3R)
Panel board de 800 amp 3
compuesto por:
1-bkr 150 amp 3 cuerpo I
1-bkr 150 amp 3 cuerpo II
1-bkr 150 amp 3 cuerpo III

306.84

PL

439.99

186.30

PL

461.62

186.30

PL

461.62

328.00

PL

41.61

2.00

Uds

95,251.75

1.00

Uds

456,038.81

1.00

P.A

200,066.85

1-bkr 150 amp 3 cuerpo III


lavanderia, dos espacios disponibles.

Subtotal:
X
1
2
3

APLICACIN PINTURA:
Semigloss en muros interiores
Acrilica en muros exteriores
Acrilica en techos

2,983.03
1,364.99
902.33

M3
M3
M3

142.95
74.46
74.46

902.33

M2

164.94

20.17

P2

309.72

440.17

PL

136.68

1.00

Uds

15,485.96

13.94

PL

2,374.51

15.41

PL

2,300.00

31.16

Pl

136.68

1.00

Uds

6,194.38

5.90

PL

2,300.00

5.40
0.44

M2
M3

62.12
367.98

3.60

M2

246.86

1.00

Uds

5,154.53

Subtotal:
XI
1

MISCELANEOS:
Pulido y brillado de pisos
Suministro y colocacion tope de
marmolite en archivo e informacion
Suministro y colocacion trameria de
roble en archivo (11 tramos).
Suministro y colocacion counters en
informacion
Suministro y colocacion gabinete de
piso en roble color caoba en area de
esterilizacion
Suministro y colocacion gabinete de
pared en roble color caoba en area de
esterilizacion
Suministro y colocacion divisiones en
roble en despensa de esterilizacion

Suministro y colocacion puerta de


polimetal en despensa (1.20x2.10)mt

2
3
4
5

9
10
11
12
13

Suministro y colocacion gabinete de


pared en roble color caoba en
Demolicion
de
ceramica
en
esterilizacion
Bote material material
Paete
en
muros
area
de
esterilizacion
Suministro y colocacion fregadero
doble de acero inoxidable en
esterilizacin (incluye mezcladora)

14

15
16

17

18
19

Suministro y colocacion puerta de


aluminio y vidrio en esterilizacion y
entrada sucia de medicos (0.90x2.10)
Suministro y colocacion tope de
marmolite en estacion de enfermeras
Suministro y colocacion gabinete de
piso y pared en roble tintado color
caoba en estacion enfermeras
Suministro y colocacion A/A split de
36000 BTU marca Lennox en
quirofanos
Suministro y colocacion A/A split de
24000 BTU marca Lennox en sala de
partos
Limpieza final

2.00

Uds

12,878.12

15.36

P2

309.72

13.38

PL

2,374.51

1.00

Uds

58,751.03

1.00
1.00

Uds
P.A

39,167.35
25,626.15

38.84

M2

15,343.01

2.24

M2

854.63

1.00

uds

43,104.12

7.80

M2

872.35

38.84

M2

872.35

1.00

uds

91,852.82

19.20

M2

176.97

4.00
4.00
4.00
12.00

Uds
Uds
Uds
Uds

103.54
103.54
51.77
103.54

Subtotal:
XII
1
2
3
4
5
6
7

RAYOS X
Emplomado en muros
Construccion de muros para cristal
plomado (bloques de 6")
Suministro y colocacion cristal
plomado 1`x 1`
Suministro y colocacion muro de
sheeterock area plomada
Sheetrock para division area plomada
Suministro y colocacion puerta
plomada (1.00x2.10).
Aplicacin pintura mate en cuarto
oscuro
Subtotal:

VIII
I
1
2
3
4

DIVISIONES
HABITACIONES:
DESMONTES
DEMOLICIONES:
Desmonte de inodoros
Desmonte de lavamanos
Desmonte de duchas
Desmonte de puertas

EN
Y

5
6

Demolicion de muros
Bote material demolido

103.45
21.72

M2
M3

56.48
367.98

1.00

P.A

3,078.87

33.08
46.31
16.54

M3
M3
M3

326.97
367.98
103.54

8.27
22.05

M3
M3

9,657.14
22,099.51

1.46

M3

22,099.51

1.10

M3

5,361.60

5.85
22.05
0.99

M3
M3
M3

22,099.51
22,099.51
22,266.38

1.31

M3

14,327.43

73.50
207.91

M2
M2

897.06
722.74

7.44

M2

722.74

Subtotal:
II

Construccion Divisiones Muros de 6" y Baos Nuevos:

A
1

Preliminares:
Replanteo con hilo y cal
Subtotal:

B
1
2
3

Movimiento de Tierra:
Excavacion zapata de muros de 6"
Bote material excavado
Relleno de reposicion
Subtotal:

C
1
2
3
4
5
6
7
8

Hormigon Armado
Zapata de muros
Viga de amarre (0.15x0.20)mt
Pichones de columnas de amarre
(0.15x00.20)mt BNP
Losa de piso con malla e=0.10mt
(baos)
Columnas de amarre (0.15x0.20)MT
SNP
Viga de amarre (0.15x0.20)mt SNP
Dinteles (0.15x0.20)mt
Losa de techo e=0.12mt baos nuevos

Subtotal:
D
1
2
3

Construccion de Muros:
Colocacion block de 6" BNP
Colocacion block de 6" SNP
Colocacion block de 6" SNP en
antepecho
Subtotal:

Terminacion de Superficie:

1
2
3
4
5

Fraguache en muros nuevos y losas


Paete en muro y techos
Revestimiento de ceramica en muros
Construccion cantos
Paete en antepecho

412.82
412.82
78.91
263.88
7.07

M2
M2
M2
ML
M2

67.03
246.86
881.64
82.68
246.86

29.40

M2

920.33

57.84

M2

891.86

79.20

ML

123.04

10.95
18.60

M2
ML

430.31
99.95

2.00

Uds

1,120.15

21.18

M2

412.96

161.51
10.95

M2
M2

142.95
74.46

10.00

Uds

24,777.54

12.00

Uds

6,194.38

34.43

P2

215.52

Subtotal:
F
1
2
3

Terminacion de Pisos:
Suministro y colocacion piso de
granito fondo blanco (0.50x0.50) alto
transito
Suministro y colocacion ceramica de
piso antiresvaladiza en baos
Suministro y colocacion zocalos de
granito
Subtotal:

G
1
2
3
4

Terminacion de Superficie:
Fino de techo plano
Zabaleta
Desague 3" PVC con bajante
h=3.00mt
Aplicacin impermeabilizante tipo
lona asfaltica granulada de 4.00kg/m
con refuerzo de poliester.
Subtotal:

Aplicacin de Pintura:
Semigloss en muros
Acrilica en techos
Subtotal:

I
1
2
3

Puertas y Ventanas:
Suministro y colocacion puerta de
polimetal doble
Suministro y colocacion puerta de
polimetal sencilla
Suministro y colocacion ventana
salomonica de aluminio doble A

Subtotal:
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Instalacion Sanitaria:
Suministro y colocacion inodoros
Suministro y colocacion lavamanos
con pedestal
Suministro y colocacion duchas
Suministro y colocacion piletas
revestida de ceramica (incluye
desague y llave chorro)
Suministro y colocacion desagues de
pisos 2"
Suministro y colocacion llave chorro
Suministro y colocacion juego de
accesorios porcelana
Suministro y colocacion tubos para
cortinas
Construccion camara de inspeccion
Suministro y colocacion tuberia para
drenaje 4" PVC
Suministro y colocacion tuberia para
drenaje 3" PVC
Suministro y colocacion tuberia para
drenaje 2" PVC
Suministro y colocacion tuberia de
presion para agua potable 1" PVC
Suministro y colocacion tuberia de
presion para agua potable 1" PVC
Suministro y colocacion tuberia de
presion para agua potable 3/4"
PVC
Piezas y tuberias especiales

11.00

Uds

5,698.00

11.00
11.00

Uds
Uds

4,673.60

11.00

Uds

4,196.45

23.00
1.00

Uds
Uds

962.39
567.82

11.00

Uds

1,850.00

11.00
7.00

Uds
Uds

361.34
5,489.50

109.55

PL

52.35

54.78

PL

48.90

76.00

PL

55.59

102.00

PL

55.59

51.00

PL

47.65

57.00
1.00

PL
P.A

44.47
3,613.39

27.00

Uds

977.48

13.00
14.00
22.00

Uds
Uds
Uds

2,764.02
644.25
1,143.18

Subtotal:
X
1
2
3
4

INSTALACIONES
ELECTRICAS:
Salida de techos
Suministro y colocacion lamparas
fluorescente 3x32w T8 con balstro
electrico
Suministro y colocacion globos 8"
Salidas interruptor simple

5
6
7

8
9
10
11

12

13

14

Salidas
tomacorriente
120v
aterrizados
Salidas
tomacorriente
220v
aterrizados para A/A
Drenajes empotrados con tubo PVC3/4"-SDR-26 para unidades de aires
acondicionados.
Ductos de PVC-2" empotrados para
paso de tuberias de cobre de unidades
de A/C
Suministro y colocacion A/A split de
12000 BTU marca Lennox.
Panel de 24 circuitos de distribucion
para iluminacion y tomacorriente
120v
Panel de 24 circuitos de distribucion
para A/C
Alimentadores electricos de panel de
distribucion de iluminacion y
tomacorrientes con 2#4 THHN para
fase, 1#6 THHN para neutro, 1#10
THHN para tierra en PVC 1"-SDR26
Alimentadores electricos de panel de
distribucion de A/C con 2#2 THHN
para fase, 1#4 THHN para neutro,
1#10 THHN para tierra en PVC 1"SDR-26
Registros
10x10x4
para
comunicacin electrica

34.00

Uds

1,236.00

14.00

Uds

2,024.71

14.00

Uds

266.43

14.00

Uds

217.31

14.00

Uds

23,690.09

1.00

Uds

8,233.81

1.00

Uds

8,233.81

100.00

PL

250.99

100.00

PL

316.24

4.00

Uds

359.20

Sistema Central De Gases Medicinales (rea de Ciruga)


Sistema Central de Gases Mdicos
58.00
Uds.
Salidas de pared de Oxigeno
38.00
Uds.
Salidas de pared Vaco
17.00
Uds.
Salidas de pared Aire
58.00
Uds.
Slide Bracket
96.00
Uds.
Adaptadores
58.00
Uds.
Flujmetro 0-15 Lpm, DISS OXIGENO
17.00
Uds.
Flujmetro 0-15 Lpm, DISS AIRE
38.00
Uds.
Regulador de Vacio

5,196.10
5,227.03
5,227.03
3,757.93
2,214.49
6,091.14
6,091.14
23,332.18

Subtotal:

1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08

38.00
2.00
6.00
5.00
5.00

1.09
1.10
1.11
1.12
1.13

Botellas colectoras de succin 1000 cc


Caja de Vlvula de un gas
Caja de Vlvula Tres gases
Alarma un gas
Alarma Tres gases (O2/Air/Vac)

2.00
2.01
2.02

Equipos
1.00
Manifold de Oxigeno header 10x10
Manifold de Aire Medicinal M2-HBTC-12S-AIR1.00
6x6
Bomba de vaco 5 HP Dplex, 3 Ph,
60 Hz, Modelo S500B-T2
1.00

2.03

3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11

1.00

2.00

Miscelneos de Instalacin
Tubera rgida de cobre de 1 5/8"
Tubera rgida de cobre de 1 1/8"
Tubera rgida de cobre de 7/8"
Tubera rgida de cobre de 3/4"
Tubera rgida de cobre de 5/8"
Tubera rgida de cobre de 1/2"
Miscelneos de Instalacin (tee,
codos, niples, coupling, etc.)(Sujeto a
desglose en cubicaciones)
Suministro de Sistema de soportara
Suministro de Sealizacin
Suministro de otros accesorios e
insumos (plata, tubos pvc, O2, etc.)
Ejecucin de Prueba
Mano de Obra de Instalacin
Limpieza continua y final

Uds.
Uds.
Uds.
Uds.
Uds.

14,453.56
28,390.93
49,389.89
87,237.58
193,264.78

Ud.
Ud.

700,316.41
371,663.04

Ud.

############

600.00
1,120.00
440.00
880.00
300.00
600.00

P.L.
P.L.
P.L.
P.L.
P.L.
P.L.

569.88
381.99
268.42
211.64
175.51
129.05

1.00
1.00
1.00

PA
PA
PA

180,669.53
123,887.68
30,971.92

1.00
1.00
1.00
1.00

PA
PA
PA
PA

123,887.68
92,915.76
############
15,220.38

Subtotal
Sistema de Control de Acceso Empleados
1.00
Uds.
15,561.01
Sistema de Control de Acceso Empleados, Incluye:
Reloj Biometrico
Nueva generacin de sensor: totalmente sellado, aprueba de polvo, agua y rayones
Pantalla LCD 128x64
Formas de identificacin: Id, Clave ID + Huella digital
Capacidad de registro: 50000
USB + Puerto USB (memorias USB)
Bateria recargable para emergencias o portabilidad
Hasta 2000 huellas digitales
Idiomas: Ingles, Espaol, Portugues y Frnces
1.00
Uds.
5,449.59
Instalacin, configuracin y entrenamiento

Subtotal Sistema de Control Acceso


Empleados

1.00

2.00

3.00

4.00

Sistema de Camaras De Seguridad


Suministro y colocacin DVR
independiente con 1TB H 2.64 HD y
8 cmaras de seguridad al libre que
ofrecen todo lo necesario para el
sistema de vigilancia
Camara de vigilancia de visin
nocturna para interiores y exteriores
Instalacin y configuracin de
camaras de seguridad por pie (incluye
cableado, terminales y coneccion
electrica)
Configuracin de acceso remoto via
web o dispositivo movil

3.00

Uds.

18,242.87

10.00

Uds.

1,576.75

1,640.00

PL

26.89

1.00

P.A.

35,920.10

30.00
30.00
30.00

Uds.
Uds.
Uds.

5,086.29
302.76
1,816.53

102.00

Uds.

7,298.35

102.00

Uds.

1,054.20

15.00
1.00

Uds.
P.A

7,703.80
290,255.19

Subtotal Sistema de Camaras De


Seguridad

1.00
2.00
3.00
4.00
6.00
7.00
8.00

Sistema Contra Incendios


Suministro y colocacin de extintores
de 20 Lbs con quimico seco
Sealizacin
Base para extintor
Suministro e instalacin Detector de
humo tipo fotoelectrico modelo SIGAPS
Base estandard para detectores para
detectores modelo SIGA-SB
Estacion manual de alarma del tipo
simple modelo SIGA-270P
Mano de obra
Subtotal Sistema Contra Incendio:

COUNTER:

Counter (3.04 x 0.80 x 1.20)mt en


melamina, perfil de aluminio en "U"
y rodapie en aluminio, tope en
silestone (sujeto a presentacion de
factura)

2.00

Uds

184,543.16

Subtotal:

CUADROS Y LAMINAS (Sujetos a Presentacion de Facturas):


Laminas impresas en canvas 18x24
full color moldura 2.25"
6.00
Uds
Cuadros impresos en canvas 24x30
full color moldura 4"
5.00
Uds
9.00
Uds
Cuadro full color mondura 4"
Cuadros impresos en canvas 34x46
full color moldura 4"
5.00
Uds
1.00
Uds
Directorio
1.00
Uds
Mural informativo

2,493.75
4,346.33
6,735.02
9,491.89
25,144.07
12,572.03

Subtotal:
Jardineria (Sujeto a Presentacion de Factura):
1.00
Reflexa
3.00
Palo de brazil
2.00
Trepadoras
2.00
Palma rafia
2.00
Arallanes
12.00
Plantas pequeas
2.00
Tarros de fibra de vidrio 37,5"
6.00
Tarros de fibra de vidrio 20"
7.00
Maceteros rectangulares
12.00
Maceteros pequeos
1.00
Arreglo floral orquideas
Arreglo floral con anturios y bromelia
6.00
1.00
Saco de guajaca
1.00
Spray para plantas
Subtotal:

Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds
Uds

3,342.39
1,400.19
1,174.35
8,130.13
9,033.48
271.00
14,993.43
4,516.74
1,174.35
451.67
3,252.05

Uds
Uds
Uds

1,264.69
4,336.07
1,147.73

ACABADOS PARA LAS AREAS


DE QUIROFANOS Y
EMERGENCIA (INCLUYE SALA
DE PARTOS, POSTPARTO)
PROTECTORES DE CAMILLA
Terminales
para
bompers
(Protectores de camillas)
Bompers (protectores de camillas)
base de aluminio y revestido de vinyl
(140 mm x 38 mm separado a 76 mm
de la pared) (sujeto a presentacin de
factura)
Protectores de esquinas base de
aluminio y revestido de vinyl (2" x 2"
x 4") (sujeto a presentacin de
factura)
REVESTIMIENTO ASEPTICO
EN PAREDES
Revestimiento en muros de material
vinilico aseptico, con juntas sanitarias
y electrosoldado. (incluye todo lo
necesario para su correcta instalacin)
(sujeto a presentacin de factura)
PLAFON (FALSO CIELO)
Falso cielo (plafon aseptico tipo
clean room liso o similar) (sujeto a
presentacin de factura)
PISOS
Piso de vinyl aseptico, incluye juntas
sanitarias y electrosoldado (incluye
todo lo necesario para su correcta
instalacin) (sujeto a presentacin de
factura)
Auto nivelante para pisos (sujeto a
presentacin de factura)
PUERTAS
Puerta de acero inoxidable
(2.00x2.10) (sujeto a presentacin de
factura)
CORTINAS

208.00

Uds

758.81

447.75

PL

1,102.60

96.00

Uds

1,620.00

100.26

M2

4,955.51

51.20

M2

5,451.06

100.26

M2

5,574.95

100.26

M2

1,486.65

1.00

Ud

273,585.30

Suministro y colocacin de Cortinas


Antibacteriales, resistentes al fuego y
resistentes a las manchas (sujeto a
presentacin de factura)

5.00

Ud

16,518.36

Subtotal:
RUTA DE EVACUACION
Diseo y rotulacin de las rutas de
evacuacin (sujeto a presentacin de
factura)

1.00

P.A.

153,943.27

Subtotal:
APLICACION: DRY-COOL / CHILLED BEAMS / CWP (PLANTA AGUA HELADA)
EQUIPOS MAYORES

SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15 HP
HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL DE
FILTRACION 60/95%. PANEL
DESCONECTIVO ELECTRICO
NEMA 3R INSTALADOS. PANEL
DE CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS INSTALADOS
EN FABRICA. SET DE
COMPRESORES SCROLL DE
CAPACIDAD VARIABLE.
VARIADOR DE FRECUENCIA
PARA MOTOR VENTILADOR
AIRE DE SUMINISTRO. CURVA
DE INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN EN
OBRA HACIA ABAJO Y-O
HORIZONTAL.ESTA PARTIDA
INCLUYE LOS CHILLED BEAMS,
SU UBICACION (MANO DE OBRA
Y MATERIALES)

1.00

UD

1,350,133.81

SISTEMA DE DISTRIBUCION
CHILLED BEAMS ACTIVO (A
BASE DE VIGAS FRIAS),
SUSPENDIDAS EN PLAFON
UNIVERSAL, DIFUSOR DE AIRE
LINEAL DE DOS VIAS PARA
PROVEER 75 F/ 55% HR Y 4 CAH,
25 DB, EN 40 HABITACIONES Y
SUS AREAS DE APOYO,
CONTROL INDIVIDUAL DE
TEMPERATURA Y HUMEDAD
ZONAL, CONTROL
TEMPERATURA DE ROCIO PARA
EVITAR CONDENSACION EN EN
CUARTO. TODO EL SISTEMA
INSTALADO DE ACUERDO A
LOS PLANOS Y
ESPECIFICACIONES ANEXOS.
ESTA PARTIDA INCLUYE LOS
CHILLED BEAMS, SU
UBICACION (MANO DE OBRA Y
MATERIALES)
1.00

PA

36,031.96

PLANTA DE AGUA HELADA DE


50 TONR, ROOF TOP DE
PAQUETE QUE INTEGRA
CHILLER SCROLL ENFRIADO
POR AIRE DE CAPACIDAD
VARIABLE DE 10@100%, SET DE
BOMBA DUAL CENTRIFUGAS
VERTICALES EN LINEA,
DESAIREADOR AUTOMATICO,
TANQUE DE ESPANSION,
VALVULAS DE CONTROL Y
SERVICIO, PANELES
ELECTRICOS Y CONTROL
DIGITAL. TODO MONTADO
SOBRE FRAME COMUN DE
ACERO, Y HOUSING METALICO,
SISTEMAS IEM BALANCEADOS
Y PROBADOS EN FABRICA.
VOLTAJE DE OPERACION 408/3
60. ESTA PARTIDA INCLUYE
LOS CHILLED BEAMS Y SU
UBICACION (MANO DE OBRA Y
MATERIALES)
1.00

UD

1,235,138.19

1.00

UD

76,663.75

SET VENTILADOR DE
EXTRACCION DUAL MONTADO
SOBRE FRAME COMUN, TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO DE
TIRO VERTICAL CON CURVA DE
INSTALACION EN TECHO. CADA
VENTILADOR 2880 CFM @ 1
PULG DE H20. 480/3/60 ,
DESCONETIVO NEMA 3R. UNO
STAND-BY. ESTA PARTIDA
INCLUYE LA MANO DE OBRA Y
MATERIALES PARA SU
UBICACION.

INSTALACIONES MECANICAS

SISTEMA DE CONDUCTOS DE
AIRE PARA SUMINISTRO Y
EXTRACCION CONSTRUIDOS EN
ZINC GALVANIDADO,
AISLADOS CON FIBRA DE
VIDRIO, Y DUCTOS FLEXIBLES
TERMINALES DE ALUMINIO
CON BRIDAS DE SEGURIDAD
PARA EVITAR FUGAS Y
CONDENSACION EN PLENUM,
SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
1.00

PA

140,550.21

1.00

PA

140,550.21

SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO Y
CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE AGUA
HELADA, CONSTRUIDAS EN
TUBERIAS DE COBRE Y
AISLADAS TERMICAMENTE
CON CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE ALUMINIO
EN EL AMBIENTE EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y ESPECIFICACIONES
DE CONSTRUCCION ANEXOS

SISTEMA DIGITAL DIRECTO


(DDC) PARA CONTROL DE
TEMPERATURA, HUMEDAD
DENTRO DE LAS SALAS DE
CIRUGIA DE ACUERDO A LAS
ESPECIFICACIONES Y PLANOS
ANEXOS. ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.
1.00

PA

340,727.78

1.00

PA

85,181.94

1.00

PA

51,109.17

1.00

PA

42,590.97

1.00

PA

46,850.07

SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRY-COOL,
CWP, VE, PANELES DDC) ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
OBRAS CIVILES MENORES
PARA UBICACION DE EQUIPOS
IN SITU E INSTALACION DE
SISTEMAS MECANICOS DE
ACUERDO A ESPECIFICACIONES
Y PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION

TRANSPORTE PESADO, IZADO


Y MONTACARGA PARA
UBICACION DE EQUIPOS
MAYORES EN OBRA Y/O IN SITU
MISCELANEOS PARA
MATERIALES Y SERVICIOS EN
OBRA
ENTREGA Y PUESTA EN OPERACION

10

11

12

PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES,
SISTEMA DE CONDUCCION DE
AIRE, SISTEMA HIDRONICO Y
SISTEMA DDC.
1.00

PA

34,072.78

1.00

PA

34,072.78

1.00

PA

34,072.78

LIMPIEZA,
DESCONTAMINACION BLOQUE
HABITACIONES PARA PUESTA
EN OPERACION. INCLUYE
EVACUACION DURANTE 72 HRS
DE LA EDIFICACION A PRESION,
HEPA-VACUUM Y LIMPIEZA
HUMED DE SUPERFICIES Y
CONTENIDO,
DESCONTAMINACION TOTAL A
BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE TODO
EL SISTEMA HVAC (DUCTOS,
DRY-COOL)
COMISIONAMIENTO DEL
SISTEMA HVAC DE ACUERDO A
NORMAS DE CONSTRUCCION Y
ESPECIFICACIONES.

APLICACION: UPS - IPS BARRA REFERENCIA


PARA SUIT OPERACIONES &
UCI
EQUIPOS MAYORES
1

Breaker 175 A desde panel existente,


2 polos, 120/240 V,

1.00

UD

Unidad UPS de 40 KVA, 1 fase,


120/240 V, con transferencia y bypass externo con baterias de ciclo
profundo de gelatida @ 48 voltios,
autonomia de 30 min a plena carga.

1.00

UD

Panel de distribucin principal


regulado, con barras de 175A, 1 fase
, 120/240 v, 4h, con:
a) 1-175A, 2 polos, main breaker
b) 4-40A, 2polos, breaker
c) 1-30A, 2 polos, breaker

1.00

UD

Set DE 3 Paneles aislados (IPS)


integrados en housing comun para
rea de cirugia, 8 KVA, 1 fase,
120/240 V Nema 1, 4h, N/S, con 8
brakers dobles termomagneticos 20
amp, monitor de falla, panel
anuciacion y barra de tierra

1.00

UD

1 Panel aislados (IPS) para rea de


uci, de 6 KVA, 1 fase, 120/240 V
Nema 1, 4h, N/S, con 8 brakers
dobles termomagneticos 20 amp,
monitor de falla, panel anuciacion y
barra de tierra

1.00

UD

1Panel aislado (IPS) para rea de


recuperacin, de 4 KVA, 1 fase,
120/240 V Nema 1, 4h, N/S, con 8
brakers dobles termomagneticos 20
amp, monitor de falla, panel
anuciacion y barra de tierra

1.00

UD

Alimentador AL1 desde fuente


existente al Enclosed con breaker de
150A, formado por: 2 THHN 1/0 y 1
THNN 4, en 2" EMT

100.00

UD

Alimentador AL2 a UPS desde


Enclosed breaker,formado por: 2
THHN 1/0, 1 THHN 2 y 1 THHN 4,
en 2" EMT + BX

50.00

Pie

INSTALACIONES ELECTRICAS

10

11

12

13

Alimentador AL3 desde UPS hasta


Panel Principal regulado, formado
por: 2 THHN 1/0, 1 THHN 2 y 1
THHN 4, en 2" EMT,

15.00

PIE

180.00

PIE

Alimentador AL4 desde Panel


Principal regulado a Paneles aislados
(IPS), de 6 KVA, formado por: 2
THHN 8 y 2 THHN 10, en 1" EMT

Alimentador AL5 desde Panel


Principal regulado a Panel aislado
(IPS), de 4 KVA, formado por: 4
THHN 10, en 3/4" EMT

20.00

Sistema de tierra fsica compuesto


por:
a) anillado en el entorno de la
edificacin cubierta, usando
conductor desnudo de cobre mnimo
No. 2, con conexiones a la estructura
edificacin en varios puntos,
b aterizaje de placas en piso de tres
salas de cirugia conectado atraves de
barra de refererencias en cada una de
las salas
c) anillo de barra de refrencia de
tierras ubicadas en salas de cirugia,
recuperacion y operaciones
interonectadas a pozo de tierra de 5
ohmios o menor.
1.00

PA

1.00

UD

Un Pozo de tierra a capa fretica con


resistencia electrica menor o igual @
5 ohms, usando ultrafill y varilla de
tierra 3/4" x 10 pie con cable 32R.

14

15

16

17

18

5 Barras de tierra de referencia


comn del sistema, con derivacin
para cada elemento del equipamento
medico y edificacion segun
especificaciones anexas

1.00

PA

1.00

PA

1.00

PA

1.00

PA

1.00

PA

OBRAS CIVILES MENORES


PARA UBICACION DE EQUIPOS
IN SITU E INSTALACION DE
SISTEMAS MECANICOS DE
ACUERDO A ESPECIFICACIONES
Y PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION

TRANSPORTE PESADO, IZADO


Y MONTACARGA PARA
UBICACION DE EQUIPOS
MAYORES EN OBRA Y/O IN SITU

MISCELANEOS PARA
MATERIALES Y SERVICIOS EN
OBRA
Mano de obra Instalacin equipos
mayores e
instalaciones electricas relacionadas
de acuerdo aespecificaciones y planos

ENTREGA Y PUESTA EN OPERACION

19

20

PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES Y
TODAS LAS INSTALACIONES
PARA PUESTA EN OPERACION
DE ACUERDO A
ESPECIFICACIONES ANEXAS

COMISIONAMIENTO DEL
SISTEMA ELECTRICO DE
ACUERDO A NORMAS DE
CONSTRUCCION Y
ESPECIFICACIONES.
APLICACION: DRY-COOL /
FLUJO LAMINAR / CWP
(PLANTA AGUA HELADA)
PARA SUITE OPERACIONES &
UCI
EQUIPOS MAYORES

1.00

PA

1.00

PA

SISTEMA ENFRIAMIENTO Y
DESHUMIDIFICACION POR
DESECANTE LIQUIDO DE
PAQUETE TIPO TECHO , 3500
CFM 100% AIRE FRESCO, 15 HP
HVOLTAJE 460/3/60,
REFRIGERANTE 410a, NIVEL DE
FILTRACION 60/95%. PANEL
DESCONECTIVO ELECTRICO
NEMA 3R INSTALADOS. PANEL
DE CONTROL DE
TEMPRATURA Y HUMEDAD
DIGITAL. AMBOS INSTALADOS
EN FABRICA. SET DE
COMPRESORES SCROLL DE
CAPACIDAD VARIABLE.
VARIADOR DE FRECUENCIA
PARA MOTOR VENTILADOR
AIRE DE SUMINISTRO. CURVA
DE INSTALACION EN TECHO DE
ZINC GALVANIZADO Y
DESCARGA AJUSTAGLE EN EN
OBRA HACIA ABAJO Y-O
HORIZONTAL.
1.00

UD

924,224.09

SISTEMA DE FLUJO LAMINAR


(> 100 FPM) PARA PRODUCIR 15
CAMBIOS POR HORA EN SALA
DE OPERACIONES, MONTADO
SOBRE TB UNIVERSAL DE
ESTRUCTURA DE ALUMINIO
ELECTROSOLDADO EN
FABRICA. CON UN AREA DE 2.80
X 2.80 M. SET DE DIFUSORES DE
SUMINISTRO DE 24" X 24" TBAR
CON FILTRO HEPA 99.9997%.
DAMPER DE MARIPOSA Y
PLATO DE DIFUSION
INTEGRADOS. CUELLO DE
SUMINISTRO DE INCLUYE
ADEMAS SET DE REJILLAS DE
RETORNO CONSTRUIDAS EN SS,
CON FILTRO 60% Y DAMPER DE
HOJAS OPUESRAS INCLUIDO

1.00

UD

298,136.80

1.00

UD

85,181.94

SET VENTILADOR DE
EXTRACCION DUAL TIPO
CENTRIFUGO Y
CONFIGURACION DE DOMO DE
TIRO VERTICAL MONTADO
SOBRE FRAME COMUN CON
CURVA DE INATALACION EN
TECHO. CADA VENTILADOR
3000 CFM @ 1 PULG DE H20.
480/3/60 INCLUYE
DESCONETIVO NEMA 3R. UNO
STAND-BY

MANEJADORA DE AIRE DE
TECHO DE 1500 CFM @ 2" H2O,
VENTILADOR CENTRIFUGO ,
DOBLE PARED, FILTRACION
60/95%, COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60
1.00

UD

259,166.06

1.00

UD

352,227.34

1.00

PA

161,845.69

MANEJADORA DE AIRE DE
TECHO DE 1000 CFM @ 2" H2O,
VENTILADOR CENTRIFUGO ,
DOBLE PARED, FILTRACION
60/95%, COIL AGUA HELADA,
DESCONECTIVO Y PANEL DE
CONTROL DIGITAL STAND
ALONE. VOLTAJE 460/3/60

INSTALACIONES IEM

SISTEMA DE CONDUCTOS DE
AIRE PARA SUMINISTRO Y
EXTRACCION CONSTRUIDOS EN
ZINC GALVANIDADO,
AISLADOS CON FIBRA DE
VIDRIO, Y DUCTOS FLEXIBLES
TERMINALES SEGUN PLANOS Y
ESPECIFICACIONES DE
CONSTRUCCION ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.

SISTEMA DE TUBERIAS Y
ACCESORIOS DE SERVICIO Y
CONTROL DE FLUJO,
INDICADORES DE
TEMPERATURAS Y PRESION,
PARA CONDUCCION DE AGUA
HELADA, CONSTRUIDAS EN
TUBERIAS DE COBRE Y
AISLADAS TERMICAMENTE
CON CANALETAS DE
POLIURETANO EXPANDIDO
CON CUBIERTAS DE ALUMINIO
EN EL AMBIENTE EXTERIOR E
INTERIORMENTE CUBIERTAS
CON MASTICO Y MALLA DE
FIBRA DE VIDRIO, SEGUN
PLANOS Y ESPECIFICACIONES
DE CONSTRUCCION ANEXOS
1.00

PA

140,550.21

1.00

PA

383,318.75

SISTEMA DE CONTROLES
DIGITALES PARA MONITOREO
Y CONTROL INDIVIDUAL DE
TEMPERATURA, HUMEDAD,
CAMBIOS DE AIRE,
PRESSURIZACION Y NIVEL DE
POLUCION DENTRO DE LAS
SALAS DE CIRUGIA, UCI Y
DIFERENTES ZONAS DEL AREA
COMUN DE APOYO DE LA SUIT,
DE ACUERDO A LAS
ESPECIFICACIONES Y PLANOS
ANEXOS. ESTA PARTIDA
INCLUYE EL SUMINISTRO DE
TODOS LOS MATERIALES Y
MANO DE OBRA PARA SU
INSTALACION.

SUMINISTRO DE ENERGIA A
EQUPOS MAYORES ( DRY-COOL,
VE, AHU`S, PANELES DDC) ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION.
1.00

PA

85,181.94

1.00

PA

51,109.17

1.00

PA

46,850.07

1.00

PA

38,331.87

1.00

PA

42,590.97

OBRAS CIVILES MENORES


PARA UBICACION DE EQUIPOS
IN SITU E INSTALACION DE
SISTEMAS MECANICOS DE
ACUERDO A ESPECIFICACIONES
Y PLANOS ANEXOS. ESTA
PARTIDA INCLUYE EL
SUMINISTRO DE TODOS LOS
MATERIALES Y MANO DE OBRA
PARA SU INSTALACION

TRANSPORTE PESADO PARA


IZADO Y MONTACARGA PARA
UBICACION DE EQUIPOS
MAYORES EN OBRA Y/O IN SITU

MISCELANEOS PARA
MATERIALES Y SERVICIOS EN
OBRA
ENTREGA Y PUESTA EN OPERACION

10

PRUEBAS AJUSTES Y
BALANCE DEL SISTEMA.
INCLUYE EQUIPOS MAYORES,
SISTEMA DE CONDUCCION DE
AIRE, SISTEMA HIDRONICO Y
SISTEMA DDC, SEGUN
ESPECIFICACIONES ANEXAS

11

12

LIMPIEZA,
DESCONTAMINACION SUIT
OPERACIONES Y UCI PARA
PUESTA EN OPERACION.
INCLUYE EVACUACION
DURANTE 72 HRS DE LA
EDIFICACION A PRESION, HEPAVACUUM Y LIMPIEZA HUMED
DE SUPERFICIES Y CONTENIDO,
DESCONTAMINACION TOTAL A
BASE DE PEROXIDO DE
HIDROGENO. lIMPIEZA
DESCONTAMINACION DE TODO
EL SISTEMA HVAC (DUCTOS,
AHU, DRY-COOL)
1.00

PA

46,850.07

1.00

PA

34,072.78

COMISIONAMIENTO DEL
SISTEMA HVAC DE ACUERDO A
NORMAS DE CONSTRUCCION Y
ESPECIFICACIONES.

Totales

11,534.15
23,006.75
52,175.50
19,139.00
5,648.29
1,078.77
3,512.22
476,917.63
151,322.56
261.00
8,471.33
19,471.64
772,538.84

40,254.88
162,209.78
511,003.84
1,569.45
6,678.86
721,716.81

151,955.10
766,103.61
918,058.71

73,197.12
211,336.61
85,823.26

10,066.42
80,430.01
15,000.00
18,147.42
138,085.47
632,086.31

24,974.21
29,889.89
16,450.80
91,630.00
16,651.15
4,962.18
21,045.58
19,099.35
1,951.23
226,654.40

2,981.95
43,058.67
23,698.63
132,000.00
23,987.25
7,148.40
26,724.55

259,599.45

2,348.29
33,908.70
18,662.67
103,950.00
18,889.96
5,629.37
21,045.58
204,434.57

22,444.93
49,882.75
5,161.99
15,000.00
1,300.82

5,292.23
99,082.72

53,258.38
110,721.82
163,980.20

7,184.02
3,982.92
2,454.43

33,012.06
46,633.44

46,612.32
46,612.32

10,000.00
32,167.02
5,161.99

55,749.46
17,241.04
15,485.96
135,805.46

1,035.40
1,035.40
877.54
877.54
2,927.48

227,032.43
35,951.49
269,737.27

1,907.77
89,513.70

125,831.79

9,831.11
232.97
214.50

14,525.83

20,419.17

19,249.17

17,431.00
55,749.46
24,777.54
1,084.02
10,133.78
16,360.40
13,629.71
59,196.63
13,629.71

63,874.42
557,592.66

6,116.95
6,116.95

5,265.23
2,211.95
4,769.16
4,636.77
24,914.18
41,797.29

414.16
828.32
232.97
22,792.00
35,520.00
9,648.95

46,307.09
2,887.17
3,819.87
66.71
122,517.23

4,509.73
2,142.00
444.92
981.18
170.82
166.77

71,070.26

29,303.66

117,502.05
3,599.97
32,226.24
3,393.13
4,576.51
270,087.23

2,565.58
2,565.58

4,208.97
395.55
60,762.84
5,161.99
70,529.35

28,711.96

28,711.96

2,070.80
1,755.08
1,465.84

113,679.34
118,971.05

2,762.82
129,652.26
2,588.50
232.97

51,824.69

34,861.99

69,723.99

26,146.50

13,073.25

18,483.05
74,332.61
74,332.61
15,956.73
20,420.82
15,956.73
20,420.82
570,770.33

621.24
517.70
4,824.48
5,154.53
28,490.00
17,760.00
5,090.75

202,349.88
9,549.68
1,445.36
333.54
5,643.17
281,780.32

12,884.94
1,938.00
444.92
254.38

85.41
619.44
82.75
16,309.83

1,018.83
3,354.99
4,373.82

8,516.58
3,782.85
4,633.58
493.43
120,864.45
5,000.00
143,290.88

11,043.98
10,436.83
21,480.81

2,134.29
8,396.49
6,116.95
16,647.73

2,070.80
877.54
12,161.89

156,399.94
171,510.17

117,481.73
2,141.58
100,486.78
2,174.34
232.97
99,110.14
99,110.14
34,290.00

17,274.90
38,714.90
50,624.64
50,624.64
4,893.56
617,160.32

16,400.74

7,668.59
10,104.76
34,174.09

221,983.99
22,086.31
21,943.69
266,013.99

931.86
931.86
232.97
51,282.00
39,960.00
10,309.07
22,908.38
17,189.42
3,252.05
3,716.63
733.80
151,448.03

6,442.47
2,856.00
296.61
1,090.20
170.82
82.75

47,380.17

29,303.66
309.72
36,829.99
85,672.96
210,435.35

2,691.17
2,691.17

1,481.16
5,000.00
173,331.03
179,812.20

26,128.43
523.22
3,230.37
722.50
10,253.51
15,655.41

4,824.48
1,500.00
62,837.92

1,032.40
1,032.40

4,414.07
6,458.07
879.82
10,704.49
22,456.45

33,799.99
63,900.34
23,867.47
17,813.10
80,663.21
30,420.00
250,464.11

18,228.17
56,098.73
74,326.90

11,922.69
38,322.65
9,400.27
2,789.98

62,435.60

18,533.09
18,533.09

11,053.22

21,440.83
2,158.85
3,244.68
37,897.58

28,543.72
5,096.78
33,640.51

9,394.82
9,394.82

1,954.96
1,143.18
72.68

3,170.82

11,072.25

351,726.44
2,588.50
365,387.19

1,522.04
3,613.39
5,135.43

9,194.35
4,237.51
2,925.01
23,971.12
22,675.00
63,002.98

45,291.99
33,413.71
17,900.60
39,461.38
49,723.89
185,791.57

40,221.11
62,983.60
31,602.30
116,906.40

9,797.21
50,676.24
184,680.59
2,951.17
499,818.60

58,748.17
91,772.96
150,521.13

6,171.88
17,024.13
26,374.87
62,692.74
13,707.69
125,971.32

67,718.00
6,014.37
73,732.37

27,181.35
1,779.05

42,799.06
10,049.40

2,640.74
5,145.88
4,174.41
2,943.27
96,713.16

6,855.76
7,916.85
18,079.98
32,852.60

24,777.54
12,878.12
134,467.69
22,263.28
194,386.63

2,811.30

905.33
2,271.27

4,074.00
10,979.01
5,024.70

5,154.53

15,485.96
4,645.79
6,710.58
58,062.47

13,684.74
33,168.20
1,954.96
2,286.35
4,969.42
5,014.02
8,775.38
8,232.36
1,176.05
5,510.97
5,161.99
5,177.00
95,111.44

18,166.69
31,459.54
13,863.03
1,035.40
64,524.67

507.35

1,032.40
1,539.74

7,160.61
1,701.16
12,088.18
10,747.92
31,697.87

52,921.13
8,839.80
32,265.28
21,235.83
115,262.05

17,679.61
32,265.28
87,563.50
137,508.39

55,661.28
50,060.84
23,492.25
129,214.37

2,770.54
9,787.07
11,839.61
36,041.66
9,387.04

69,825.93

12,204.59

17,071.72
4,302.33
33,578.65

4,951.76
16,422.97
7,316.01
28,690.73

58,681.46
58,681.46

2,064.79
528.05
2,592.85

14,918.76
3,613.39
191.10

10,323.97
5,161.99

34,209.21

14,927.72

41,708.99

28,146.25

26,473.76

25,049.06

10,599.57
12,698.49
32,004.32
7,052.07
1,445.36

67,820.63

37,839.00
-

38,082.49

38,082.49

38,082.49

127,069.23

135,006.65

86,000.66

86,000.66

13,646.68

190,503.51
456,038.81
200,066.85

1,714,345.71

426,416.16
101,640.59
67,189.76
595,246.51

148,829.61
6,247.04
60,162.03
15,485.96

33,100.72

35,443.00

4,258.92

6,194.38
13,570.00
335.47
161.91
888.70

5,154.53

25,756.25
4,757.29

31,771.00

58,751.03

39,167.35
25,626.15
515,661.33

595,922.62
1,914.37
43,104.12
6,804.29
33,881.89
91,852.82
3,397.86
776,877.96

414.16
414.16
207.08
1,242.48

5,842.48
7,992.55
16,112.91

3,078.87
3,078.87

10,816.12
17,041.21
1,712.55
29,569.87

79,864.56
487,294.16
32,265.28
5,897.76
129,282.13
487,294.16
22,043.71
18,768.93
1,262,710.70

65,933.59
150,263.95
5,377.15
221,574.69

27,673.26
101,909.03
69,570.46
21,816.56
1,745.31
222,714.62

27,057.75
51,585.07
9,745.05
88,387.87

4,711.89
1,859.01
2,240.30

8,746.47
17,557.68

23,087.42
815.36
23,902.79

247,775.36
74,332.61
7,420.37

329,528.34

62,678.00
51,409.61

46,160.92
22,134.98
567.82
20,350.00
3,974.73
38,426.52
5,734.51
2,678.91
4,224.89

5,670.24
2,430.10

2,534.93
3,613.39
272,589.55

26,392.00

35,932.22
9,019.46
25,149.87

42,024.11
28,345.94

3,730.09

3,042.29
331,661.28

8,233.81
8,233.81

25,098.91

31,624.05
1,436.80
579,924.64

301,373.72
198,627.05
88,859.47
217,959.73
212,591.26
353,286.37
103,549.45
886,622.84

549,235.38
56,781.85
296,339.33
436,187.88
966,323.91

700,316.41
371,663.04
1,884,269.68

341,930.00
427,825.46
118,106.26
186,244.48
52,652.26
77,429.80

180,669.53
123,887.68
30,971.92
123,887.68
92,915.76
2,833,039.33
15,220.38
12,228,767.93
15,561.01

5,449.59

21,010.60

54,728.62
15,767.49

44,097.56
35,920.10

150,513.76

152,588.57
9,082.65
54,495.92

744,431.49
107,528.76
115,557.06
290,255.19

1,473,939.63

369,086.32
369,086.32

14,962.50
21,731.66
60,615.16
47,459.43
25,144.07
12,572.03
182,484.85

3,342.39
4,200.57
2,348.70
16,260.26
18,066.95
3,252.05
29,986.87
27,100.43
8,220.46
5,420.09
3,252.05
7,588.12
4,336.07
1,147.73
134,522.74

157,832.91

493,689.31

155,520.00

496,839.16

279,094.17

558,944.05
149,051.75

273,585.30

82,591.79
2,647,148.42

153,943.27
153,943.27
AGUA HELADA)

1,350,133.81

36,031.96

1,235,138.19

76,663.75

140,550.21

140,550.21

340,727.78

85,181.94

51,109.17

42,590.97

46,850.07

34,072.78

34,072.78

34,072.78
-

924,224.09

298,136.80

85,181.94

259,166.06

352,227.34

161,845.69

140,550.21

383,318.75

85,181.94

51,109.17

46,850.07

38,331.87

42,590.97

46,850.07

34,072.78

Vous aimerez peut-être aussi