Dry construction: assembled partitions , suspended ceilings, floor structures

Istvn Vidovszky PhD

introduction

drywall systems dry linings suspended ceilings acoustic ceilings dry screeds raised floor system attics

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

systems and productes

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

technical performance

drywall systems height: 2,75 - 10,0 + acoustic insulation capacity: 41 - 69 dB fire resistance: 0,2 - 1,5 (3,0) h

raised floor systems fire resistance= 0,5 h load-bearing capacity= 5 kN/m2

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

technical performance

fireshields fire resistance=0,5 - 3,0 h without framework as well

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

technical performance

gypsum plasterboard types

Wallboard Moistureshiled Fireshield Fire Moistureshield information on the labeling

Typ A Typ H2 Typ DF Typ DFH2

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

wall systems

simple frame single-layer lining

distance of the studs (a) d h d


Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

wall systems

simple frame double-layer lining

distance of the studs (a) d

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

wall systems

simple frame triple-layer lining

distance of the studs (a)

d
Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

wall systems

twin frame double-layer lining

distance of the studs (a)

d
Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

wall systems

installation wall twin frame double-layer lining

distance of the studs (a) d h d


Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

wall systems

twin frame double-layer lining

distance of the studs (a) d


Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

d
17.02.2011

2011.12.01.

wall systems

security wall simple frame triple-layer lining + steal plate

distances of the studs a a d h d


Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

assembled partiton details

expansion joint is required:

in every 15 m at the geometrical turns of the partitions at the dilatations of the superstructure

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

assembled partiton details

expansion joint

20 20 20 20

plasterboard

CW-studs insulation

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

assembled partiton details

Sliding slab-connection joints if the expectable f value of the slab is more than 15mm recommended in case of over 7.00 meters distance between the supports of the slab fire-protective or normal the figures in the catalogues are valid up to max. 25 mm creep

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

assembled partiton details

sliding slab-connection joints

corner protective profile 23/15

a 10 20

Uniflott

a = 10-25 mm

joint filling Knauf 6-8 cm wide wallboard stripes

a = 10-25 mm

partition wall compound

F 30

F 90

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

a corner protective profile 23/15


17.02.2011

dry lining

bases of dry lining

Vaulted surface wet bending

tool for the bending

the bended board is fastened with a lath

the board is placed into a CD or a UD stud plasterboard stripe band plasterboard shape

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

2011.12.01.

dry lining

Vapour technique differing outer boundary system should be checked (vapour barrier)

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

suspended ceiling

Supports

Rapid hanger

Ankerfix support system > 0.25 and 0.40 kN load bearing capacity
Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management 17.02.2011

10

2011.12.01.

suspended ceiling Supports

Nonius support => 0.40 kN

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

suspended ceiling Supports

Suspended ceiling systems

Nonius support => 0.40 kN

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

11

2011.12.01.

suspended ceiling

suspended ceiling with split-level frame

distance of the supports


1/3 a a a A

A B D D C B C c
100 ca. 100

aligning the main ribs

aligning the fixing profiles


Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management 17.02.2011

suspended ceiling

suspended ceiling with single-level frame

distance of the supports a a A

A B D D C B C c
100 < 1220

Achsabstand Grundprofil aligning of the main ribs

aligning of the fixing profiles

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

12

2011.12.01.

suspended ceiling

Lining - aligning of the boards

400 400 400 400 400 400 400 400

ca. 400

< 1220

1250

1250

aligning of the main ribs

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

distance of the fixing profiles

2. layer

1. layer

17.02.2011

suspended ceiling

Suspended ceiling systems

Nonius-support - upper part dry lining separation strip Nonius-fixing bolt Nonius lower part (0.4 kN)

fast-construction screw In case of fire-protection gypsum plaster rendering on the whole surface

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

13

2011.12.01.

suspended ceiling

Fitting to walls with shadow joint

UD-stud 28x27x06 edge trim 23x15 (in case of demand) Do not fasten to the UD-stud!

dowels

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

suspended ceiling

Stepped wall-connection joint

corner joint

CD 60 x 27 separation strip

fast-construction screw CW-stud TB fast-construction screw UW- stud separation strip

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

14

2011.12.01.

suspended ceiling

Movement control joints in case of fire-protection

dowel

direct supports for the CD 60x27 studs LN 3,5x9 mm screw for fixing on the framework

Edge trim profile (in case of claim)

Fireshield fixed with joint filler on one side

Fireshield

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

suspended ceiling

Installation of electrical fixture mounting box in fireprotective suspended ceiling

The continuity of the suspended ceiling is ensured by the lining around the lamps.

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

15

2011.12.01.

suspended ceiling

Acoustic suspended ceilings

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

dry srceeds

gypsum fibre boards: gypsum in combination with reinforcing cellulose fibres two factory-glued 10 or 12,5mm thick 1500 x 500 mm Knauf Vidifloor board connect the boards with overlapping (joint staggering) on each sides

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

16

2011.12.01.

? dry srceeds

two 10 or 12,5mm thick 1500 x 1000 mm Knauf Vidifloor board are glued together in situ for double-layer lining join the boards with half a board overlapping/joint staggering

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

raised floors

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

17

2011.12.01.

raised floors

assemble with glue

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

? raised floors

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

18

2011.12.01.

raised floors

Combination of hollow and raised floor

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

raised floors

Structure of raised floors

1 - pedestal 2 - panel 3 - vent 4 - perforated panel 5 electrical box 6 skirting 7 suction grip tool

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

19

2011.12.01.

raised floors

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

raised floors

raised floor system with cast surface

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

20

2011.12.01.

pargeting work

decoration work

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

Thank you for your attention!

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

21

2011.12.01.

References

[1] [2] [3] [4] [5] [6]

Wiesner Gyrgy: Knauf ltalnos bemutat (presentation) http://www.knauf-gipsfaser.com/knauf/home-gf.nsf/Vidiwall_Vidifloor_en.pdf 2011.11.09. http://www.knauf-gipsfaser.com/knauf/home-gf.nsf/vPagesLookup/home~en 2011.11.09. http://www.knauf-integral.de/english 2011.11.09. http://manual.knaufdrywall.co.uk/ 2011.11.09. http://www.knauf.ae 2011.11.09.

Vidovszky BUTE/BME-Faculty of Architecture Department of Construction Technology and Management

17.02.2011

22

Vous aimerez peut-être aussi