Hauling Systems Production Study Data Collection Form

Step 1: Input basic study information below:

Production Study Name Name of Study Date of Data Collection: October 1, 2010 Location: Location of Study Study Conducted by: Persons conducting study.

Purpose: Enter purpose of study here.

Comments: Enter any additional comments here.

Step 2: Input jobsite characteristics. Hours in working day: 10 Material Type Category: Moist Dirt 10-20% Moisture Material Description: Loess over Glacial Till Material Density (BCY) 3200 Material Density (LCY) 2600 Material Moisure %: 11% Total Cycle Distance (ft): 5000 Cut Area Profile Length (ft.) 300 Grade % (Min/Max/Ave) Rolling Resistance % (Min/Max/Ave) Loaded Haul Profile Length (ft.) 2500 Grade % (Min/Max/Ave) Rolling Resistance % (Min/Max/Ave) Dump Area Profile Length (ft.) 200 Grade % (Min/Max/Ave) Rolling Resistance % (Min/Max/Ave) Return Profile Length (ft.) 1800 Grade % (Min/Max/Ave) Rolling Resistance % (Min/Max/Ave)

Step 3: Input Machine and Material Information Unit 1 Model MT865 Unit 1 Serial Number E1K001 Unit 1 Hours 2000 Unit 1 Stall Speed (Front) 1400 Unit 1 Stall Speed (Rear) Unit 1 Tires 800R 49 Unit 1 Operator Bob Unit 2 Model Unit 2 Serial Number Unit 2 Hours Unit 2 Stall Speed (Front) Unit 2 Stall Speed (Rear) Unit 2 Tires Unit 2 Operator Comments:

Step 4: Select hauling system type. This will take you to the appropriate Scale Sheet. Articulated Truck Articulated Truck with 7460 Rigid Frame Truck Single Towed Scraper with Rubber Belted Ag Tractor Tandem Towed Scraper with Rubber Belted Ag Tractor Single Towed Scraper with Rubber Tired Ag Tractor Tandem Towed Scraper with Rubber Tired Ag Tractor Single Towed Scraper with Track-Type Tractor Single Wheel Tractor-Scraper Push-Pull Wheel Tractor-Scraper

Step 5: Copy and paste cycle timer data into Cycle Timer Sheet.

Scale Sheet.

Material Type
Dry Dirt 0-10% Moisture Moist Dirt 10-20% Moisture Wet Dirt 20-30% Moisture Sand Sand and Gravel 0 - 3 inch (0 - 76mm) Rock (< 12 inch) less than 50% content (< 305mm) Rock (< 12 inch) more than 50% content (< 305mm)

Rock (> 12 inch) less than 50% content (> 305mm) Rock (> 12 inch) more than 50% content (> 305mm) Scrap/Demolition Material

Name of Study
October 1, 2010

Location of Study
Model Serial #(s) Hours # of Runs MT865 E1K001 2,000 0

Front Stall Speed 1400 Rear Stall Speed 0 Tires 800R 49 Machine 1

BCY Density (lb/yd3)

LCY Density (lb/yd3)

Hours/Day

3200 2600 10

Front Axle (tons) Empty Weight Run #1 Run #2 Run #3 Run #4 Run #5 Run #6 Run #7 Run #8 Run #9 Run #10 Total Average 0 #DIV/0!

Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Rear Axle (Tons)

Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Total Weight (lb) 0 0 0 0 0 0 0 0 0 0 0 0

Payload (lb) x 0 0 0 0 0 0 0 0 0 0 0 0 0.00

BCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

LCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

0 #DIV/0! #DIV/0! #DIV/0!

0 Average Tons

From CYT Files Avg Load Time Avg Haul Time Avg Dump Time Avg Return Time Avg Trvl to Scales Avg Total Cycle Cycle Per Hour Cycles Per 10 Hour Day BCY's Moved Per Hour BCY's moved per 10 Hr. Day 0.00 0.00 0.00 0.00 0.00 0.00

min : sec #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Length of Cut Length of Haul Length of Return Total Cycle Material Type Material Moisture

Site Information 300 ft 2500 ft 1800 ft 5000 ft Loess over Glacial Till 11%

Data Taken [Date] By: Persons conducting study.

Name of Study
October 1, 2010

Location of Study
Model Serial #(s) Hours # of Runs MT865 E1K001 2,000 0 Front Stall Speed 1400 Rear Stall Speed 0 Tires 0.0 Machine Middle Axle Split (Tons) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! BCY Density (lb/yd3) LCY Density (lb/yd3) Hours/Day 3200 2600 10

Front Axle (tons) Empty Weight Run #1 Run #2 Run #3 Run #4 Run #5 Run #6 Run #7 Run #8 Run #9 Run #10 Total Average 0 #DIV/0!

Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Rear Axle (tons)

Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Total Weight (lb) 0 0 0 0 0 0 0 0 0 0 0 0 0 Average Tons

Payload (lb) x 0 0 0 0 0 0 0 0 0 0 0 0 0.00

BCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

LCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

From CYT Files Avg Load Time Avg Haul Time Avg Dump Time Avg Return Time Avg Trvl to Scales Avg Total Cycle Cycle Per Hour Cycles Per Hours/Day Hour Day BCY's Moved Per Hour BCY's moved per Hours/Day Hr. Day 0.00 0.00 0.00 0.00 0.00 0.00

min : sec #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Site Information Length of Cut Length of Haul Length of Return Total Cycle Material Type Material Moisture 300 ft 2500 ft 1800 ft 5000 ft Loess over Glacial Till 11%

Data Taken [Date] By: Persons conducting study.

Name of Study
October 1, 2010

Location of Study
Model MT865 Serial #(s) E1K001 Hours 2,000 # of Runs 0 0 0 0 Front Stall Speed 1400 Rear Stall Speed 0 Tires 0.0 Machine 2 Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! Front Axle (tons) Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! Rear Axle (Tons) Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total Weight (lb) 0 0 0 0 0 0 0 0 0 0 0 0 0 Average Tons From CYT Files Avg Load Time Avg Haul Time Avg Dump Time Avg Return Time Avg Trvl to Scales Avg Total Cycle Cycle Per Hour Cycles Per Hour Day BCY's Moved Per Hour BCY's moved per Hr. Day 0.00 0.00 0.00 0.00 0.00 0.00 min : sec #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Data Taken [Date] By: Persons conducting study. Length of Cut Length of Haul Length of Return Total Cycle Material Type Material Moisture Other Information 300 ft 2500 ft 1800 ft 5000 ft Loess over Glacial Till 11% Payload (lb) x 0 0 0 0 0 0 0 0 0 0 0 0 0.00 BCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 LCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0.0 BCY Density (lb/yd3) LCY Density (lb/yd3) Hours/Day 3200 2600 10

Machine 1 Front Axle (tons) Empty Weight Run #1 Run #2 Run #3 Run #4 Run #5 Run #6 Run #7 Run #8 Run #9 Run #10 Total Average 0 #DIV/0! Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Rear Axle (Tons)

Name of Study
October 1, 2010

Location of Study
Model MT865 Serial #(s) E1K001 Hours 2,000 # of Runs 0 0 0 0 Front Stall Speed 1400 Rear Stall Speed 0 Tires 0.0 Middle Axles Axle 2 (tons) Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! Axle 3 (tons) Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! Axle 4 (tons) Rear Axles Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0 #DIV/0! #DIV/0! Axle 5 (tons) Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Total Weight (lb) 0 0 0 0 0 0 0 0 0 0 0 0 0 Average Tons From CYT Files Avg Load Time Avg Haul Time Avg Dump Time Avg Return Time Avg Trvl to Scales Avg Total Cycle Cycle Per Hour Cycles Per Hour Day BCY's Moved Per Hour BCY's moved per Hr. Day 0.00 0.00 0.00 0.00 0.00 0.00 min : sec #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Data Taken [Date] By: Persons conducting study. Length of Cut Length of Haul Length of Return Total Cycle Material Type Material Moisture Other Information 300 ft 2500 ft 1800 ft 5000 ft Loess over Glacial Till 11% Payload (lb) x 0 0 0 0 0 0 0 0 0 0 0 0 0.00 BCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LCY x 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0.0 BCY Density (lb/yd3) LCY Density (lb/yd3) Hours/Day 3200 2600 10

Front Axle Axle 1 (tons) Empty Weight Run #1 Run #2 Run #3 Run #4 Run #5 Run #6 Run #7 Run #8 Run #9 Run #10 Total Average 0 #DIV/0! Split 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Enter Average Times from Cycle Time Study (in hundredths of minutes Load Area Wait Time Load Time Travel To Scales Time At Scales Travel To Leave Load Area Haul Travel Time Loaded Travel In Dump Loaded Dump Time Travel In Dump Empty Return Time Total Cycle Time 0 0 0 0 0 0 0 0 0 0 0

undredths of minutes)