Vous êtes sur la page 1sur 8

Bd-F REINFORCEMENT CEMENT CONCRETE

Sr. No. & Item Code 1 BDF-3 DESCRIPTION OF ITEMS Providing and laying in situ cement concrete M-...... of trap/granite/quartzite/gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, formwork, cover blocks, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) complete. Spec No: Bd.F.3 Page No. 298 and B.7, Page No.38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand. Unit Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

4,540.00 4,515.00 5,125.00 5,100.00 5,285.00 5,260.00 5,905.00 5,880.00 5,950.00 5,925.00

746.00 746.00 746.00 746.00 746.00 746.00 746.00 746.00 746.00 746.00

15

Sr. No. & Item Code 2 BDF-5

DESCRIPTION OF ITEMS Providing and casting in situ cement concrete M -- of trap granite/ quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including centering, formwork,cover blocks, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement).. Spec No: Bd.F.5 Page No. 300 and B.7, Page.No. 38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand. Providing and casting in situ cement concrete in M --of trap/granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including centering, formwork, cover blocks, compaction and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd.F.6 Page No. 300 and B.7, Page No.38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand.

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

6,380.00 6,355.00 6,922.00 6,897.00 7,065.00 7,040.00 7,540.00 7,515.00 7,655.00 7,630.00

1,083.00 1,083.00 1,083.00 1,083.00 1,083.00 1,083.00 1,083.00 1,083.00 1,083.00 1,083.00

3 BDF-6

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

6,565.00 6,540.00 7,095.00 7,070.00 7,240.00 7,215.00 7,775.00 7,750.00 7,820.00 7,795.00

1,374.00 1,374.00 1,374.00 1,374.00 1,374.00 1,374.00 1,374.00 1,374.00 1,374.00 1,374.00

16

Sr. No. & Item Code 4 BDF-8

DESCRIPTION OF ITEMS Providing and casting in situ cement concrete M------.of trap/gran-ite/quartzite/gneiss metal for R.C.C. slabs and landings canopy, waist slab with steps as per detailed designs and drawings including centering, formwork, cover blocks, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd.F.8 Page No. 302 and B.7, Page No.38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand. Providing & casting in situ cement concrete M----. of trap / granite / quartzite / gneiss metal for R.C.C. Chajja as per detailed design & drawings including centering, formwork, cover blocks, compacting & roughening the surface if special finish is to be provided & curing complete. (Excluding reinforcement) Spec No: Bd.F.9 Page No. 303 and B.7, Page No.38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand.

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

6,840.00 6,815.00 7,365.00 7,340.00 7,505.00 7,480.00 8,050.00 8,025.00 8,090.00 8,065.00

1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00

5 BDF-8

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

7,280.00 7,255.00 7,815.00 7,790.00

1,400.00 1,400.00 1,400.00 1,400.00

17

Sr. No. & Item Code 6 BDF-11

DESCRIPTION OF ITEMS Providing and casting in situ cement concrete in M---of trap/granite/quartzite/gneiss metal for R.C.C. pardi 75mm thick fins including centering, formwork, cover blocks, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd.F.11 Page No. 304 and B.7, Page No. 38 (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. Providing and casting in situ cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C.coping to plinth or parapet amd sill of doors and windows moulded as per detailed drawings or chamfered as approved by the Engineer including centering, formwork, cover blocks, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd. F. 12 Page No. 304 & B-7, Pg 38 a) With natural sand. b) With crushed sand. Providing and fixing in position TMT-FE-500 reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. Spec No: Bd.F.17, Page No 306 Providing and fixing in position after hoisting, precast 1:2 cement mortar reinforcement Jali 50mm thick of approved design cement mortar 1:3 and curing complete (including 6mm diameter mild steel bar reinforcement). Spec No: Bd. F. 19 Page No. 307

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

7,510.00 7,485.00 8,085.00 8,060.00

1,870.00 1,870.00 1,870.00 1,870.00

7 BDF-12

Cu.Mt. Cu.Mt. M.T.

5,110.00 4,985.00 62,600.00

1,015.00 1,015.00 4,045.00

8 BDF-17

9 BDF-19

Sq.Mt.

635.00

59.00

18

Sr. No. & Item Code 10 BDF-41

DESCRIPTION OF ITEMS Providing and casting in situ c.c. ........... of trap metal for RCC rectangular grid beam with slab as per detailed design and draw-ing or as directed including dewatering if necessary, centering, formwork, cover blocks, compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement). Spec No: Bd.F.6, Page No.300 / Bd.F.8, Page No.302 and B.7 Page No. 38. (i) M-20 a) With natural sand. b) With crushed sand. (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand. Providing and fixing fan hook box of 2 mm thick M.S. sheet rectangular size 180x100 mm with required depth with holes or notches as required, bottom and top sides of 1.6 mm M.S. sheet fixed with 3.5 mm dia round headed screws together with 12 mm dia. M.S. bar bent to shape with hooked ends for fan hook and painting to exposed surface. Spec No: As directed by Engineer in charge

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

8,100.00 8,075.00 8,645.00 8,620.00 8,795.00 8,770.00 9,360.00 9,335.00 9,400.00 9,375.00

1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00

11 BDF

No.

225.00

10.00

19

Sr. No. & Item Code

DESCRIPTION OF ITEMS NEW ITEMS

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

12 BDF-3

Providing and laying in situ Ready Mix cement concrete M- ----- of trap/granite/quartzite/gneiss metal, for R.C.C. work in foundations like raft, strip, foundations, grillage and footings of R.C.C. columns and steel stanchions etc.including bailing out water, formwork, cover blocks, compaction, curing and roughening the surface if special finish is to be provided ( Excluding reinforcement) complete. Spec No: Bd.F.3 Page No. 298 and B.7, Page No.38 (i) M-25 a) With natural sand. b) With crushed sand. (ii) M-30 a) With natural sand. b) With crushed sand. (iii) M-35 a) With natural sand. b) With crushed sand. (iv) M-40 a) With natural sand. b) With crushed sand. Providing and casting in situ Ready Mix cement concrete M ----------- of trap granite/quartzite/gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including centering, formwork, cover blocks, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement).. Spec No: Bd.F.5 Page No. 300 and B.7, Page.No. 38 (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand.

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

5,575.00 5,550.00 5,735.00 5,710.00 6,355.00 6,330.00 6,400.00 6,375.00

600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00

13 BDF-5

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

7,310.00 7,285.00 7,545.00 7,520.00 7,910.00 7,885.00 8,025.00 8,000.00

740.00 740.00 740.00 740.00 740.00 740.00 740.00 740.00

20

Sr. No. & Item Code 14 BDF-6

DESCRIPTION OF ITEMS Providing and casting in situ Ready Mix cement concrete in M ------ of trap/granite/quartzite/gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including centering, formwork, cover blocks, compaction and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd.F.6 Page No. 300 and B.7, Page No.38 (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand. Providing and casting in situ Ready Mix cement concrete .M -------- .of trap/gran-ite/quartzite/gneiss metal for R.C.C. slabs and landings canopy, waist slab with steps as per detailed designs and drawings including centering, formwork, cover blocks, compacting and roughening the surface if special finish is to be provided and curing complete. (Excluding reinforcement). Spec No: Bd.F.8 Page No. 302 and B.7, Page No.38 (ii) M-25 a) With natural sand. b) With crushed sand. (iii) M-30 a) With natural sand. b) With crushed sand. (iv) M-35 a) With natural sand. b) With crushed sand. (v) M-40 a) With natural sand. b) With crushed sand.

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

7,575.00 7,550.00 7,720.00 6,695.00 8,260.00 8,235.00 8,300.00 8,275.00

1,130.00 1,130.00 1,130.00 1,130.00 1,130.00 1,130.00 1,130.00 1,130.00

15 BDF-8

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

7,760.00 7,735.00 7,910.00 7,885.00 8,455.00 8,430.00 8,480.00 8,455.00

1,040.00 1,040.00 1,040.00 1,040.00 1,040.00 1,040.00 1,040.00 1,040.00

21

Sr. No. & Item Code 16 BDF-41

DESCRIPTION OF ITEMS Providing and casting in situ Ready Mix cement concrete M ------. of trap metal for RCC rectangular grid beam with slab as per detailed design and draw-ing or as directed including dewatering if necessary, centering, formwork, cover blocks, compacting, finishing the form surface with C.M. 1:3 of sufficient minimum thickness to give smooth and even surface or roughening them if special finish is to be provided and curing complete (Excluding reinforcement). Spec No: Bd.F.6, Page No.300 / Bd.F.8, Page No.302 and B.7 Page No. 38. (i) M-25 a) With natural sand. b) With crushed sand. (ii) M-30 a) With natural sand. b) With crushed sand. (iii) M-35 a) With natural sand. b) With crushed sand. (iv) M-40 a) With natural sand. b) With crushed sand.

Unit

Rate for 2012-2013 (in Rs.) Completed Labour

Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt. Cu.Mt.

9,105.00 9,080.00 9,255.00 9,230.00 9,825.00 9,800.00 9,860.00 9,835.00

1,650.00 1,650.00 1,650.00 1,650.00 1,650.00 1,650.00 1,650.00 1,650.00

22