Vous êtes sur la page 1sur 3

SAP SD Pricing Conditions

Written by Anon. Saturday, 19 January 2008 10:35 -

Q: It is impossible to price at the material level (matnr) , when a material has a pricing reference (mvke-pmatn) set up against it in the master data. Pricing always look for the pref, even if a price is set up against the material and not the pref. How can we price by material and pref?

Ans: The field used to look up at the price is defined in Access sequence. You may find a step with PMATN as material number. If you insert a step with MATNR then the system will first look for the material, if not found (use the exclusion tick box) it will look for the pref.

Customizing

Q: We generated a new condition table. Assigned the condition to access sequence. Created a condition record. Access sequence is assigned to the output type. But when we create a billing document, output screen comes up blank for the output type. When we look up Determination Analysis, we get an error "Note 524 Access not made (Initialized Field)". What else is required to be done?

A: Assign output determination procedure to the type.

header of the document and the output

Q: How can we set up to have the VAT# be Data Control screen?

accepted in the Ship-To Master File

A: IMG->Fin. Acct.->AR and AP ->Customer Customer-> Define Acct. Group.

acct->Master Record -> Prepare to Create

1/3

SAP SD Pricing Conditions


Written by Anon. Saturday, 19 January 2008 10:35 -

Q: We want to explode Bill of Material automatically at time of Order entry and explode an Equipment BOM in the sales order. What are the setting required?

Ans: Use an item category that is configured for to explode automatically.

bills of material for having a sales BOM

Standard SAP item categories are :

TAQ - Pricing and inventory control take place at

the BOM header level

TAP - Pricing and inventory control take place at

the BOM item level

These can be automatically derived using the item respectively.

category groups ERLA and LUMF,

Q: How can we make the Customer Group 1 (or 2,

3, 4, 5) a mandatory field?

Ans: Logistic General-> Logistics Basic Data: Business Partners -> Customers -> Control -> Define account groups and field selection for customer

Choose Customer Acct. GR. (double-click). -> Field Status: Sales data (double click) -> sales (double click) .Check the radio button against Customer Gr as REQ. ENTRY. Save the

2/3

SAP SD Pricing Conditions


Written by Anon. Saturday, 19 January 2008 10:35 -

settings to

make customer GR entry mandatory .

Q: Is there an user exit to copy the data into

planning table?

Ans: Use user exit MCP20001 and include ZXSOPU01.

Others
Q: We get a report screen: "Goods issue: Problem Log" during the delivery process when activating Post Goods Issue button. We want to include our own error message to this list if the selected batch is not on a customer defined table. What is the best way?

Ans: Try User exit -

USEREXIT_SAVE_DOCUMENT_PREPARE

3/3

Vous aimerez peut-être aussi