Unless otherwise approved,this inspection request form shall be submitted during the daily morning meeting among LTA,Contractor and QP(S). Contractor: Project: ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA SAMWOH CORPORATION PTE LTD SK E & C
GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND ASSOCIATED ROAD WIDENING WORKS INTERCHANGE
To: LTA
Date: Time:
The work described below has been inspected by our Site Engineer and is complete and ready for your inspection. A checklist is attached overleaf. Location Checked and Requested By: Chainage Activity Drawings Used for Construction Other Description
The meeting noted that information provided by Contractor is adequate/not adequate*. QP(S) may proceed *delete where appropriate Request Rejected
LTA The above process for request for inspection of work by Contractor and approval by QP(S) is noted. ________________________________ LTA's representative/Date/Time
No.
Location:
Description of Works
Chainage:
Checked by Contractor Confirmed by QP(S)
Check preparation work for launching 1.1 Check availability of method statement of beam launching submitted by Contractor's PE including safety precautions 1.2 Check certificate of fitness for lifting crane and lifting chain / cable / hook etc. 1.3 Check certificate of competency of crane operator 1.4 Check certificate of competency of lifting supervisor 1.5 Check availability of traffic diversion plan (if road closure is required) 1.6 Visual inspect beam for any cracks, defects and damages at casting yard 1.7 Check safe means of access for inspection of beam 1.8 Check no physical obstruction eg. Tree, lamp post, overhead cable affecting launching Check before launching 2.1 Check adequate lighting provided on site (for night launching) 2.2 Check road and access leading to launching site closed 2.3 Check sufficient warning signs, rotating lights, barricades,etc placed on site according to C P for Temp Traffic Control 2.4 Check crane parked on firm ground 2.5 Check beam reference number to ensure correct beam delivered and beam oriented correctly for launching 2.6 Visual inspect beam delivered on site for any cracks, defects and damages 2.7 Check all dowel holes in the beam, if any, are opened and unobstructed Check during launching 3.1 Check beam properly secured to the lifting chain / cable before lifting 3.2 Check all workers kept at a safe distance during lifting of beam to position 3.3 Check beam properly and securely seated on cross head or temp steel wedge before releasing from the lifting hook 3.4 Check hook completely removed from the beam before moving the crane 3.5 Check at least 3 independent systems fo restraints provided to prevent movement of beam immediately after launching Check after completion of launching 4.1 Check all warning signs, lights, barricades, etc removed and road open to traffic 4.2 Check 4.5 m high restriction sign installed (for beam across carriageway only) Check sufficient temporary traffic devices if lane closure is required Others