ITEM PARTICULARS NO 1

NO LENGTH BREADTH HEIGHT QUANTITY NOTES 30.8 61.6 Length=30+0.4+0.4

Putting up ring bund with 2 25 mat top and 3.25 mat bottom of main bund and 0.75 mat top and 1.00 mat bottom coconut post 6m & 5m at 1m centre to centre driving down on both and half split coconut post 4m long lied with coir yard at 1m centre to centre and screening with ettamate thatties. Half split wailing piers and kayal clay etc and dismantling the same after the construction of work. Bund =230.8=61.6

Say 61.6m @ 4550 Rs/m =Rs. 280280/2 Bailing out water using 5 H.P engine & pump set including conveyance to site and erection. Cost of fuel lubricating oil, all sandy charges etc. 100 days

Say 100 days @650/day = Rs.65000/3 Earthwork excavation in 5 all class of soil except hard and medium rock for foundation of retaining wall & culvert etc. for box 6 8 1.4 336 Height =0.5+0.3+0.6

Say 336m^3 @ Rs. 450/10m^3 = Rs.15120/4 Supplying, storing and 15 driving down well 0 maintained coconut post 7 1050 Length= 7m / each post.

200mm to 300mm diameter 60cm centre to centre to line and level through rod. Strata including other appliances etc. Say 1050 m @Rs.275/m = Rs.288750/5 Cutting and removing 15 excess length of coconut 0 pile to line and level and removing the cut end. 150

Say 150 numbers @33/each= Rs.4950/6 Supplying and fill clean 1 gritty river sand in foundation trenches including all cost and conveyance of material and labour charges etc. 30.8 8.8 0.6 163 Length=30+0.4+0.4 Breadth=8+0.4+0.4

Say 163 m3 @Rs. 1700/m3=Rs.277100/7 Cement concrete 1:4:8 1 using 400mm broken stone from foundation of culvert including all cost and conveyance of materials & labour charges etc 30.4 8.4 0.3 76.6 Length=30+0.2+0.2 Breadth=8+0.2+0.2

Say 76.6 m3 @2240/m2=Rs.171602/8 Vibrated reinforced cement concrete 1:1.5:3 using 20mm broken stone for providing box culvert as per specification including all cost of conveyance of materials and labour for formwork, watering, curing etc.

Excluding cost reinforcement. For box Top & bottom slab Side wall culvert 1 Side wall culvert 2 Side wall culvert 3

of

2 2 2 2

30 8 8 8

8 0.5 0.5 0.5

0.5 4 3.25 3.25

240 32 26 20 Say 31.8 dm3 @5050/dm3=Rs.160590/-

RCC 1:2:4 using 20mm 2 broken stone for hand rails and kerb kerb Vertical post Rails 11 4 40

30

0.3

0.3

5.4

0.3

0.3

3.6

1.5

0.2

0.2

6.8 Say 1.58 dm3 @5050/dm3= Rs.7979/-

10

Plastering of culverts, kerb, hand rails, vertical post Culvert,Top of top slab Culvert, Bottom of top slab Bottom slab , top face Sides of top slab Deduct side walls area for top & bottom slab Side walls Culvert 1 1 1 1 2 12 30 30 30 30 8 8 8 8 0.5 0.5 240 240 240 30 48

3.5

112

Side walls Culvert2 Side walls Culvert 3 Sides of side walls Culvert 1 Sides of side walls Culvert 2 Sides of side walls Culvert 3

2.75

88

32

0.5

3.5

0.5

2.75

5.5

0.5

Kerb Top Kerb Sides Deduct area for vertical post Vertical post Deduct area of hand rails Top Rails

30

0.3

18

30

0.3

36

40 16 0 76 40 45 6

0.3 0.3 0.2 0.2 1.5

0.3 1 0.2 0.2 0.2

3.6 48 3.04 1.6 136.8 Say 1184m2@Rs.50/m2 = Rs.59210/-