Site Name: MILE 2 Address: 5, WISEMAN AVENUE UBA ESTATE MILE 2, LAGOS.

Customer Name: MTN

Site ID:LAG2514 Location:MILE 2 Date: 02-01-2013

RF PLAN

Sector: Height of Antenna Azimuth Mech. Tilt Elect. Tilt Type of Antenna:

S1 60M
60 0 2

S2 60M 150
0 4

S3 60M 300
0 2

AC15BD

GN43DP

DY78KL

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

LIST OF TOOLS
SL.NO
1 2 3

PARTICULARS
Flat Head screw driver Screw Drive set D-Type Spanner

SPECIFICATION
Heavy Duty spanner Poker 10-11mm spanner 12-13mm spanner 30-32mm spanner 50m Pure chromium blade 10-11mm spanner 12-13mm spanner Heavy Duty Crimp Upto 16mm 500 gm Flat

QUANTITY 1
1 2 2 2 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1

REMARKS

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Measuring Tape Tilt Meter Knife Ring Type Spanner Adjustable Spanners Crimping Tool Ball Pin Hammer File Combinational Plier Mirror Compass RF Cable Cutter Cable Cutter Tie Cutter Rope Pulley First Aid Box Helmet Safety Belt

Heavy Duty 100 mtr length and 16 inch dia. 6 inch doule bearing

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

LIST OF MATERIAL
Sl.NO
1

PARTICULARS
GSM Antenna

SPECIFICATIONS AS14BV BN43ZN AY78NM

QUANTITY (Nos./Mtr)
1 1 1

REMARKS

Dual Port, Cross Polarised, Katherine Manufacturer

RF cable Jumper Cable with Jumper Connector RF Connectors RF Clamps Earthing Kits Roxtec Surge Arrestors IGB EGB Weather Proofing Kits Grounding Cable Lugs Cable Ties

3 4 5 6 7 8 9 10 11 12 13

7/8" dia 342mtr 1/2''dia.(Cable) & 1/2''dia. (DIN-F Connector) 12nos. (Each 3mtr.) 7/8 dia. (N-M) 12 7/8 dia. (6 way) 55 1/2mtr. Copper Cable 12 6 way 1 6 300*100*10 1 300*100*10 1 8-10 Sets 16 sq.mm Green 8 mtr 35 sq.mm Yellow-Green 5 mtr Ring Type (35 Sq.mm) 12 Ring Type (16 Sq.mm) 4 Length 10 (Black) 1 pck

For 6 RF Cables (3 Sectors)

6 X 1.5 mtr 2 mtr + 3 mtr

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

Quality Check Points for the installation of Antenna and Antenna line
Sl.No.
1 2 3

Particulars
Installation Of GSM Antenna on the Pole mount

Status
NOT OK

Remarks
Antenna Clamps not properly tightened to the polemount. Second Lock not provided on Antenna Clamps. Jumper Connector not properly connected. Weatherproofing is not done properly. Outer PVC taping of the weatherproof is in wrong direction. 3 cable ties are not tightened to the weatherproof. The knots of cable ties are not in the same position. Not properly marked with the marker pen. Lebeling not done in backside of antenna. Not as per the RF plan. Not as per the RF plan. Electrical tilt is given but the Mechanical tilt not turned to 0 Tilt not proper as per the RF plan. Coloured PVC tape is not used for temporary marking at the Jumper. Stickers, Marker pens is used without Cellotape for permanent marking. Lebeling is not as per the sector selected during the RF plan Loop is not proper at the bend. Loop is not atleast 1m. of length. 2 Cable ties are not tied at the loop. Bending on Jumper cable is sharp. Routing not done along with tower body. Cable ties are not tied while routing with the tower body. Cable ties are not provided at sufficient distances.

Jumper Connector to the Antenna connection NOT OK Weatherproofing on O/D Jumper connector NOT OK

4 5 6 7

Lebeling of Antenna Height of Antenna Azimuth of Antenna Tilt of Antenna

NOT OK NOT OK NOT OK NOT OK

Lebeling on O/D Jumper

NOT OK

9 Loop on the O/D Jumper

NOT OK

10 Bend on the O/D Jumper 11 Routing of O/D Jumper 12 Cable ties on O/D Jumper

NOT OK NOT OK NOT OK

13 Jumper Connectors on O/D Jumper

NOT OK

Jumper Connectors are not properly connected. Not properly weatherproofed. Last hand taping of PVC tape is not directed in the direction opposite to the water flow.

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

14 Routing of RF Cable

15 RF Clamps on Cable Tray

3 Cable ties are not tightened to the weatherproof. NOT OK Routing of RF cables is not staight. Pattern of routing of RF cables through RF clamps is not proper. NOT OK Distance between RF clamps on HCT is not less than 1m. NOT OK Distance between RF clamps on VCT is not between 1-1.5m. RF clamps not properly tightened to the cable tray. Bending on RF cable is sharp. Bending radius is not atleast 300mm. Dummy clamp not provided at the bend. Coloured PVC tape is not used for temporary marking at the Jumper. Stickers, Marker pens is used without Cellotape for permanent marking. Lebeling is not as per the sector selected during the RF plan

16 Bend on RF Cable

NOT OK

17 Lebeling of RF Cable

NOT OK

18 S-bend on RF Cable

S-bend not provided on RF cable before entering the Shelter. NOT OK S-bend not provided on RF cable but it is not proper. NOT OK NOT OK NOT OK Extra length of 0.5-1m of RF cable is not kept to go inside shelter. Length of RF cable inside shelter is not same. Earting Kit is not properly installed on RF cable. All Earthing Kits are not at same position. Weatherproofing is not done properly. Outer PVC taping of the weatherproof is in wrong direction. 3 cable ties are not tightened to the weatherproof. Direction of Grounding Cable is not downward.

19 Length of RF Cable inside Shelter 20 Earthing Kit on RF Cable 21 Weather Profing on Earthing Kit

22 Grounding Cable of the Earthing Kit

NOT OK

Grounding Cable is not routed 0.5m. Along with RF cable. NOT OK Grounding Cable is not connected to the tower body. Grounding Cable is connected to tower body without C-Clamp. NOT OK Grounding Cable is connected to tower body using CClamp but not properly NOT OK

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

C-Clamp tigthened to the tower body without filing the outer paint NOT OK NOT OK Nuts and Bolts of C-Clamp are not tightened properly. More than 2 Grounding Cable passed through a single C-Clamp. NOT OK 23 Connecting the RF Connectors to the RF Cable NOT OK VSWR of RF Connectors is exceeding the limit. RF Connectors are not properly connected to the RF Cable. Weatherproofing on RF Connectors is not done properly. NOT OK Last hand taping of PVC tape is not directed in the direction opposite to the water flow. 3 Cable ties are not tightened to the weatherproof. Roxtec is not properly tigthened and sealed to the Shelter. NOT OK Boots are not properly tigthened to the Roxtec. RF Cable is not inserted in a group. Empty holes are not properly sealed using Silicon Gel. NOT OK Not properly marked with the marker pen. RF cables is not properly connected to the Surge Arrester using RF connectors. NOT OK I/D Jumper is not properly connected to the Surge Arrester. Grounding Cable is not connected properly to the Surge Arrester. NOT OK Bend on the I/D Jumper is kept sharp. Coloured PVC tape is not used for temporary marking at the Jumper. NOT OK Stickers, Marker pens is used without Cellotape for permanent marking. Lebeling is not as per the sector selected during the RF plan NOT OK Jumper Connectors are not properly connected.

24 Weatheprofing on RF Connectors

25 Installation of Roxtec

26 Lebeling on Roxtec 27 Connections of the Surge Arrester

28 Bend on I/D Jumper 29 Lebeling on I/D Jumper

30 Jumper Connector on I/D Jumper

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

Site Name: NMC Complex Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur Customer Name: Airtel

Site ID:25SL16 Location: Jaipur Date: 24-06-12

properly.