Project Status Report

Project Name: R.B.A. Consultancy and General Services Client Servicing System Department: Focus Area: Product/Process:

Prepared By: Document Owner(s) Ryan Ric G. Alegre Mariz B. Atok Julie Anne N. Cortez Project/Organization Role Project Manager Project Developer Project Developer

Confidential StatusReport_Calimlim(10JUL) Last printed on 7/10/2013 6:49:00 PM

Project Status Report

TABLE OF CONTENTS 1 2 PROJECT STATUS REPORT PURPOSE ............................................................. 3 PROJECT STATUS REPORT TEMPLATE ......................................................... 3 2.1 2.2 3 4 Project Status Report Details ............................................................................ 3 Project Status Report Template ........................................................................ 3

PROJECT STATUS REPORT APPROVALS ....................................................... 5 APPENDICES ............................................................................................................ 6 4.1 4.2 Document Guidelines........................................................................................ 6 Project Status Report Sections Omitted ............................................................ 6

Confidential

Page 2

7/10/2013

Project Status Report

PROJECT STATUS REPORT PURPOSE The purpose of the project status report is to discuss what the group have done and accomplished from July 19, 2013 to July 25, 2013.

2 2.1

PROJECT STATUS REPORT TEMPLATE Project Status Report Details The group completed the Event table, CFD, DFD, Use Case, Use Case Full Description, Entity Relationship Diagram, Activity Diagram and Data Dictionary. The Project is still on process. o The project for R.B.A consultancy and General Services is a client servicing system. The system will help client of R.B.A Consultancy and General Services access their transaction status at any time and place. o Creating the Event Table, Context Flow Diagram, Data Flow Diagram, Use Case, Use Case - Full Description, Entity Relationship Diagram and Data Dictionary is the Milestone deliverables for the last reporting period. o If our milestone deliverables is successful, we can now proceed to our next milestone deliverables but if failed, we can't proceed to our next milestone and should be able to fix the problem on our previous deliverables. The group must always conduct an interview to their advisers regarding their project to get an advice from them to improve the project.

2.2

Project Status Report Template

Project Name Prepared By: Ryan Ric G. Alegre Date: 07/25/13 Reporting Period: 07/19/13 to 07/25/13

Confidential

Page 3

7/10/2013

Project Status Report

Project Overall Status: The group completed the Event table, CFD, DFD, Use Case, Use Case Full Description, Entity Relationship Diagram, Activity Diagram and Data Dictionary. Project Summary: The group completed the Event Table, CFD, DFD, Use Case, Use Case Full Description, Entity Relationship Diagram, Activity Diagram and Data Dictionary for the client servicing system of RBA Consultancy and General Services for the second week because we made some changes and add something in our diagrams. The group was able to discussed it with the advisers and get some corrections and advice. Milestone Deliverables performance reporting over last period Milestone Deliverables Milestone 1 Revised Event Table Revised CFD Revised DFD Revised UCD Revised Use Case Full Description ERD Revised Activity Diagram Data Dictionary 07/25/13 07/25/13 07/25/13 07/25/13 07/25/13 07/12/13 07/25/13 07/12/13 100% 100% 100% 100% 100% 100% 100% 100% Behind schedule Behind schedule Behind schedule Behind schedule Behind schedule On Schedule On Schedule On Schedule Due Date % Completed Deliverable Status

Milestone Deliverables scheduled for completion over next period Milestone Deliverables Milestone 1 Client Servicing Design Storyboard 07/26/13 0% On schedule Due Date % Completed Deliverable Status

Confidential

Page 4

7/10/2013

Project Status Report

Client Servicing System Prototype

07/26/13

0%

On schedule

Project Recommendations The group must conduct an interview with Mr. Alegre for further suggestions and clarifications of the client servicing system. The group should keep up with the schedule and once the consultation with the advisers started and submits requirements on time.

Objectives for Next Project Status Review The objective for the next project status review is to be able to produce drafts of R.B.A. Consultancy and General Services Client Servicing System Storyboard and Prototype.

Confidential

Page 5

7/10/2013

Project Status Report

APPENDICES 2.3 2.4 Document Guidelines Project Status Report Sections Omitted Project Status Report Version Control Project Budget/Financial Status Project Risk Management Status Project Issue Management Status