M/S. Akar Technical Services Co. (L.L.C) Dubai, U.A.E Kind Attn: Mr.

Juzer Eski Senior Project Manager.

Date: 03-07-2011

Sub: Quotation for Air Conditioning Chilled Water Piping & Unit Installation with Valve Package on Labor Charge Basis
Dear Sir, Pursuant to your request for the quotation of the above-mentioned subject, we thank you giving us an opportunity to quote on your requirements. We are now pleased to submit our best competitive offer for your kind consideration and approval

Description of work: 1. Shifting F.C.U from the store area to the tower floor location and Installation of F.C.U with hanging bush and necessary threading rod, nut and bolts as per the drawings. 2. Installation of Valve Package with necessary fittings, by pass, flexible.2 way valve, test points, drainage lines per the Approved drawings. Do the 150 PSI Hydrostat Pressure Test. After getting the approval to do the proper insulation and handover the main contractor. 3. Installation of Chilled Water Piping with proper Supports as per the Approval drawings. 150 PSI Hydrostat Pressure Test. After getting the approval to do the proper insulation and handover the main contractor.

Price for shifting, unit installation of F.C.U with necessary support per unit

=200 AED

Price for Installation Valve Package piping Connection with Main line (Approximate 1 meter)
Sl NO 1 2 3 Size of Valve Package with Unit Installation
1/2 Valve Package

Dhs/Valve Package 300 300 300

3/4 Valve Package 1 Valve Package

Price for Chilled Water Piping Works.Pressure Test and piping Insulation / Running meter

Sl NO 1 2 3 4 5 6

Size of Chilled water pipe 1/2 " 3/4" 1" 1 1/2 2" 2 1/2"

Dhs/Valve Package 25 30 40 50 60 100

Note:
1. All the air conditioning equipments necessary fitting, 3Way Valves, and accessories Supply by Main contractor 2. The main contractor should provide the Proper Materials in time. 3. The main contractor provides Wall Opening for chilled water piping as per the drawings. 4. The main contractor provides Store Area, Power Supply and Water during the working Hours. 5. After work completion, if any changes have to be made, charges will be extra. Excluded Work All the electrical wiring and drainage connection are not included. Start up and commissioning, not in our scope. Flushing up and Chemical treatment works are excluded. Terms of Payment Invoice to be Submit as per progress of work. Payment shall be made in 30 days from the date of submission invoice. We hope our offer will be inline with your requirements. Assuring our best services at all times. Waiting for a favorable reply and with best regards. Its always ADYMs pleasure to work with you. Thanking you, Yours faithfully, For ADYM Mechanical and Air conditioning Works LLC Over fifteen years of experience in Air-conditioning works Rajan V Valathe Managing Director

Mob: 0506257340