JOB SAFETY ANALYSIS FOR BLINDING, SCREEDING , WATER PROOFING, FORM WORK , REINFORCEMENT AND CONCRETING AT RECEIVING BASIN

AND DISCHARGE CHANNEL COMMON COOLING SEAWATER SYSTEM PHASE 2 SEQUENCE OF BASIC ACTIVITY STEPS 1.0 Weather POTENTIAL HAZARDS 1.1 Sun Burn 1.2 Heat stress and dehydration 1.3 Dust 2.0 Excavation and cutting 2.1 Collapse of Excavation 2.2 Fall and hit 2.3 Movement of Machinery HAZARDS CONTROL 1.1.1 Adequate shelter will be provided for workers to take rest 1.2.1 Sufficient quantity cool drinking water will be made 1.2.2 Rotation of workers will be made suitably 1.3.1 Water will be sprayed to suppress the dust and dust mask will be provided to workers 2.1.1 Sloping,shoring benching will be applied as applicable. 2.2.1 Excavated materials to be kept away from the edge of excavation. 2.3.1 Equipment will be equiped with Reverse alarm and revolving warning light 2.3.2 Banks Man will be provided for heavy equipments 2.4.1 Excavated area must be barricaded with crash barrier and deep excation board will be displayed. proper access and egress will be kept available 2.4.2 Equipments should keep a proximity of 1.5 meter from the edge of excavation. 2.5.1 Undergroud services shall be identified if any by using electronic detector or by trial pit and checking through
concerned drawing

RESPONSIBLE Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

2.4 Deep Fall

2.5 Undergroud services

SEQUENCE OF BASIC ACTIVITY STEPS 3.0 Form work

POTENTIAL HAZARDS 3.1 Collapse of structure, and injury

HAZARDS CONTROL

RESPONSIBLE Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

3.1.1 Skilled and competent workers to be depolyed 2.1.2 Form work shall be constructed as per approved drawing and design with adequate strength. 3.1.3 Only approved materials to be used and also ensured the application of Tie rod, standard wooden support and universal jack 3.1.4 Removal of form shall be done only after specified time duration to set concrete to gain sufficient strength 3.2 Fall of personel, material and 3.2.1 Adequate working platform with sufficient board ,toe board and guard rail to be provided injury 3.2.2 Adequate, clear access and egress shall be maintained always. 3.2.3 Personnesl working at elevated position shall wear full body harness with fall arrestor system 3.3 Nails, tools and sharp edge 3.3.1 Deffect free tools, denailing and application of sharp edge protection and appropriate PPEs injury 3.4.1 Good housekeeping shall be maintained all the time and 3.4 Slip, trip and fall materials shall be stored at designated places only 3.4.2 Work area shall be illuminated with adequated lightrs during work at neight or when visibility is poor

3.4.3 Area shall be barricaded with relevant sign board

Dodsal Site Supervisor

SEQUENCE OF BASIC ACTIVITY STEPS


4.0 Working at height with

POTENTIAL HAZARDS

HAZARDS CONTROL

RESPONSIBLE

4.1 Fall of personnel and material 4.1.1

provision of scaffolding

and injury 4.1.2

4.1.3 4.1.4 4.2 Slip, trip and fall 4.2.1 4.2.2 5.1.1 5.1.2 5.1.3 5.1.4 5.2 Manual lifting of steel structures 5.3 Enviornmental pollution 6.0 Cleaning of form work prior to concreting 7.0 Concreting / masonary work 6.1 Compressor air, Dust and nuisance to public 5.2.1 5.3.1 6.1.1 6.1.2 7.1 Fall of personel, material and 7.1.1 injury and collapse 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6

5.0 Steel bar bending, fixing and storage / Reinforcement

5.1 Equipment failure, cut and injury due to splashing of metal parts

Experienced and competent workers shall be deployed Dodsal Site Supervisor and personnel working at height shall wear full body harness with fall aresstor system Inspected and certified scaffold and access ladder Dodsal Site Supervisor shall be erected and working platform shall be provided with adequate number of wooden planks,guard rail and toe board Materials left at elevated places shall be properly secured Dodsal Site Supervisor Area shall be barricaded with relavent sign board Dodsal Site Supervisor to prevent unauthorized entry No loose material shall be left at elavated work area Dodsal Site Supervisor and all tools and material shall be secured and stored properly Adequate access and egress shall be maintained always Dodsal Site Supervisor Equipment shall be inspected and certified for its Dodsal Site Supervisor competency Experienced and competent workers shall be deployed Dodsal Site Supervisor with adequate and appropriate tools Store the steel in segregation at the designated places with Dodsal Site Supervisor proper barrication and sign board Equipments shall be fitted with apporpriate machine guard Dodsal Site Supervisor to protect from moving parts Manual lifting shall be avoided, use equipments to lift heavyDodsal Site Supervisor steel structures Steel scraps shall be accumulated and disposed as per Dodsal Site Supervisor the approved procedure at designated area Use only low pressure compressor air to avoid emission of Dodsal Site Supervisor dust. Compressor air shall not be used to clean dirt and dust on Dodsal Site Supervisor cloth Use certified working platform, approved form work Dodsal Site Supervisor and follow scaff tag System for scaffolding. Material handling and storage shall be done as per Dodsal Site Supervisor standard procedure and complay good house keeping Experienced and competent person shall be deployed Dodsal Site Supervisor Concrete shall not be allowed to fall freely from a height of Dodsal Site Supervisor more than 1.5 mts to avoid displacement of reinforcement or form work Concreting shall not be done when adverse weather Dodsal Site Supervisor condition prevails House keeping to be maintained always Dodsal Site Supervisor

SEQUENCE OF BASIC ACTIVITY STEPS

POTENTIAL HAZARDS

HAZARDS CONTROL

RESPONSIBLE

8.0 Compaction of concrete

9.0 Curing of concrete

10.0 Water proofing

11.0 Material handling and Storage

7.2 Equipments failure, collapse 7.2.1 Equipments shall be inspected and certified by QP approved Dodsal Site Supervisor and injury third party 7.2.2 Operators of mixers, pumps and other equipments involved Dodsal Site Supervisor shall be approved with relevant licence by QP approved third Dodsal Site Supervisor party 7.2.3 All access road leading to site shall be safe for traffic Dodsal Site Supervisor movements 7.2.4 No infringing activity shall be permitted when concreting Dodsal Site Supervisor is going on 7.3 Enviornmental pollution 7.3.1 Dumping, cleaning and disposal of concrete waste Dodsal Site Supervisor to be done at designated area only 8.1 Equipment failure and injury 8.1.1 Equipment shall be maintained and inspected for its suitablity Dodsal Site Supervisor 8.1.2 Experienced workers shall be deployed to man such Dodsal Site Supervisor equipment 8.2 Exposure to viberation 8.2.1 Workers shall be rotated suitably to avoid prolonged Dodsal Site Supervisor exposure to viberation 8.3 Collapse of form work and 8.3.1 Inspect the form work prior to concreting and compaction Dodsal Site Supervisor displacement of reinforcement 8.3.2 Viberators shall not be used along the forms to avoid damageDodsal Site Supervisor and displacement of reinforcement 8.4 Noise 8.4.1 Ear plugs shall be used to avoid exposure to noise Dodsal Site Supervisor 9.1 Equipment failure 9.1.1 Equipment shall be certified by QP approved third party Dodsal Site Supervisor 9.1.2 Operators shall be certified with licence by QP approved Dodsal Site Supervisor third party 9.2 Fall of personel and injury 9.2.1 Clear access shall be maintained all the time and working Dodsal Site Supervisor platform shall be provided 10.1 Corrosive material 10.1.1 Workers shall be trained for application and safe handling Dodsal Site Supervisor of the material. 10.1.2 Water proofing material shall be stored in designated area Dodsal Site Supervisor 11.1 Slip,trip, fall and injury 11.1.1 Material will be stored in their designated area Dodsal Site Supervisor 11.1.2 Barricading will be provided for open the storage area Dodsal Site Supervisor 11.1.3 As far as possible mechanical handling will be done to Dodsal Site Supervisor to avoid manual handling

Remarks: 1- Prior to start any work it will be made sure that personnel are safety inducted. 2- Prior to start any work Tool Box Talk will be crried out. 3- Personnel will wear applicable PPE. 4- Adequate first aid facility will be provided. 5- Adequate fire extinguishers shall be provided with every equipments to meet any eventuality Prepared By: M P Gupta ( Civil Engineer ) Reviewed By: Solayappan ( HSE Officer )