Vous êtes sur la page 1sur 3

Punit Tiwari

Hounse No. 24, Shiv Mandir Wali Gali, Mehroli, Ghaziabad, NH-24, (U.P.) Mob. No. 9560411384 Email: punit44t@live.in

RESUME
POSITION FOR : Land Surveyor cum Civil Foreman

WORK EXPERIENCE: May 2013 Till date Land Surveyor / Civil Foreman Mahagun India Pvt. Ltd. Sector 62, Noida. Land Surveyor / Civil Foreman Ghantoot Company. Abu Dhabi, U.A.E.

August 2011 May 2013

November 2006 August 2011

Land Surveyor / Civil Foreman LINDENBERG EMIRATES LLC Abu Dhabi, U.A.E.

Job Profile: Setting out, Pipe Laying, theist block, Chamber etc. Survey Instrument Handling: Total Station, Theodolite, Auto Level (Nikon). Detail of Projects Executed @ LINDENBERG EMIRATES LLC 1. Contract No. Client: Consultant: 2. Contract No. Client: Consultant: 3. Contract No. Client: Consultant: 4. Contract No. Client: Consultant: D5630 ADDC Ital N4604 Transco Mott Mac Donald 119C Dewa NJS D10599 ADDC Decon Proposed new line (DI-200,600,800)

Proposed new line (DI-1000)

Proposed new line (GRE-1200)

Transfer of 11KV Load to New Primary-E48/02

Page 1 of 3

Duties and Responsibilities: Water Works (Land Surveyor cum Civil Foreman) Pre work levels, topographic survey, traversing, layout of facilities, fixing of control points, checking the co-ordinates before & after commencement of work. Making horizontal & vertical profile data. Route Survey for D.I, GRE & UPVC Pipe Laying and Making Drawings with the Help of Draughtsman and Getting its Approval from the Consultant. Setting out of Pipe Line Route as per contract Drawings. Making Chamber, Thrust Block, Line Block, & NDRC. Installation of Pipe & Taking Its Level.

Duties and Responsibilities: Electrical Works (Land Surveyor cum Civil Foreman) Surveying for H.V Cable & Preparing Drawings with Draughtsman and Getting Its Approval from the Consultant. Making of Cable Route as par Approval Drawings and Responsible for all other surveying Activities as Service Corridor, NDRC Existing Ducts etc.

Duties and Responsibilities: Sewerages Works (Land Surveyor cum Civil Foreman) Route Survey for D.I. Pipe Laying and Making Drawings with the Help of Draughtsman and Getting its Approval from the Consultant. Setting out of Pipe Line Route as per contract Drawings. Making Chamber, Thrust Block, Line Block, & NDRC. Installation of Pipe & Taking Its Level.

Meager Client Handled: ADDC & Transco, Dewa. Meager Consultant Handled: Ital & Mott Mac Donald, NJS, Decon. All over Work Exeprience : Over 7 Years 2 months of Working Experience in Project Management for Various EPC Projects Such As Waterworks, Electrical, Sewerages.

Educational Qualification 10+2 (Science with Maths). Certificate Course in surveying.

Computer Skills Office Suite MS Office, Outlook, Express, and basic knowledge of power point and MS Access, Tally 4.5 & Page Maker, Coral Draw.

Page 2 of 3

PERSONAL BACKGROUND Fathers Name Nationality Sex Date of Birth Marital Status Language Known : : : : : : Shri Kanhiya Tiwari Indian Male 24/07/1986 Married English, Hindi & Arabic

Declaration: I, Punit Kumar, hereby affirm that all the information present above is True to the best of my knowledge.

Date. Place

Punit Kumar.

Page 3 of 3

Vous aimerez peut-être aussi