Vous êtes sur la page 1sur 5

Continental Warehousing Corporation ( Nhava Seva ) Ltd.

D.No.1088, Khopta Village, Taluka -Uran, District - Raigad, Navi Mumbai 400 702 Tel : +91-22-67937777 , Fax : +91-22-67937788

IMPORT TARIFF W.E.F. 20.09.12


1] Delivery Charges (FCL/LCL/Bonded) Min. of 5 Sq.m per item or per delivery 2] Cargo Storage Charges Bonded Cargo Additional Insurance Fee Container Destuffing Charges Inbonding (Haz cargo Storage 30% will be extra) 2A] Measurement LCL Cargo Rs.85 per MT

Rs.95 per Sq.mt/week 0.25ps/week/Rs.1000 on Cargo value +C/duty Rs.1500 per Teu

Rs.2.50 Per Carton Rs.80 per Sq.mt/week for first two weeks; For 3rd & 4th week - Rs.100 per Sqmt/week; From 5th week onwards Rs.150 per Sqmt/week

(Haz cargo Storage 30% will be extra) ODC LCL Cargo Rs.150 per Sq.mt/week for first two weeks; For 3rd & 4th week - Rs.175 per Sqmt/week; From 5th week onwards Rs.300 per Sqmt/week Rs.150 per item Rs.100 per item Rs.400 per item Rs.200 per Document per FCL Rs.100 per Document per LCL Rs.5000 per Container 20' 40'

Min. of 5 Sq mts. per item or per delivery for LCL cargo Fuel Surcharge Survey Charges Scanning 2B] Documentation Processing Charges

2C] Underhook Charges 3] Handling & Transport Destuff Delivery ( Dock Destuffing ) a) For DV/OT ( Within Gauge ) Upto 23 MT Above 23 MT to 27 MT Above 27 MT b) For OOG cargo on FR / OT Upto 23 MT Above 23 MT to 27 MT Above 27 MT c) For Reefers Upto 23 MT Above 23 MT to 27 MT Above 27 MT d) Hazardous Cargo Loaded Delivery ( Factory Destuffing ) a) For DV/OT ( Within Gauge ) Upto 23 MT Above 23 MT to 27 MT Above 27 MT b) For ODC/FR Upto 23 MT Above 23 MT to 27 MT Above 27 MT c) For Reefers Upto 23 MT Above 23 MT to 27 MT Above 27 MT d) Hazardous Cargo 4] Custom Examination / Reworking Exam less than 25% More than 25%

Rs 6100 Rs 7400 Rs 11525 Rs 10250 Rs 11600 Rs 15700 Rs 8900 Rs 10100 Rs 14200 Rs.1300 per Teu extra

Rs 9540 Rs 11600 Rs 18100 Rs 16100 Rs 18200 Rs 24600 Rs.13800 Rs.15900 Rs.22250

Rs 4950 Rs 6450 Rs 10700 Rs 8650 Rs 10150 Rs 14400 Rs 7950 Rs 9450 Rs 13650 Rs.1300 per Teu extra

Rs 7550 Rs 9850 Rs 16300 Rs 13200 Rs 15450 Rs 21950 Rs 12150 Rs 14500 Rs 20850

Rs.750 Rs.2500

Rs.1500 Rs.5000

5] Container Ground Rent Charges ( Per Day ) 1st to 3rd day Rs.150 Rs.350 4th to 6th day 7th to 9th day Rs.450 10th to 12th day Rs.550 13th to 15th day Rs.800 16th day onwards Rs.900 Charges on Reefers / Haz Cntrs will be 200% of normal rate Charges on ODC Cntrs will be 300% of normal rate 6] Housekeeping Charges 7] Crane Charges Capacity 15MT Capacity 20MT Capacity 25MT Capacity 30MT Capacity 40MT Rs.100 Half Shift Rs.3800 Rs.5000

Rs.300 Rs.700 Rs.900 Rs.1100 Rs.1600 Rs.1800

Rs.200 Full Shift Rs.7800 Rs.9800 Rs.11900 Rs.13800 Rs.15800

Continental Warehousing Corporation ( Nhava Seva ) Ltd.


D.No.1088, Khopta Village, Taluka -Uran, District - Raigad, Navi Mumbai 400 702 Tel : +91-22-67937777 , Fax : +91-22-67937788

EXPORT TARIFF W.E.F. 20.09.12


1] Carting Charges Unloading of Export Cargo Shifting of cargo Loading for Back to Town Measurement 2] Cargo Storage Charges General Space Reserved Space (1 months advance notice to be given for cancellation of space from either side) (Haz cargo Storage 30% will be extra) 3] Handling & Transport a) For DV/OT ( Within Gauge ) Upto 23 MT Above 23 MT to 27 MT Above 27 MT b) For OOG cargo on FR / OT Upto 23 MT Above 23 MT to 27 MT Above 27 MT c) For Reefers Upto 23 MT Above 23 MT to 27 MT Above 27 MT d) Hazardous Cargo 4] Reworking Charges For DV/OT/FR Additional charges for use of Crane 5] Container Ground Rent Charges Upto 7th day 8th to 15th day 16th to 30th day 31st day onwards 20' 40' Rs.85 per MT Rs.85 per MT Rs.85 per MT Rs.2.50 per Carton

Rs.55 per Sq.mt/week Rs.175 per Sq.mt ( 3 months in advance )

Rs 6000 Rs 7500 Rs 11650 Rs 10250 Rs 11800 Rs 16000 Rs 8750 Rs 10300 Rs 14450 Rs.1300 per Teu extra

Rs 9390 Rs 11750 Rs 18250 Rs 16050 Rs 18450 Rs 24950 Rs 13700 Rs 16050 Rs 22600

Rs.2100 (Single) Rs.3680 (Full)

Rs.4200 (Single) Rs.7350 (Full)

Rs.75 Rs.145 Rs.340 Rs.600 Charges on Hazardous Cargo Cntrs will be 200% of normal rate Charges on Reefers Cntrs will be 200% of normal rate Charges on ODC Cntrs will be 300% of normal rate Rs.3500 Half Shift Rs.3800 Rs.5000

Rs.150 Rs.290 Rs.680 Rs.1200

6] Removement Charges from Port to CFS (One Side) 7] Crane Charges Capacity 15MT Capacity 20MT Capacity 25MT Capacity 30MT Capacity 40MT

Rs.5000 Full Shift Rs.7800 Rs.9800 Rs.11900 Rs.13800 Rs.15800

Continental Warehousing Corporation ( Nhava Seva ) Ltd.


D.No.1088, Khopta Village, Taluka -Uran, District - Raigad, Navi Mumbai 400 702 Tel : +91-22-67937777 , Fax : +91-22-67937788

EMPTY & GENERAL TARIFF W.E.F. 20.09.12


1] TRANSPORTATION ( Excl Lo/Lo) For Empty Containers For Loaded Containers within JNPT Area Upto 23 MT Above 23 MT to 27 MT Above 27 MT Rs. 1100 per Teu within 10Km Radius Rs. 1400 per Teu Upto Panvel Rs. 2500 per Teu Rs. 3500 per Teu Rs.5000 per Teu

* Toll Charges at Actuals if applicable


2] Lift Off / Lift On For Empty Containers For Loaded Containers 3] Internal Shifting For Empty Containers For Loaded Containers 4] Sweeping Charges 5] Reefer Charges Plugging Monitoring

Rs. 150 per Teu Rs. 300 per Teu

Rs. 300 per Teu Rs. 1350 per Teu Rs. 40 per Teu

Rs. 2050 per day per container Rs. 250 per Shift Rs.350 per shift on Sundays/Holidays

PTI Charges 20' 40' 6] Survey Charges CLP Charges for Container Stuffed EIR ( In / Out ) / Survey Charges Pre - Repair Damage Survey Post - Repair Damage Survey 7] Locking Charges 8] Empty Ground Rent Charges Upto 7th day 8th to 14th day 15th day onwards ( Date in & out / Stuffing date, both will be taken into account ) (Ground rent charges on Spcl. Eqpt. / FR Container will be 300 % of normal rate) 9] Weighment Charges Weighment of Loaded Contr. In addition Internal Shifting charges and lift off -lift on will be applicable if CWC(NS)L vehicle used 10] Weighment Charges for Scanning 11] Forklift / Reach Stacker Charges Capacity 3MT Capacity 5MT Capacity 10MT Capacity 45MT

Running Rs.600 Rs.700

Full Rs.1000 Rs.1100

NIL Rs. 175 per container Rs. 75 per container Rs. 75 per container Rs. 75 per Day / Container Rate per Day / Teu ( Rs. ) 10 75 100

Rs. 200 per Truck Rs.300 per Teu on party's vehicle

Rs.750 per Teu Half Shift Rs.1000 Rs.2000 Rs.3000 Full Shift Rs.1500 Rs.4000 Rs.6000 Rs.20000

Continental Warehousing Corporation ( Nhava Seva ) Ltd.


D.No.1088, Khopta Village, Taluka -Uran, District - Raigad, Navi Mumbai 400 702 Tel : +91-22-67937777 , Fax : +91-22-67937788

ESTATE RELATED CHARGES W.E.F. 20.09.12


1] OFFICE AC Office Area Non AC Office Area ( Rent payable quarterly in advance ) ( Security deposit does not bear any interest ) Locker 2] a) b) c) Palletisation Providing labour, material as required, strapping, stretch filming With HM cover With HDPE cover Rent / Quarter Seurity Deposit Rs. 125 per sqft Rs. 75 per sqft

Rs. 250 per year

Rs. 600 per pallet Rs. 700 per pallet Rs. 800 per pallet

3] Chocking a) Standard Wooden Chocking b) Extra over above for chocking with plywood 4 mm ply 6 mm ply 8 mm ply c) Standard Chocking for coil cargo Note: Fumigated Material for Chocking 4] Lashing Standard lashing with wire sling for ODC Contr. Standard lashing with wire sling for Box Contr. 5] Fumigation Ports a) USA/ UK/ EUROPE / S.E.ASIA/ AFRICA b) USA/ UK/ EUROPE / S.E.ASIA/ AFRICA (ISPM) c) AUSTRALIA/ NEW ZEALAND (Wood Packing) d) AUSTRALIA/ NEW ZEALAND (Non -Wood Packing) e) All Ports: ALUMINIUM PHOSPHIDE -Pre Pack Sachets (No Residue) f) Empty Containers Fumigation

Rs. 1600 per container Rs. 20 sqft Rs. 25 sqft Rs. 30sqft Rs. 4000 per Teu On Case to Case Basis

Rs. 7000 per Teu Rs. 5000 per Teu

20' Rs.1200 Rs.1700 Rs.3300 Rs.2700 Rs.700 Rs.1300

40' Rs.2400 Rs.3400 Rs.6600 Rs.5400 Rs.1400 Rs.2600

6] FUEL SURCHARGE RS. 375/RS. 750/ENERGY SURCHARGE RS. 125/RS. 250/NOTE: 1) All Cheques / DDs should be drawn in favour of "Continental Warehousing Corporation (Nhava Seva) Limited" payable at Mumbai/ Navi Mumbai. 2) Payment of charges is not a guarantee for services, which is strictly on completion of all customs and other statutory formalities. 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) Service Tax & other statutory levies will be applicable at prevailing rates. Payment of charges for 45'' containers will be 2.5 times respectively of the per TEU rates. All payments in advance. The chocking & lashing rates are applicable for standard design. Any additional materials will be charged extra. CHA/ Consignees intend to pay by cheque must obtain prior permission from the CFS management. For safety reasons if ODC Cargo is to be moved on Lowbed trailors, the movement charges will be quoted on case to case basis. An administrative cost of Rs. 100 will be charged per amendment. Charges for labour Supply - Skilled Labour Rs.500 Per Shift /Per Labour and Unskilled labour Rs.425/- Per Labour / Per Shift The above rates are subject to change without prior notice. Hazardous cargo declaration with all details may please be provided for safe handling, stacking & segregation norms compliances. CFS reserves the right for allowing or rejecting specific hazardous commodities in the premises. Additional Charges will be levied if the cargo is metal scrap that requires special handling. Additional Charges will be levied for containers that have already been processed for auction Additional charges of Rs.2500/- per vehicle will be charged towards Scanning Detention(Upto 24 Hrs.) Trailer Detention Charges Rs.1000/- per container. Additional Handling Charges at GTI 250/- Per TEU.

Continental Warehousing Corporation ( Nhava Seva ) Ltd. D.No.1088, Khopta Village, Uran Taluka, Raigad District, Navi Mumbai 400 702 Tel : +91-22-67937777 , Fax : +91-22-67937788

BUFFER YARD TARIFF W.E.F. 20.09.12


ACTIVITY 1. Handling & Transportation Receiving Factory stuffed containers at Buffer Yard, off loading these from party's trailers, stacking with proper inventorisation and transporting them to the container yards of PORT after getting movement orders (this include lift off & lift on at Buffer yard) Upto 23 MT Above 23 MT to 27 MT Above 27 MT - Hazardous transportation will be applied @ 1.5 times - ODC Handling will be @ 1.5 times - ODC Transportation will be on case to case basis Rs.3700 Rs.5100 Rs.6500 Rs.4700 Rs.6100 Rs.7500 20' 40'

2. Loaded Ground Rent Charges Per Day Upto 7th day Rs.75 8th to 15th day Rs.145 16th to 30th day Rs.340 31st day onwards Rs.600 (Ground rent for Hazardous and Reefer will be levied at 200% of normal rate) (Ground rent for ODC will be levied at 300% of normal rate) 3. Lift-on / Lift-off of loaded containers 4. Custom Examination / Reworking Exam less than 25% More than 25% 5. Administration/Documentation Charges Rs.300

Rs.150 Rs.290 Rs.680 Rs.1200

Rs.600

Rs.600 Rs.2100 Rs.200

Rs.1200 Rs.4200 Rs.400

TARIFF FOR EXPORT FACTORY STUFFED SELF - SEALED CONTAINER


1. Registration charges of container (on wheel examination & movement by party) 2. Registration charges of container (off loaded in CFS, Examination & movement by party) "Incl. of lift on & lift off. Rs.1000 Rs.1530 Rs.1500 Rs.2560

Note - If the self seal Container is off loaded and moved by Continental CFS, then Buffer charges are applicable.

Remark:
1. All payment should be made in advance, 2. All the charges should be paid to M/s. Continental Warehousing Corporation (Nhava Seva) Limited. 3. Applicable Taxes Extra.

Vous aimerez peut-être aussi