MonthName of Contractor :- Jaycon Infrastructure Ltd.


Name of Works
:- Civil & Structural work for wish Town Kosmos B-43 Towers (KM72A to 72C, 79A & 79B) at Jaypee Greens , Noida (UP )
Work Order No.
:- JAL/YEP/LD-1/305/483 dated 29th May 2010

Re-concillation of Reinforcement Steel


TOWERS 79A,B & 72A,B,C & SC-08
S.No

Description

Unit

6mm

8mm

10mm

12mm

16mm

20mm

25mm

28mm

32mm

Total

18.502

533.262

439.121

419.589

560.789

711.314

587.256

769.013

0.000

4038.846

OPENING BALANCE

UPTO FEB

RECIEVED LAST MONTH

MARCH

MT

RECIEVED THIS MONTH

APRIL

MT
MT

18.502

533.262

439.121

419.589

560.789

711.314

587.256

769.013

0.000

4038.846

BILLED QTY UP TO LAST MONTH (Towers)

RA -14

MT

18.234

456.632

384.608

305.077

399.128

685.825

552.279

740.388

0.000

3542.171

BILLED QTY UP TO LAST MONTH ( SC-08)

RA -14

MT

0.000

12.336

39.449

65.898

60.178

14.652

33.460

0.000

0.000

225.973

BILLED QTY FOR THIS MONTH (Towers)

RA - 15

MT

BILLED QTY FOR THIS MONTH ( SC-08)

RA - 15

MT
18.234

468.968

424.057

370.975

459.306

700.477

585.739

740.388

0.000

3768.144

TOTAL - A =1+2 (RECIEVED QTY)

TOTAL - B=3+4+5+6 (BILLED QTY)

MT

PHYSICAL BALANCE

MT

CUT AND BEND

MT

SCRAP

MT

TOTAL - C= 7+8+9 ( AT SITE)

MT

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

13.555

QTY OF WORK IN PROGRESS

MT

0.268

64.294

15.064

48.614

101.483

10.837

1.517

28.625

0.000

257.147

10

13.555

Remarks

Real Estate Projects


Wish Town NOIDA
Name of Contractor :- Jaycon Infrastructure Ltd.
Name of Works
:- Civil & Structural work for wish Town Kosmos B-43 Towers (KM72A to 72C, 79A & 79B) at Jaypee Greens , Noida (UP )
Work Order No.
:- JAL/YEP/LD-1/305/483 dated 29th May 2010

Re-concillation of Reinforcement Steel


(Upto 31st March 2013)
S.No

Unit

6mm

MT
MT

d
3

Total Steel issued up to 31.03.2013


Consumptions up to 15.03.2013
As per certified bill No13thfor period
up to 31.01.2013..
Bill submitted & under checking.
Bill No14thfor period up
to15.03.2013
Bill yet to be submitted for workdone up
to period 31.03.2013
Sub Total (2a+2b+2c)
Physical Balance as on 31.03.2013

4
5

Scarp Returned to store


Scrap available st site

MT
MT

1
2
a
b
c

Description

8mm

10mm

12mm

16mm

28mm

32mm

Total

22.112
20.27

541.382 458.271 453.409 560.789 711.314 587.256 769.013


468.967 424.056 371.988 459.954 701.303 583.043 740.786

0.000
0

4103.546
3770.367

MT

18.234

400.278 370.131 338.852 413.336 660.531 553.692 737.157

0.000

3492.211

MT

2.036

68.689

53.926

32.926

46.617

40.741

29.668

3.231

0.000

277.834

MT

1.000

34.000

25.000

16.000

30.000

15.000

15.000

2.000

0.000

138.000

MT
MT

21.270
1.000

502.967 449.057 387.778 489.953 716.272 598.360 742.388


0.000
38.000 20.000
6.000
16.000 32.000 22.000

0.000
0.000

3908.045
135.000

0.000
50.000

20mm

25mm

Remarks

0.000
50.000
.

Billing Engineer
JAL

Site Incharge
JAL

Project Incharge
JAL

Real Estate Projects


Wish Town NOIDA

Name of Contractor :- Jaycon Infrastructure Ltd.


Name of Works
:- Civil & Structural work for wish Town Kosmos B-43 Towers (KM72A to 72C, 79A & 79B) at Jaypee Gree
Work Order No.
:- JAL/YEP/LD-1/305/483 dated 29th May 2010
Re-concillation of Cement
(Upto 31st March 2013)
Sr.No.

a
b
c
d

Description
1 Total Cement issued up to 31.03.2013
2 Consumptions up to 15.03.2013
As per certified bill No13thfor period up to 31.01.2013..
Bill submitted & under checking.
Bill No14thfor period up to15.03.2013
Bill yet to be submitted for workdone up to period 31.03.2013
Sub Total (2a+2b+2c)
3 Physical Balance as on 31.03.2013

Billing Engineer
JAL

Unit
Bags
Bags
Bags
Bags
Bags
Bags
Bags

OPC

PPC
0
221593
0
202812
0
189781
0
0
0
0

Site Incharge

13031
6500
209312
1100

Date:- 05.04.2013

9A & 79B) at Jaypee Greens , Noida (UP )

ge

Total
Remarks
221593
202812
189781
13031
6500
209312
1100
.

Project
Incharge
JAL

JAL

BRICKWORK 230MM
BRICKWORK 230MM
PALSTER INTERNAL

cum

RCC -COLUMNS
RCC - BEAM/SLABS
RCC - STAIRCASE

cum

SHUTTERING - COLUMNS
SHUTTERING - BEAM/SLABS
SHUTTERING -STAIRCASE

sqm

79a

79b

72a

72b

72c

79a

79b

72a

72b

72c

cum
sqm

cum
cum

sqm
sqm

79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE

Dia

10

12

16

20

25

28

79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE

Dia

10

12

16

20

25

28

79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE

Dia

10

12

16

20

25

28

79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE

Dia

10

12

16

20

25

28