REF NO: AT/TMBR/001/J3-1

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG


PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Decorative landscape
AUDITED BY: Group 3, Department of Building TIME: 1300 Building component: External
Surveyor, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny
Visual Information: Types of Defect: (Cause)
-Category 3
-Decay

Cause(s) of defect:

Durability of material: Insects and fungi on materials timber


based easily attacked by insects.
Building design: Rain causes humidity, rot, and leakage
Building element specification
Material: timber
Colour: Dark brown/black(originally)
Height: 2.84 m (measured from floor)

Description of defect

Timber was found in the state of decaying. It has become


rotten; as shown white elements which are the fungi and
bacteria had appear on the surface of the timber. It has
become dirt. As the timber is exposed towards sun and rain,
these become an influence for the fungi to grow.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

9
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

REF NO: AT/CEIL/002/J-1A

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG


PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Ceiling
AUDITED BY: Group 3, Department Of Building TIME: 1305 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual information: Types of Defect:
Category 2
Sagging
Cause(s) of defect:

Building construction: It doesn’t have quality observation


during construction
Durability of materials: -Short term of usage and easily spoil
as the strength of material is low and sensitive towards outer
environment.
Building Element Specification:
Height: 2.84 m.
Colour: Chocolate
Material: Timber

Defect Description

Excessive roof sagging occurred in one of the partitions.


Existence of hole in the center of the ceiling.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

10
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

REF NO: AT/GUT/003/J1-1

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG


PROJECT: Building Measurement and Analysis. DATE: 22nd May 2008 ELEMENT: Gutter
AUDITED BY: Group 3, Department of Building TIME: 1310 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 4
Corrosion

Cause(s) of defect:

Durability of Materials: Corrosion happens as the


materials are being exposed to sun, rain without no anti-
corrosion coating
Building Design: Increase of water level causes
dampness on building walls, weakens the strength of a
building as corrosion occurs, spoils the paint of a building.
Building Element Description:
Colour: Dark grey
Material: Zinc

.
Defect Description

Brown element appeared on the surface of the gutter. The


colour of the gutter itself had faded as the corrosion
occurs on it. As the corrosion process occurs, rough
surfaces can be seen.

INSPECTED BY: Nadhirah Bt Mohd Muhiyuddin

REF NO: AT/WNDW/004/G1-2

11
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG


PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Window
AUDITED BY: Group 3, Department Of Building TIME: 1315 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 3:
Vandalism

Cause(s) of defect:

Building construction: Quality of material is not being proper


observed, from the aspect of how it is being used or installed
Usage and outer pressure: Vandalism towards material,
building components and elements by irresponsible parties.
Building element specifications:
Material: timber.
frame thickness 150mm;
glass thickness 10mm.

Description of defect

A piece of glass was found missing and causes existence of


hole in the middle of the window.

INSPECTED BY: Nadhirah Bt Mohd Muhiyuddin

REF NO: AT/DRN/005/E-1

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

12
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT:Building Measurement and Analysis. DATE: 22nd May 2008 ELEMENT:Drain


AUDITED BY: Group 3, Department of Building TIME: 1320 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 3
Crack

Cause(s) of defect:

Selection of site and location: Impact of the surrounding


developments is something that can’t be avoid. It can gives
impact towards surrounds building

Durability of materials: Absorption of water


Building element specifications:

Colour: Greyish

Description of defect

As the impact that the surrounding gives to the drain, crack can be found
. on certain parts. Crack were measured using vernier caliper. Estimated size
of crack was 4mm. Around the crack part, there were mould growth,
greenish black colour. Which signifies, the mould had grow for a long time.
The longer the time period of the mold growth, the darker the colour of it.

INSPECTED BY: Nadhirah Bt Mohd Muhiyuddin

REF NO: AT/COL/006/D2-1

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

13
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column
AUDITED BY: Group 3, Department of Building TIME: 1325 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 2
Crack

Cause(s) of defect:

Building design: Changes of temperature cause crack and


building materials contract
Selection of site and location -Vibration causes crack on
any part of the buildings
Building element specifications:
Height 2.84m;
Diameter 0.44m;
Made of concrete and brick;
function: decorative columns in ITB.
Description of defect

The depth of crack was measured using vernier caliper. The


depth of crack in the column is 0.35mm. Crack was found
diagonally on the surface of the column.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/FLR/007/B3-3

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

14
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Floor
AUDITED BY: Group 3, Department of Building TIME: 1330 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Hole
Category 4

Cause(s) of defect:

Durability of materials: Short term of usage and easily spoil


as the strength of material is low and sensitive towards outer
environment.

Building element specifications


Floor covering; fully tar, it covers up the outer area of the
building.
Colour: Black

Description of defect

-Settlement occurred on the floor nearby one of the


columns.. The depth was not measured.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/DRN/008/E2-1

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

15
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Drain
AUDITED BY: Group 3, Department of Building TIME: 1335 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 3
Crack

Causes(s) of defect:

Building construction: Lack preparation of protection


towards sun exposure and rain during construction works.
Building Design: Humidity can affect the stability of the
building structure, can cause the growth of algae, fungi and
plant growth on buildings.
Building element specifications:
Made of: concrete and brick,
Colour: Greyish

Description of defect

Using a moisture equipment, the humidity reading is >2%. It


shows that the humidity of the concrete is high. That caused
mould growth surrounds the drain.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/TMBR/009/E-2

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

16
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Decorative
AUDITED BY: Group 3, Department of Building TIME: 1340 landscape
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny BUILDING COMPONENT:
External
Visual Information: Types of Defect:
Category 3

Decay

Cause(s) of defect:

Durability of materials: Insects and fungi on materials


timber based easily attacked by insects
Building Design: Humidity can affect the stability of the
building structure, can cause the growth of algae, fungi and
plant growth on buildings.
Building element specifications:

Material:Timber
usage: joist,

Description of defect

Rotten timber found decaying below the gutter. The colour of


the timber fades as it is being exposed to sun and rain.
Growth of spore can be found on the surface of the timber.
The reading taken using moisture meter exceeds 1%

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/WNDW/010/B-4C

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

17
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Timber window
AUDITED BY: Group 3, Department of Building TIME: 1340 Frame
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny BUILDING COMPONENT:
External
Visual Information: Types of Defect:
Category 2
Decay

Cause(s) of defec:

Durability of materials: Short term of usage and easily spoil


as the strength of material is low and sensitive towards outer
environment

Building element specifications:


Material: Timber
Colour: Black

Description of defect

At the timber window frame, there were decayed parts of the


timber as shown. As the material is not durable enough
causes it to decay, influenced by the weather. The reading
taken was 1.5 %. Low amount of humidity.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/DOOR/011/K2-6C

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

18
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May ELEMENT:Timber Door
AUDITED BY: Group 3, Department of Building TIME: 1530 Frame
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy BUILDING COMPONENT:
Internal
Visual Information: Types of Defect:
Category 4
Crack

Cause(s) of defect:

Durability of materials: Short term of usage and easily spoil


as the strength of material is low and sensitive towards outer
environment
Building Element Specifications:

Material: timber,

Colour: Black

Description of defect

On the timber door, at certain parts, crack was found. By


using the moisture meter, there were no humidity shown.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/WNDW/012/J-9

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

19
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Timber window
AUDITED BY: Group 3, Department of Building Surveying, TIME: 1535 frame
Universiti Malaya, Kuala Lumpur. WEATHER: Rainy BUILDING
COMPONENT: Internal
Visual Information: Types of Defect:
Category 2
Split
Cause(s) of defect:

Durability of material: Short term of usage and easily


spoil as the strength of material is low and sensitive
towards outer environment
Building element specifications:

Colour: Black
Material: Timber

Description of Defect:

On the timber window frame, split were found. It looked


like it were being torn. This small size of split may cause
bigger splits in the future if there is no precaution being
taken. Using a moisture meter, the reading for the
humidity of the timber is 15%.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/WLL/013/I1-9

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

20
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Masonry
AUDITED BY: Group 3, Department of Building TIME: 1540 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal

Visual Information: Types of Defect:


Broken
Category 3

Cause(s) of defect:

Building construction: Quality of material is not being


proper observed, from the aspect of how it is being used or
installed.
Selection of site and location: Vibration causes crack on
any part of the buildings.
Building element description:

Colour: White

Description of Defect

At the concrete, located lower part on top of the floor, it


looked like the concrete was being broken by an impact that
causes dirt as well pieces of debris on the floor. Using a
moisture meter, the taken reading was 1.0%, it means the
concrete has a low amount of humidity inside it.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/CEIL/014/F1-7

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

21
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Ceiling
AUDITED BY: Group 3, Department of Building TIME: 1545 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Poor Installation
Category 2

Cause(s) of defect:

Building construction : Quality of material is not being


proper observed, from the aspect of how it is being used or
installed.
Building Element Specifications:
Height: 10.15m
Material: timber,

Description of defect

There was a hole on top of the ceiling. This may cause by


poor installation during construction. As there were no proper
maintenance of the building, the hole gets bigger, because
splits can occur bit by bit.

INSPECTED BY: Nadhirah Bt Mohd Muhiyuddin

REF NO: AT/SKT/015/F1-2

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

22
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column skirting
AUDITED BY: Group 3, Department of Building TIME: 1550 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Broken
Category 3

Cause(s) of defect:

Building Construction: Quality of material is not being


proper observed, from the aspect of how it is being used or
installed
Building Element Specification:

Color: Black

Description of Defect:

At the column skirting, a broken part causes rough surface on


it. The humidity of the concrete exceeds than 2%, which
shows a hig amount of humidity.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/LMP/017/J-2

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

23
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Lamp
AUDITED BY: Group 3, Department of Building TIME: 1555 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Poor installation
Category 2
Cause(s) of defect:

Usage and outer pressure:Vandalism towards material,


building components and elements by irresponsible parties

Building Element Specification:

Colour: White

Description of defect

Lamp was found hanging on one side. Plus, the lam is not
functioning as well.

INSPECTED BY: Nadhirah Bt Mohd Muhiyuddin

REF NO: AT/FLR/018/K-3A

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

24
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Floor
AUDITED BY: Group 3, Department of Building Surveying, TIME: 1600 BUILDING COMPONENT:
Universiti Malaya, Kuala Lumpur. WEATHER: Cloudy, after Internal
rain
Visual Information: Types of Defect:
Hole
Category 3
Cause(s) of defect:

Selection of site and location: Vibration causes crack


on any part of the buildings
Building Element Specification:
Length:
colour:
location:

Description of defect

There were no floor covering to cover up the wiring


beneath the floor. Besides, dirt can be found surrounds
it. Inside the hole there were also, sand and other kind of
dirt can be found.

INSPECTED BY: Mohd Qisti Husin @ Shaaban

REF NO: AT/SKT/019/K-4B

BUILDING CONDITION SURVEY FOR DEFECTS OF INSTITUTE TECHNOLOGY OF BANDUNG

25
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY

PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column skirting
AUDITED BY: Group 3, Department of Building TIME: 1605 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Cloudy, after Internal
rain
Visual Information: Types of Defect:
Broken
Category 2

Cause(s) of defect:
Durability of materials:Short term of usage and easily spoil
as the strength of material is low and sensitive towards outer
environment.

Building Element Specification:

colour: Black
Material : Brick

Description of defect

At the column skirting, there were several parts found broken.


This caused rough surfaces on it.