Cause(s) of defect:
Description of defect
9
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
Defect Description
10
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
Cause(s) of defect:
.
Defect Description
11
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
Cause(s) of defect:
Description of defect
12
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
Cause(s) of defect:
Colour: Greyish
Description of defect
As the impact that the surrounding gives to the drain, crack can be found
. on certain parts. Crack were measured using vernier caliper. Estimated size
of crack was 4mm. Around the crack part, there were mould growth,
greenish black colour. Which signifies, the mould had grow for a long time.
The longer the time period of the mold growth, the darker the colour of it.
13
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column
AUDITED BY: Group 3, Department of Building TIME: 1325 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 2
Crack
Cause(s) of defect:
14
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Floor
AUDITED BY: Group 3, Department of Building TIME: 1330 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Hole
Category 4
Cause(s) of defect:
Description of defect
15
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Drain
AUDITED BY: Group 3, Department of Building TIME: 1335 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny External
Visual Information: Types of Defect:
Category 3
Crack
Causes(s) of defect:
Description of defect
16
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Decorative
AUDITED BY: Group 3, Department of Building TIME: 1340 landscape
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny BUILDING COMPONENT:
External
Visual Information: Types of Defect:
Category 3
Decay
Cause(s) of defect:
Material:Timber
usage: joist,
Description of defect
17
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Timber window
AUDITED BY: Group 3, Department of Building TIME: 1340 Frame
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Sunny BUILDING COMPONENT:
External
Visual Information: Types of Defect:
Category 2
Decay
Cause(s) of defec:
Description of defect
18
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May ELEMENT:Timber Door
AUDITED BY: Group 3, Department of Building TIME: 1530 Frame
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy BUILDING COMPONENT:
Internal
Visual Information: Types of Defect:
Category 4
Crack
Cause(s) of defect:
Material: timber,
Colour: Black
Description of defect
19
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Timber window
AUDITED BY: Group 3, Department of Building Surveying, TIME: 1535 frame
Universiti Malaya, Kuala Lumpur. WEATHER: Rainy BUILDING
COMPONENT: Internal
Visual Information: Types of Defect:
Category 2
Split
Cause(s) of defect:
Colour: Black
Material: Timber
Description of Defect:
20
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Masonry
AUDITED BY: Group 3, Department of Building TIME: 1540 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Cause(s) of defect:
Colour: White
Description of Defect
21
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Ceiling
AUDITED BY: Group 3, Department of Building TIME: 1545 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Poor Installation
Category 2
Cause(s) of defect:
Description of defect
22
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column skirting
AUDITED BY: Group 3, Department of Building TIME: 1550 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Broken
Category 3
Cause(s) of defect:
Color: Black
Description of Defect:
23
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Lamp
AUDITED BY: Group 3, Department of Building TIME: 1555 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Rainy Internal
Visual Information: Types of Defect:
Poor installation
Category 2
Cause(s) of defect:
Colour: White
Description of defect
Lamp was found hanging on one side. Plus, the lam is not
functioning as well.
24
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT: Floor
AUDITED BY: Group 3, Department of Building Surveying, TIME: 1600 BUILDING COMPONENT:
Universiti Malaya, Kuala Lumpur. WEATHER: Cloudy, after Internal
rain
Visual Information: Types of Defect:
Hole
Category 3
Cause(s) of defect:
Description of defect
25
AULA TIMUR
BANDUNG INSTITUTE OF TECHNOLOGY
PROJECT: Building Measurement and Analysis DATE: 22nd May 2008 ELEMENT:Column skirting
AUDITED BY: Group 3, Department of Building TIME: 1605 BUILDING COMPONENT:
Surveying, Universiti Malaya, Kuala Lumpur. WEATHER: Cloudy, after Internal
rain
Visual Information: Types of Defect:
Broken
Category 2
Cause(s) of defect:
Durability of materials:Short term of usage and easily spoil
as the strength of material is low and sensitive towards outer
environment.
colour: Black
Material : Brick
Description of defect
26