The surveying process is being done accordingly, stage by stage. Firstly, images of defect
on the regarded elements were captured as this helps in giving a better view to analyses. Secondly,
5.1 Methodology defect spots were jotted down on the floor plan, as it shows the exact location of each defect.
Samples of defect on certain elements were taken to ensure the main causes of each defect
There were several methods being used in order to obtain an accurate data of defect occurred. At the final stage, the obtained data’s were transferred on measured drawings, elevations
analysis. Usage of equipments is needed during the surveying process, as it helps in obtaining and floor plan, and an analysis of defect report is produced for the usage of clients and future
data. purposes. The main purpose in producing an analysis of defect faultiness is to check whether the
regarded building is safe for future usage or it needs a refurbishment in terms of maintenance,
SURVEYING WORK STARTS extensions or restoration so that the length period of the building last long.
IMAGES OF DEFECT IS
CAPTURED
b. Laser Distance
PRODUCTION OF FULL REPORT
c. Measuring Tape (30 m, 50m)
e. Vernier Caliper
32
REF NO: AT/TMBR/001/J3-1
For professional view and purposes, each defect that is being detected is on each element
were labeled with a standard coding system. This is for reference usage in the defect checklist, as it
is also noted down on the floor plan accordingly on the grid lineage.
Example of a defect checklist is being attached below for a clear view; AT is the abbreviation of the
building, which is Aula Timur, whereas TMBR stands for the element involved which is timber,
numerical 001 shows the defect number accordingly, and lastly J3-1 shows the grid line which can
33
5.3 Condition Survey Checklist
Referring to the
inspection form, the main
cause
Captured images of defect Cause(s) of defect:
failures
There may be several factors
that contribute to the defect
Description of defect
Defect failure is described in detail. If a
equipment is used during surveying work,
the reading is noted down.
INSPECTED BY:
34
-Erosion on materials that can’t stand heavy loads, frictions and -Blister
5.3.2 EXAMPLE OF INSPECTION FORM repeatedly usage.
35
5.4 Building Survey and Analysis Major defect shows that the defect that can cause serious damage in a short time length if it
is not being treated. From the analysis being made, it is shown that the major defect in Aula Timur
As the measurement data’s had been obtained, a surveying process on defect analysis was is crack. This type of defect can be found in the internal and external component of the building.
done. Crack can be found on the drainage area which is hazardous for the people who walks on it.
First of all, types of defect were being categorized into four different categories; Without realizing, it can cause fatal accidents and can lead to injury. Besides that, crack weakens
the building structure. The management people of the building should take precaution steps before
• Category 1 (one) - defect that is being categorized in this category is said that it is slightly
it collapse.
faulty in certain parts, and it does not need any repair.
• Category 2 (two) - defect is in an averagely state, needs to be observe, replace and repair
On top of that, there were several elements being detected involved with the defect faulty.
if possible.
As shown in the pie chart below, elements can be found such as ceiling, window, drain, column,
• Category 3 (three) - defects are in serious state, needs to be repair as soon as possible
floor and others. Others consist of skirting of columns, doors and etc. Drain and window carried out
• Category 4 (four) - defect in critical state, and must be replace and repair for future
the highest percentage of defect occurred. This is due to the external factor that influenced by outer
purposes.
climate.
From the surveying results, it showed that 44% of the total defect found, is categorized in 11%
category 3 (three), this shows an immediate maintenance work is needed so it would not affect the
39% CATEGORY3
11% COLUMN FLOOR
CATEGORY4
11%
17%
causes, what causes the defect occurred. As listed in the chart below, there five main types of
REFERENCE NUMBER TYPE OF DEFECT
defect which is by consideration of decaying, poor installation, hole, crack, and broken. Meanwhile
other consist of several small types of defect. As described previously, crack which is the major type 1 AT/TMBR/001/J3-1 Decay
of defect holds the highest number of defect occurred on the elements. Followed by decays on the 2 AT/CEIL/002/J-1A Sagging
5 AT/DRN/005/E-1 Crack
Each element is analysed in a detail way, by examining the material that made up the
element, the colour of the element involved, the thickness and size of the element, and etc, as this 6 AT/COL/006/D2-1 Crack
conclude the building element specification. These specifications helped in deciding what causes 7 AT/FLR/007/B3-3 Hole
defect failures on each element. Each defet failures may be caused by several factors, as it 8 AT/DRN/008/E2-1 Crack
10 AT/WNDW/010/B-4C Decay
11 AT/DOOR/011/K2-6C Crack
12 AT/WNDW/012/J-9 Split
13 AT/WLL/013/I1-9 Broken
15 AT/SKT/015/F1-2 Broken
17 AT/FLR/018/K-3A Hole
18 AT/SKT/019/K-4B Broken
It is found the major defect which is crack occurred on external compounds. Crack is said to
be the major defect because it can cause severe damage to the structural compounds. Cracks in
5.4.3 Corrosion
Corrosion can be found on the external component. It occurred on gutter. This is due to the
exposure of outside climate which is rain and sun. Common problems associated with the defective
5.4.4 Decay
rainwater goods is corroded or broken galvanized iron down pipes; or leaking rainwater heads.
There are a few possible causes to the defective of rainwater goods. Lack of proper fixings of the
Timbers are widely used in many historic buildings and that applies to Aula Timur.Some of
wall, particularly by means of projecting lead ears or lugs can cause instability to the down pipes.
the timbers are badly abused with serious damages on the surface and deteriorated; leading to
further structural problems and unsafety of occupants. The main causes to the deterioration are Short term of
usage and
insect and termite attacks. easily spoil
as the
strength of
material is
ELEMENTS REFERENCE CAUSES VISUAL INFORMATION low and
NUMBER OF sensitive
DEFECT(S) towards
outer
1 DECORATIVE AT/TMBR/001/J3- Durability environment
LANDSCAPE 1 of material:
Insects and
fungi on
materials
timber
based easily
attacked by
insects.
Building
design:
Rain causes
humidity,
rot, and
leakage
3 TIMBER AT/WNDW/010/B- Building holds the length of the building age. Other than that the historical usage is being persevered.
WINDOW 4C Design:
FRAME Humidity
can affect
the stability Defect on earlier stages which is being categorized in category 2 (two) and 3 (three), must
of the
building be observe and replace if needed. This is to prevent severe damage occurrence. Meanwhile,
structure,
can cause defects that had been categorized in category 4 (four) should be taken serious action as it can be
the growth
of algae, hazardous to people who may not know about it.
fungi and
plant growth
on buildings.
Durability
of
materials:
A proper scheduled maintenance should be done and manage by a professional team in
repairing the building for restoration. It may be cost in terms of finance as can be seen that Aula
Timur had not have its proper maintenance for several years.
Extra attention is needed for severe defect such as crack. It is found that crack is one of the
major defects in Aula Timur and can cause structural damages and be hazardous towards people.
Each defect has their own main cause, what causes them to occur. This may due to the
factor of climate changes, the rain and sun causes corrosion as it is being exposed externally.
Other than that, durability of materials is another concern that causes defect failures on elements
such as timber. This causes the timber to decay when there are growth of mould on it. This defect
is also caused by humidity. With the existence of humid air around the timber, it provokes the
growth of mould. Meanwhile for defect of poor installation is caused by lack of responsibility by the
management team of Aula Timur. Each defect failures need to be observed and report quickly as
With the findings of overall defect failures in Aula Timur, it is advised precaution steps need
to be taken by responsible parties. As defect failures can cause severe damages, this will lead in
giving bad reputation of the building image as the building holds a historical record for ages.