Gestamp Solar

Some facts
This type of projects represents a challenge in three major elds:
Economic viability and nancing. A project of this magnitude requires a huge investment. There is usually a need to seek for a strong nancial partner in order to canalize investment and minimize risks. Gestamp Solar brings the nancial strength and expertise collected after many years in the PV business, with over 300MW PV nished and over 2300MW currently in advanced development. RENAULT 55 MW Legality Regulations in renewable energies eld are constantly changing, sometimes even while a project is in construction. Gestamp Solar legal experts have strongly contributed towards projects success, merging previous experiences with Corporacin Gestamp seriousness and countries strategic weight as a global player with production facilities in over 25 countries with over 27.000 employees. Technical challenge Project implementation must happen without disturbing the normal day to day activity in the factory/plant. It is necessary to deal with important technical constraints, respect distances and space requirements to ensure proper access to both trucks and transport vehicles as well as to emergency and safety units. The optimization of the available surface in order to achieve the maximum nominal installed capacity is always a challenge for Gestamp Solars engineers.

RENAULT 55MW
240.000 modules placed over parking shelters, constitute the biggest roof-top project in the world. The specially designed structure brings special protection for brand-new cars and nigh-lightning. During module installation, the paving and ground lines painting were renewed.

SEAT 12MW
In mid 2011 Gestamp Solar nished implementation of SEAT al sol photovoltaic Project, that allows clean electricity generation in SEATs factory in Martorell, Barcelona. This project, consisting in parking shelters and rooftop PV installations, is SEATs strong bet for CO2 emissions reduction and environmental care, proting of photovoltaic great advantages and light-speed reducing installation costs.

Spain +34 91 177 00 10 India +91 2240907268 France +33 561 239 733 Italy +39 068412640 USA +14 152305601 Southafrica +27794879551

Top Photovoltaic Solutions

SEAT 12 MW

NEVADA 3MW
Green energy project developed and constructed for Nevadas Army National Guard, built in 3 phases located in Las Vegas (2) and Carson City (1) over parking shelters in a surface of 40.000 square meters.

LAMBORGHINI 1MW
One of the photovoltaic pioneer roof tops in Europe, mounted over Lamborghinis facilities in Bologna, Italy. It is part of the companys strategic objectives to contribute, towards environmental protection and become a green manufacturer.

NEVADA ARMY National Guard 3 MW

info@gestampren.com www.gestampsolar.com www.gestampren.com


The conversation continues at: Twitter

LAMBORGHINI 1 MW

Facebook Youtube Flickr Issuu Linkedin

201109SOL_TRI_EN_top

A company of Gestamp Renewables

Corporacin Gestamp

Gestamp Solar

The strength of a Business Group


Global Presence R&D Industrial Capacity Financial Strength

Global presence
North America 9 Industrial Plants 4 Commercial Offices 1.500 Employees Europe 57 Industrial Plants 17 Commercial Offices 20.000 Employees

71 MW in large roof tops


...and 120 MW projected, mostly on parking shelters. Gestamp Solar has installed 71 MW of PV electricity generation facilities of some of the most important automobile manufactures in the world.
parking shelters

roof top

Quality Guarantees

Supply Chain Management

Corporacin Gestamp is an european, multinational leader in steel service centers, automotive components and renewable energy. Comprised of three large divisions Gonvarri Steel Industries, Gestamp Automocin and Gestamp Renewables the holding has a strong global presence, with nearly of hundred industrial plants in more than 25 countries worldwide and global business revenues in excess of 5,5 billion annually. Our efforts are focused on providing our clients integrated solutions customized to their needs.

With the goal of supporting sustainable growth with in the corporation, we focus in the quality and the conservation of the environment wich are in line with the strategy of our business. Therefore our plants are certied under regulation ISO 9.001 and regulation ISO 14.001. A professional team in the industrial sector of more than 27,000 employees worldwide is the fundamental pillar which makes our future growth possible. Gestamp Solar is built upon on the strength of Corporacin Gestamp, and photovoltaic solar energy is our hope for the future.
31

1 2 3 4 5

Vehicle and material protection against meteorological elements Cost reduction in insurances Infrastructure improvements Ecological and green image Availability of electricity

Largest parking shelter facility in the world


Renault and Gestamp Solar have recently launched a 55 MW solar photovoltaic roof project (parking shelters) through an innovative partnership. Gestamp Solar prepares and adapts Renault facilities in order to install solar modules over the awnings that shelter brand-new cars outside 5 factories in France. The total area to be covered this way is about 370,000 square meters, which will result in 55 MW of nominal power generating capacity. The facilities hosting PV generation plants are Douai, Maubeuge, Flins, Batilly and Sandouville. The solar panels will cover the areas corresponding to new cars delivery and dispatch in the facilities of Douai, Maubeuge, Flins Batilly and Sandouville as well as the staff car parkings in Maubeuge. They will decrease the CO2 emissions in 9,000 tons every year, delivering the annual electricity consumed by 13,000 households. With this achievement Gestamp Solar settles its position as world leader in park shelter and roof top projects. Renaults installation is the largest project ever carried out in France in terms of megawatts, contributing to the reduction of CO2 emissions and giving a true ecological image to the automotive industry. According to this plan, Renault is aiming to cut its carbon footprint by 10% by 2013, and then by another 10% by 2016. The construction of parking shelters installations started in June 2011, while completion will be achieved in February 2012.

The Gestamp Corporation centers its industrial activity in three business lines:

Steel Service Centers and Renewable Industries

Renewable energies

Components for the automotive industry

South America 12 Industrial Plants 2 Commercial Offices 3.000 Employees

Africa Commercial Offices

Asia 17 Industrial Plants 2 Commercial Offices 2.500 Employees

Gestamp Solar Commercial Offices Countries with Gestamp Solar Projects Industrial Plants of Corporacin Gestamp Countries with a Corporacin Gestamp presence