Vous êtes sur la page 1sur 18

COST OF BITUMEN / MT WITH LEADS Name of Work SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM.

5/000 TO 7/000 & 7/600 TO 9/700 Ref ::-For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.16-12-2009
For Bulk Bitumen 80/100, 60/70:- HPCL Price List With Effect From Dt. 16-12-2009

Lead for KM 7/0 to 7/400


Bulk 80/100 Grade Bulk 60/70 Grade Visakha Visakha Emulsion (Bulk)

Visakha 29448.64

Basic Price

32432.58

33384.55

Lead from Visakhapatnam 416.00 Kms Lead charges for Bulk @ 1.50 per KM

1248.00

1248.00

1248.00

33680.58

34632.55

30696.64

ROAD METAL RATES


NAME OF WORK ::KM

SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700
Source of Supply Lead in Kms Conveyance Initial cost less stacking Blasting charges Machine crushing charges Seigniorage charges Deduct stacking charges for conveyance Toal Cost per Cum

Description of Metal A) FOR ROAD WORKS

1 2 3 4 5 6 7 8 9

40 to 45 mm IRC and MoRTH HBG M/C metal 25 to 27 mm IRC and MoRTH HBG M/C metal 19 to 22 mm IRC and MoRTH HBG M/C metal 12 to 14 mm IRC and MoRTH HBG M/C metal 9.5 to 11.20 mm IRC and MoRTH HBG M/C metal 5 to 7 mm IRC and MoRTH HBG M/C metal 2.36 to 5 mm IRC and MoRTH HBG M/C metal HBG Stone chips 2.36mm and below Selected Earth

Kethanakonda Kethanakonda Kethanakonda Kethanakonda Kethanakonda Kethanakonda Kethanakonda Kethanakonda Purushothapatna m

97 97 97 97 97 97 97 97 76

632.25 632.25 632.25 632.25 632.25 632.25 632.25 632.25 470.40

491.30 821.30 836.30 681.30 551.30 421.30 225.30 216.30 19.50

70.00 70.00 70.00 70.00 70.00 70.00 70.00 0.00 0.00

122.83 205.33 209.08 170.33 137.83 105.33 56.33 0.00 0.00

50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 22.00

-8.70 -8.70 -8.70 -8.70 -8.70 -8.70 -8.70 -8.70 -5.50

1357.68 1770.18 1788.93 1595.18 1432.68 1270.18 1025.18 889.85 506.40

LEAD STATEMENT
SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700 Average Butimen Lead Visakha to M.N.K.Road M.N.K.Road Km Byepass road 0/0 to 3/100 VM Road 64/985 to 63/8 Sultanagaram - Mukkollu road Avg lead (5/0 to 9/7) Or Say Average HBG metal / Chips Lead From Kathanakonda CT + 10% SHV ROAD (266.30 TO 244.60) Vijayawada MPL ROAD V.V.ROAD (0/0 to 5/9) V.M.ROAD(KM1.700 to 63.800 SNM Road 0/0 to 5/0 Average Lead (5/0 to 9/7) Or Say Average Selected Earth Lead 0.220 21.700 0.200 5.900 62.100 5.000 2.350 97.470 97.00 59.800 0.000 64.985 0.000 0.800 3.100 63.800 5.000 From Visakha 345.326 59.000 3.100 1.182 5.000 2.350 415.958 416.00

From 11/4 of MeerjapuramGopavaram Road quarry 1.000 0.100 1.400 62.348 0.000 64.985 0.000 3.100 63.800 5.000 3.100 1.182 5.000 2.350 76.480 76.00

CT 10% EXTRA G M ROAD(12.8 TO 11.40) MNK Road (68.148 to 5.800) Byepass road 0/0 to 3/100 VM Road 64/985 to 63/8 Sultanagaram - Mukkollu road Avg lead (5/0 to 9/7)

Or Say

GOVERNMENT OF ANDHRA PRADESH ROADS AND BUILDINGS DEPARTMENT

Name of Work ::

SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700 DISTRICT :: Krishna

Assembly constituency: Parliament constituency:

Pedana Machilipatnam

ESTIMATE AMOUNT:

Lakhs

CIRCLE DIVISION S U B-D I V I S I O N SECTION

:: :: :: ::

Vijayawada Machilipatnam Machilipatnam Pedana

Specification Report to accompany the Estimate for the work " Special Repairs to Nadupukru-Vadavalli-Korukollu Road from 7/0 to 14/0 Estimated cost :: Rs: 30.00 Lakhs
NECESSITY:-

The following provisions are made in the estimate 1 2 3 4 5 6 7 8 9 10 11 Scarifying the existing B.T.Surface. Providing Wet Mix Macadam to a width of 4.10Mts. Providing and laying surface dressing in single coat with 60/70 Grade Bitumen. Providing and applying tack coat with bitumen Emulsion Providing and laying SDBC 25mm thick using 60/70 grade Bitumen. Providing Selected earth shoulders 150mm thick for 1.00 mts width on either side Provision for VAT @ 4% Provision for Avagahana Sadassu Proviison for Q.C.Charges L. S PROVISION FOR Price Escalanation L. S PROVISION FOR Unforseen items

RATES : The estimate is prepared adopting the average rates as per the upgraded Current Schedule of rates of Andhra Pradesh for the year 2008-2009 and the work will be carried out as per standard specification and circulars issued from time to time

Assistant Executive Engineer (R&B) Pedana.

Deputy Executive Engineer(R&B) Machilipatnam

DETAILED CUM ABSTRACT ESTIMATE Name of Work ::SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700

Sl.No 1

Description of Item

NO

Quantity

Rate

Amount

Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (4th Revision) Specn. No.305.4.3

From Km 5/0 to 7/000 From Km 7/6 to 9/600

1 1

2000 2000

3.80 3.80

7600.00 7600.00 15200.00 15200.00 Sqm

5.40 /Sqm

82080

Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) for finished item of work.

From Km 5/0 to 7/000 From Km 7/6 to 9/600 1 2000 3.80 0.150 1140.00 1140.00 cum
3 Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG machine crushed stone aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 60/70 grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for finished item of work as per MoRT&H Specification 510 (4th Revision) and as directed by the Engineer-in-charge.

2244.00 /Cum

2558160

From Km 5/0 to 7/000 From Km 7/6 to 9/600

1 1

2000 2000

3.80 3.80

7600.00 7600.00 15200.00 Sqm

41.30 /Sqm

627760

Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4th revision) and as directed by the Engineer-in-Charge.

From Km 5/0 to 7/000 From Km 7/6 to 9/700

1 1

2000 2100

3.80 3.80

7600.00 7980.00 15580.00 Sqm

8.30 /Sqm

129314

Sl.No 5

Description of Item

NO

Quantity

Rate

Amount

Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by hot mix plant using hard blasted granite crushed aggregates of Grading -2 as per table 500-15 of specification 508 of MoRT&H (4th Revision), premixed with bituminous binder 60/70 grade @ 5% of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 508 (4th Revision) complete for finished item of work in all respects as directed by Engineer-in-charge.

From Km 5/0 to 7/000 From Km 7/6 to 9/700

1 1

2000 2100

3.80 3.80

0.025 0.025

190.00 199.50 390.00 cum

7828.00 /Cum

3052920

Construction of earthern shoulders with approved material ( Selected soils having MDD not less than 17.5KN/Cum ) obtained from borrow pits from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (4th revision)

For Shoulders From Km 5/0 to 7/000 From Km 7/6 to 9/700

2 2

2000 2100

1.00 1.00

0.100 0.100

400.00 420.00 820.00 cum

795.00 /Cum

651900

TOTAL :

7102134

DATA Name of Work ::SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700 (For KM 7/0 to 7/400 ) Quantity Description of Item Rate per Amount

1 Construction of earthern shoulders with approved material ( Selected soils having MDD not less than 17.5KN/Cum )
obtained from borrow pits from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (4th revision) Unit : Cum Taking out put = 100 Cum (A) Labour 0.04 day 1.00 day Mate Mazdoor unskilled 188.00 146.00 day day 7.52 146.00 153.52 (B) Machinery 100.00 cum 12160.00 t.km Rate as per G.O. Ms No 10, Dt 26/7/2005 Tipper (for 1 Km = 160x76 = 12160) Add 10% of cost of carriage to cover cost of loading and unloading 0.50 hr 4.00 hr 1.00 hr Dozer 80 HP for spreading @ 200 cum per hour Water tanker 6 KL Vibratory roller 8T 2760.00 345.00 1550.00 hr hr hr 13.00 4.50 cum t.km 1300.00 54720.00 5472.00 1380.00 1380.00 1550.00 65802.00 (C) Seigniorage charges 100.00 Cum Seigniorage charges 22.00 cum 2200.00 4089.33 72244.85 7224.49 79469.34 794.69 Page 68,69 of MoRT&H SDB

(D) Over head charges @6% (10%-VAT) on (A) + (B)+( C) (E) Total of (A) + (B)+( C)+(D) (F) Add Contractors Profit at 10% on (E) Cost per 100 cum (E) + (F) Rate per Cum

Rate per 1 cum 795.00 2 Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (4th Revision) Specn. No.305.4.3 Unit = sqm Taking output = 100 sqm (A) Labour 0.01 0.25 day day (B) Machinery 0.08 0.20 0.23 hr hr hr Tractor with ripper attachment @ 60 cum per hour 345.00 Front end loader 1 cum capacity Tipper 5.50 cum capacity, 4 trips/Hour Total 1320.00 575.00 hr hr hr 27.60 264.00 132.25 423.85 Mate Mazdoor Total 188.00 146.00 day day 1.88 36.50 38.38 Page 67,68 of MoRT&H SDB

Page 9

Quantity
6.00 %

Description of Item
Add for Over head charges @ 6% on (A)+(B) Add Contractors Profit at 10% on (A)+(B)+ Cost per 100 sqm Rate per 1 sqm Rate to be adopted

Rate

per

Amount
27.73 49.00 538.96 5.39 5.40

(C) Over head charges @ 6% (10%-VAT)

1 Sqm 3 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost,seignorage of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4 th revision) for finished item of work. Unit = cum Taking output = 225 cum (A) Labour 0.48 nos. 2.00 nos. 10.00 nos. Mate Mazdoor skilled Mazdoor Total (B) Machinery 6.60 hr 6.00 hr 6.00 hr 6.00 hr 3.90 hr 3.00 hr Wet mix plant of 60 tonne hr. capacity Electric generating set 125 KVA front end loader 1 cum capacity Mechanical Paver finisher 100 TPH Vibratory roller 8-10 T Water tanker Total (C) Material 89.10 cum 118.80 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30% (Av. Of 40-45, 25-27, 19-22mm ) 22.4 to 2.36mm IRC&MoRT&H HBG M/C metal@40% (Av. Of 19-22mm, 12-14mm, 9.5-11.2mm, 5-7mm, 2.36 - 5mm ) 2.36mm to 75 micron @ 30% (2.36mm & below) Total (D) Over head charges @ 6% (10%-VAT) 6.00 % Add for Over head charges @ 6% on (A)+(B)+( C) (E) Total of (A) + (B)+( C)+(D) (F) Add Contractors Profit at 10% on (E) Cost per 225 cum (E) + (F) Rate per 1 cum Rate to be adopted per 1 cum 25981.68 459009.70 45900.97 504910.67 2244.05 2244.00 Cum 1422.43 cum 168984.68 1638.93 cum 146028.66 1320.00 1090.00 1320.00 1090.00 1550.00 345.00 hr hr hr hr hr hr 8712.00 6540.00 7920.00 6540.00 6045.00 1035.00 36792.00 188.00 193.40 146.00 day day day 90.24 386.80 1460.00 1937.04 Page 110,111 of MoRT&H SDB

89.10 cum

889.85

cum

79285.64 394298.98

4 Providing and laying surface dressing in single coat using 6 mm nominal size IRC HBG machine crushed stone
aggregates @ 0.004 cum / sqm on a layer of bitumen binder of 60/70 grade @ 0.75 kg / sqm including cost, seigniorage and conveyance of all materials to work site and laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for finished item of work as per MoRT&H Specification 510 (4 th Revision) and as directed by the Engineer-in-charge. Page 141,142 of MoRT&H SDB Unit = sqm Taking output = 9000 sqm (A) Labour 0.44 nos. Mate 9.00 nos. Mazdoor 2.00 nos. Mazdoor skilled Total Page 10 188.00 146.00 193.40 day day day 82.72 1314.00 386.80 1783.52

Quantity

Description of Item

Rate
290.00 370.00 2070.00 575.00

per
hr hr hr hr

Amount
2088.00 2664.00 12420.00 3450.00

(B) Machinery 7.20 hr Mechanical broom @ 1250 sqm/hr. 7.20 hr Air compressor 250 cfm 6.00 hr 6.00 hr Hydraulic self propelled chip spreader @ 1500 sqm/hr. Tipper 10Tonne capacity for carriage of stone chips from stock pile on road side to chip spreader (Rate of Tipper 5 cum Front end loader 1 cum bucket capacity Bitumen pressure distributor @1750 sqm/hr smooth wheeled roller 8 Ton Total (C) Material 6.75 MT Bitumen 60/70 @ 0.75 Kg / sqm 36.00 cum Crushed stone chippings 6 mm nominal size @0.004 cum/sqm Total (D) Over head charges @ 6% (10%-VAT) 6.00 % Add for Over head charges @ 6% on (A)+(B)+( C) (E) Total of (A) + (B)+( C)+(D) (F) Add Contractors Profit at 10% on (E) Cost per 9000 sqm (E) + (F) Rate per 1 sqm Rate to be adopted.

6.00 hr 6.00 hr 6.00 hr

1320.00 940.00 540.00

hr hr h

7920.00 5640.00 3240.00 37422.00

34632.55 1270.18

MT cum

233769.72 45726.48 279496.20 19122.10 337823.82 33782.38 371606.20 41.29 41.30

1 Sqm Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion pressure 5 distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4 th revision) and as directed by the Engineer-inCharge. Page 124 of MoRT&H SDB unit = sqm Taking output = 3500 sqm (A) Labour 0.08 nos 2.00 nos Mate Mazdoor Total (B) Machinery 2.80 hr Mechanical broom Hydraulic @ 1250 sqm/hr. 2.80 hr 2.00 hr Air compressor 250 cfm Emulsion pressure distributor @1750 sqm/hr Total (C) Material 0.70 MT Bitumen Emulsion @ 0.20 Kgs/sqm Total (D) Over head charges @ 6% (10%-VAT) 6.00 % Add for Over head charges @ 6% on (A)+(B)+( C) (E) Total of (A) + (B)+( C)+(D) (F) Add Contractors Profit at 10% on (E) Cost per 3500 sqm (E) + (F) Rate per 1 sqm Rate to be adopted 30696.64 MT 290.00 370.00 690.00 hr hr hr 188.00 146.00 day day 15.04 292.00 307.04 812.00 1036.00 1380.00 3228.00 21487.65 21487.65 1501.36 26524.05 2652.41 29176.46 8.34 8.30 1 Sqm

Page 11

Quantity

Description of Item

Rate

per

Amount

6 Providing 25 mm thick compacted Semi-Dense Bituminous Concrete by hot mix plant using hard blasted granite
crushed aggregates of Grading -2 as per table 500-15 of specification 508 of MoRT&H (4 th Revision), premixed with bituminous binder 60/70 grade @ 5% of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 508 (4 th Revision) complete for finished item of work in all respects as directed by Engineer-in-charge. Page 135,136,137 of MoRT&H SDB Unit = cum Taking output = 195 cum (450 tonnes.) (A) Labour 0.84 14.00 nos. nos. Mate Mazdoor working with HMP, Mechanical broom, paver,roller,asphalt cutter and assistance for setting outlines,levels and layout of construction. Skilled Mazdoor for checking line and levels. Total (B) Machinary 11.00 hr Hot mix plant 40 to 60 TPH 6.00 hr Mechanical Paver finisher @ 100 TPH 6.00 6.00 3.90 3.90 3.90 hr hr hr hr hr Generator 250 KVA Front end loader 1 cum capacity Power road roller 8 tonne for initial break down rolling Vibratory roler 8 tonne for intermediate rolling 15525.00 1090.00 1550.00 1320.00 540.00 1550.00 1320.00 hr hr hr hr hr hr hr 207834.00 34632.55 MT 779232.40 188.00 146.00 day day 157.92 2044.00

5.00

nos.

193.40

day

967.00 3168.92 170775.00 6540.00 9300.00 7920.00 2106.00 6045.00 5148.00

Finish rolling with 6-8 tonne smooth wheeled tandem roller. Total (C) Material 22.50 M.T (I) Bitumen @ 5% by weight of mix (ii) Aggregate 162.450 cum For Grading II IRC &MORT&H HBG M/C chips 9.5 to 4.75mm @ 57% Average rate of IRC&MoRT&H HBG M/C metal of sizes 9.5-11.2, 5-7mm,2.36 - 5mm IRC &MORT&H HBG M/C chips 4.75 mm and below @ 41% Average rate of IRC&MoRT&H HBG M/C metal of sizes 2.36 - 5mm and 2.36mm& below Filler @ 2% of weight of aggregates.

1242.68

cum

201873.37

116.850 cum

957.52

cum cum

111885.63

5.70

cum

889.85

cum

5072.15 1098063.55 78543.99 1387610.46 138761.05 1526371.51 7827.55 7828.00 1 Cum

Total (D) Over head charges @ 6% (10%-VAT) 6.00 % Add for Over head charges @ 6% on (A)+(B)+( C) (E) Total of (A) + (B)+( C)+(D) (F) Add Contractors Profit at 10% on (E) Cost per 195 cum (E) + (F) Rate per 1 cum Rate to be adopted

Page 12

SPECIAL REPAIRS PROGRAMME PROPOSALS FOR THE YEAR 2009-10


DISTRICT : KRISHNA CIRCLE : (R&B), VIJAYAVADA Sub Existing Grade Crust CBR 5 3% 6 B.T road Width of Carriage way SL/IL/DL 7 SL Traffic Volume CVPD PCU's 8 220 Repairs carried out during last two years DIVISION : (R&B), MACHILIPATNAM SUB-DIVISION : (R&B), MACHILIPATNAM Estimate Technical cause Drainag cost with Strip Plan identified by the SE for e Status line the suggested estimate 12 Poor 13 14 70.00 Lakhs 15 Road surface was severly damaged. Proposals: For km. 5/0to 7/0. SDBC - 25 mm thick, Shoulders 1.0 m wide For KM 7/6 to 9/6 : WMM 150mm thick, For KM 7/6 to 9/7 : SDBC - 25mm, Shoulders 100mm thick 1.0m wide. Remarks with reference 16

S.No 1 1

Name of Division 2 Krishna Machilipatnam

Name of Constituency 3 Pedana

Name of work 4 SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700

Year of Last Renewal

9 10 11 1250 Maintenance 2003-04

Formation 4-6 m

8-10m Right of way

Name of Work : SPECIAL REPAIRS TO SULTANAGARAM TO MUKKOLLU ROAD FROM KM. 5/000 TO 7/000 & 7/600 TO 9/700 QUARRY AND LAND CERTIFICATE Certified that 1) The quarry distances noted in the quarry map are correct. 2) The quarries noted are correct. 3) The routes shown are correct. 4) The description of the materials available in the quarries noted are correct.

Asst. Engineer (R&B) North Section,

Dy.Executive Engineer (R&B) Sub-Division, Machilipatnam

Executive Engineer (R&B)Division, Machilipatnam

Superintending Engineer (R&B) Circle, Vijayawada

INSPECTION CERTIFICATE Certified that I have inspected the above road personally on date provisions made in the estimate are essential and adequate. and the

Asst. Engineer (R&B) North Section,

Dy.Executive Engineer (R&B) Sub-Division, Machilipatnam

Executive Engineer (R&B)Division, Machilipatnam

Superintending Engineer (R&B) Circle, Vijayawada

CARTING EARTH CERTIFICATE This is to certify that there is no side earth is availabe in the vicinity of the work. Hence, Selected earth with 65 km Lead for the stretch from KM 7/0 to 7/4 & 71 Kms lead for the stretch from KM 13/400 to 14/0 is proposed for shoulders.

Asst. Engineer (R&B) North Section,

Dy.Executive Engineer (R&B) Sub-Division, Machilipatnam

Executive Engineer (R&B)Division, Machilipatnam

Superintending Engineer (R&B) Circle, Vijayawada

loading unloading stacking 0.25 0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Earth/Gravel/ Sand 10.00 8.50 5.50 50.00 75.00 100.00 106.00 112.00 118.00 124.00 130.00 136.00 142.00 148.00 154.00 160.00 166.00 172.00 178.00 184.00 190.00 196.00 202.00 208.00 214.00 219.00 224.00 229.00 234.00 239.00 244.00 249.00 254.00 259.00 264.00 268.80 273.60 278.40 283.20 288.00 292.80 297.60 302.40 307.20 312.00 316.80 321.60 326.40 331.20 336.00 340.80 345.60 350.40 355.20 360.00

Metal 12.80 8.70 8.70 110.00 110.00 120.00 126.00 132.00 138.00 144.00 150.00 156.00 162.00 168.00 174.00 180.00 186.00 192.00 198.00 204.00 210.00 216.00 222.00 228.00 234.00 239.75 245.50 251.25 257.00 262.75 268.50 274.25 280.00 285.75 291.50 297.00 302.50 308.00 313.50 319.00 324.50 330.00 335.50 341.00 346.50 352.00 357.50 363.00 368.50 374.00 379.50 385.00 390.50 396.00 401.50 Material Rates 60 to 63 mm IRC & MoRTH HBG metal 50 to 55 mm IRC & MoRTH HBG metal 40 to 45 mm IRC & MoRTH HBG metal Roughstone 300mm (HBG)for revetment Roughstone 225mm (HBG)for revetment SS Revetment work 225mm SS Revetment work 300mm SS Revetment work 450mm Laterite for Revetment 225mm Laterite for Revetment 300mm Jeddy stone above 450mm to 600mm Quarry spall(Field picked metal) Av. Of rate 25mm & 40mm 150 mm soling stone HBG metal 40 to 45 mm IRC & MoRTH HBG M/C metal 25 to 27 mm IRC & MoRTH HBG M/C metal 19 to 22 mm IRC & MoRTH HBG M/C metal 12 to 14 mm IRC & MoRTH HBG M/C metal 9.5 to 11.20 mm IRC & MoRTH HBG M/C metal 5 to 7 mm IRC & MoRTH HBG M/C metal 2.36 to 5 mm IRC & MoRTH HBG M/C metal HBG Stone chips 2.36mm and below Quarry Rubbish 40 mm SS-5 m/c HBG metal 25 mm SS-5 m/c HBG metal 20 mm SS-5 m/c HBG metal 12 mm SS-5 m/c HBG metal 10 mm SS-5 m/c HBG metal 6 mm SS-5 m/c HBG metal Sand for Mortar Sand for Filling HYSD Steel Mild Steel Cement Mild Steel 6mm Blasting charges Blasting charges Blasting charges for rough stone Seigniorage charges Metal Gravel/earth Sand Labour Rates Mate Mazdoor skilled Mazdoor unskilled Machinery Rates Dozer 80 HP for spreading @ 200 cum per hour Motor grader 3.35M Blade @50 cum/Hr Hydralic excavator Front end loader 1 cum capacity Tipper 5 cum Vibratory roller 8T smooth wheeled roller 8 Ton

360.00 390.00 500.00 136.00 117.00 71.00 95.00 114.00 98.00 114.00 156.00 39.75 82.00 500.00 830.00 845.00 690.00 560.00 430.00 234.00 225.00 25.00 500.00 830.00 845.00 690.00 560.00 430.00 175.00 60.00 41500.00 42900.00 4400.00 41500.00 70.00 67.00 45.00 20.00 36.00 188.00 193.40 146.00 2760.00 2600.00 2250.00 1320.00 575.00 1550.00 540.00

51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109

364.60 369.20 373.80 378.40 383.00 387.60 392.20 396.80 401.40 406.00 410.60 415.20 419.80 424.40 429.00 433.60 438.20 442.80 447.40 452.00 456.60 461.20 465.80 470.40 475.00 479.60 484.20 488.80 493.40 498.00 502.40 506.80 511.20 515.60 520.00 524.40 528.80 533.20 537.60 542.00 546.40 550.80 555.20 559.60 564.00 568.40 572.80 577.20 581.60 586.00 590.20 594.40 598.60 602.80 607.00 611.20 615.40 619.60 623.80

406.50 411.50 416.50 421.50 426.50 431.50 436.50 441.50 446.50 451.50 456.50 461.50 466.50 471.50 476.50 481.50 486.50 491.50 496.50 501.50 506.50 511.50 516.50 521.50 526.50 531.50 536.50 541.50 546.50 551.50 556.25 561.00 565.75 570.50 575.25 580.00 584.75 589.50 594.25 599.00 603.75 608.50 613.25 618.00 622.75 627.50 632.25 637.00 641.75 646.50 651.00 655.50 660.00 664.50 669.00 673.50 678.00 682.50 687.00

Water tanker 6 KL Tractor Tractor with Rotavator Tractor with ripper attachment @ 60 cum per hour Air compressor 250 cfm Wet mix plant of 60 tonne hr. capacity Mechanical broom @ 1250 sqm/hr. Bitumen pressure distributor @1750 sqm/hr Emulsion pressure distributor @1750 sqm/hr Hot mix plant 40 to 60 TPH Mechanical Paver finisher 100 TPH Hydraulic self propelled chip spreader @ 1500 sqm/hr. Finish rolling with 6-8 tonne smooth wheeled tandem roller. Pneumatic road Roller GSB Plant 50 Cum Generator 250 KVA Generator set 125 KVA Generator set 35 KVA Concrete mixer 0.4/0.28 cum Tipper 5.50 cum capacity per Tonne per km Tipper 5.50 cum per km Plate compactor/Power rammer

345.00 345.00 345.00 345.00 370.00 1320.00 290.00 940.00 690.00 15525.00 1090.00 2070.00 1320.00 1035.00 920.00 1550.00 1090.00 620.00 345.00 4.50 45.00 40.00

Tipper 10Tonne capacity for carriage of stone chips from stock pile on road side to chip spreader

110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150

628.00 632.20 636.40 640.60 644.80 649.00 653.20 657.40 661.60 665.80 670.00 674.20 678.40 682.60 686.80 691.00 695.20 699.40 703.60 707.80 712.00 716.20 720.40 724.60 728.80 733.00 737.20 741.40 745.60 749.80 754.00 758.20 762.40 766.60 770.80 775.00 779.20 783.40 787.60 791.80 796.00

691.50 696.00 700.50 705.00 709.50 714.00 718.50 723.00 727.50 732.00 736.50 741.00 745.50 750.00 754.50 759.00 763.50 768.00 772.50 777.00 781.50 786.00 790.50 795.00 799.50 804.00 808.50 813.00 817.50 822.00 826.50 831.00 835.50 840.00 844.50 849.00 853.50 858.00 862.50 867.00 871.50

Vous aimerez peut-être aussi