Vous êtes sur la page 1sur 202

ROAD METAL RATES ( BY ROA

District : Lucknow Construction of Residential Quarters at Dilkusha

Name of Work :
Km No. Name of Quarry (Loading Station) Rate at Quarry

Deduct loading

Distance from Quarry Total Cost of Net Kutcha Pucca Kutcha Cartage Quarry rate

Total of Was Col. 5,8 tage

10

11

12

Kabrai

634.00

19.00

300.00

280

Stone Boulder 281 1307.76 1607.76 20 mm gauge Stone Grit

Kabrai Kabrai Kabrai Kabrai Kabrai Hamir Pur

634.00 1050.00 880.00 842.00 460.00 580.00

19.00 19.00 19.00 19.00 19.00 19.00

615.00 1031.00 861.00 823.00 441.00 561.00

1 1 1 1 1 1

205 205 205 205 205 159

0 0 0 0 0 0

20 to 40 mm gauge Stone Grit 206 1052.08 1667.08 20 mm gauge Stone Grit 206 1052.08 2083.08 16 to 22 mm gauge Stone Grit(13.2mm) 206 1052.08 1913.08 10 to 16 mm gauge Stone Grit(11.2 mm) 206 1052.08 1875.08 Crushed singal (6.7 mm) 206 1052.08 1493.08 Coarse Sand Hamir Pur 160 885.90 1446.90

Junior Engineer Maint.Division 1,Civil

Assistant Engineer Maint.Division 1,Civil

P.W.D. Lucknow

P.W.D. Lucknow

D METAL RATES ( BY ROAD )

Stacking Contra Toll Tax Total VAT@ Total Rate Charges ctor's Rate 4.0% Rate rounded Profit (Col.11+ on (Col.16+ to 10 on 15) (Col.517) paise Col.3 roylty) 13 14 15 16 17 18 19

Details of Cartage Calculations

66.67

1674.43

9.28

1683.71 1683.70

66.67 66.67 66.67 66.67 66.67 66.67

1733.75 2149.75 1979.75 1941.75 1559.75 1513.57

21.88 1755.63 1755.60 38.52 2188.27 2188.30 31.72 2011.47 2011.50

Stone Grit(13.2mm)

Stone Grit(11.2 mm)

Km nos. Kms Rate Shankergarh to Site : 1 to 250Km 250 251th to 280th 30 3.75 Total rate for 280 Kms Add for Kachcha Kilometer For 1st Km 1 Total rate for 281 Kms Cartage Without C.P. Kabrai to Site : 1 to 200Km 200 201th to 205th 5 3.75 Total rate for 205 Kms Add for Kachcha Kilometer For 1st Km 1 Total rate for 206 Kms Cartage Without C.P.

Amount 1312.25 112.50 1424.75 13.79 1438.54 1307.76 1124.75 18.75 1143.50 13.79 1157.29 1052.08 724.75 236.00 13.79 974.54 885.90 612.25 36.00 13.79 4.95 666.99 600.29

30.20 1971.95 1971.90 Hamirpur to Site :1 to 100 Km 100 14.92 1574.67 1574.70 101 to 159 Km 59 4.00 Add for Kachcha Kilometer 21.16 1534.73 1534.70 For 1st Km 1 Total rate for 160 Kms Cartage Without C.P. Gahagra to Site : 1 to 75 75 76 to 83 Km 8 4.50 Add for Kachcha Kilometer For 1st Km 1 For 2nd Km 1 Total rate for 85 Kms Cartage Without C.P.

gineer on 1,Civil

Ex. Engineer Maint.Division 1,Civil

now

P.W.D. Lucknow

Analysis of Rate R.C.C. works with cement approved coarse sand 20 mm approved stone ballast in the proporation 1:1.5:3 ( 1 cement :1.5 c beam and Slab roofs and columns excluding supply of reinforcement and its bending the same with 24 B.W. G.G.I. binding centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of shall no be less than M- 20. Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19
Item No.- etc.required for completion of the work.

Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including su

Sl.No. 279

Description Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total

Unit

Qty

Cum Cum Bags

2.55 1.27 18.90

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

L.S.

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

Reference from UPPWD Analysis of rate - 1969, Item No.-283, Page No.-21 R.C.C work with cement,approved course sand and 20 mm. gauge approved stone ballast in the proportion of 1:2:4 in excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. bin Item No.neccessary centering and shuttering etc. and also including the supply of binding wire , moulds and all other materials for completion of the work.
Sl.No.

Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement Cost of binding wire & extra cement & lobour for floating coat etc ={25.00x17657.79/455.85} = 969.46

Unit Day
L.S.

Qty 2

Cost of centering etc. with extra lobour etc={25.00x17657.79/455.35} = 969.46


TOTAL

L.S.

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Total
Rate for 2.83 Cum 17657.79 +

Rate for 2.83 Cum


Reference from UPPWD Analysis of rate - 1969, Item No.-288, Page No.-22
Item No.- As

in item no. 283 but in R.C.C. T- beams and slab roofs and columns. Description Unit Qty

Sl.No.

Rate as per S.I. 283 Add extra for bricks or ballies supports stronger shuttering
7208.76

Contractor's profit @ 10.00% on Rate for One Cum

1831.63

Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22
Item No.- Extra

for RCC in 1:1.5:3 Unit Cum Cum Bags Qty 0.14 0.07 4.65

Sl.No.

Description Stone ballast/agg. 20mm nominal size Coarse sand Cement

Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum
RATE FOR R.C.C. 1:1.5:3 IN lighter beams,ie having spans up to 6 metrs

1004.46

9223.55

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

ion 1:1.5:3 ( 1 cement :1.5 coarse sand : 3 aggregate) in RCC T with 24 B.W. G.G.I. binding wire and includuing necessary ed for proper completion of works. Strength of the concrete

m No.-279, Page No.-19

oportions of 4:2:1, including supply of all materials, labor and T & P

Rate

Cost

Rate Code Remark

2188.30 1534.70 305.00

5580.17 1949.07 5764.50 192.84

RMR Rate UPPWD S.R.

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 UPPWD S.R. 680.00 410.00 26.00 15441.77 373.53 15815.30

237.23 16052.53 1605.25 17657.79 6239.50

m No.-283, Page No.-21 in the proportion of 1:2:4 in lintels of doors and windows same with 24 B.W.G. G.I. binding wire , and including oulds and all other materials, labours and T & P etc. required

Rate 260.00

Cost 17657.79 520.00

Rate Code Remark


UPPWD S.R.

968.40

968.40
2456.80

36.85 2493.65 249.36 2743.01


2743.01 20400.80

7208.76

No.-288, Page No.-22

Rate

Cost 7208.76

Rate Code Remark

1.40/5.51

1831.63 183.16 9223.55

m No.-289, Page No.-22

Rate 2188.30 1534.70 305.00

Cost 306.36 107.43 1418.25

Rate Code Remark


RMR Rate
UPPWD S.R.

1832.04 15.07 1847.11 184.71 2031.82 717.96

717.96

9941.51 Per Cum

ngineer ion 1,Civil know

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Analysis of Rate R.C.C. works with cement approved coarse sand 20 mm approved stone ballast in the proporation 1:1.5:3 ( 1 cement :1.5 coarse sand : 3 aggregate) in lighter beams,ie having spans up to 6 metrs excluding supply of reinforcement and its bending the same with 24 B.W. G.G.I. binding wire and includuing necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of works. Strength of the concrete shall no be less than M- 20. Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19
Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including supply of all materials, labor and T & P
Item No.- etc.required for completion of the work.

Sl.No. 279

Description Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total

Unit

Qty

Rate

Cost

Cum Cum Bags

2.55 1.27 18.90

2188.30 1534.70 305.00

5580.17 1949.07 5764.50 192.84

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 680.00 410.00 26.00 15441.77 373.53 15815.30

L.S.

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

237.23 16052.53 1605.25 17657.79 6239.50

Reference from UPPWD Analysis of rate - 1969, Item No.-283, Page No.-21 R.C.C work with cement,approved course sand and 20 mm. gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire , and including Item No.neccessary centering and shuttering etc. and also including the supply of binding wire , moulds and all other materials, labours and T & P etc. required fo completion of the work.
Sl.No.

Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement Cost of binding wire & extra cement & lobour for floating coat etc ={25.00x17657.79/455.85} = 969.46

Unit Day
L.S.

Qty 2

Rate 260.00

Cost 17657.79 520.00

968.40 968.40
2456.80

Cost of centering etc. with extra lobour etc={25.00x17657.79/455.35} L.S. = 969.46


TOTAL

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Total
Rate for 2.83 Cum 17657.79 + 2743.01

36.85 2493.65 249.36 2743.01


20400.80

Rate for 2.83 Cum


Reference from UPPWD Analysis of rate - 1969, Item No.-285, Page No.-22
Item No.- As in item no. 283 but in lighter beams, having spans up to 6.00m

7208.76

Sl.No.

Description Rate as per S.I. 283 Add extra for bricks or ballies supports ={1.30x7936.50/5.51} = 1872.50
L.S.

Unit

Qty

Rate

Cost 7208.76

Contractor's profit @ 10.00% on

1700.80

1700.80 170.08

Rate for One Cum


Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22
Item No.- Extra

9079.64

for RCC in 1:1.5:3 Unit Cum Cum Bags Qty 0.14 0.07 4.65 Rate 2188.30 1534.70 305.00 Cost 306.36 107.43 1418.25

Sl.No.

Description Stone ballast/agg. 20mm nominal size Coarse sand Cement

Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum
RATE FOR R.C.C. 1:1.5:3 IN lighter beams,ie having spans up to 6 metrs

1004.46

1832.04 15.07 1847.11 184.71 2031.82 717.96

9079.64

717.96

9797.60

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

nt :1.5 coarse sand : 3 aggregate) in lighter I. binding wire and includuing necessary tion of works. Strength of the concrete

No.-19

luding supply of all materials, labor and T & P

Rate Code Remark

RMR Rate UPPWD S.R.

UPPWD S.R.

No.-21 1:2:4 in lintels of doors and windows . G.I. binding wire , and including materials, labours and T & P etc. required for

Rate Code Remark


UPPWD S.R.

22

Rate Code Remark

No.-22

Rate Code Remark


RMR Rate
UPPWD S.R.

Per Cum

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Analysis of Rate

R.C.C. works with cement approved coarse sand 20mm (3/4") gauge approved stone ballast in the proporation 1 :4.5 aggregate) in Raft Foundation and footing excluding supply of reinforcement and its bending the same with binding wire and includuing necessary centering and shuttering etc. and also including supply of all materials, lab required for proper completion of works. Strength of the concrete shall no be less than M- 20.

Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including Item No.- materials, labor and T & P etc.required for completion of the work. Sl.No. Description 279 Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum Unit Qty Rate

Cum Cum Bags

2.55 1.27 18.90

2188.30 1534.70 305.00

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

L.S.

Reference from UPPWD Analysis of rate - 1969, Item No.-287, Page No.-22 Item As in item no. 283 but in R.C.C. Raft foundation and footing with 20mm gauge approved stone ballast. No.Sl.No. Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement Cost of binding wire , pumping out of water if any TOTAL Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Total Rate for 2.83 Cum Rate for 2.83 Cum Unit Qty Rate

Day 17657.79

1/2 x

260.00 40/455.35

17657.79

1876.99

Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22 Item Extra for RCC in 1:1.5:3 No.Sl.No. Description Unit Qty Rate Stone ballast/agg. 20mm nominal size Cum 0.14 2188.30 Coarse sand Cum 0.07 1534.70 Cement Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum Bags 1004.46 4.65 305.00

RATE FOR R.C.C. 1:1.5:3 IN SLAB

6902.75

717.96

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

ne ballast in the proporation 1:1.5:3 ( 1 cement nd its bending the same with 24 B.W. G.G.I. ding supply of all materials, labour, T&P etc. than M- 20.

o.-279, Page No.-19 n the proportions of 4:2:1, including supply of all

Cost

Rate Code Remark

5580.17 1949.07

RMR Rate

5764.50 UPPWD S.R. 192.84 29.20 130.00 680.00 UPPWD S.R. 680.00 410.00 26.00 15441.77 373.53 15815.30 237.23 16052.53 1605.25 17657.79 6239.50

o.-287, Page No.-22 one ballast.

Cost 17657.79 130.00 1551.14 1681.14 25.22 1706.36 170.64 1876.99 19534.78 6902.75

Rate Code Remark UPPWD S.R.

o.-289, Page No.-22

Cost 306.36 107.43

Rate Code Remark RMR Rate

1418.25 UPPWD S.R. 1832.04 15.07 1847.11 184.71 2031.82 717.96

7620.71 Per Cum

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Analysis of Rate

R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5 aggregate) in slabs excluding supply of reinforcement and its bending the same with 24 B.W. G.G.I. binding wire and includuing necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of works. Strength of the concrete shall no be less than M- 20.

Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 Item Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including supply of all materials, No.- labor and T & P etc.required for completion of the work. Sl.No. Description 279 Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum Unit Qty Rate Cost Rate Code

Cum Cum Bags

2.55 1.27 18.90

2188.30 1534.70 305.00

5580.17 1949.07

RMR Rate

5764.50 UPPWD S.R. 192.84

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 UPPWD S.R. 680.00 410.00 26.00 15441.77 373.53 15815.30 237.23 16052.53 1605.25 17657.79 6239.50

L.S.

Reference from UPPWD Analysis of rate - 1969, Item No.-283, Page No.-21 R.C.C work with cement,approved course sand and 20 mm. gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows Item excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire , and including No.- neccessary centering and shuttering etc. and also including the supply of binding wire , moulds and all other materials, labours and T & P etc. required for completion of the work. Sl.No. Description Cost of 1:2:4 as per item 279 Unit Qty Rate Cost 17657.79 Rate Code UPPWD S.R.

Day Blacksmith for binding & fixing reinforcement 2 260.00 520.00 Cost of binding wire & extra cement & lobour for floating coat L.S. etc ={25.00x17657.79/455.85} = 969.46 968.40 Cost of centering etc. with extra lobour L.S. etc={25.00x17657.79/455.35} = 969.46 968.40 2456.80 TOTAL Add for water charges-@ 1.50% 36.85 Total 2493.65 Contractor's profit @ 10.00% 249.36 Total 2743.01 20400.80 Rate for 2.83 Cum 17657.79 + 2743.01 Rate for 2.83 Cum 7208.76 Reference from UPPWD Analysis of rate - 1969, Item No.-284, Page No.-22 Item As in item no. 283 but for slabs. No.Sl.No. Description Rate as per S.I. 283 Add extra cost of centering and shuttering ={28.25x7208.76/194.50} = 1046.64 Contractor's profit @ 10.00% Rate for One Cum Unit Qty Rate Cost 7208.76 1046.64 104.66 8360.07

Rate Code

L.S.

Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22

Junior Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Assistant Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Executive Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Item Extra for RCC in 1:1.5:3 No.Sl.No. Description Stone ballast/agg. 20mm nominal size Coarse sand Cement Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

Unit Cum Cum Bags 1004.46

Qty 0.14 0.07 4.65

Rate 2188.30 1534.70 305.00

Cost 306.36 107.43

Rate Code RMR Rate

1418.25 UPPWD S.R. 1832.04 15.07 1847.11 184.71 2031.82 717.96

RATE FOR R.C.C. 1:1.5:3 IN SLAB

8360.07

717.96

9078.03 Per Cum

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Junior Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Assistant Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Executive Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Analysis of Rate

e sand 2cm (3/4") gauge approved stone ballast in the proporation 1:1.5:3 ( 1 cement :4.5 nforcement and its bending the same with 24 B.W. G.G.I. binding wire and includuing nd also including supply of all materials, labour, T&P etc. required for proper completion o be less than M- 20.

rom UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 one ballast, approved course sand and cement in the proportions of 4:2:1, including supply of all materials, on of the work. Remark

rom UPPWD Analysis of rate - 1969, Item No.-283, Page No.-21 sand and 20 mm. gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire , and including nd also including the supply of binding wire , moulds and all other materials, labours and T & P etc. required

Remark

rom UPPWD Analysis of rate - 1969, Item No.-284, Page No.-22

Remark

rom UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22

Junior Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Assistant Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Executive Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Remark

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Junior Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Assistant Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Executive Engineer Maintenance Div. No.- 1, Civil P.W.D. Lucknow

Analysis of Rate
Cast cement concrete door sills,chaukhats,boundary posts,shelves and similar small works with cement, Ite approved coarse sand, & 2cm.(3/4") gauge approved stone ballast in the proporation 1:2:4 (1 cement:2 m coarse sand:4 stone ballast 20 mm size) excluding supply of reinforcement and its bending the same with 24 No.- B.W. G.G.I. binding wire and includuing necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of works. Strength of the concrete shall no be less than M- 15.
Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including Item supply of all materials, labor and T & P etc.required for completion of the work. No.Sl.N o. Description 279 Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

Unit

Qty

Rate

Cost

Rate Code

Remark

Cum Cum Bags

2.55 1.27 18.90

#REF! #REF! 305.00

#REF! #REF! 5764.50 #REF!

RMR Rate UPPWD S.R.

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 680.00 410.00 26.00 #REF!

UPPWD S.R.

L.S.

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

Analysis of Rate Reference from UPPWD Analysis of rate - 1969, Item No.-282, Page No.-21 Cast cement concrete door sills, chaukhats boundry post, shelves and similar small work with cement,approved course sand and 20 mm. Gauge approved stone ballast including its fixing and binding the same with 24 B.W.G. G.I. Binding wire , and including Item No.- the cost of binding wire , moulds and all other materials, labours and T & P etc. required for completion of the work. Sl.N o.

Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement TOTAL Cost of mould & extra cement and labor for floating coat ={35.00x18697.79/504.85} = 1296.27 Cost of centering etc. with extra lobour etc. {15.00x18697.79/504.85} = 555.54 TOTAL Add for water charges-@ 1.50% on Total Contractor's profit @ 10.00% Rate for 2.83 Cum

Unit

Qty

Rate

Cost #REF! 1040.00 #REF!

Rate Code UPPWD S.R.

Remark

Day

260.00

L.S. L.S. #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

Rate for One Cum

#REF!

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Detail of cost for 100 cft. A

Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (2466.34+5764.50 = 205.77) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total = T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. (10.50x15272.51/434.07 = 369.44) Total B = Blacksmith for binding & fixing reinforcement Sub Total C = Cost of mould & extra cement & lobour for floating coat etc. {35.00x16681.95/483.07} = 1208.66

Cum Cum Bags

2.55 1.27 18.90

1914.00 1942.00 305.00

4880.70 Market rate 2466.34 Market rate 5764.50


UPPWD S.R.

205.77
Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 680.00 410.00 26.00 15272.51

UPPWD S.R.

L.S.

369.44 15641.95 4.00 260.00 1040.00 16681.95

Day

L.S.

1208.66

Cost of centering etc. with extra lobour etc. L.S. {15.00x16681.95/483.07} = 518.00 Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 100 Cft. Rate for One Cum Say Rs 7263.00

518.00 18408.61 276.13 18684.74 1868.47 20553.21 7262.62 per cum

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Analysis of Rate Cast cement concrete door sills,chaukhats,boundary posts,shelves and similar small works with cement, approved coarse sand, & 2cm.(3/4") gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of reinforcement and its bending the same with 24 B WG binding wire and necessary centering and shuttering etc, and also including supply of all materials labour and tools and plants etc required for proper completion of works. Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including supply of all Item materials, labor and T & P etc.required for completion of the work. No.-

Sl.No. Description 279 Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

Unit

Qty

Rate

Cost

Rate Code

Cum Cum Bags

2.55 1.27 18.90

2188.30 1534.70 305.00

5580.17 1949.07

RMR Rate

5764.50 UPPWD S.R. 192.84

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 UPPWD S.R. 680.00 410.00 26.00 15441.77 373.53 15815.30 237.23 16052.53 1605.25 17657.79 6239.50

L.S.

Analysis of Rate Reference from UPPWD Analysis of rate - 1969, Item No.-282, Page No.-21 Cast cement concrete door sills, chaukhats boundry post, shelves and similar small work with cement,approved course sand and 20 mm. Gauge approved stone ballast including its fixing and binding the same with 24 B.W.G. G.I. Binding wire , and including the cost of binding wire , moulds Item No.- and all other materials, labours and T & P etc. required for completion of the work.

Sl.No.

Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement TOTAL Cost of mould & extra cement and labor for floating coat ={35.00x18697.79/504.85} = 1296.27 Cost of centering etc. with extra lobour etc. {15.00x18697.79/504.85} = 555.54 TOTAL Add for water charges-@ 1.50% on Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

Unit

Qty

Rate

Cost 17657.79

Rate Code

Day

260.00

1040.00 UPPWD S.R. 18697.79 1296.27 555.54 20549.60 43.38 20592.98 293.52 20886.50 7380.39

L.S. L.S. 2891.82

Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22 Item Extra for RCC in 1:1.5:3 No.Sl.No. Description Stone ballast/agg. 20mm nominal size Unit Cum Qty 0.14 Rate 2188.30 Cost 306.36 Rate Code RMR Rate

Coarse sand Cement Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum RATE FOR R.C.C. 1:1.5:3 IN DOOR SILL

Cum Bags 1004.46

0.07 4.65

1534.70 305.00

107.43

RMR Rate

1418.25 UPPWD S.R. 1832.04 15.07 1847.11 184.71 2031.82 717.96

7380.39

717.96

8098.35 Per Cum

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

& 2cm.(3/4") gauge ding wire and necessary etion of works.

cluding supply of all

Remark

sand and 20 mm. Gauge t of binding wire , moulds

Remark

Remark

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Analysis of Rate

R.C.C. works with cement approved coarse sand 2cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 cement :4.5 aggregate) in lintels of doors & windows , excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centering and shuttering etc., and also including supply of all materials, labour, T&P etc. required for proper completion of works.

Reference from UPPWD Analysis of rate - 1969, Item No.-279, Page No.-19 Item Concrete with 20 mm. gauge approved stone ballast, approved course sand and cement in the proportions of 4:2:1, including supply of all materials, la No.- and T & P etc.required for completion of the work.
Sl.No.

Description 279 Detail of cost for 2.83 cum Materials Stone ballast/agg. 20mm nominal size Coarse sand Cement Add wastage at 2.5% on coarse sand and cement. (1949.07+5764.50)x2.5% = 192.84) Labour Mistri Mason Beldar Coolie Bhisti Blacksmith Total T&P and Sundries etc, hire of C.C. Mixer, Lubricant etc. {10.50x(15441.77)/434.07 = 306.84} Total

Unit

Qty

Rate

Cost

Cum Cum Bags

2.55 1.27 18.90

2188.30 1534.70 305.00

5580.17 1949.07 5764.50 192.84

Day Day Day Day Day Day

1/10 1/2 4.00 4.00 2.00 1/10

292.00 260.00 170.00 170.00 205.00 260.00

29.20 130.00 680.00 680.00 410.00 26.00 15441.77 373.53 15815.30

L.S.

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

237.23 16052.53 1605.25 17657.79 6239.50

Reference from UPPWD Analysis of rate - 1969, Item No.-283, Page No.-21

R.C.C work with cement,approved course sand and 20 mm. gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows exclu Item supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. binding wire , and including neccessary centeri No.- and shuttering etc. and also including the supply of binding wire , moulds and all other materials, labours and T & P etc. required for completion of the w

Sl.No.

Description Cost of 1:2:4 as per item 279 Blacksmith for binding & fixing reinforcement Cost of binding wire & extra cement & lobour for floating coat etc ={25.00x17657.79/455.85} = 969.46

Unit

Qty

Rate

Cost 17657.79 520.00

Day
L.S. L.S.

260.00

968.40 968.40
2456.80

Cost of centering etc. with extra lobour etc={25.00x17657.79/455.35} = 969.46


TOTAL

Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Total
Rate for 2.83 Cum 17657.79 + 2743.01

36.85 2493.65 249.36 2743.01


20400.80

Rate for 2.83 Cum


Reference from UPPWD Analysis of rate - 1969, Item No.-289, Page No.-22

7208.76

Item Extra for RCC in 1:1.5:3 No.Sl.No.

Description Stone ballast/agg. 20mm nominal size Coarse sand Cement

Unit Cum Cum Bags

Qty 0.14 0.07 4.65

Rate 2188.30 1534.70 305.00

Cost 306.36 107.43 1418.25

Total Add for water charges-@ 1.50% Total Contractor's profit @ 10.00% Rate for 2.83 Cum Rate for One Cum

1004.46

1832.04 15.07 1847.11 184.71 2031.82 717.96

RATE FOR R.C.C. 1:1.5:3 IN LINTEL

7208.76

717.96

7926.72

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

last in the proportion 1:1.5:3 ( 1 ent and its bending the same ding supply of all materials,

No.-19

4:2:1, including supply of all materials, labor

Rate Code Remark

RMR Rate

UPPWD S.R.

UPPWD S.R.

No.-21

2:4 in lintels of doors and windows excluding wire , and including neccessary centering & P etc. required for completion of the work.

Rate Code Remark UPPWD S.R.

Rate Code Remark


RMR Rate

UPPWD S.R.

Per Cum

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123

Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.76 1.76 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 4173.14 9999 9999 Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 UPPWD S.R. 1642.13 RMR Rate

Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.5.1), Page No.-710

15 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse sand )
Sl.No. Description Detail of cost for 10 sqm Material :Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Unit Qty Rate Cost Rate Code Remark

Cum Day Day Day L.S.

0.172 0.80 0.88 0.99 12.61

4173.14 260.00 170.00 205.00 1.76 Total =

717.78

Analysed rate

208.00 149.60 UPPWD S.R. 202.95 22.19 9999 1300.52 13.01 1313.53 131.35 1444.88 144.49

Total =

Say Rs

144.00

per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122

Item Cement Mortar 1:3 (1 cement:3 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.76 1.76 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 4966.14 9999 9999 Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.51 1.070

6100.00 1534.70

3111.00 UPPWD S.R. 1642.13 RMR Rate

Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.5.1), Page No.-710

15 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :3 coarse sand )
Sl.No. Description Detail of cost for 10 sqm Material :Cement mortar 1:3 (1 cement : 3 coarse sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Unit Qty Rate Cost Rate Code Remark

Cum Day Day Day L.S.

0.172 0.80 0.88 0.99 12.61

4966.14 260.00 170.00 205.00 1.76 Total =

854.18

Analysed rate

208.00 149.60 UPPWD S.R. 202.95 22.19 9999 1436.92 14.37 1451.29 145.13 1596.42 159.64

Total =

Say Rs 160.00

per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.6, Page

Item No.Sl.No .

Cement Mortar 1:6 (1 cement: 6 coarse sand)

Description Detail of cost for one cum Material :(0.178 cum. of cement = 0.25 tonne) Cement required for cement mortar is 17.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum

Unit

Qty

Rate

Cost

Rate Code

Remark

Tonne Tonne cum

0.25 1.070

6100.00 1534.70

1525.00 UPPWD S.R. RMR Rate 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 3380.14


9999 9999

Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.2.2), Page No.-708

15 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :6 coarse sand )
Sl.No . Description Detail of cost for 10 sqm Material :Cement mortar 1 : 6 (1 cement: 3 fine sand:3 coarse Sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Unit Qty Rate Cost
Rate Code

Remark

Cum Day Day Day L.S.

0.172 0.80 0.88 0.99 12.61

3380.14 260.00 170.00 205.00 1.76 Total =

581.38 Analysed rate 208.00 149.60 UPPWD S.R. 202.95 9999 22.19 1164.13 11.64 1175.77 117.58 1293.35 129.33

Total =

Say Rs 129.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.6, Page

Item Cement Mortar 1:6 (1 cement: 6 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.178 cum. of cement = 0.25 tonne) Cement required for cement mortar is 17.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost
Rate Code

Remark

Tonne Tonne cum

0.25 1.070

6100.00 1534.70

1525.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.64 1.64 Total =

127.50 14.35 44.13 22.17 3375.28

UPPWD S.R. UPPWD S.R. 9999 9999

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse sand )
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1), Page No.-711 Description Unit Qty Rate Cost Detail of cost for 10 sqm Material :Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Cum Day Day Day L.S. 0.224 0.94 1.02 1.10 12.61 3375.28 260.00 170.00 205.00 1.64 Total = Rate Code Remark

756.06 Analysed rate 244.40 173.40 UPPWD S.R. 225.50 20.68 9999 1420.04 14.20 1434.24 143.42 1577.67 157.77

Total =

Say Rs 158.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.6, Page

Item Cement Mortar 1:6 (1 cement: 6 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.178 cum. of cement = 0.25 tonne) Cement required for cement mortar is 17.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost
Rate Code

Remark

Tonne Tonne cum

0.25 1.070

6100.00 1534.70

1525.00 1642.13

UPPWD S.R. Market rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 3380.14

UPPWD S.R. UPPWD S.R. 9999 9999

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and rounded Item angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse No.- sand ) including Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1 + 13.21, Page No.-711 Description Unit Qty Rate Cost Rate Code Detail of cost for 10 sqm Material :Cement mortar 1:4 (1 cement : 4 coarse sand) Waterproofing material Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Cum Kg Day Day Day L.S. 0.224 1.70 0.94 1.02 1.10 19.76 3375.28 40.00 260.00 170.00 205.00 1.76 Total = 756.06 Analysed rate 68.00 UPPWD S.R. 244.40 173.40 UPPWD S.R. 225.50 34.78 9999 1502.14 15.02 1517.16 151.72 1668.88 166.89

Sl.No.

Remark

Total =

Say Rs 167.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
40mm. thick Cement concret flooring 1:2:4 (1 cement, 2 coarse sand,4 Stone aggregate of size 20 mm nominal size ) laid in one layer finished with floating coat of neat cement and curing complete and including supply of all materials,labour T & P etc.required for proper completion of work
Reference from UPPWD Analysis of rate - 1969, Item No.-605, Page No.-77 Description Unit Qty Rate Cost Rate Code Remark Detail of cost for 100 Sqft Material :graded brick aggregate 20mm Cum 805.29 Market rate 0.368 2188.30 Coarse sand Cum 282.38 Market rate 0.184 1534.70 Cement Labour :Mistri

Item No.-

Sl.No.

Bag
Day Day Day Day Day

2.75 1/8 1 1/4 1 3/4 1/4

305.00 292.00 260.00 170.00 170.00 205.00

838.75 UPPWD S.R. 36.50 325.00 170.00 UPPWD S.R. 127.50 51.25 2636.68 70.10 2706.78 40.60 2747.38 274.74
3022.12

Mason Beldar Coolie Bhisti Sub Total Sundries, phanties etc (2636.68x2/75.23 = 70.10) Total Add water charges @ 1.5% Add for contractor's proffit @10%
Cost of 100 Sqft

L.S.

Total =

Rate Per Sqm

325.18

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis
Providing and laying in cement concrete floor of 40mm top of roof 1:2:4 (1cement :2 course sand :4 graded stone aggregate stone grit 20mm size) with waterproofing compound and finished with a flooting coat of neat cement including cost of all material, labour, T&P etc. required for proper completion of work.
Reference from UPPWD Analysis of rate - 1969, Item No.-605, Page No.-77 Description Unit Qty Rate Cost Rate Code Detail of cost for 100 Sqft Material :graded brick aggregate 20mm Cum 805.29 Market rate 0.368 2188.30 Coarse sand Cum 282.38 Market rate 0.184 1534.70 Cement Water Proofing Compound Labour :Mistri

Item No.-

Sl.No.

Bag Kg
Day Day Day Day Day

2.75 2.75 1/8 1 1/4 1 3/4 1/4 2746.68

305.00 40.00 292.00 260.00 170.00 170.00 205.00 2/75.23

838.75 110.00 36.50 325.00 170.00 127.50 51.25 2746.68 73.02 2819.70 42.30 2862.00 286.20
3148.20

UPPWD S.R.

Mason Beldar Coolie Bhisti Sub Total Sundries, phanties etc Total Add water charges @ 1.5% Add for contractor's proffit @10%
Cost of 100 Sqft

UPPWD S.R.

L.S.

Total =

Rate Per Sqm

338.75

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division P.W.D. Lucknow

(1cement :2 rproofing t of all material,

No.-77 Remark

Ex. Engineer Maint.Division P.W.D. Lucknow

ANALYSIS OF RATES
N.B.O. No. 14.69 25 mm cement concrete flooring 1:2:4 (1 cement:2 coarse snad:4 graded stone aggregate stone grit 12.5 mm size) ,laid over base concrete finished with floating coat of neat cement,including supply of all material labour and T&P etc. required for completion of the work.

Taking 100.00 sft or 9.29 sqmt

Materials
Stone grit 12.50 nominal size,7.50 cft or 0.212 cum

0.212 0.105 2.03

Cum Cum Bag

@ @ @

1971.90 1534.70 305.00

Rs. Rs. Rs.

418.04 161.14 619.15

Coarse sand,3.70 cft or 0.105 cum Cement (including wastage)

Labour 1 1 2 3 4
Mistri

1/8 1 1/2 1/2 1/4

per day per day per day per day per day

@ 292.00 @ 260.00 @ 170.00 @ 170.00 @ 205.00

Rs. Rs. Rs. Rs. Rs.

36.50 260.00 85.00 85.00 51.25 1716.09

Mason
Beldar Coolie

Bhisti Sub Total Sundries (1.50x1716.09/50.36 = 51.11)

L.S.
Total

51.11
1767.20

Add 1.5% Water Charges

Rs.
Rs.

26.51
1793.71

Add 10% C.P. on Rs.

1793.71

Rs.
Total Rs.

179.37
1973.08

Hence Rate Per sqmt

1973.08 X 10.76 100.00


Say Rs 212.00

Rs

212.30

per sqm

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division No.1 P.W.D. Lucknow

Assistant Engineer Maint.Division No.1 P.W.D. Lucknow

Executive Engineer Maint.Division No.1 P.W.D. Lucknow

Rate Analysis
Item Providing and laying in position cement concrete of specified grade excluding the cost of centering No.- and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-4.1.3, Page No.-132 Sl.No . Description Detail of cost for one cum Material :Unit Qty Rate Cost Rate Code Remark

Graded Stone aggregate 20mm Coarse sand


Cement Labour :-

cum cum Tonne


Day Day Day

0.89 0.89 0.32 0.10 1.63 0.70

2188.30 1534.70 6100.00 260.00 170.00 205.00

1947.59 1365.88

Market rate Market rate

1952.00 UPPWD S.R. 26.00 277.10 143.50

Mason Beldar Bhisti Hire charges of Concrete Mixer 0.25 to 0.40 d cum with Hopper Vibrator (Needle type 40 mm) Sundries Add water charges @ 1%

UPPWD S.R.

Day Day

L.S.

0.07 0.07 14.30

800.00 300.00 1.64

Total = Total = Add for contractor's proffit and overheads @10%


Cost of One Cum

56.00 21.00 23.45 5812.52 58.13 5870.65 587.06


6457.71

0012 9999

Item 40 mm thick damp proof course with cement and approved coarse sand 1:2 with and including water No.- proofing materials as ordered by the Engineer-in-charge in the proportion as specified by the
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-4.10, Page No.-157 Sl.No . Description Details of cost for 10 sqm Material :Unit Qty Rate Cost Rate Code Remark

Cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) 10x0.040 = 0.40 cum
Add for delay:

cum
Day Day

0.40 0.40 0.40 1.95 6.40

6457.71 260.00 235.00 1.76 44.00

2583.08

Analysis rate

Mason 1 st class Mason 2nd class Sundries (Form work etc.) Water proofing materials @ 1.0 Kg/bag cement Total = Add Water Charges @ 1% except on A Total = Add CPOH @ 10% except on A
Cost of 10 Sqm Cost of per Sqm

L.S. Kg

104.00 UPPWD S.R. 94.00 3.43 9999 281.60 3066.12 4.83 3070.95 73.18
3144.13 314.41 UPPWD S.R.

Say Rs 314.00

per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item No.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level 1:4:8 (1 cement:4 Fine sand:8 graded brick aggregate 40mm nominal size)
Reference from UPPWD Analysis of rate - 1969, Item No.-275, Page No.-18 Sl.No. Description Detail of cost for 100 ft Material :Unit Qty Rate Cost Rate Code Remark

graded brick aggregate 40mm Fine sand


Cement Add 2.5% for wastage on cement and sand Labour :Mistri

Cum Cum Bag

2.83 1.42 9.30

950.00 450.00 305.00

2690.10 UPPWD S.R. 637.20 2836.50 86.84

Mason Beldar Coolie Bhisti Blacksmith Sub Total T&P and Sundries etc, Hire of C.C.Mixer, lubricants etc. including wastage if materials at 2.5% (7348.14x11/215.85 = 374.47) Total Add water charges @ 1.5% Add for contractor's proffit @10%
Cost of 100 Cft

Day Day Day Day Day Day

1/8 1/3 3 3 1 1/8

292.00 260.00 170.00 170.00 205.00 260.00

36.50 86.67 510.00 UPPWD S.R. 510.00 205.00 32.50 7631.31

L.S.

Total =

388.90 8020.21 120.30 8140.51 814.05


8954.56

Rate Per Cum

3161.86

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis
Item No.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:l: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm size)
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-4.1.8, Page No.-135 Sl.No. Description Detail of cost for one cum Material :Unit Qty Rate Cost Rate Code

Stone aggregate 40mm Coarse sand


Cement Labour :-

cum cum Tonne


Day Day Day

0.89 0.47 0.17 0.10 1.63 0.70

1755.60 1534.70 6100.00 235.00 170.00 205.00

1562.48 RMR RATE 721.31 1037.00


UPPWD S.R.

Mason Beldar Bhisti Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper Vibrator (Needle type 40 mm) Sundries Add water charges @ 1%

23.50 277.10 143.50 UPPWD


S.R.

Day Day

L.S.

0.07 0.07 13.52

800.00 300.00 1.64

Total = Total = Add for contractor's proffit and overheads @10%


Cost of One Cum

56.00 21.00 22.17 3864.07 38.64 3902.71 390.27


4292.98

0012 9999

Say Rs

4293.00 per cum

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division P.W.D. Lucknow

uding the cement : 4 coarse

Remark

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis
Item No.Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-4.2.6, Page No.-143 Sl.No. Description Detail of cost for one cum Material :Unit Qty Rate Cost Rate Code Remark

Stone aggregate 40mm Coarse sand


Cement Labour :-

cum cum Tonne


Day Day Day Day

0.89 0.47 0.22 0.06 0.06 0.90 0.78 0.70

1914.00 1942.00 6100.00 260.00 235.00 170.00 170.00 205.00

1703.46 Market rate 912.74 Market rate 1342.00


UPPWD S.R.

Mason Ist class Mason 2nd class Beldar Coolie Bhisti Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper Vibrator (Needle type 40 mm) Scaffolding Sundries Coolie Extra labour for lifting.material upto floor level = 0.75x2.50 = 1.88 Add water charges @ 1%

15.60 14.10 153.00 132.60 UPPWD S.R. 143.50

Day Day

L.S. L.S.

0.07 0.07 114.40 13.52

800.00 300.00 1.64 1.64

56.00 21.00 187.62 22.17

0012 9999 9999

Day

1.88

170.00

Total = Total = Add for contractor's proffit and overheads @10%


Cost of One Cum

319.60 UPPWD S.R. 5023.39 50.23 5073.62 507.36


5580.98

Say Rs

5581.00 per cum

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-305+309+310+310(a), Page No.-26/27

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

First Class brick work in 1:4 (1 cement: 4 part of coarse sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc. required for proper completion of the work. wall of half brick 4" thick.
Unit Qty Rate Cost Rate Code Remark

Nos Cum

1300 0.764

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

5 1/4 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1172.51

1601.25 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Extra labour in Superstructure for 1 1/2 brick wall Mason Coolie Scaffolding etc. Total Extra labour in Superstructure for 1brick thick Mason Coolie Total Extra labour in half brick wall Mason Coolie Total Total A+B+C+D Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

340.00 102.50 10624.93 47.45 10624.93 0.75/167.93 10672.38

2 1/2

Day Day

L.S.

1 1 430.00

260.00 170.00

1.5/8.50

260.00 UPPWD S.R. 170.00 75.88 505.88

Day Day

1 1

260.00 170.00

260.00 UPPWD S.R. 170.00 430.00 130.00 UPPWD S.R. 85.00 215.00 11823.26 177.35 12000.61
1200.06

Day Day

1/2 1/2

260.00 170.00

Cost of 100 Cft

13200.67

Rate Per Cum

4661.16

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-305, Page No.-26

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

Class- 150 brick work in 1:4 mortar (1 cement:4 coarse sand) in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work.
Unit Qty Rate Cost Rate Code Remark

Nos Cum

1300 0.764

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

5.25 1/6 2
2

4.90 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6370.00 1172.51

1601.25 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

340.00 102.50 10494.93 10494.93 0.75/152.18 51.72 10546.65 158.20 10704.85


1070.49

2 1/2

Cost of 100 Cft

11775.34

Rate Per Cum

4157.87

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-305, Page No.-26

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

Class- 150 brick work in 1:4 mortar (1 cement:4 coarse sand) in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work.
Unit Qty Rate Cost

Nos Cum

1300 0.764

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

5.25 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1172.51

1601.25 48.67 520.00


340.00

Coolie Bhisti Sub Total T&P etc Total Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

340.00 102.50 10624.93 10624.93 0.75/167.93 47.45 10672.38 160.09 10832.47


1083.25

2 1/2

Cost of 100 Cft

11915.71

Rate Per Cum

4207.44

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

ndation and plinth including n of the work.


Rate Code Remark

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-305+309+310, Page No.-26/27

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

First Class brick work in 1:4 (1 cement: 4 part of coarse sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc. required for proper completion of the work. wall of one brick thick
Unit Qty Rate Cost Rate Code Remark

Nos Cum

1300 0.764

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

5 1/4 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1172.51

1601.25 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc A Total Extra labour in Superstructure for 1 1/2 brick wall Mason Coolie Scaffolding etc. Total Extra labour in Superstructure for 1brick thick Mason Coolie Total Total A+B+C Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

2 1/2

340.00 102.50 10624.93 47.45 10672.38

10624.93 0.75/167.93

Day Day

L.S.

1 1 430.00

260.00 170.00

1.5/8.50

260.00 UPPWD S.R. 170.00 75.88 505.88

Day Day

1 1

260.00 170.00

260.00 UPPWD S.R. 170.00 430.00 11608.26 174.12 11782.39


1178.24

Cost of 100 Cft

12960.62

Rate Per Cum

4576.40

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-307, Page No.-26

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

Class- 150 brick work in 1:3 mortar (1 cement:3 coarse sand) in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work.
Unit Qty Rate Cost Rate Code Remark

Nos Cum

1300 0.765

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

7 1/2 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1174.05

2287.50 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day

2 1/2

340.00 102.50 11312.71 38.82 11351.53 170.27 11521.81


1152.18

L.S.

11312.71 0.75/218.55

Cost of 100 Cft

12673.99

Rate Per Cum

4475.19

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-306+309+310, Page No.-26/27

Item No.Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

First Class brick work in 1:3 (1 cement: 3 part of coarse sand 2.25 FM) mortar in super structure including supply of all materials, labour, T&P etc. required for proper completion of the work. wall of one brick thick
Unit Qty Rate Cost Rate Code Remark

Nos Cum

1300 0.765

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

7 1/2 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1174.05

2287.50 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Extra labour in Superstructure for 1 1/2 brick wall Mason Coolie Scaffolding etc. Total Extra labour in Superstructure for 1brick thick Mason Coolie Total Total A+B+C Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

2 1/2

11312.71 0.75/218.55

340.00 102.50 11312.71 38.82 11351.53

Day Day

L.S.

1 1 430.00

260.00 170.00

1.5/8.50

260.00 170.00 75.88 505.88

UPPWD S.R.

Day Day

1 1

260.00 170.00

260.00 170.00 430.00 12287.42 184.31 12471.73


1247.17

UPPWD S.R.

Cost of 100 Cft

13718.90

Rate Per Cum

4844.14

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-303, Page No.-25

Item No.-

Class- 150 brick work in 1:6 mortar (1 cement:6 coarse sand) in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work.

Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

Unit

Qty

Rate

Cost

Rate Code

Remark

Nos Cum

1300 0.765

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

3.75 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1174.05

1143.75 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Add water charges @ 1.5% Total
Add for contractor's proffit @10%

Day L.S.

340.00 102.50 10168.96 10168.96 0.75/152.18 50.12 10219.08 153.29 10372.36


1037.24

2 1/2

Cost of 100 Cft

11409.60

Rate Per Cum

4028.73

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-303, Page No.-25 Item First Class brick work in 1:6 (1 cement: 6 part of coarse sand 2.25 FM) mortar in super structure including supply of all No.- materials, labour, T&P etc. required for proper completion of the work.

Sl.No. Description Detail of cost for 100 Cft Material :Bricks Class 150 Coarse sand

Unit

Qty

Rate

Cost

Rate Code

Remark

Nos Cum

1300 0.765

Cement Labour :Mistri Mason


Beldar

Bag
Day Day Day Day

3.75 1/6 2
2

5.00 1534.70 305.00 292.00 260.00 170.00 170.00 205.00

6500.00 1174.05

1143.75 48.67 520.00


340.00

UPPWD S.R. RMR Rate UPPWD S.R.

UPPWD S.R.

Coolie Bhisti Sub Total T&P etc Total Extra labour in Superstructure for 1 1/2 brick wall Mason Coolie Scaffolding etc. Total

Day

2 1/2

340.00 102.50 10168.96 50.12 10219.08

L.S.

10168.96 0.75/152.18

Day Day

L.S.

1 1 430.00

260.00 170.00

1.5/8.50

260.00 170.00 75.88 505.88

UPPWD S.R.

Extra labour in Superstructure for 1brick thick Day Mason Day Coolie Total Total A+B+C Add water charges @ 1.5% Total
Add for contractor's proffit @10%

1 1

260.00 170.00

260.00 170.00 430.00 11154.96 167.32 11322.29


1132.23

UPPWD S.R.

Cost of 100 Cft

12454.51

Rate Per Cum

4397.69

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-2.1.1, Page No.-71

Item No.Sl.No.

Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed : All Kinds of soil
Description Unit Details of cost for 100 sqm and average depth 15 cm Labour :Beldar Day Collie Day Qty Rate Cost Rate Code

7.20 6.00

170.00 170.00

Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 100 Sqm

1224.00 1020.00 2244.00 22.44 2266.44 226.64


2493.08

UPPWD S.R.

Rate per Sqm

24.93

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

ing 1.5 m in width as nd lift up to 1.5 m,


Remark

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Excavation in foundation in ordinary soil,lome,clay or sand] including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space Item beetween the building & the sides of foundation trenches or in to the plinth & removal & disposal No.- of surplus earth as directed by the engineer -in-charge upto a distance of 30m from the foundation trenches.
Reference from UPPWD Analysis of rate - 1969, Item No.-251, Page No.-13 Sl.No. Description Detail of cost for 1000 Cft. Labour :Mistry

Unit

Qty

Rate

Cost

Rate Code Remark

Beldar Coolie Blacksmith Total T&P and Basket etc. G.Total Add for contractor's proffit and overheads @10%
Cost of 1000 Cft.

Day Day Day Day L.S.

1/8 6 7 1/8

292.00 170.00 170.00 260.00

2279.00 0.75/38.50

36.50 1020.00 UPPWD S.R. 1190.00 32.50 2279.00 44.40 ` 2323.40 232.34
2555.74

Hence Rate Per Cum

2555.74 /28.32

90.24

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-2.25, Page No.-105

Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Item in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and No.- watering, lead up to 50 m and lift upto 1.5 m.
Sl.No. Description Details of cost for 10 cum Labour :Mate

Unit

Qty

Rate

Cost

Rate Code

Remark

Coolie Bhisti Total Add water charges @ 1% Total = Add for contractor's proffit and overheads @10%
Cost of 10 Cum

Day Day Day

0.20 2.50 0.20

185.00 170.00 205.00

37.00 425.00 UPPWD S.R. 41.00 503.00 5.03 508.03 50.80


558.83

Hence Rate Per Cum

55.88

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Sand filling in plinth including supply of necessary sand from a distance not exceeding 8 KM,(5 miles) from the site of the work and including watering, ramming, consolaiting and dressing Item etc.rate to include cost of all materials,labours and T & P etc required for proper completion of No.- the work.
Reference from UPPWD Analysis of rate - 1969, Item No.-255, Page No.-14 Description Unit Qty Rate Cost Rate Code Details of cost for 1000 cft Material :Local Sand Cum 28.32 350.00 9912.00 UPPWD S.R. Labour :Day 170.00 Beldar 3.00 510.00 Day 170.00 Coolie 5.00 850.00 UPPWD S.R. Day 205.00 Bhisti 3/4 153.75

Sl.No.

Remark

Total T&P Total Add for contractor's proffit @10%


Cost of 1000 Cft

L.S.

11425.75 0.50/325.43

11425.75 17.55 11443.30 1144.33


12587.64

Hence Rate Per Cum

444.64

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-15.1, Page No.-827

Item No.-

Demolishing lime concrete manually / by mechanical means and disposal of material up to 4 floor level roof top to ground floor/up to malba bump site by manual labour and then by mechanically out side of city area mean distance up to 12.00 km or as per direction of Engineerin-Charge.

Sl.No.

Description Details of cost for 1 cum Labour :Beldar Collie

Unit

Qty

Rate

Cost

Rate Code

Day Day

sundries additional ead of 100 metre beyond 1st 50 metre already includ Cartage by mechnically transport up to 12 Km Less Loading and Un loading Total Add water charges @ 1% Except B Total Add for contractor's proffit and overheads @10% Except B Cost of One Cum

L.S.

0.44 0.37 1.04

170.00 170.00 1.76

74.80 UPPWD SR 62.90 1.83 9999 DSR-2012-Item No-1.2.1

2.00

16.01

32.01

B-1 B-2

207.75 UPPWD SR -19.00 360.29 1.72 362.01 17.33 379.33

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

of material up to 4 and then by direction of Engineer-

Remark

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.80, Page No.-757

Item No.Sl.No.

Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Description Details of cost for 10 sqm Material :10x0.001x1429 = 14.29kg Add 2% wastage= 0.29kg Total = 14.58kg Say 14.58 kg White cement based putty Labour :Unit Qty Rate Cost Rate Code Remark

Kg Day Day

14.58

29.25 260.00 170.00 1.76

426.47

Market Rate

Mason
Beldar

Scaffolding and sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 15 Sqm

L.S.

0.45 0.45 40.00

117.00 76.50 70.40 690.37 6.90 697.27 69.73


767.00

UPPWD S.R.

9999

Rate per Sqm

76.70
"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

ove mentioned market rates verified from market and found lowest."

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-401, Page No.-37

Supply and fixing Salwood wrought framed and fixed including simple moulding straight work as in Item Chaukhat frame including supply of all materials, labour, T&P etc. required for proper completion of No.- work.
Sl.No. Description Take a size of opening as 4' x 7' section of Chaukhat 4" x 3" Material :Salwood 1x18x1/3x1/4 = 1.5 cft wastage 5% = 0.075 cft Total = 1.575 cft say 1.60 cft Sal wood Labour :Unit Qty Rate Cost Rate Code Remark

Cum Day Day Day

0.0453 50000.00

2265.00

DSR 2012Item-1199

Carpenter Mistri Carpenter


Beldar

1/16 1/2 1/4

292.00 260.00 170.00

Sub Total Sundries Total Add for contractor's proffit @10%


Cost of 1.5 Cft Rate per Cum

18.25 130.00 UPPWD S.R. 42.50 2455.75 60.93 2516.68 251.67


2768.34 65166.83

2455.75 1.5/60.46

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis Providing and fixing wire gauge shutters using galvanized M.S. wire gauge of average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm, for doors, windows and clerestory windows with Item hinges and necessary screws : 35 mm thick shutters, With ISI marked stainless steel butt hinges of No.required size Second class teak wood Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.27.1.2.1, Page No.-383 Description Unit Qty Rate Cost Rate Code Remark Details of cost for door shutters 2.00x1.08m = 2.16sqm Material :Second class Teak wood Styles 4x200x9.5x3.5cm = 0.0266cum+ Top Rail - 1x110.5x9.5x3.5cm = 0.0036cum+ Lock and bottom rail 2x110.5x19.7x3.5cm = 0.0152 cum.+ Beadings (2x312+2x 150)x( 1.2)x( 1.2)cm = 0.001 cum Total = 0.0464 cum.+ Add for wastage @ 10% = 0.005 cum. Total = 0.0514 cum. Say 51.4 cudm

Sl.N o.

Second class teak wood

10 cudm Wire gauge 2xl60x40cm = 1.28 sqm.+ Add wastage @ 10% = 0.13 sqm. Total= 1.41 sqm Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire sqm 0.63 mm Stainless steel butt hinges (heavyweight) 10 n 100x60x2.5 mm IS : 12817 marked 10 nos Stainless steel butt hinges 50x37x1.5 mm IS:10 10 nos 12817 marked Stainless steel screws 40 mm 10 100 nos Stainless steel screws 20 mm 10 100 nos Labour :Day Carpenter Ist class Day Carpenter Iind class Day Belder Day Mistry Sundries L.S. Add water charges @ 1%

51.40

604.00

3104.56 UPPWD S.R.

1.41

230.00

324.30

DSR -20127029 DSR -20128220 DSR -20128218 DSR -20128211 DSR -20128214

6.00

230.00

138.00

2.00 48.00 8.00 1.30 0.90 1.05 0.105 33.80

125.00 195.00 95.00 290.00 260.00 170.00 292.00 1.76 Total = Total =

25.00 93.60 7.60

377.00 234.00 UPPWD S.R. 178.50 30.66 9999 59.49 4572.71 45.73 4618.44 461.84 5080.28 2351.98

Add for contractor's proffit and overheads @10% Cost of 2.16 sqm Rate of 1 Sqm Shutter Say Rs 2352.00 per cum

Rate Analysis Providing and fixing wire gauge shutters using galvanized M.S. wire gauge of average width of aperture Item 1.4 mm in both directions with wire of dia 0.63 mm, for doors, windows and clerestory windows with No.- hinges and necessary screws : 35 mm thick shutters, With ISI marked stainless steel butt hinges of required size Second class teak wood Sl.N o. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.27.1.2.1, Page No.-383 Description Unit Qty Rate Cost Rate Code Remark Details of cost for door shutters 2.00x1.08m = 2.16sqm Material :Second class Teak wood Styles 4x200x9.5x3.5cm = 0.0266cum+ Top Rail - 1x110.5x9.5x3.5cm = 0.0036cum+ Lock and bottom rail 2x110.5x19.7x3.5cm = 0.0152 cum.+ Beadings (2x312+2x 150)x( 1.2)x( 1.2)cm = 0.001 cum Total = 0.0464 cum.+ Add for wastage @ 10% = 0.005 cum. Total = 0.0514 cum. Say 51.4 cudm Second class teak wood 10 cudm 51.40 720.00 3700.80
DSR -20121190

Wire gauge 2xl60x40cm = 1.28 sqm.+ Add wastage @ 10% = 0.13 sqm. Total= 1.41 sqm Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire sqm 0.63 mm Stainless steel butt hinges (heavyweight) 10 n 100x60x2.5 mm IS : 12817 marked 10 nos Stainless steel butt hinges 50x37x1.5 mm IS:10 10 nos 12817 marked Stainless steel screws 40 mm 10 100 nos Stainless steel screws 20 mm 10 100 nos Labour :Day Carpenter Ist class Day Carpenter Iind class Day Belder Day Mistry Sundries L.S. Add water charges @ 1%

1.41

230.00

324.30

DSR -20127029 DSR -20128220 DSR -20128218 DSR -20128211 DSR -20128214

6.00

230.00

138.00

2.00 48.00 8.00 1.30 0.90 1.05 0.105 33.80

125.00 195.00 95.00 290.00 260.00 170.00 292.00 1.76 Total = Total =

25.00 93.60 7.60

377.00 234.00 UPPWD S.R. 178.50 30.66 9999 59.49 5168.95 51.69 5220.64 522.06 5742.70 2658.66

Add for contractor's proffit and overheads @10% Cost of 2.16 sqm Rate of 1 Sqm Shutter Say Rs 2659.00 per cum

Rate Analysis
Item Supply & fixing Non-Asbestos fibre (high impact poly propelene reinforced) cement corrugated sheet 6 mm thick No.- roofing in position including supply of all materials, labour and T&P etc. required for the proper completion of the
Reference from UPPWD Analysis of rate - 1969, Item No.-541, Page No.-63 Sl.No. Description Unit Qty Rate Cost Rate Code Remark

Take a roof area of 61x32.5 = 1982.50 sft 2x19nos.x8'x3' = 1051.30 sft 2x19x9'x3'-5 1/2" = 1182.80 sft Wastage at 10% at on 2234.10 = 223.41 sft Total = 2457.51 say = 2458.00 sft Cost of sheet Hook bolts G.I. Washer Bitumen washer Sub total = Sundries
Labour :-

Sft

2458.00
34 34 34

23.23 108.00 3.60 3.36

57109.67 3672.00 122.40 114.24 61018.31 720.34

doz. doz. doz.


L.S. Day Day Day

DSR-20120223 DSR-20121023 UPPWD S.R.

61018.31 30.00/2541.24
2 10 8

Mistry
Carpenter
Beldar

292.00 260.00 170.00

Total Add for contractor's proffit @10%


Cost of 1982.50 Sft

584.00 2600.00 1360.00 66282.64 6628.26


72910.91

UPPWD S.R.

Rate per Sqm

395.72

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-12.41.2, Page No.-679

Item No.Sl.No.

Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for ther expansion, (i) Single socketed pipes. 110 mm diameter
Description Details of cost for 6 metre Material :uPVC pipes110 mm dia uPVC pipes Rubber (Seal) Ring 110 mm dia Adhesive, and sundries etc. Labour :Fitter (grade 1) Beldar Bandhani Scaffolding Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10% Unit Qty Rate Cost

metre Each L.S. Day Day Day L.S.

6 1 8.06 0.23 0.45 0.11 18.59

215.00 20.00 1.76 260 170 170 1.76

1290.00 20.00 14.19 59.80 76.50 18.70 32.72 1511.90 15.12 1527.02 152.70

Cost of 6 metre Rate per Metre

1679.73 279.95

Say Rs

280.00

per Metre

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

2, Page No.-679

pipes conforming to IS : 13592 ving 10 mm gap for thermal


Rate Code Remark

UPPWD SR DSR 2012-Item7191 9999

UPPWD S.R. 9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Supply & fixing of 40 mm thick sal wood door and window shutters with panels of heavy quality galvanised iron wire gauge 2.5 mm or 2 mm or 1.5 mm. (1/10 or 1/12 or 1/16 inch) mesh or any other size with necessary Item beading, including supplying and fixing of wooden cleats and stops and including fixing and adjustment of No.hinges bolts locks, handles, spring and/or other fittings, if necessary (Fittings with necesary screws to be supplied departmentaly/ paid for separately)
Reference from UPPWD Analysis of rate - 1969, Item No.-452, Page No.-44 Sl.No. Description Details of door shutter of size 3'6" x 6'9" Area = 23.62 sqft Material :Sal wood Wire Gauge Labour :Cft Sqft Day Day Day Day L.S. 2.50 16.00 1416.00 21.38 3540.00 342.08 DSR 2012Item-1199 Unit Qty Rate Cost Rate Code

Mistry
Carpenter
Beldar Glazer Sub Total Sundries (4927.33x1.00/138.56 = 35.56)

1/8 3 1 1/4

292.00
260.00 170.00 235.00

36.50 780.00 UPPWD S.R. 170.00 58.75


4927.33 35.56

Total Add for contractor's proffit @10%


Cost of 23.62 Sqft

4962.89 496.29
5459.18

Rate per Sqm

2486.91

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-452, Page No.-44

Supply & fixing 40 mm thick sall/sheesham fully mosquito proof jali shutterr ,including supply of wooden cleats Item & stoppers and including fixing & adjustment of hinges, bolts, locks, handles, spring, & other fittings with No.necerssary scrws but excluding there supply and also including S/O all materials,labour,T & p etc complete

Sl.No.

Description Details of door shutter of size 3'6" x 6'9" Area = 23.62 sqft Material :Sal wood Wire Gauge Labour :-

Unit

Qty

Rate

Cost

Rate Code

Cft Sqft Day Day Day Day L.S.

2.50 16.00

1416.00 21.38

3540.00 342.08

DSR 2012Item-1199 DSR -20127029

Mistry
Carpenter
Beldar Glazer Sub Total Sundries (4927.33x1.00/138.56 = 35.56)

1/8
3 1 1/4

292.00
260.00 170.00 235.00

36.50 780.00 UPPWD S.R. 170.00 58.75 4927.33 35.56

Total Add for contractor's proffit @10%


Cost of 23.62 Sqft

4962.89 496.29
5459.18

Rate per Sqm

2486.91

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis

al wood door and window shutters with panels of heavy quality galvanised iron 1.5 mm. (1/10 or 1/12 or 1/16 inch) mesh or any other size with necessary d fixing of wooden cleats and stops and including fixing and adjustment of ng and/or other fittings, if necessary (Fittings with necesary screws to be separately)

Remark

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis

e from UPPWD Analysis of rate - 1969, Item No.-452, Page No.-44

sheesham fully mosquito proof jali shutterr ,including supply of wooden cleats & adjustment of hinges, bolts, locks, handles, spring, & other fittings with there supply and also including S/O all materials,labour,T & p etc complete

Remark

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float Item glass panes including ISI marked stainless steel butt hinges of required size with necessary screws. No.- Sal/Sheesham wood. 35 mm thick Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.9.1.1, Page No.-363 Description Unit Qty Rate Cost Details of cost for door shutters 2.00x1.08m = 2.16sqm Material :Second class Teak wood Styles : 4x200x9.5x3.5cm = 0.027cum Rails: Top & intermediate rails 2x110.5x9.5x3.5cm = 0.008cum Lock and bottom rails 2x110.5xl9.7x3.5cm = 0.015cum Beadings: 2x186.1x1.9x1.2cm = 0.001cum 4x 171.70x 1.9x 1.2cm = 0.002cum. Total = 0.053 cum. Add for wastage @ 10% = 0.005cum. Grand Total = 0.058 cum = 58 cudm Second class teak wood 10 cudm sqm Plain Glass 3.8 to 4.7 mm thick Stainless steel butt hinges (heavyweight) 10 n 10 nos 100x60x2.5 mm IS : 12817 marked Stainless steel butt hinges 50x37x1.5 mm IS:10 10 nos 12817 marked Stainless steel screws 40 mm 10 100 nos Stainless steel screws 20 mm 10 100 nos Labour :Day Carpenter Iind class Day Glazer Day Belder L.S. Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 2.16 sqm Rate of 1 Sqm Shutter Say Rs 2235.00 per sqm 58.00 1.27 500.00 358.00

Sl.N o.

Rate Code

Remark

2900.00 UPPWD S.R. 454.66


DSR -20128220 DSR -20128218 DSR -20128211 DSR -20128214

6.00

230.00

138.00

2.00 48.00 8.00 1.83 0.23 0.77 40.43

125.00 195.00 95.00 260.00 235.00 170.00 1.64 Total =

25.00 93.60 7.60 475.80 54.05 130.90 66.31 4345.92 43.46 4389.37 438.94 4828.31 2235.33

9999

Rate Analysis Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float Item glass panes including ISI marked stainless steel butt hinges of required size with necessary screws. No.- Second class teak wood. 35 mm thick Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.9.1.1, Page No.-363 Description Unit Qty Rate Cost Details of cost for door shutters 2.00x1.08m = 2.16sqm Material :Second class Teak wood Styles : 4x200x9.5x3.5cm = 0.027cum Rails: Top & intermediate rails 2x110.5x9.5x3.5cm = 0.008cum Lock and bottom rails 2x110.5xl9.7x3.5cm = 0.015cum Beadings: 2x186.1x1.9x1.2cm = 0.001cum 4x 171.70x 1.9x 1.2cm = 0.002cum. Total = 0.053 cum. Add for wastage @ 10% = 0.005cum. Grand Total = 0.058 cum = 58 cudm Second class teak wood Plain Glass 3.8 to 4.7 mm thick 10 cudm sqm 58.00 1.27 720.00 325.00 4176.00

Sl.N o.

Rate Code

Remark

DSR -20121190

412.75 UPPWD S.R.


DSR -20128220 DSR -20128218 DSR -20128211 DSR -20128214

Stainless steel butt hinges (heavyweight) 10 n 10 nos 100x60x2.5 mm IS : 12817 marked Stainless steel butt hinges 50x37x1.5 mm IS:10 10 nos 12817 marked Stainless steel screws 40 mm 10 100 nos Stainless steel screws 20 mm 10 100 nos Labour :Day Carpenter Iind class Day Glazer Day Belder L.S. Sundries Add water charges @ 1%

6.00

230.00

138.00

2.00 48.00 8.00 1.83 0.23 0.77 40.43

125.00 195.00 95.00 260.00 235.00 170.00 1.76 Total = Total =

25.00 93.60 7.60 475.80 54.05 130.90 71.16 5584.86 55.85 5640.71 564.07 6204.78 2872.58

9999

Add for contractor's proffit and overheads @10% Cost of 2.16 sqm Rate of 1 Sqm Shutter Say Rs 2873.00 per Sqm

Rate Analysis
Item No.Cement Mortar 1:3 (1 cement:3 coarse sand)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Cost

Tonne Tonne cum

0.51 1.07

6100.00 1534.70

3111.00 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4966.14

Item No.White cement mortar 1:2 (1 white cement : 2 marble dust)


Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.15, Page No.-126 Description Unit Qty Rate Detail of cost for one cum Material :(0.475 cum. of white cement = 0.68 tonne) Cement required for cement mortar is 47.50% White Cement Tonne 0.68 10900.00 Carriage of cement Tonne Marble dust/ powder Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum cum 0.95 1000.00 Cost

7412.00 950.00

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 8575.01

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.1.1.2, Page No.-331

Marble work gang saw cut (polished and machine cut) of thickness 16 to 18 mm for wall linin work), backing filled with a grout of 12 mm thick average in cement mortar 1:3 (1 cement : 3 c Item sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with No.- admixture of pigment to match the marble shade (To be secured to the backing by means of which shall be paid for separately) Plain white marble Area of slab over 0.50 sqm

Sl.No.

Description Details of cost for 1.00 sqm

Unit

Qty

Rate

Cost

Material :Finished work = 1.00sqm Add for wastage @ 20% = 0.20 sqm Total = 1.20sqm Plain white marble (table rubbed and polished) 18 mm thick (slab area more than 0.50 sqm) Cement mortar 1:3 (1 cement : 3 coarse sand) White cement mortar 1:2 (1 white cement: 2 marble dust) Labour :-

Sqm Cum Cum Day Day Day Day Day Day Day L.S.

1.20 0.0144 0.0025

1100.00 4966.14 8575.01 290.00 235.00 170.00 170.00 205.00 260.00 260.00 1.76

1320.00 71.51 21.44

Mason Ist class Bandhani

0.67 0.67

Beldar Coolie Bhisti Mate Blacksmith 1 st class da


Scaffolding Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 1 Sqm

0.67 0.67 0.67 0.33 0.27


26.91

194.30 157.45 113.90 113.90 137.35 85.80 70.20 47.36 2333.21 23.33 2356.54 235.65
2592.20

Say Rs

2592.00

per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Item Providing and fixing 20 mm thick granite saw cut, mirror polished, premoulded and prepolish No.- machine cut for kitchen platforms, vanity counters, window sills , facias and similar location
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.2.2.2, Page No.-334 Sl.No. Description Details of cost for 2.00 sqm Material :Unit Qty Rate Cost

Mirror polished granite= 2.00 sqm Wastage 5% = 0.10sqm Total = 2.10sqm Black granite (polished) in big slab 20 mm thick Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :-

Sqm Cum Day Day Day L.S. L.S.

2.10 0.05

2600.00 4966.14 260.00 170.00 170.00 1.76 1.76

5460.00 238.37

Mason Ist class

2.80

Beldar Coolie
Moulding and edge polishing Sundries apoxy resin & cutting machine etc. Total Add water charges @ 1% Total Add for contractor's proffit and overheads @15%
Cost of 2 Sqm Rate per Sqm

1.30 1.30
78.00 65.00

728.00 221.00 221.00 137.28 114.40 7005.65 70.06 7075.71 1061.36


8137.07 4068.53

Say Rs

4069.00

per Sqm

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

Rate Code

Remark

UPPWD S.R. DSR 20120784

UPPWD S.R. UPPWD S.R. 9999 9999

to 18 mm for wall lining (veneer rtar 1:3 (1 cement : 3 coarse t : 2 marble dust) with an backing by means of cramps, r 0.50 sqm

Rate Code

Remark

UPPWD S.R. Analysed rate

UPPWD S.R.

9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

moulded and prepolished, s and similar locations of


Rate Code Remark

UPPWD S.R. Analysed rate

UPPWD S.R. 9999 9999

Rate Analysis
Reference from UPPWD Analysis of rate - 1969, Item No.-415, Page No.-39

Supply & fixing 40 mm thick sall/sheesham fully glazed shutter ,including supply of wooden cleats & Item stoppers and including fixing & adjustment of hinges, bolts, locks, handles, spring, & other fittings with No.- necerssary scrws but excluding there supply and also including S/O all materials,labour,T & p etc complete
Sl.No . Description Details of door shutter of size 24.75 Sqft Material :Sal wood Plain Glass 3.8 to 4.7 mm thick Brad and Putty {(3900.00+546.00)x1.00/134.51= 33.05} Labour :Cum Sqm L.S. Day Day Day Day 0.078 50000.00 1.68 325.00 3900.00 DSR 2012Item-1199 Unit Qty Rate Cost Rate Code Remark

546.00 UPPWD S.R. 33.05

Mistry
Carpenter
Beldar Glazer

1/8 3 1 1/4

292.00 260.00 170.00 235.00

Sub Total Sundries such as glue black Japan, etc. (5524.30x1.75/165.94 = 75.72) Total Add for contractor's proffit @10%
Cost of 24.75 Sqft

36.50 780.00 UPPWD S.R. 170.00 58.75 5524.30 58.26 5582.56 558.26
6140.82

Rate per Sqm

2669.71

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Supply & fixing 40 mm thick sal wood fully glazed shutter ,including supply of wooden cleats & stoppers Item and including fixing & adjustment of hinges, bolts, locks, handles, spring, & other fittings with No.- necerssary scrws but excluding there supply and also including S/O all materials,labour,T & p etc complete (Fittings with necesary screws to be supplied departmentaly/ paid for separately)
Reference from UPPWD Analysis of rate - 1969, Item No.-415, Page No.-39 Sl.No . Description Details of door shutter of size 24.75 Sqft Material :Sal wood Plain Glass 3.8 to 4.7 mm thick Brad and Putty {(4233.93+619.34)x1.00/134.51= 36.08} Labour :Cum Sqm L.S. Day Day Day Day 0.078 50000.00 1.73 358.00 3900.00 DSR 2012Item-1199 Unit Qty Rate Cost Rate Code Remark

619.34 UPPWD S.R. 33.60

Mistry
Carpenter
Beldar Glazer

1/8 3 1 1/4

292.00 260.00 170.00 235.00

Sub Total Sundries such as glue black Japan, etc. (5598.19x1.75/127.68 = 76.73) Total Add for contractor's proffit @10%
Cost of 24.75 Sqft

36.50 780.00 UPPWD S.R. 170.00 58.75 5598.19 76.73 5674.92 567.49
6242.41

Rate per Sqm

2713.87

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.25, Page No.-609 Sl.No. Description Details of cost for 10 sqm Labour :Unit Qty Rate Cost

Item Extra for marble stone flooring in treads of steps and risers using single length up to 2.00 me No.-

Mason Ist class

Day Day Day Day L.S.

1.95

290.00 170.00 170.00 175.00 1.76

Beldar Coolie Skilled Beldar (for floor rubbing etc.)


Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 10 Sqm Rate per Sqm

1.40 0.75 1.40


26.91

565.50 238.00 127.50 245.00 47.36 1223.36 12.23 1235.60 123.56


1359.15 135.92

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

le length up to 2.00 metre.

Rate Code

Remark

UPPWD S.R.

9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123

Item Cement Mortar 1:4 (1 cement: 4 coarse sand 2.25 FM) No.Sl.No. Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

UPPWD S.R. UPPWD S.R. 9999 9999

Providing and fixing 18(+/-2) mm thick granite saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills , facias and similar locations of Item required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 No.- cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shade. Area of slab over 0.50 sqm
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.2.2.2, Page No.-334 Sl.No. Description Details of cost for 2.00 sqm Material :Mirror polished granite= 2.00 sqm Wastage 5% = 0.10sqm Total = 2.10sqm Black granite (polished) in big slab 18(+/-2) mm thick Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :Unit Qty Rate Cost Rate Code Remark

Sqm Cum Day Day Day L.S. L.S.

2.10 0.048

2600.00 4173.14 290.00 170.00 170.00 1.76 1.76

5460.00 UPPWD S.R. 200.31 Analysed rate

Mason Ist class

2.80

Beldar Coolie
Moulding and edge polishing Sundries apoxy resin & cutting machine etc. Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 2 Sqm Rate per Sqm

1.30 1.30
78.00 65.00

812.00 221.00 UPPWD S.R. 221.00 137.28 9999 114.40 9999 7165.99 71.66 7237.65 723.77
7961.42 3980.71

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item Cement No.Mortar 1:3 (1 cement:3 coarse sand)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Cost

Tonne Tonne cum

0.51 1.07

6100.00 1534.70

3111.00 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4966.14

Item White No.- cement mortar 1:2 (1 white cement : 2 marble dust)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.15, Page No.-126 Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.475 cum. of white cement = 0.68 tonne) Cement required for cement mortar is 47.50% White Cement Tonne 0.68 10900.00 7412.00 Carriage of cement Tonne Marble dust/ powder Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum cum 0.95 1000.00 950.00

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 8575.01

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.1.1.2, Page No.-332

Granite work (lakha red) gang saw cut (polished and machine cut) of thickness 18 (+/-2) mm fo wall lining (veneer work), backing filled with a grout of 12 mm thick average in cement Ite mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar m 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the No.- marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). lakha red (polished) Area of slab over 0.50 sqm
Sl.N o. Description Details of cost for 1.00 sqm Unit Qty Rate Cost

Material :Mirror polished granite = 1.00sqm Add for wastage @ 20% = 0.20 sqm Total = 1.20sqm lakha red (polished) in big slab 18 (+/-2) mm thick Cement mortar 1:3 (1 cement : 3 coarse sand) White cement mortar 1:2 (1 white cement: 2 marble dust) Labour :Sqm Cum Cum Day Day Day Day Day Day Day L.S. 1.20 0.0144 0.0025 3766.00 4966.14 8575.01 290.00 235.00 170.00 170.00 205.00 260.00 260.00 1.76 4519.20 71.51 21.44

Mason Ist class Bandhani

0.67 0.67

Beldar Coolie Bhisti Mate Blacksmith 1 st class da


Scaffolding Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 1 Sqm

0.67 0.67 0.67 0.33 0.27


26.91

194.30 157.45 113.90 113.90 137.35 85.80 70.20 47.36 5532.41 55.32 5587.74 558.77
6146.51

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item Cement No.Mortar 1:3 (1 cement:3 coarse sand)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Cost

Tonne Tonne cum

0.51 1.07

6100.00 0.00

3111.00 0.00

Day Day L.S.

0.75 0.07 26.91

170.00 205.00 1.76

127.50 14.35 47.36

Sundries Cost of One Cum

L.S.

13.52

1.76 Total =

23.80 3324.01

Item White No.- cement mortar 1:2 (1 white cement : 2 marble dust)
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.15, Page No.-126 Sl.No. Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.475 cum. of white cement = 0.68 tonne) Cement required for cement mortar is 47.50% White Cement Tonne 0.68 10900.00 7412.00 Carriage of cement Tonne Marble dust/ powder Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum cum 0.95 1000.00 950.00

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 8575.01

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.1.1.2, Page No.-332

Granite work (lakha red) gang saw cut (polished and machine cut) of thickness 18 (+/-2) mm fo wall lining (veneer work), backing filled with a grout of 12 mm thick average in cement Ite mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar m 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the No.- marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). lakha red (polished) Area of slab over 0.50 sqm
Sl.N o. Description Details of cost for 1.00 sqm Material :Mirror polished granite = 1.00sqm Add for wastage @ 20% = 0.20 sqm Total = 1.20sqm lakha red (polished) in big slab 18 (+/-2) mm thick Cement mortar 1:3 (1 cement : 3 coarse sand) White cement mortar 1:2 (1 white cement: 2 marble dust) Labour :Unit Qty Rate Cost

Sqm Cum Cum Day Day Day Day Day Day Day

1.20 0.0144 0.0025

3766.00 4966.14 8575.01 290.00 235.00 170.00 170.00 205.00 260.00 260.00

4519.20 71.51 21.44

Mason Ist class Bandhani

0.67 0.67

Beldar Coolie Bhisti Mate Blacksmith 1 st class da

0.67 0.67 0.67 0.33 0.27

194.30 157.45 113.90 113.90 137.35 85.80 70.20

Scaffolding Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10% Add 1% hindrance on material Add 10% hindrance on Labour
Cost of Per Sqm

L.S.

26.91

1.76

47.36 5532.41 55.32 5587.74 558.77 46.12 92.03


6284.66

Rate per Sqm

6284.66

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

6 Rate Code Remark

UPPWD S.R. DSR 20120784

UPPWD S.R. UPPWD S.R. 9999 9999

332

t) of thickness 18 (+/-2) mm for ck average in cement ite cement mortar t to match the , which shall be qm
Rate Code Remark

Market Rate Analysed rate

UPPWD S.R.

9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999

9999

6 Rate Code Remark

UPPWD S.R. DSR 20120784

UPPWD S.R. UPPWD S.R. 9999 9999

332

t) of thickness 18 (+/-2) mm for ck average in cement ite cement mortar t to match the , which shall be qm
Rate Code Remark

Market Rate Analysed rate

UPPWD S.R.

9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123

Ite m No.Sl.N o.

Cement Mortar 1:4 (1 cement: 4 coarse sand 2.25 FM)

Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum

Unit

Qty

Rate

Cost

Tonn e Tonn e cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.2.2.2, Page No.-334

Providing and fixing lakha red (polished) in big slab 18 (+/-2) mm thick,for kitchen Ite platforms,vanity counters,windows sills,facias and similar locations of required size of m approved shed,colour,and texture liad over 20 mm thick base cement mortar (1 cement:4 No.- coarse sand) with joined treated with white cement slurry,mixed with pigment to match the shade,including rubbing and polishing complete,
Sl.N o. Description Details of cost for 2.00 sqm Material :Mirror polished granite= 2.00 sqm Wastage 5% = 0.10sqm Total = 2.10sqm lakha red (polished) in big slab 20 mm thick Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :Unit Qty Rate Cost

Sqm Cum Day Day Day L.S. L.S.

2.10 0.05

3766.00 4173.14 290.00 170.00 170.00 1.76 1.76

7908.60 200.31

Mason Ist class

2.80

Beldar Coolie
Moulding and edge polishing Sundries apoxy resin & cutting machine etc. Total

1.30 1.30
78.00 65.00

812.00 221.00 221.00 137.28 114.40 9614.59

Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 2 Sqm Rate per Sqm

96.15 9710.74 971.07


10681.81 5340.91

Say Rs

5341.0

per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123

Ite m No.Sl.N o.

Cement Mortar 1:4 (1 cement: 4 coarse sand 2.25 FM)

Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum

Unit

Qty

Rate

Cost

Tonn e Tonn e cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-8.2.2.2, Page No.-334

Providing and fixing lakha red (polished) in big slab 18 (+/-2) mm thick,for kitchen Ite platforms,vanity counters,windows sills,facias and similar locations of required size of m approved shed,colour,and texture liad over 20 mm thick base cement mortar (1 cement:4 No.coarse sand) with joined treated with white cement slurry,mixed with pigment to match the

Sl.N o.

Description Details of cost for 2.00 sqm Material :Mirror polished granite= 2.00 sqm Wastage 5% = 0.10sqm Total = 2.10sqm lakha red (polished) in big slab 20 mm thick Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :-

Unit

Qty

Rate

Cost

Sqm Cum Day Day Day L.S. L.S.

2.10 0.05

3329.00 4173.14 290.00 170.00 170.00 1.76 1.76

6990.90 200.31

Mason Ist class

2.80

Beldar Coolie
Moulding and edge polishing Sundries apoxy resin & cutting machine etc. Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10% Add 1% hindrance on material Add 10% hindrance on Labour
Cost of 2 Sqm Rate per Sqm

1.30 1.30
78.00 65.00

812.00 221.00 221.00 137.28 114.40 8696.89 86.97 8783.86 878.39 71.91 150.57
9884.73 4942.36

Say Rs

4942.0

per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Code

Remark

UPPWD S.R.

RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

334

thick,for kitchen ons of required size of ment mortar (1 cement:4 with pigment to match the

Rate Code

Remark

Market Rate Analysed rate

UPPWD S.R. 9999 9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Page No.-123

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

334

thick,for kitchen ons of required size of ment mortar (1 cement:4 with pigment to match the

Rate Code

Remark

Market Rate Analysed rate

UPPWD S.R. 9999 9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.10.1.3, Page No.-1002

Item No.Sl.No.

Supply and fixing of steel kitchen sink 600X450X200 mm with drain board,with C.P.jali,P.V.C.waste pipe,bracket,including supply of all material, labour, T&P etc. for proper completion of work.
Description Details of cost for one no Material :steel kitchen sink 600X450X200 mm with drain board C.I. bracket for wash basin and sinks Cement, sand and grit etc. Painting brackets P.V.C.waste pipe Labour :Fitter (grade 1) Mason Grade- I Beldar Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10% Unit Qty Rate Cost Rate Code Remark

Each Pair L.S. L.S. Each Day Day Day

1 1 27.04 27.04 1 0.22 0.6 0.82

2700 50 1.76 1.76 21 260 260 170

2700.00 UPPWD S.R. DSR 201250.00 Item-1309 47.59 9999 47.59 9999 DSR 201221.00 Item-7117 57.20 156.00 139.40 UPPWD S.R. 3218.78 32.19 3250.97 325.10

Cost of One

3576.07

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.10.1.3, Page No.-1002

Item No.Sl.No.

Supply and fixing of steel kitchen sink 1040X510X200 mm with drain board (Nirali make Elegance stain),with C.P.jali,P.V.C.waste pipe,bracket,including supply of all material, labour, T&P etc. for proper completion of work.
Description Details of cost for one no Material :Unit Qty Rate Cost Rate Code Remark

steel kitchen sink 600X450X200 mm with drain board C.I. bracket for wash basin and sinks Cement, sand and grit etc. Painting brackets P.V.C.waste pipe Labour :Fitter (grade 1) Mason Grade- I Beldar Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%

Each Pair L.S. L.S. Each Day Day Day

1 1 27.04 27.04 1 0.22 0.6 0.82

7995 50 1.76 1.76 21 260 260 170

7995.00 50.00 47.59 47.59 21.00

Market Rate (Nirali Popular range Elegance stain) DSR 2012Item-1309 9999 9999 DSR 2012Item-7117

57.20 156.00 139.40 UPPWD S.R. 8513.78 85.14 8598.92 859.89

Cost of One

9458.81

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-13

Item No.Sl.No .

Cement Mortar 1:4 (1 cement:4 coarse sand)

Description Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum

Unit

Qty

Rate

Cost

Rate Code

Remark

Tonne Tonne cum

0.38 1.07

6100.00 1534.70

2318.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

UPPWD S.R. UPPWD S.R. 9999 9999

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.41.2, Page No.-622

Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) Item with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and No.- shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete. (size of tiles 600X600mm)
Sl.No . Description Details of cost for 1 sqm Material :Vitrified floor tiles 60x60 cm size = 1.00 sqm Add for wastage & breakage @ 2.5 % = 0.025 sqm Total = 1.025 sqm Unit Qty Rate Cost Rate Code Remark

1 1

Vitrified floor tile 60x60 cm Lite shade (D1-SR1-4) (80%) Vitrified floor tile 60x60 cm Dark shade (DC-4) (20%)
Cement mortar 1:3 (1 cement : 3 coarse sand) Mortar for pointing in white cement Cement for slurry over bed @ 3.3 kg per sqm Labour :Mason Coolie Sundries including carriage of cement etc. Add water charges @ 1%

Sqm Sqm
Cum L.S. Tonne Day Day L.S.

0.820 0.205
0.024 3.64 0.0033 0.20 0.20 26.91

534.00 885.00
4173.14 1.76 6100.00 292.00 170.00 1.76 Total = Total =

437.88 181.43
100.16 6.41 20.13

Market rate
Analysed rate 9999 UPPWD S.R.

Add for contractor's proffit and overheads @10%

58.40 UPPWD S.R. 34.00 47.36 9999 885.76 8.86 894.62 89.46

Cost of 1 Sqm
"Certified that above mentioned market rates verified from market and found lowest."

984.08

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Anlysis of Rate
Reference from Analyses of rates CPWD-2012, Vol-I, Item code-11.49.2 + 11.48.2 with UPPWD SR/Market rates.

Providing and laying Vitrified tiles in floor, dado/skirting with different sizes (thickness to be spe manufacturer), with water absorption less than 0.08% and conforming to IS:15622 , of approved brand & ma all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) IS : 15477, in average 10 mm thickness, including grouting of joints Grouting the joints of flooring tiles hav mm width, using Polymer based grout mix of 0.70 kg of organic coated filler of desired shade, including fi Item and finishing complete as per direction of Engineer-in-charge. Size of Tile 600x600 mm
Sl.No. Description Details of cost for 1 sqm Material :Unit Quantity Rate

Vitrified floor tiles 60 x 60 cm size = 1.00 sqm + Add wastage & breakage @ 2.5% = 0.025 sqm, Total = 1.025 sqm 1 2 3 4 5 6 7 8 Vitrified floor tile 60x60 cm Dark shade (DC-4)(20%) High polymer modified quickset tile per adhesive Polymer based Grout
Labour :-

Sqm Kg Kg day day L.S.

1.025 16.67 0.18 0.28 0.48 31.91

885.00 20.00 60.00 292.00 170.00 1.76

Mason 1 st class Coolie Sundries including carriage of quick set polymer etc. Total = Add water charges @ 1% Total = Add for CPOH @ 10%
Cost of 1 sqm

Rate per Sqm


"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

h UPPWD SR/Market rates.

sizes (thickness to be specified by the 5622 , of approved brand & manufacturer, in et tile adhesive (water based) conforming to the joints of flooring tiles having joints of 3 of desired shade, including filling/ grouting x600 mm
Amount Item code Remark as per

907.13 Market 333.40 rate 10.80 81.76 81.60 56.16 1470.85 14.71 1485.56 148.56
1634.11

9999

1634.11

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Anlysis of Rate
Reference from Analyses of rates CPWD-2012, Vol-I, Item code-11.49.2 + 11.48.2 with UPPWD SR/Market rates. Providing and laying Vitrified tiles in floor, dado/skirting with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622 , of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 10 mm thickness, including grouting of joints Grouting the joints of flooring tiles having joints of 3 mm width, using Polymer based grout mix of 0.70 kg of organic coated filler of desired shade, including filling/ grouting and finishing Item complete as per direction of Engineer-in-charge. Size of Tile 600x600 mm
Sl.No. Description Details of cost for 1 sqm Material :Unit Quantity Rate Amount Item code as per

Vitrified floor tiles 60 x 60 cm size = 1.00 sqm + Add wastage & breakage @ 2.5% = 0.025 sqm, Total = 1.025 sqm 1 1 2 3 4 5 6 7 8 Vitrified floor tile 60x60 cm Lite shade (D1-SR1-4) (80%) Vitrified floor tile 60x60 cm Dark shade (DC-4)(20%) High polymer modified quickset tile per adhesive Polymer based Grout
Labour :-

Sqm Sqm Kg Kg day day L.S.

0.820 0.205 16.67 0.18 0.28 0.48 31.91

555.00 885.00 20.00 60.00 292.00 170.00 1.76

455.10 Market 181.43 rate 333.40 10.80 81.76 81.60 56.16 1200.25 12.00 1212.25 121.22
1333.47

Mason 1 st class Coolie Sundries including carriage of quick set polymer etc. Total = Add water charges @ 1% Total = Add for CPOH @ 10%
Cost of 1 sqm

9999

Rate per Sqm


"Certified that above mentioned market rates verified from market and found lowest."

1333.47

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

WD-2012, Vol-I, Item code-11.49.2 + 11.48.2 with UPPWD SR/Market rates.

in floor, dado/skirting with different sizes (thickness to be specified by the manufacturer), 08% and conforming to IS:15622 , of approved brand & manufacturer, in all colours and gh polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in ng grouting of joints Grouting the joints of flooring tiles having joints of 3 mm width, using 0 kg of organic coated filler of desired shade, including filling/ grouting and finishing eer-in-charge. Size of Tile 600x600 mm
Remark

et rates verified from market and found lowest."

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123

Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

UPPWD S.R. UPPWD S.R. 9999 9999

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.37, Page No.-618

Providing and laying Ceramic glazed floor rectifited tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours Item such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 No.Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
Sl.No. Description Details of cost for 1 sqm Material :Glazed Ceramic floor tiles 300x300 mm size = 1.00 sqm Add for wastage & breakage @ 2.5 % = 0.025 sqm Total = 1.025 sqm Ceramic Glazed Tiles 1st quality 300 x 300 mm Cement mortar 1:3 (1 cement : 3 coarse sand) Mortar for pointing in white cement L Cement for slurry over bed @ 3.3 kg per sqm Labour :Mason Coolie Sundries including carriage of cement etc. L. Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1 Sqm Total = Sqm Cum L.S. Tonne Day Day L.S. 1.025 0.024 20.20 0.0033 0.20 0.20 26.91 655.00 4173.14 1.64 6100.00 292.00 170.00 1.64 Total = 671.38 100.16 33.13 20.13 Market Rate Analysed rate 9999 UPPWD S.R. Unit Qty Rate Cost Rate Code Remark

58.40 UPPWD S.R. 34.00 44.13 9999 961.32 9.61 970.93 97.09 1068.03

Say Rs

1068.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item No.- Cement Mortar 1:3 (1 cement:3 coarse sand)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Tonne 0.51 6100.00 Carriage of cement Tonne Coarse sand cum 1.07 1534.70 Labour :For measuring, carring depositing and mixing Beldar Day 0.75 170.00 Bhisti Day 0.07 205.00 Hire and running charges of mechanical mixer L.S. 26.91 1.76 Sundries L.S. 13.52 1.76 Cost of One Cum Total = Cost

3111.00 1642.13

127.50 14.35 47.36 23.80 4966.14

Providing and fixing 1st quality ceramic glazed wall tiles (bell/kajaria/somany)confo 15622 (thickness to be specified by the manufacturer), of approved make, in all col except burgundy, bottle green, black of any size as approved by Engineer-in-Charg Item No.- risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coa jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cemen pigment of matching shade complete. 300x450mm
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.36, Page No.-618 Description Unit Qty Rate Details of cost for 1 sqm Material :Ceramic Glazed tiles = 1.00 sqm Add for wastage & breakage @ 2.5 % = 0.025 sqm Total = 1.025 sqm

Sl.No.

Cost

Ceramic Glazed Tiles 1st quality 200 x 300 mm Cement mortar 1:3 (1 cement : 3 coarse sand) Mortar for pointing in white cement L Cement for slurry over bed @ 3.3 kg per sqm Labour :Mason Coolie Sundries including carriage of cement etc. L. Add water charges @ 1%

Sqm Cum L.S. Tonne Day Day L.S.

1.025 0.014 40.43 0.0033 0.25 0.25 26.91

694.00 4966.14 1.76 6100.00 292.00 170.00 1.76 Total = Total =

711.35 69.53 71.16 20.13 73.00 42.50 47.36 1035.02 10.35 1045.37 104.54

Add for contractor's proffit and overheads @10%

Cost of 1 Sqm

1149.91

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

aria/somany)conforming to IS : d make, in all colours, shades Engineer-in-Charge, in skirting, 3 (1 cement : 3 coarse sand) and ing in white cement mixed with

Rate Code

Remark

Market Rate (Kajaria300x450 Digital) Analysed rate 9999 UPPWD S.R. UPPWD S.R. 9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item No.- Cement Mortar 1:3 (1 cement:3 coarse sand)
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Tonne 0.51 6100.00 Carriage of cement Tonne Coarse sand cum 1.07 1534.70 Labour :For measuring, carring depositing and mixing Beldar Day 0.75 170.00 Bhisti Day 0.07 205.00 Hire and running charges of mechanical mixer L.S. 26.91 1.64 Sundries L.S. 13.52 1.64 Cost of One Cum Total = Cost Rate Code Remark

3111.00 1642.13

UPPWD S.R. RMR Rate

127.50 14.35 44.13 22.17 4961.28

UPPWD S.R. UPPWD S.R. 9999 9999

Providing and fixing 1st quality ceramic glazed wall tiles (bell/kajaria/somany)conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, Item No.- risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. non rectficed ordnary tile.
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.36, Page No.-618 Description Unit Qty Rate Details of cost for 1 sqm Material :Ceramic Glazed tiles = 1.00 sqm Add for wastage & breakage @ 2.5 % = 0.025 sqm Total = 1.025 sqm Ceramic Glazed Tiles 1st quality 200 x 300 mm Cement mortar 1:3 (1 cement : 3 coarse sand) Mortar for pointing in white cement L Cement for slurry over bed @ 3.3 kg per sqm Labour :Mason Coolie Sundries including carriage of cement etc. L. Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1 Sqm

Sl.No.

Cost

Rate Code

Remark

Sqm Cum L.S. Tonne Day Day L.S.

1.025 0.014 40.43 0.0033 0.25 0.25 26.91

416.00 4961.28 1.76 6100.00 292.00 170.00 1.76 Total =

426.40 69.46 71.16 20.13

UPPWD S.R. Analysed rate 9999 UPPWD S.R.

73.00 UPPWD S.R. 42.50 47.36 9999 750.01 7.50 757.51 75.75 833.26

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis

Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-16.68, Page No.-967 Providing and laying 80 mm thick factory made cement concrete interlocking paver block of m block making machine with strong vibratory compaction, of approved size, design & shape, laid in r Item colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the join No.fine sand etc. all complete as per the direction of Engineer-in-charge.
Sl.No. Description Detail of cost for 10 sqm Material :Unit Qty Rate Cost

Interlocking C.C. paver block (80 mm thick, )


Bedding Layer 50mm thick Coarse sand =10x0.050=0.50 cum

Sqm Cum Cum Day Day Day Day

10.00 0.50 0.15 0.50 0.50 1.00 0.50

495.00 1534.70 450.00 260.00 235.00 170.00 170.00 Total = Total =

4950.00 767.35 67.50 130.00 117.50 170.00 85.00 6287.35 62.87 6350.22 635.02 6985.25

Fine sand (zone IV)


Labour :Mason 1 st class Mason 2 st class Beldar Coolie Add water charges @ 1%

Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm

Total =

698.52

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

age No.-967 erlocking paver block of made by ze, design & shape, laid in required coarse sand, filling the joints with

Rate Code

Remark

Market Rate RMR Rate UPPWD S.R.

UPPWD S.R.

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123 Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.19.3, Page No.-598 Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, joint neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and p Item complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) :Dark shade pigmen No.ordinary cement
Sl.No. Description Detail of cost for 10 sqm Material :Unit Qty Rate Cost

Chequered terrazzo tiles 22 mm thick (dark shade)including 10% wastage. 11.00 sqm
Cement mortar 1:4 (1 cement : 4 coarse sand)

Sqm Cum

11.00 0.224

760.00 4173.14

8360.00 934.78

Ordinary cement for (i) Cement slurry @ 4.4kg/sqm = 44kg+ (ii) Grouting = 44 kg. Total = 88kg or 0.088 tonne
Black colour dark shade pigment Labour :Mason Coolie Skilled Beldar (for floor rubbing etc.) Bhisti Machine for rubbing of floors Sundries including carborandum stone etc. L

Tonne Kg Day Day Day Day Day L.S.

0.088 3.08 1.60 2.00 1.00 1.00 1.60 161.98

6100.00 75.00 260.00 170.00 170.00 205.00 280.00 1.76

536.80 231.00 416.00 340.00 170.00 205.00 448.00 285.08

Total = Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm

11926.67 119.27 12045.93 1204.59 13250.53

Total =

1325.05

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

e No.-123

Rate Code

Remark

UPPWD S.R. RMR Rate

UPPWD S.R. UPPWD S.R. 9999 9999

Page No.-598 up to 6 mm in floors, jointed with s, including rubbing and polishing e sand) :Dark shade pigment using

Rate Code

Remark

Market Rate Analysed rate

UPPWD S.R.

UPPWD S.R.

9999

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123 Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.64 1.64 Total =

127.50 14.35 44.13 22.17 4168.28

UPPWD S.R. UPPWD S.R. 9999 9999

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.16.3, Page No.-593 Precast terrazo tiles 22 mm thick with graded marble chips of size upto 12 mm, laid in floors, and landings, jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and Item polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) :Dark shade No.pigment using ordinary cement
Sl.No. Description Detail of cost for 10 sqm Material :Unit Qty Rate Cost Rate Code Remark

Precast terrazo tiles,22 mm thick white cement (250X250 mm size),including 10% wastage 11.00 sqm or 176 No
Cement mortar 1:4 (1 cement : 4 coarse sand)

Ordinary cement
Black colour dark shade pigment Labour :Mason Coolie Skilled Beldar (for floor rubbing etc.) Bhisti Machine for rubbing of floors Sundries including carborandum stone etc. L Add water charges @ 1%

Nos. Cum Tonne Kg Day Day Day Day Day L.S.

176.00 0.224 0.088 3.08 1.60 2.00 1.00 1.00 1.60 161.98

12.00 4168.28 6100.00 75.00 260.00 170.00 170.00 205.00 280.00 1.76 Total = Total =

2112.00 933.70 536.80 231.00 416.00 340.00 170.00 205.00 448.00 285.08 5677.58 56.78 5734.36 573.44 6307.79

UPPWD S.R. Analysed rate UPPWD S.R.

UPPWD S.R.

9999

Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm

Total =

630.78

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item No.Sl.No .

Cement Mortar 1:4 (1 cement:4 coarse sand)

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123 Description Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Unit Qty Rate Cost Rate Code Remark

Tonne Tonne cum

0.38 1.070

6100.00 1534.70

2318.00 1642.13

UPPWD S.R. RMR Rate

Day Day L.S. L.S.

0.75 0.07 26.91 13.52

170.00 205.00 1.76 1.76 Total =

127.50 14.35 47.36 23.80 4173.14

UPPWD S.R. UPPWD S.R. 9999 9999

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-11.26.1, Page No.-609

Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement Item slurry mixed with pigment to match the shade of the slab, including rubbing and polishing cmplete No.- with base of cement mortar 1: 4 (1cement : 4 coarse sand) :25mm thick
Sl.No .

Description Detail of cost for 10 sqm Material :-

Unit

Qty

Rate

Cost

Rate Code

Remark

Kota stone slab 25 mm thick (semi-polished) including 15% wastage


Cement mortar 1:4 (1 cement : 4 coarse sand) Cement for slurry(i) for bedding = 44kg+ (ii) for joints = 20 kg. Total = 64 kg. or 0.064 tonne

Sqm Cum

11.50 0.224

400.00 4173.14

4600.00 934.78

UPPWD S.R. Analysed rate

Ordinary cement
Black colour dark shade pigment Labour :Mason Beldar Coolie Skilled Beldar (for floor rubbing etc.) Machine for rubbing of floors Sundries Add water charges @ 1%

Tonne Kg Day Day Day Day Day L.S.

0.064 4.50 1.20 1.00 1.00 5.00 4.00 208.13

6100.00 75.00 260.00 170.00 170.00 170.00 280.00 1.76 Total = Total =

390.40 UPPWD S.R. 337.50 312.00 170.00 170.00 UPPWD S.R. 850.00 1120.00 366.31 9999 9250.99 92.51 9343.50 934.35 10277.85 1027.79

Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm

Total =

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-18.10.1, Page No.-1097

Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and mak Item No.-Internal work - Exposed on wall, 15 mm dia nominal bore
Sl.No. Description Details of cost for 10 metre Material :G.I. pipes 15 mm dia 15% for fiitings White lead, hemp, oil etc Cement, sand and grit etc. Labour :Fitter (grade 1)/Plumber Assistant Fitter/Plumber Beldar Total Add water charges @ 1% except on A Total Add for contractor's proffit and overheads @10% except on A Unit Qty Rate

RMT L.S. L.S. Day Day Day

11.50 8.06 2.73 0.33 0.66 0.66

88.20 1.76 1.76 260 220 170

Cost of 10 metre Cost of Per metre


"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

/c cutting and making good the walls etc.

Cost

Rate Code

Remark

1014.30 14.19 4.80 85.80 145.20 112.20 1376.49 13.72 1390.21 138.54

Market Rate 9999 9999

UPPWD S.R.

1528.75 152.87

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-18.11.1, Page No.-1097

Providing & Fixing GI pipes complete with GI fittings and clamps including making good the walls etc. Item No.-concealed pipe including painting with anti corrosive bitumastic paint, cutting chases and making good the wall: 15 mm dia nominal bore
Sl.No. Description Details of cost for 10 metre Material :G.I. pipes 15 mm dia 15% for fiitings White lead, hemp, oil etc Painting G.I. pipe with anti-corrosive bitumastic paint two or more coats Rate as per DSR- 2012-Item Number 18.40.1 of SH: Water supply Making chases upto 7.5x7.5cm in walls and making good the same Labour :Fitter (grade 1)/Plumber Assistant Fitter/Plumber Beldar Total Add water charges @ 1% except on A Total Add for contractor's proffit and overheads @10% except on A Unit Qty Rate Cost Rate Code Remark

RMT L.S.

11.50 8.06

88.20 1.76

1014.30 14.19

Market Rate 9999

metre

10.00

4.40

44.00

DSR 2012Item-18.40.1

metre Day Day Day

10.00 0.33 0.66 0.66

55.52 260 220 170

555.16 Analysed Rate 85.80 145.20 112.20 1970.84 13.72 1984.56 138.54

UPPWD S.R.

Cost of 10 metre Cost of Per metre


"Certified that above mentioned market rates verified from market and found lowest."

2123.10 212.31

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-4.2.5, Page No.-142 Sl.No. Description Detail of cost for one cum Material :Unit Qty Rate Cost Rate Code

Item No.-

Stone Aggregate (Single size) : 20 mm nominal size Stone Aggregate (Single size) : 10 mm nominal size Coarse sand
Cement Labour :-

cum cum cum Tonne


Day Day Day Day

0.70 0.24 0.47 0.22 0.06 0.06 0.90 0.78 0.70

2188.30 1971.90 1534.70 6100.00 260.00 235.00 170.00 170.00 205.00

1531.81
RMR Rate

473.26 721.31 1342.00


UPPWD S.R.

Mason Ist class Mason 2nd class Beldar Coolie Bhisti Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper Vibrator (Needle type 40 mm) Scaffolding Sundries Coolie Extra labour for lifting.material upto floor level = 0.75x2.50 = 1.88 Add water charges @ 1%

15.60 14.10 153.00 132.60 UPPWD S.R. 143.50

Day Day

L.S. L.S.

0.07 0.07 114.40 13.52

800.00 300.00 1.76 1.76

56.00 21.00 201.34 23.80

0012 9999 9999

Day

1.88

170.00

Total = Total = Add for contractor's proffit and overheads @10%


Cost of One Cum

319.60 UPPWD S.R. 5148.91 51.49 5200.40 520.04


5720.44

Say Rs

5720.00 per cum

Junior Engineer

Assistant Engineer

Ex. Engineer

Maint.Division 1,Civil P.W.D. Lucknow

Maint.Division 1,Civil P.W.D. Lucknow

Maint.Division P.W.D. Lucknow

lls (any rs, posts, s, anchor excluding e sand : 6 graded

Remark

Ex. Engineer

Maint.Division P.W.D. Lucknow

Rate Analysis
Making chases up to 7.5x7.5 cm in walls including making good and finishing Item No.- with matching surface after housing G.I. pipe etc.
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-18.78, Page No.-1218 Description Unit Qty Details of cost for 10 metre Material :Labour for making chases Mason 1 st class Day 0.25 Mason 2nd class Day 0.25 Beldar Day 1 Cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 0.075x0.075x10 m = 0.05625 cum Les 33% for pipe etc. = (-) 0.01856 cum = 0.03769 cum Say 0.04 cum Cum 0.04 Total Add water charges @ 1% except on A Total Add for contractor's proffit and overheads @10% except on A

Sl.No.

Rate

Cost

Rate Code

Remark

260 235 170

65.00 58.75 170.00

UPPWD S.R.

5720.00

228.80 522.55 2.94 525.49 29.67

Analysed rate

Cost of 10 metre Cost of Per metre

555.16 55.52

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.18.1/18.53.1/18.21.1.1, Page No.-1008/1170/1112

Supply and fixing of P.V.C low level cistern with all internal fittings M.S. bracket P.V.C. Connection C.P. Item angle valve 15mm dia, brass ball cock complete including suplly of all material, labour, T&P etc. required for No.- proper completion of the work.
Sl.No . Description Details of cost for one no Material :Unit Qty Rate Cost Rate Code Remark

Flushing Cistern P.V.C. 10 litre capacity (low evel ) (White) ( with fittings, accessories and flush pipe) C.P. Brass angle valve 15 mm Unplasticised P.V.C. connection pipe
Labour :Fitter (grade 1 Beldar Carriage and fixing changes for angle valve Carriage of materials and fixing charges Add water charges @ 1%

Each Each Each Day Day L.S. L.S.

1.00 1.00 1.00 0.125 0.125 11.31 12.22

695.00 422.00 45.00 235.00 170.00 1.76 1.76 Total = Total =

695.00 422.00 45.00

UPPWD S.R. Market Rate UPPWD S.R.

29.38 UPPWD S.R. 21.25 19.91 9999 21.51 9999 1254.04 12.54 1266.58 126.66

Add for contractor's proffit and overheads @10%

Cost of One No.

Total =

1393.24

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint. Division-1, Civil UP PWD, Lucknow

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow Assistant Engineer


Maint. Division-1, Civil UP PWD, Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow Ex. Engineer


Maint. Division-1, Civil UP PWD, Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.18.1/18.53.1/18.21.1.1, Page No.-1008/1170/1112

Supply and fixing of P.V.C low level cistern (Paryware/Cera/Johnson make) with all internal fittings M.S. Item bracket P.V.C. Connection C.P. angle valve 15mm dia, brass ball cock complete including suplly of all No.- material, labour, T&P etc. required for proper completion of the work.
Sl.No . Description Details of cost for one no Material :Unit Qty Rate Cost Rate Code Remark

Flushing Cistern P.V.C. 10 litre capacity (low evel ) (White) ( with fittings, accessories and flush pipe) C.P. Brass angle valve 15 mm Unplasticised P.V.C. connection pipe
Labour :Fitter (grade 1 Beldar Carriage and fixing changes for angle valve Carriage of materials and fixing charges Add water charges @ 1%

Each Each Each Day Day L.S. L.S.

1.00 1.00 1.00 0.125 0.125 11.31 12.22

1545.00 600.00 45.00 235.00 170.00 1.76 1.76 Total = Total =

1545.00 600.00 45.00

Market Rate Market Rate UPPWD S.R.

29.38 UPPWD S.R. 21.25 19.91 9999 21.51 9999 2282.04 22.82 2304.86 230.49

Add for contractor's proffit and overheads @10%

Cost of One No.

Total =

2535.34

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint. Division-1, Civil UP PWD, Lucknow

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow Assistant Engineer


Maint. Division-1, Civil UP PWD, Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow Ex. Engineer


Maint. Division-1, Civil UP PWD, Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.7.3, Page No.-996

Supply and fixing of White Glazed earthen ware wash hand basin with C.P. jali, angle valve, PVC Item waste pipe,pillar cock,bracket etc complete including supply of all materials,Labours,T & P No.- etc.required for proper completion of the work (22"X16" size)
Sl.No . Description Details of cost for one no Material :Unit Qty Rate Cost Rate Code Remark

wash basin 22"x16" 15 mm C.P . brass tap C.P . brass waste 32 mm PVC Waste Pipe 32mm C.P. Brass angle valve 15 mm C.I. bracket for wash basin and sinks
Red lead, white lead and gasket Cement, sand and grit etc. Painting of brackets, fittings etc. Labour :Fitter (grade 1 Mason 2n Grade Beldar Add water charges @ 1%

Each Each Each Each Each Pair L.S. L.S. L.S. Day Day Day

1.00 1.00 1.00 1.00 1.00 1.00 16.12 13.39 26.91 0.330 0.330 0.670

580.00 434.00 58.00 33.00 422.00 50.00 1.76 1.76 1.76 235.00 235.00 170.00 Total = Total =

580.00 434.00 58.00 33.00 422.00 50.00 28.37 23.57 47.36

UPPWD S.R. UPPWD S.R. UPPWD S.R. UPPWD S.R. Market Rate UPPWD S.R. 9999 9999 9999

77.55 77.55 UPPWD S.R. 113.90 1945.30 19.45 1964.75 196.48

Add for contractor's proffit and overheads @10% Cost of One No.

Total =

2161.23

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-17.7.3, Page No.-996

Supply and fixing of White Glazed earthen ware wash hand basin with pedestal Item (Paryware/Cera/Johnson make) with C.P. jali, angle valve, PVC waste pipe,C.P . brass Piller Cock No.- Long Neck,bracket etc complete including supply of all materials,Labours,T & P etc.required for proper completion of the work (22"X16" size)
Sl.No . Description Details of cost for one no Material :Unit Qty Rate Cost Rate Code Remark

wash basin 22"x16" Pedestal 15 mm C.P . brass Piller Cock Long Neck C.P. Brass angle valve 15 mm C.P . brass waste 32 mm PVC Waste Pipe 32mm C.I. bracket for wash basin and sinks
Red lead, white lead and gasket Cement, sand and grit etc. Painting of brackets, fittings etc. Labour :Fitter (grade 1 Mason 2n Grade Beldar Add water charges @ 1%

Each Each Each Each Each Each Pair L.S. L.S. L.S. Day Day Day

1.00 1.00 1.00 1.00 1.00 1.00 1.00 16.12 13.39 26.91 0.330 0.330 0.670

1270.00 1035.00 875.00 600.00 58.00 33.00 50.00 1.76 1.76 1.76 235.00 235.00 170.00 Total = Total =

1270.00 1035.00 875.00 600.00 58.00 33.00 50.00 28.37 23.57 47.36 UPPWD S.R. UPPWD S.R. UPPWD S.R. 9999 9999 9999 Market Rate

77.55 77.55 UPPWD S.R. 113.90 4289.30 42.89 4332.19 433.22

Add for contractor's proffit and overheads @10% Cost of One No.

Total =

4765.41

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Supply & Fixing 1 mm thick M.S.sheet Garrage door with frame of 40X40X6 mm thick M.S.gusset plate at the junction and corners including supply and fixing of necessary fittings,lock rail of 15" length oxidised iron Item ,pintels,hooks at the top,including cost of all materials, labour, T&P etc. complete No.-

Reference from UPPWD Analysis of rate - 1969, Item No.-517, Page No.-56 Sl.No . Description Details of cost of a double lift door size 2.40x2.40m = 5.76 Sqm Material :Unit Qty Rate Cost Rate Code Remark

MS Sheet 1mm thick Gusset Plate Angle Iron Pintels including bolt & nuts & fitting in Position Hooks Sub Total Locking Arrangement & handles etc. (8.00x8432.79/229.88 = 293.47) Cement Concrete (5.00x8432.79/229.88 = 293.47) Rivets (10.00x8432.79/229.88 = 293.47)
Labour :labour Fitter Blacksmith Mason Beldar Mazdoor

Kg Kg Kg Each Each

49.74 16.08 93.56 4.00 2.00

62.50 44.00 44.00 110.00 30.00

3108.63 707.52 4116.64 440.00 60.00 8432.79

UPPWD S.R. UPPWD S.R. UPPWD S.R. DSR-20121222 DSR-20121019

L.S. L.S. L.S. Day Day Day Day Day 2.000 7.000 1/8 2.000 3.000 170.00 260.00 260.00 170.00 170.00

293.47 183.42 366.83 340.00 1820.00 32.50 UPPWD S.R. 340.00 510.00 12319.00 220.55 12539.56 1253.96 13793.51 2394.71

Sub Total
Sundries (6.00x12319.00/335.13 = 220.55) L.S. Total = Add for contractor's proffit and overheads @10% Cost of 5.76 Sqm Rate per Sqm

Total =

Say Rs

2395.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
S/F of 25 mm thick flush door shutter one side laminated ,including supply of all materials, labour, Item T&P etc. required for proper completion of work. No.Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.21.3, Page No.-378 Sl.No . Description Details of cost for 2.2 sqm Material :Unit Qty Rate Cost Rate Code Remark

25 mm thick flush door shutter one side laminated Add Wastage 10% Fittings for a door 2.2x1.0m = 2.20 sqm Nickel plated bright finished mild steel me piano hinges 1 mm thick 25 mm wide screws 25 mm
Labour :Carpentar Beldar Add water charges @ 1%

Sqm

2.20

1320.00

2904.00 290.40

market rate

Mtr 100 Nos Day Day

4.40 125.00 0.550 0.550

35.00 30.00 260.00 170.00 Total = Total =

154.00 37.50

DSR-20120608 UPPWD S.R.

143.00 UPPWD S.R. 93.50 3622.40 36.22 3658.62 548.79 4207.42 1912.46

Add for contractor's proffit and overheads @15% Cost of 2.20 sqm Rate per Sqm

Total =

Say Rs

1912.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate Brick Bata Coba Treatment- 2009, Item No.-1, Page No.-12

Item No.Sl.No. Description Detail of cost for 10 Sqm i) Cement Slury

Providing and laying "brick coba" 12 mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15 mm to each other , over 20 mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with aerclic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30 cm X 30 cm and side wall parapet shall be mono tythic plaster wall upto 30 cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary Coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including s/o all material, laboure, T & P etc. complete for proper completion of work.
Unit Qty Rate Cost Rate Code Remark

Cement
ii) iii) Cement mortar 1:5 (1cement : 5coarse sand) Roof Treanment with brick bats and cement mortar Materials : Bricks bats/brick aggregate Cement mortar 1:5 (1cement : 5coarse sand) Labour : Beldar

Tonne
Cum

0.028
0.224

6100.00 3746.14

170.80
839.13

UPPWD S.R. Analysed rate

Cum Cum Day

0.94 0.50 1.75

850.00 3746.14 170.00 205.00 260.00 235.00 185.00 170.00 1.64 6100.00 170.00 188.00 40.00

799.00 1873.07 297.50

Market rate Analysed rate

Bhisti Mason Ist class Mason IInd class Mat


Extra Labour for ramming : Beldar Sundries Cement Slury :

Day
Day Day Day Day L.S.

0.28 0.05 0.05 0.04


0.25 13.65

57.40 13.00 11.75 7.40


42.50 22.39

UPPWD S.R.

UPPWD S.R. 9999 UPPWD S.R.

iv)

Cement
Beldar 20mm cement Plaster 1:4 (1cement : 4 coarse sand) Waterproofing compound Extra for making chequers for 10 Fibre glass tissue reinforcement type II grade I

Tonne
Day Sqm Kg

0.028
0.2 10.00 5.00

170.80
34.00 1880.00 200.00

v) vi)

Analysed rate UPPWD S.R.

Mason IInd class


Beldar chequer Plate Add labour for laying 20mm bed

Sqm Day Day L.S. Day Day

10.50

0.36
0.36 13.65

65.00 235.00 170.00 1.64 235.00 170.00 205.00

682.50 DSR 2012-7233

84.60
61.20 22.39

UPPWD S.R. 9999

Mason IInd class


Beldar

0.54
0.54

126.90
91.80
UPPWD S.R.

Bhisti Total Add water charges @ 1% on all except labour charges and (V) Total
Add for contractor's proffit and OH @10% on all except (V)

Day

0.45

92.25 7580.37 49.14 7629.52


574.95

Cost of 10 Sqm Rate Per Sqm

8204.47 820.45

Say Rs

820

per Sqm

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Rate Analysis
Item No.Sl.No .

Cement Mortar 1:5 (1 cement : 5 coarse sand)

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.10, Page No.-123 Description Detail of cost for one cum Material :(0.214cum. of cement = 0.31 tonne) Cement required for cement mortar is 21.40% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.76 1.76 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 3746.14
9999 9999

Unit

Qty

Rate

Cost

Rate Code

Remark

Tonne Tonne cum

0.31 1.070

6100.00 1534.70

1891.00 UPPWD S.R. RMR Rate 1642.13

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123 Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.64 1.64 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 44.13 22.17 4168.28 9999 9999 Tonne Tonne cum 0.38 1.070 6100.00 1534.70 Rate Code Remark

2318.00 UPPWD S.R. 1642.13 RMR Rate

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse sand )
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1), Page No.-711 Description Unit Qty Rate Cost Detail of cost for 10 sqm Material :Cement mortar 1:4 (1 cement : 4 coarse sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Cum Day Day Day L.S. 0.224 0.94 1.02 1.10 12.61 4168.28 260.00 170.00 205.00 1.64 Total = Rate Code Remark

933.70 Analysed rate 244.40 173.40 UPPWD S.R. 225.50 20.68 9999 1597.68 15.98 1613.65 161.37 1775.02 177.50

Total =

Say Rs 178.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item Cement Mortar 1:4 (1 cement:4 coarse sand) No.Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.9, Page No.-123 Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.268 cum. of cement = 0.38 tonne) Cement required for cement mortar is 26.80% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.76 1.76 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 4173.14 9999 9999 Tonne Tonne cum 0.38 1.070 6100.00 1534.70 Rate Code Remark

2318.00 UPPWD S.R. 1642.13 RMR Rate

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and rounded Item angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :4 coarse No.- sand ) including Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1 + 13.21, Page No.-711 Description Unit Qty Rate Cost Rate Code Detail of cost for 10 sqm Material :Cement mortar 1:4 (1 cement : 4 coarse sand) Waterproofing material Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Cum Kg Day Day Day L.S. 0.224 1.70 0.94 1.02 1.10 19.76 4168.28 40.00 260.00 170.00 205.00 1.76 Total = 933.70 Analysed rate 68.10 UPPWD S.R. 244.40 173.40 UPPWD S.R. 225.50 34.78 9999 1679.87 16.80 1696.67 169.67 1866.33 186.63 Remark

Total =

Say Rs 187.00 per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Item Cement Mortar 1:3 (1 cement:3 coarse sand) No.Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.64 1.64 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 44.13 22.17 4961.28 9999 9999 Tonne Tonne cum 0.51 1.070 6100.00 1534.70 Rate Code Remark

3111.00 UPPWD S.R. 1642.13 RMR Rate

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior Item plastering upto floor two level including internal rounded angles chamfers, and rounded No.- angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :3 coarse sand )
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1), Page No.-711 Description Unit Qty Rate Cost Detail of cost for 10 sqm Material :Cement mortar 1:3 (1 cement : 3 coarse sand) Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Cum Day Day Day L.S. 0.224 0.94 1.02 1.10 12.61 4961.28 260.00 170.00 205.00 1.64 Total = 1111.33 Rate Code Remark

Analysed rate

244.40 173.40 UPPWD S.R. 225.50 20.68 9999 1775.31 17.75 1793.06 179.31 1972.37 197.24

Total =

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis

Item Cement Mortar 1:3 (1 cement:3 coarse sand) No.Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-3.8, Page No.-122 Description Unit Qty Rate Cost Detail of cost for one cum Material :(0.357 cum. of cement = 0.51 tonne) Cement required for cement mortar is 35.70% Cement Carriage of cement Coarse sand Labour :For measuring, carring depositing and mixing Beldar Bhisti Hire and running charges of mechanical mixer Sundries Cost of One Cum Day Day L.S. L.S. 0.75 0.07 26.91 13.52 170.00 205.00 1.76 1.76 Total = 127.50 UPPWD S.R. 14.35 UPPWD S.R. 47.36 23.80 4966.14 9999 9999 Tonne Tonne cum 0.51 1.070 6100.00 1534.70 Rate Code Remark

3111.00 UPPWD S.R. 1642.13 RMR Rate

20 mm Cement plaster in single coat on rough side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and rounded Item angles not exceeding 80 mm. in girth and finished even and smooth.( 1 Cement :3 coarse No.- sand ) including Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers.
Sl.No. Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.6.1 + 13.21, Page No.-711 Description Unit Qty Rate Cost Rate Code Detail of cost for 10 sqm Material :Analysed Cement mortar 1:3 (1 cement : 3 coarse sand) Cum 0.224 4961.28 1111.33 rate Waterproofing material Labour :Mason Coolie Bhisti Scaffolding & Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 10 Sqm Cost of One Sqm Kg Day Day Day L.S. 1.70 0.94 1.02 1.10 19.76 40.00 260.00 170.00 205.00 1.76 Total = 68.00 UPPWD S.R. 244.40 173.40 UPPWD S.R. 225.50 34.78 9999 1857.41 18.57 1875.98 187.60 2063.58 206.36 Remark

Total =

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate Brick Bata Coba Treatment- 2009, Item No.-2, Page No.-13
Item Providing and laying water proofing on lime concrete roof by way of ferro concrete method detail as No.- under:(a)

Removing of bitu-felt, 25mm cement concrete/20mm cement mortar/25mm loose lime concrete & gola etc. (b) Making up with 25mm thick cement concrete 1:2:4 (12.5 mm stone aggregate) admixed with concrete bond-101/chembond/warrior-W-4, or equivalent polymer based bonding materials, one kg per bag of cement. (c) applying doncrete-A&B/Roof coat-AR/ Supercrete-SB (IS: 13435, Part-3), or equivalent polymer based coating (coating (two pack system) @ 400gm/sqm, second layer @ 600gm/sqm by brush. (d) Protective layer of 20mm thick cement: coarse sand (1:4) with power loom (G.I.) chicken mesh and admixed with concrete bond-101/chembond/warrior-Warrior-W-4, or equivalent polymer based bonding materials one kg per bag of cement, finishing the surface with neat cement and making of 9300 X 300)mm square. The entire treatment will be taken up to 30cm on parapet wall.
Sl.N o. Description Detail of cost for 10 Sqm A Removing of loose materials Beldar Unit Qty Rate Cost Rate Code Remark

Day

1.00

Bhisti 25mm C.C.(1:2:4) with 12.5mm concrete bond101& chicken mesh stone aggregates Cement Coarse sand
Concrete bond-101 Chicken mess Add wastage 2.5% on cement and C-sand Foreman/mistry

Day

0.06

170.00 205.00

170.00

12.30

UPPWD S.R.

Cum Bags Cum


Kg sqm Day

0.24 3.04 0.11


3.04 10.00 0.10

1971.90 305.00 1534.70 150.00 50.00 292.00 260.00 170.00 170.00 205.00

473.26 927.20 168.82


456.00 500.00 27.40 29.20

Market rate UPPWD S.R. Market rate Market rate UPPWD S.R.

Mason
Beldar Coolie

Day
Day Day

0.90
0.90 0.90

234.00
153.00 153.00
UPPWD S.R.

Bhisti/waterman Application of Doncrete A & B/RoofcoatAR/Supercrete SB or equivalent


Doncrete A & B/Roofcoat-AR/Supercrete SB or equivalent

Day

0.90

184.50

Kg

10.00

Mason (skilled)
Beldar 20mm thick C.M. (1:4) mixed concrete Bond101/Chembond/warrior-W-4 or equivalent with neat cement finishing

Day
Day

1.00
1.00

260.00 260.00 170.00

2600.00 260.00
170.00

Market rate UPPWD S.R.

Cement Coarse sand


Concrete Bond-101/Chembond/warrior-W-4 or equivalent Add wastage 2.5% on cement and C-sand Foreman

Bags Cum
Kg Day

2.70 0.29
2.7 0.45

305.00 1534.70 150.00 292.00 260.00 170.00 170.00 205.00

823.50 445.06
405.00 31.71 131.40

UPPWD S.R. Market rate Market rate

Mason (skilled)
Beldar Coolie

Day
Day Day

0.90
1.35 0.90

234.00
229.50 153.00
UPPWD S.R.

Bhisti/waterman Total
Add for contractor's proffit and OH @10%

Day

0.90

184.50 9156.35
915.64

Cost of 10 Sqm

10071.99

Rate Per Sqm Say Rs 1007.00 per Sqm

1007.20

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate Brick Bata Coba Treatment- 2009, Item No.-3, Page No.-13
Item No.-

Providing and laying water proofing treatment in sunkn portion of W.Cs, Bathroom etc, by applying cement slury mixed with waterproofing cement compound consisting of applying: (a) First layer of slurry of cement @ 0.488kg/sqm mixed with waterproofing cement compound @ 0.253kg/sqm. this layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm. mixed with waterproofing cement compound @ 0.126kg/sqm. this layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. the rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.

Sl.N o. Description Detail of cost for 10 Sqm Material:Cement 10x(0.488+0.242)=7.30 kg Seailing fillests 10x0.5kg=5.00kg Total = 12.30 kg = 0.012 Tonne

Unit

Qty

Rate

Cost

Rate Code Remark

UPPWD S.R.

Tonne

0.012

6100.00

73.20

Bonding material 1.60kgx30x2= 96 kg Bitumen(Blown/Residual type) 10x(0.25+0.125) = 3.79 kg Sealing 10x0.10kg/sqm = 1.00 kg Wastage @5% on 4.79kg = 0.24kg Total = 5.03 kg say 5.00 kg Polymer modified cementation coating
Labours:-

Kg Day
Day

5.00 2.00
2.00

150.01 260.00 170.00 205.00 1.76

750.07 DSR-2012-8501 520.00


340.00
UPPWD S.R.

Mason
Beldar

Bhisti/waterman Sundries, brushes etc. Total


Add water charges @ 1%

Day L.S.

0.25 15.60

51.25 27.46 1761.97


17.62 1779.59 177.96

9999

Total = Add for contractor's proffit and OH @10%

Cost of 10 Sqm

1957.55

Rate Per Sqm Say Rs 196.00 per Sqm

195.76

Junior Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil


P.W.D. Lucknow

Ex. Engineer Maint.Division


P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate watersupply and sanitary - 1975, Item No.-314, Page No.-24

Providing and fixing Indian type glazed earthen ware W.C. pan (Indian make) of approved Item quality size 580mm Orisa pan with 100 mm Sand Cast Iron P or S trap, including supply of all No.- materials, labour and T&P etc for the proper completion of the work including removal of old pan etc. if so required.
Sl.No. Description Detail of cost for 1 No Material :W.C. Pan size 580 mm Cement and sand etc. (900.00x1.00/100) Base Concrete 1:4:8 (900.00x3.50/100) 100 mm S.C.I. trap with vent heel Labour :Unit Qty Rate Cost Rate Code Remark

No. L.S. L.S. No. Day Day Day

1.00

900.00

900.00 UPPWD S.R. 9.00 31.50

1.00

363.81 235.00 260.00 170.00

363.81

DSR-20121896

Fitter Mason
Beldar

1/2 1/4 1/2

Sub Total Add for contractor's proffit @10%


Rate per No.

117.50 65.00 UPPWD S.R. 85.00 1571.81 157.18


1728.99

Say Rs

1729.00 per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from UPPWD Analysis of rate watersupply and sanitary - 1975, Item No.-314, Page No.-24

Providing and fixing Indian type glazed earthen ware W.C. pan (Paryware/CERA/Johnson Item Make) of approved quality size 580mm Orisa pan with 100 mm Sand Cast Iron P or S trap, No.- including supply of all materials, labour and T&P etc for the proper completion of the work including removal of old pan etc. if so required.
Sl.No. Description Detail of cost for 1 No Material :W.C. Pan size 580 mm Cement and sand etc. (900.00x1.00/100) Base Concrete 1:4:8 (900.00x3.50/100) 100 mm S.C.I. P-trap Labour :Unit Qty Rate Cost Rate Code Remark

No. L.S. L.S. No. Day Day Day

1.00

1375.00

1375.00 Market Rate 13.75 48.13

1.00

733.00 235.00 260.00 170.00

733.00 Market Rate 117.50 65.00 UPPWD S.R. 85.00 2437.38 243.74
2681.11

Fitter Mason
Beldar

1/2 1/4 1/2

Sub Total Add for contractor's proffit @10%


Rate per No.

Say Rs

2681.00 per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.2.1, Page No.-986

Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually Item controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, No.- including cutting and making good the walls and floors wherever required: W.C. pan with ISI marked white solid plastic seat and lid
Sl.No. Description Details of cost for 1 pan Material :White plastic seat (solid) with lid C.P . Brass hinges and rubber buffers Vitreous china pedestal type water closet Pan 580 mm dia Flushing Cistern P.V.C. 10 litre capacity (low level) (White) (with fittings, accessories and flush pipe) Cement, sand and grit etc Labour :Unit Qty Rate Cost Rate Code Remark

No. No.

1.00 1.00

495.00 750.00

495.00 750.00 UPPWD S.R.

No. L.S. Day Day Day

1.00 26.91

695.00 1.76 235.00 260.00 170.00

695.00

47.36 293.75 130.00 170.00 2581.11


25.81 2606.92

9999

Fitter Mason
Beldar

1.25 1/2 1

UPPWD S.R.

Sub Total
Add water charges @ 1% Total =

Add for contractor's proffit @10%


Rate per No.

260.69
2867.61

Say Rs

2868.00

per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.3.1, Page No.-987

Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern (Paryware/CERA/Johnson Make) & C.P. Item flush bend with fittings & C.l.brackets, 40 mm flush bend, overflow arrangement with specials of No.- standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required: W.C. pan with ISI marked white solid plastic seat and lid
Sl.No. Description Details of cost for 1 pan Material :White plastic seat (solid) with lid C.P . Brass hinges and rubber buffers Vitreous china pedestal type water closet Pan 580 mm dia Vitreous china 10 litres low level cistern with fittings Overflow arrangement and specials for oveflow pipe Mosquito proof coupling of approved design Plugs, screws etc Red lead, white lead and gasket Cement, sand and grit etc Labour :Unit Qty Rate Cost Rate Code Remark

No. No. No. L.S. No. L.S. L.S. L.S. Day Day Day

1.00 1.00 1.00 62.79 1.00 13.52 16.12 26.91

700.00 2450.00 1595.00 1.76 31.89 1.76 1.76 1.76 235.00 260.00 170.00

700.00 2450.00 1595.00 Market Rate

110.51
31.89

23.80 28.37 47.36

9999 DSR-20121350 9999 9999 9999

Fitter Mason
Beldar

1 1 1

Sub Total
Add water charges @ 1% Total =

235.00 260.00 UPPWD S.R. 170.00 5651.93


56.52 5708.45

Add for contractor's proffit @10%


Rate per No.

570.85
6279.30

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.5.1, Page No.-990

Providing and fixing white vitreous china flat back half stall urinal of size 580x380x350 mm (Paryware/CERA/Johnson Make) with white PVC automatic flushing cistern, with fittings, standard Item size C.P. brass flush pipe, spreaders with unions and clamps (all in C.P. brass) with waste fitting as No.- per IS : 2556, C.I. trap with outlet grating and other couplings in C.P. brass, including painting o fittings and cutting and making good the walls and floors wherever required: Single half stall urina with 5 litre PVC. automatic flushing cistern
Sl.No. Description Details of cost for one no. Material :White vitreous china clay half stall urinal flat back 580x380x350 mm or angle back 450x375x350 mm with waste fittings as per IS: 2556 P.V.C. automatic flushing cistern 5 litre capacity Flush pipe with union spreaders and clamps all in C.P. brass for single stall Unit Qty Rate Cost Rate Code

Market Rate No. 1.00 2915.00 2915.00 7359 No. No. 1.00 1.00 578.79 283.49 578.79 283.49 1532

C.I. trap for standard urinal with vent arm with operating and other couplings in C.P. brass: 50 mm dia Red lead, white lead and gasket Cement, sand and grit etc. Painting of fittings etc. Carriage of materials Labour :-

No. L.S. L.S. L.S. L.S. Day Day Day

1.00 17.55 26.91 26.00 40.43

186.63 1.76 1.76 1.76 1.76 235.00 260.00 170.00

186.63

30.89 47.36 45.76 71.16

1891 9999 9999 9999 9999

Fitter (grade 1) Mason 1 st class


Beldar

1.75 2 4

Sub Total
Add water charges @ 1% Total =

411.25 520.00 UPPWD S.R. 680.00 5770.33


57.70 5828.03

Add for contractor's proffit @10%


Rate per No.

582.80
6410.84

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

e 580x380x350 mm with fittings, standard ) with waste fitting as including painting of Single half stall urinal

Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-18.50.1, Page No.-1069

Item Providing and fixing C.P. brass long nose bib cock of Jaquar or Equivalent quality conforming to IS No.- standards and weighing not less than 810 gms. 15 mm nominal bore
Sl.No. Description Details of cost for one no Material :C.P. Brass bibcock 15 mm Carriage of materials and fixing charges Unit Qty Rate Cost Rate Code

No. L.S.

1.00 16.25

850.00 1.76

850.00 Market Rate

Sub Total
Add water charges @ 1% Total =

28.60 878.60
8.79 887.39

9999

Add for contractor's proffit @10%


Rate per No.

88.74
976.12

Say Rs

976.00

per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

ality conforming to IS
Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-18.49.1, Page No.-1069

Item Providing and fixing C.P. brass bib cock of Jaquar or Equivalent quality conforming to IS:8931. 15 No.- mm nominal bore
Sl.No. Description Details of cost for one no Material :C.P. Brass bibcock 15 mm Carriage of materials and fixing charges Unit Qty Rate Cost Rate Code

No. L.S.

1.00 11.57

625.00 1.76

625.00 Market Rate

Sub Total
Add water charges @ 1% Total =

20.36 645.36
6.45 651.82

9999

Add for contractor's proffit @10%


Rate per No.

65.18
717.00

Say Rs

717.00

per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

ming to IS:8931. 15
Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.60.1.2, Page No.-1050

Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm Item inlet and 100 mm outlet Sand Cast Iron S&S as per IS: 1729 No.-

Sl.No.

Description Details of cost for 1 No Material :100 mm S.C.I. trap with 100 mm inlet and 100 mm outlet Cement, sand and grit etc Labour :-

Unit

Qty

Rate

Cost

Rate Code

Remark

No. L.S. Day Day

1.00 13.52

310.66 1.76 260.00 170.00

310.66

DSR-20121857 9999

23.80 130.00 85.00 549.45


5.49 554.95

Mason Ist class


Beldar

1/2 1/2

Sub Total
Add water charges @ 1% Total =

Add for contractor's proffit @10%


Rate per No.

55.49
610.44

Say Rs

610.00

per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.60.1.2, Page No.-1050

Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm Item inlet and 100 mm outlet Sand Cast Iron S&S as per IS: 1729 ( 100x100 Nahani Trap 6.5 kg) No.-

Sl.No.

Description Details of cost for 1 No Material :100 mm S.C.I. trap with 100 mm inlet and 100 mm outlet Cement, sand and grit etc Labour :-

Unit

Qty

Rate

Cost

Rate Code

Remark

No. L.S. Day Day

1.00 13.52

597.00 1.76 260.00 170.00

Market Rate Neco Price 597.00 list 9999 23.80

Mason Ist class


Beldar

1/2 1/2

Sub Total
Add water charges @ 1% Total =

130.00 85.00 835.80


8.36 844.15

Add for contractor's proffit @10%


Rate per No.

84.42
928.57

Say Rs

929.00

per No

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.60.2.2, Page No.-1051

Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm Item inlet and 75 mm outlet Sand Cast Iron S&S as per IS: 1729 No.-

Sl.No.

Description Details of cost for 1 No Material :100 mm S.C.I. trap with 100 mm inlet and 75 mm outlet Cement, sand and grit etc Labour :-

Unit

Qty

Rate

Cost

Rate Code

Remark

No. L.S. Day Day

1.00 13.52

233.88 1.76 260.00 170.00

233.88

DSR-20121898 9999

23.80 130.00 85.00 472.67


4.73 477.40

Mason Ist class


Beldar

1/2 1/2

Sub Total
Add water charges @ 1% Total =

Add for contractor's proffit @10%


Rate per No.

47.74
525.14

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.60.2.2, Page No.-1051

Providing and fixing trap of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: 100 mm Item inlet and 75 mm outlet Sand Cast Iron S&S as per IS: 1729 ( 100x75 Nahani Trap 5.8 kg) No.-

Sl.No.

Description Details of cost for 1 No Material :100 mm S.C.I. trap with 100 mm inlet and 100 mm outlet Cement, sand and grit etc Labour :-

Unit

Qty

Rate

Cost

Rate Code

Remark

No. L.S. Day Day

1.00 13.52

577.00 1.76 260.00 170.00

Market Rate Neco Price 577.00 list 9999 23.80

Mason Ist class


Beldar

1/2 1/2

Sub Total
Add water charges @ 1% Total =

130.00 85.00 815.80


8.16 823.95

Add for contractor's proffit @10%


Rate per No.

82.40
906.35

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.41.1.1, Page No.-1029

Providing and fixing double equal junction of required degree with access door, Insertion rubber washer 3mm thick, bolts and nuts complete:100x100x100x100 mm Sand cast iron S&S as per IS Item 1729 No.-

Sl.No.

Description Details of cost for 1 No Material :S.C.I. double equal junctions 100x100x100x100 mm dia with access door including cost of bolts and nuts Rubber insertions for 100 mm dia pipe joints 3 mm thick Carriage of materials and fixing charges

Unit

Qty

Rate

Cost

Rate Code

No. No. L.S.

1.00 1.00 13.39

912.00 16.54 1.76

Market Rate Neco Price 912.00 list

16.54 23.57 952.10


9.52 961.62

1374 9999

Sub Total
Add water charges @ 1% Total =

Add for contractor's proffit @10%


Rate per No.

96.16
1057.79

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

, Insertion rubber iron S&S as per IS -

Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.39.1.1, Page No.-1027

Item Providing and fixing plain bend of required degree. 100 mm dia Sand cast iron S&S as per IS -1729 No.Sl.No. Description Details of cost for 1 No Material :Unit Qty Rate Cost Rate Code

S.C.I. plain bend 100 mm dia Carriage of materials and fixing charges

No. L.S.

1.00 13.52

426.00 1.76

Market Rate Neco Price 426.00 list

Sub Total
Add water charges @ 1% Total =

23.80 449.80
4.50 454.29

9999

Add for contractor's proffit @10%


Rate per No.

45.43
499.72

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

S&S as per IS -1729


Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.38.1.1, Page No.-1025

Item Providing and fixing bend of required degree with access door, insertion rubber washer 3 mm thick, No.- bolts and nuts complete. 100 mm dia Sand cast iron S&S as per IS - 1729
Sl.No. Description Details of cost for 1 No Material :S.C.I. bend with access door 100 mm dia including cost of bolts and nuts Rubber insertions for 100 mm dia pipe joints Carriage of materials and fixing charges Unit Qty Rate Cost Rate Code

No. No. L.S.

1.00 1.00 13.52

506.00 16.54 1.76

Market Rate Neco Price 506.00 list

16.54 23.80 546.33


5.46 551.80

1374 9999

Sub Total
Add water charges @ 1% Total =

Add for contractor's proffit @10%


Rate per No.

55.18
606.97

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

r washer 3 mm thick,
Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-17.38.1.1, Page No.-1025

Item Providing and fixing soil, waste and vent pipes: 100 mm dia Sand cast iron S&S pipe as per IS: No.- 1729
Sl.No. Description Details of cost for 17.37m (1.8mx10)-(9x0.07m) = 17.37 m Material :S.C. I. soil, waste and vent single socketed pipe 1.80 metres long: 100 mm dia Scaffolding Labour :Unit Qty Rate Cost Rate Code

No. L.S. Day Day Day

10.50 80.73

1479.00 1.76 260.00 235.00 170.00

Market Rate Neco Price 15529.50 list 9999 142.08

Fitter (grade 1)
Bandhani Beldar

0.42 0.21 0.83

Sub Total
Add water charges @ 1% Total =

109.20 49.35 UPPWD S.R. 141.10 15971.23


159.71 16130.95

Add for contractor's proffit @10%


Cost of 17.37 metre Cost of 1 metre

1613.09
17744.04 1021.53

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

S pipe as per IS:


Remark

x. Engineer aint.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate -2012, Item No.-24.5, Page No.-1437

Supplying, filling, Brick-bats of O.B.B./Class-150, in the required thickness, for all leads & lifts, all Item complete as per direction of Engineer-in-charge. No.Sl.No. Description Details of cost for 1 Cum Material :Brick-bats of O.B.B./Class-150 including carriage Labour :Unit Qty Rate Cost Rate Code Remark

Cum Day L.S.

1.00 0.25 1.00

800.00 170.00 1.76

800.00

S.R

Beldar
Sundries

42.50
1.76

S.R. 9999

Sub Total
Add water charges @ 1% Total =

844.26
8.44 852.70

Add for contractor's proffit @10%


Rate per No.

85.27
937.97

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Rate Analysis Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm Item and nuts & bolts complete. Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on No.- both sides Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-10.29.1, Page No.-564 Description Unit Qty Rate Cost Rate Code Remark Details of cost for a window shutter 1.40x1.10=1.54 sqm Material :Wire gauze 1.40x1.10=1.54 sqm Add wastage @ 10 %=0.15 sqm Total=1.69 sqm. Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm M.S. Flat 15x3=2x(1.40+1.10)=5.0 metre Add wastage @ 5%=0.25 m Total=5.25 m 5.25@0.35kg/m=1.84 kg Flats up to 10 mm in thickness Labour :Blacksmith 2nd class Carpenter Iind class Belder Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1.54 sqm Rate of 1 Sqm Say Rs 440.00 per Sqm

Sl.N o.

Sqm

1.69

230.00

388.70

DSR -20127029

quintal
Day Day Day

0.0184 0.17 0.17 0.06 19.76

4750.00 260.00 260.00 170.00 1.76 Total =

87.40 UPPWD S.R. 44.20 44.20 UPPWD S.R. 10.20 9999 34.78 609.48 6.09 615.57 61.56 677.13 439.69

L.S.

Rate Analysis Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm Item and nuts & bolts complete. Stainless steel (grade 304) wire gauze of 0.5 mm dia wire and 1.4 mm No.- aperture on both sides Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-10.29.2, Page No.-565 Description Unit Qty Rate Cost Rate Code Remark Details of cost for a window shutter 1.40x1.10=1.54 sqm Material :Wire gauze 1.40x1.10=1.54 sqm Add wastage @ 10 %=0.15 sqm Total=1.69 sqm. Stainless steel wire guage (Grade-304) s aperture 1.4 mm and 0.50 mm dia wire M.S. Flat 15x3=2x(1.40+1.10)=5.0 metre Add wastage @ 5%=0.25 m Total=5.25 m 5.25@0.35kg/m=1.84 kg Flats up to 10 mm in thickness Labour :Blacksmith 2nd class Carpenter Iind class Belder Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1.54 sqm Rate of 1 Sqm Say Rs 1254.00 per Sqm

Sl.N o.

Sqm

1.69

897.72

1517.14

DSR -20128737

quintal
Day Day Day

0.0184 0.17 0.17 0.06 19.76

4750.00 260.00 260.00 170.00 1.76 Total =

87.40 UPPWD S.R. 44.20 44.20 UPPWD S.R. 10.20 9999 34.78 1737.92 17.38 1755.30 175.53 1930.83 1253.79

L.S.

Rate Analysis Providing and fixing fly proof galvanized M.S. wire gauge to windows and clerestory windows using Item wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm all No.- complete. With Sal wood beading 62X19 mm Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.51.1, Page No.-414 Description Unit Qty Rate Cost Rate Code Remark Details of cost for a window of size 140x110cm = 1.54sqm. Material :Wire gauge -20x60mm mesh 3.2mm wide = 1.4x1.1 m = 1.54sqm.+ Add wastage @ 10% = 0.15sqm. Total = 1.69 sqm Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm Sal wood beading 5mx62mmx19mm = 0.0059cum.+ Add wastage @ 10% = 0.00059cum Total = 0.00649cum. Say 6 cudm Sal wood in planks Labour :Carpenter Iind class Belder Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1.54 sqm Rate of 1 Sqm Say Rs 665.00 per Sqm

Sl.N o.

Sqm

1.69

271.68

459.14

DSR -20127029

10 cudm
Day Day

6.0000 0.33 0.25 19.76

500.00 260.00 170.00 1.76 Total =

300.00

DSR -20121199

L.S.

85.80 UPPWD S.R. 42.50 9999 34.78 922.21 9.22 931.44 93.14 1024.58 665.31

Rate Analysis Providing and fixing fly proof Stainless steel (grade 304) wire gauze of 0.5 mm dia wire and 1.4 mm Item aperture in both directions to windows and clerestory windows all complete. With Sal wood beading 62X19 No.- mm Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-9.51.1, Page No.-414 Description Unit Qty Rate Cost Rate Code Remark Details of cost for a window of size 140x110cm = 1.54sqm. Material :Wire gauge -20x60mm mesh 3.2mm wide = 1.4x1.1 m = 1.54sqm.+ Add wastage @ 10% = 0.15sqm. Total = 1.69 sqm Stainless steel wire guage (Grade-304) s aperture 1.4 mm and 0.50 mm dia wire Sal wood beading 5mx62mmx19mm = 0.0059cum.+ Add wastage @ 10% = 0.00059cum Total = 0.00649cum. Say 6 cudm Sal wood in planks Labour :Carpenter Iind class Belder Sundries Add water charges @ 1% Total = Add for contractor's proffit and overheads @10% Cost of 1.54 sqm Rate of 1 Sqm Say Rs 1429.00 per Sqm
DSR -20128737

Sl.N o.

Sqm

1.69

897.72

1517.14

10 cudm
Day Day

6.0000 0.33 0.25 19.76

500.00 260.00 170.00 1.76 Total =

300.00

DSR -20121199

L.S.

85.80 UPPWD S.R. 42.50 9999 34.78 1980.22 19.80 2000.02 200.00 2200.03 1428.59

Rate Analysis
502

Mild steel or iron work of small sizes and sections and such as holding down bolts, hold fasts, tie rods ,gratings etc. ( when not incuded in an over all rates ) wrought to required form, including supply of steel ,bolts, nuts and wastages etc. and their fixing required for completion of the work.
Unit =Per Qtls (A ) Materials :

Cost of steel Wastages 2.5% on steel


(B) Labour :

Per qtl Per qtl

0.508 qtl 0.0127 qtl

Rs Rs
Total

4750.00 4750.00

Rs Rs
Rs

2413.00 60.33
2473.33

Black smith Hammer man Coolies

Per day Per day Per day

1.00 no. 1.00 no. 1.00 no.

Rs Rs Rs
Total

260.00 170.00 170.00

Rs Rs Rs
Rs

260.00 170.00 170.00


600.00

Coal & T & P etc.

(2473.33+600.00)x0.75/64.07
Total

Rs
Rs

35.98
3109.30

Contractor s profit @ 10%


Total Rate for Rate for 0.51 1.00 Qtls Qtls Rs Rs Say Rs 3420.23 6732.74 67.30 Per Kg

Rs
Rs

310.93
3420.23

Rate Analysis
503

Mild steel or iron work in heavy sizes such as trusses, builts up gates, door frames ,records racks roof work ,gates etc. wrought to required form, including drilling holes, rivetting or welding where necessary, and also including supply of steel ,bolts, nuts and wastages etc. and their fixing required for completion of the work.
Unit =Per Qtls (A ) Materials :

Cost of steel Wastages 2.5% on steel


(B) Labour :

Per qtl Per qtl

0.508 qtl 0.0127 qtl

Rs Rs
Total

4600.00 4600.00

Black smith Hammer man Rivetter Coolies Coal & T & P etc. Hoisting & welding Contractor s profit @ 10%

Per day Per day Per day Per day

1.00 no. 1.00 no. 0.25 no. 1.00 no. (2473.33+667.50)x0.75/71.82 (2473.33+667.50)x4.5/71.82

Rs Rs Rs Rs
Total

260.00 170.00 270.00 170.00

Total Total Rate for Rate for 0.51 1.00 Qtls Qtls Rs Rs Say Rs 3615.26 7116.66 71.17

door frames ,records racks roof work ,gates elding where necessary, and also including or completion of the work.

Rs Rs
Rs

2336.80 58.42
2395.22

Rs Rs Rs Rs
Rs

260.00 170.00 67.50 170.00


667.50

Rs Rs
Rs

31.98 191.90
3286.60

Rs
Rs

328.66
3615.26

Per Kg.

Rate Analysis
504 HYSD or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates ) wrought to required shape as necessary including bending , and also including supply of steel and wastages and overlapping and hookes required for completion of the work.
Unit =Per Qtls (A ) Materials :

Cost of steel Wastages 5% on steel


(B) Labour :

Per qtl Per qtl

0.508 qtl 0.0254 qtl

Rs Rs
Total

4600.00 4600.00

Rs Rs
Rs

Black smith Coolies

Per day Per day

1.00 no. 1.50 no.

Rs Rs
Total

260.00 170.00

Rs Rs
Rs

T & P etc. Contractor s profit @ 10%

(2533.65+515.00)x0.40/62.59
Total Total

Rs
Rs

Rs
Rs Rs Say Rs 3269.95 6436.90 64.37 Per Kg Rs Rs

Rate for Rate for

0.508 1.00

Qtls Qtls

n not included in over all pply of steel and wastages

2336.80 116.84
2453.64

260.00 255.00
515.00

4.04
2972.68

297.27
3269.95 3269.95

Rate Analysis

Item No.-

Providing and Fixing 15 mm thick densified tegular edged eco friendly light weight false ceiling tiles (Armstrong Mineral F Acoustical Suspended Ceiling with Optra Pebble/Pearl TEG/BEV TEG Tile 600x600x15 mm module) of approved tex spintone/cosmos / Hexa or equivalent in true horizontal level, suspended on inter locking metal grid of hot dipped galvani steel sections (galvanising @ 120 grams per sqm including both side) consisting of main 'T' runner suitably spaced at jo to get required length and of size 15x38 mm made from 0.30 mm thick (minimum) sheet, spaced 1200 mm centre to cen and cross "T" of size 15x38 mm made out of 0.30 mm (Minimum) sheet, 1200 mm long spaced between main'T' at 600 centre to centre to form a grid of 1200x600 mm and secondary cross 'T'of length 600 mm and size 15 x38 mm made of 0 mm thick (Minimum) sheet to be inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm, res on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size(24x19X3000 mm made of 0.27 mm th (minimum) sheet with the help of rawl plugs at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm inte and laying 15 mm thick densified edges ceiling tiles of approved texture (Spintone / Cosmos/ hexa) in the grid, includ cutting/ making opening for services like diffusers, grills,light fittings, fixtures, smoke detectors etc., wherever required. M 'T' runners to be suspended from ceiling using Vertical Hanger fixed to ceiling with Anchor fastener M6, 2.68 mm adjustable rods with galvanised steel level clips, spaced at 1200 mm centre to centre along main 'T', bottom exposed with mm of all T-sections shall be pre-painted with polyster baked paint, for all heights, as per specifications, drawings and directed by engineer-in-charge. Note :- Only calcium silicate false ceiling area will be measured from wall to wall. deduction shall be made for exposed frames/opening (cut outs) having area less than 0.30 sqm.The False ceiling tile s have NRC. value of 0.50(Minimum), light reflection > 85%, non - combustible as per B.S. 476 part IV, 100% humidity resista and also having thermal conductivity<0.043 w/m 0 KC. The Tile & Grid system used together should carry a 15 y warrantee.

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-12.53, Page No.-699 Sl.No. Description Details of cost for 100 sqm Material :Unit Qty Rate Cost

Armstrong OPTRA-PEBBLE / Pearl(white) TEG/BEW TEG CEILING 600x600x15mm Area = 100 sqm + Add 5% wastage = 5 sqm Total = 105 sqm Sqm Galvanised Steel main Tee ceiling section ea Size 15x38x0.30 mm (3 metre long) Galvanised Steel perimeter wall Angle Size 24 x 19 x 0.27 mm (3.00 metre long)
Galvanised Steel intermediate cross T section Size 38 x 15 x 0.30 mm (1.2 metre long) Galvanised Steel intermediate cross T ea section Size 38 x 15 x 0.30 mm ( 0.6 metre long) Hanger rod 2.68 mm thick Adjustment clip Anchor fastener M6 Vertical Hanger Total Add VAT and SAT @ 14% Total

105.00

1112.00

116760.00

each

29.50

237.00

6991.50

each each each each each each each

13.50 147.00 147.00 72.00 72.00 72.00 72.00

231.00 79.20 39.60 25.00 31.00 12.00 8.00

3118.50 11642.40 5821.20 1800.00 2232.00 864.00 576.00 149805.60 20972.78 170778.38

Wooden screws with plastic rawl plugs 35x8 mm Sundries Labour :-

each L.S.
Day Day

100.00 310.70 28.00 23.00

0.65
1.76 290.00 170.00

64.97 546.83 8120.00 3910.00 183420.18 1834.20 185254.38 18525.44


203779.82 2037.80

Carpenter 1 st class Beldar Add water charges @ 1%

Total = Total = Add for contractor's proffit and overheads @10%


Cost of 100 sqm Cost of 1 sqm

Say Rs

2037.00

per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

eiling tiles (Armstrong Mineral Fiber 5 mm module) of approved texture metal grid of hot dipped galvanised n 'T' runner suitably spaced at joints , spaced 1200 mm centre to centre, spaced between main'T' at 600 mm m and size 15 x38 mm made of 0.30 om grid of size 600x600 mm, resting 9X3000 mm made of 0.27 mm thick dry wall screws @ 230 mm interval osmos/ hexa) in the grid, including, ectors etc., wherever required. Main Anchor fastener M6, 2.68 mm G.I. ng main 'T', bottom exposed with 24 per specifications, drawings and as e measured from wall to wall. No 0.30 sqm.The False ceiling tile shall 76 part IV, 100% humidity resistance d together should carry a 15 year

Rate Code Remark

Market Rate

DSR 20128595
9999 UPPWD S.R.

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis

Item No.-

Providing and Fixing 15 mm thick densified tegular edged eco friendly light weight false ceiling tiles (Armstrong Mineral F Acoustical Suspended Ceiling with Dune Max RH99 BEV TEG Tile 600x600x20 mm module) of approved tex spintone/cosmos / Hexa or equivalent in true horizontal level, suspended on inter locking metal grid of hot dipped galvani steel sections (galvanising @ 120 grams per sqm including both side) consisting of main 'T' runner suitably spaced at jo to get required length and of size 15x38 mm made from 0.30 mm thick (minimum) sheet, spaced 1200 mm centre to cen and cross "T" of size 15x38 mm made out of 0.30 mm (Minimum) sheet, 1200 mm long spaced between main'T' at 600 centre to centre to form a grid of 1200x600 mm and secondary cross 'T'of length 600 mm and size 15 x38 mm made of 0 mm thick (Minimum) sheet to be inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm, res on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size(24x19X3000 mm made of 0.27 mm th (minimum) sheet with the help of rawl plugs at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm inte and laying 15 mm thick densified edges ceiling tiles of approved texture (Spintone / Cosmos/ hexa) in the grid, includ cutting/ making opening for services like diffusers, grills,light fittings, fixtures, smoke detectors etc., wherever required. M 'T' runners to be suspended from ceiling using Vertical Hanger fixed to ceiling with Anchor fastener M6, 2.68 mm adjustable rods with galvanised steel level clips, spaced at 1200 mm centre to centre along main 'T', bottom exposed with mm of all T-sections shall be pre-painted with polyster baked paint, for all heights, as per specifications, drawings and directed by engineer-in-charge. Note :- Only calcium silicate false ceiling area will be measured from wall to wall. deduction shall be made for exposed frames/opening (cut outs) having area less than 0.30 sqm.The False ceiling tile s have NRC. value of 0.50(Minimum), light reflection > 85%, non - combustible as per B.S. 476 part IV, 100% humidity resista and also having thermal conductivity<0.043 w/m 0 KC. The Tile & Grid system used together should carry a 15 y warrantee.

Reference from CPWD Analysis of rate - 2012, Vol-I, Item No.-12.53, Page No.-699 Sl.No. Description Details of cost for 100 sqm Material :Unit Qty Rate Cost

Armstrong Dune Max RH99 BEV TEG Tile 600x600x20mm Area = 100 sqm + Add 5% wastage = 5 sqm Total = 105 sqm Galvanised Steel main Tee ceiling section ea Size 15x38x0.30 mm (3 metre long) Galvanised Steel perimeter wall Angle Size 24 x 19 x 0.27 mm (3.00 metre long)
Galvanised Steel intermediate cross T section Size 38 x 15 x 0.30 mm (1.2 metre long) Galvanised Steel intermediate cross T ea section Size 38 x 15 x 0.30 mm ( 0.6 metre long) Hanger rod 2.68 mm thick Adjustment clip Anchor fastener M6 Vertical Hanger Total Add VAT and SAT @ 14% Total

Sqm

105.00

755.00

79275.00

each

29.50

237.00

6991.50

each each each each each each each

13.50 147.00 147.00 72.00 72.00 72.00 72.00

231.00 79.20 39.60 25.00 31.00 12.00 8.00

3118.50 11642.40 5821.20 1800.00 2232.00 864.00 576.00 112320.60 15724.88 128045.48

Wooden screws with plastic rawl plugs 35x8 mm Sundries Labour :-

each L.S.
Day Day

100.00 310.70 28.00 23.00

0.65
1.76 290.00 170.00

64.97 546.83 8120.00 3910.00 140687.28 1406.87 142094.16 14209.42


156303.57 1563.04

Carpenter 1 st class Beldar Add water charges @ 1%

Total = Total = Add for contractor's proffit and overheads @10%


Cost of 100 sqm Cost of 1 sqm

Say Rs

1563.00

per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

eiling tiles (Armstrong Mineral Fiber mm module) of approved texture metal grid of hot dipped galvanised n 'T' runner suitably spaced at joints , spaced 1200 mm centre to centre, spaced between main'T' at 600 mm m and size 15 x38 mm made of 0.30 om grid of size 600x600 mm, resting 9X3000 mm made of 0.27 mm thick dry wall screws @ 230 mm interval osmos/ hexa) in the grid, including, ectors etc., wherever required. Main Anchor fastener M6, 2.68 mm G.I. ng main 'T', bottom exposed with 24 per specifications, drawings and as e measured from wall to wall. No 0.30 sqm.The False ceiling tile shall 76 part IV, 100% humidity resistance d together should carry a 15 year

Rate Code Remark

Market Rate

DSR 20128595
9999 UPPWD S.R.

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis

Item No.-

Providing fitting, Fixing of Aluminium door with OEL anodized Aluminium door section of 9202 (Hindalco) as ver (Hindalco) as top member and 9200 (Hindalco) as bottom and middle member and 5.5mm thick plain glass in top portion w laminated board in bottom portion fixed on door frame by means of taped clip no.-4660 (Hindalco) and the frame to be com jointing angle No. 1855 (Hindalco) including all fixing of hinges, door stopper, mortice lock, aluminium round handels, c Hire charges of drilling machine, labour charges etc.complete. but excluding cost of hydraulic floor spring.

Sl.No.

Description Details of cost 3'-0" x 6'-6" = 19.50 sft. Material :-

Unit Or 1.81 Sqm.

Qty

Rate

Al. Section No 9201 Al. Section No 9202 Al. Section No 9200 Al. Section No 4660 Al. Ang. Sec. No 1855 Total = Add Wastage 10% = Total =

0.91 m @ 1.296Kg/M = 1.18 Kg 3.96 m @ 1.255Kg/M = 4.97 Kg 1.83 m @ 1.974Kg/M = 3.61 Kg 15.24 m @ 0.167Kg/M = 2.55 Kg 2.44 m @ 0.517Kg/M = 1.26 Kg 13.57 Kg 1.36 Kg 14.93 Kg Kg 14.93
248.05

12mm thick Prelaminated Novapan Board 1x3'-6"x3'-0" = 10.50 Westage 10% 1.05 11.55 Sft or 1.07 Sqm 5.50mm black glass 1x3'-0"x3'-0" 9.00 Westage 10% 0.90 9.90 Sft or 0.92 Sqm Anodised Aluminium butt hinges 100x75x4 Neoprene/EPDM rubber gasket Anodised Aluminium hanging type door stopper Aluminium round shape handle (anodised AC 15) 100 mm mortice lock with 6 levers for aluminium door Hire charges of drilling machine Aluminium Screws adaessive Labour :-

Sqm Sqm Nos Mtr Nos Nos Nos L.S. L.S.


Day Day

1.07 0.92 4.00 18.29 1.00 2.00 1.00

850.47 531.54 59.06 29.53 24.81 57.88 366.17

High skilled labour /Carpenter Ist class Semi skilled labour /Beldar Add water charges @ 1%

6.22 6.22

290.00 170.00

Total = Total = Add for contractor's proffit and overheads @10%


Cost of 1.81 sqm Cost of 1 sqm

Say Rs

5767.00

per sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

n of 9202 (Hindalco) as vertical member, 9201 ck plain glass in top portion with 12mm thick predalco) and the frame to be completed by means of k, aluminium round handels, cost of labour, T&P, ic floor spring.

Cost Rate Code Remark

3703.44

2704

7480

910.00
2407

489.02 236.24 540.11 24.81 115.76 366.17 50.00 100.00 1803.80 1057.40 9396.75 93.97 9490.72 949.07
10439.79 5767.84

689 7390 2459 8663 8716

UPPWD S.R.

per sqm

Ex. Engineer Maint.Division P.W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.47.1, Page No.-736

Item No.Sl.No.

Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Description Details of cost for 10 sqm Material :Multi surface paint Exterior primer Labour :Unit Qty Rate Cost Rate Code

litre Kg Day Day Day

1.43 2.20

341.00 47.25 260.00 170.00 205.00 1.76 1.76

487.63 103.95

Market Rate 0809

Painter
Coolie Bhisti

Brushes, sand paper etc. Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 10 Sqm

L.S. L.S.

0.60 0.30 0.05 7.02 8.06

156.00 51.00 UPPWD S.R. 10.25 12.36 9999 14.19 9999 835.37 8.35 843.72 84.37
928.09

Rate per Sqm

92.81

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

ditives of required ncluding priming


Remark

und lowest."

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-13.45.1, Page No.-735

Item No.Sl.No.

Finishing walls with textured exterior paint of required shade :New work (Two or more coats applied @ 3.28 ltr/ 10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
Description Details of cost for 10 sqm Material :Textured exterior paint Exterior primer Labour :Unit Qty Rate Cost Rate Code

litre Kg Day Day Day

3.28 2.20

341.00 47.25 260.00 170.00 205.00 1.76 1.76

1118.48 103.95

Market Rate 0809

Painter
Coolie Bhisti

Brushes, sand paper etc. Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%
Cost of 10 Sqm

L.S. L.S.

0.60 0.30 0.05 7.02 8.06

156.00 51.00 UPPWD S.R. 10.25 12.36 9999 14.19 9999 1466.22 14.66 1480.88 148.09
1628.97

Rate per Sqm

162.90

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

wo or more coats mer applied @ 2.20


Remark

und lowest."

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-24.5, Page No.-1437

Item No.Sl.No.

Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-incharge.
Description Details of cost for 1 cum Material :Boulder 50 mm to 200 mm including carriage Labour :Beldar Unit Qty Rate Cost Rate Code

Cum Day

1.00

1683.70 170.00 1.76

1683.70

RMR Rate SR Rate

Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%

L.S.

0.25 1.00

42.50 1.76 1727.96 17.28 1745.24 174.52


1919.76

9999

Rate per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

o 20 cm, in recharge on of Engineer-inRemark

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-24.6, Page No.-1437

Item No.Sl.No.

Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Description Details of cost for 1 cum Material :Gravel 5 mm to 10 mm including carriage Labour :Beldar Unit Qty Rate Cost Rate Code

Cum Day

1.00

1683.70 170.00 1.76

1683.70

RMR Rate SR Rate

Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%

L.S.

0.25 1.00

42.50 1.76 1727.96 17.28 1745.24 174.52


1919.76

9999

Rate per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

m, in the recharge lifts, all complete as


Remark

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Reference from CPWD Analysis of rate - 2012, Vol-II, Item No.-24.7, Page No.-1438

Item No.Sl.No.

Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer in-charge.
Description Details of cost for 1 cum Material :Gravel 1.5 mm to 2 mm including carriage Labour :Beldar Unit Qty Rate Cost Rate Code

Cum Day

1.00

1683.70 170.00 1.76

1683.70

RMR Rate SR Rate

Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10%

L.S.

0.25 1.00

42.50 1.76 1727.96 17.28 1745.24 174.52


1919.76

9999

Rate per Sqm

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

o 2 mm all
Remark

Engineer nt.Division 1,Civil W.D. Lucknow

Rate Analysis
Water proofing of roof top with resin , fiber and hardener of two types (Titras and insulator) as per prescribed pross after proper cleanimng the surface before treatment as per direction of E/I including cost of all materials, Labour, T&P etc. complete.
Description Unit Qty Rate Cost Rate Code Remark AS Per CFS Fiberglass specification (Annexure -1) MATERIALS Once the new deck has been formed you will need the following. Resin: allow 1.5kg/m2 for 450g fi breglass or 2 kg/m2 for 600g fi breglass. Topcoat: allow 0.5kg/m2. Fibreglass: Emulsion bound chopped strand mat (CSM). The minimum should be a single layer of 450g or for a heavier laminate a single layer of 600g mat. You will also need Acetone, which is the solvent for the resin. Catalyst or hardener along with a safety dispenser. Brushes, consolidation rollers and application rollers. Trims: You will need to form the edge detail with various preformed edge trims Details of cost for 1 sqm Material :Polyester Resin Fiberglass mat Catalyst 2% Accelater 2% Total Add VAT @ 5% Labour :-

Item No.Sl.No.

Kg Kg Kg Kg

2.500 0.600 0.050 0.012

115.00 130.00 250.00 250.00

287.50 78.00 12.50 3.00 381.00 19.05

Market Rate

Mason Ist class


Coolie Beldar Extra labour Collie

Day Day Day Day

0.30 0.30 0.30 3.00

292.00 170.00 170.00 170.00

Brushes/Roller Sundries Total Add water charges @ 1% Total Add for contractor's proffit and overheads @10% Add 1% hindrance on material Add 10% hindrance on Labour

L.S. L.S.

87.60 51.00 UPPWD S.R. 51.00 510.00 20.00 50.00 1169.65 11.70 1181.35 118.13 4.00 69.96
1373.44

Rate per Sqm

"Certified that above mentioned market rates verified from market and found lowest."

Junior Engineer Maint.Division 1,Civil P.W.D. Lucknow

Assistant Engineer Maint.Division 1,Civil P.W.D. Lucknow

Ex. Engineer Maint.Division 1,Civil P.W.D. Lucknow

Vous aimerez peut-être aussi