Vous êtes sur la page 1sur 1

Main Contract 3 - Project Specification

Building, Mechanical - HVAC / Refrigeration


General Specification

Pipe dimensions
DN (inch)

DN
(mm)

Pipe sizing criteria


OD
(mm)

Flow (l/s)

dP (Pa/m)

Vel. (m/s)

1/2

15

21.3

0.091

300

0.47

3/4

20

26.7

0.199

300

0.58

25

33.4

0.365

300

0.68

1-1/4

32

42.2

0.80

300

0.83

1-1/2

40

48.3

1.21

300

0.92

50

60.3

2.35

300

1.09

2-1/2

65

73.0

3.77

300

1.22

80

88.9

6.73

300

1.41

100

114.3

13.85

300

1.69

125

141.3

25.20

300

1.95

150

168.3

40.94

300

2.20

200

219.1

88.44

300

2.64

10

250

273.1

159.60

289

3.00

12

300

323.9

228.20

233

3.00

14

350

355.6

272.00

209

3.00

16

400

406.4

359.40

177

3.00

18

450

457.0

458.50

152

3.00

20

500

508.0

563.30

135

3.00

22

550

559.0

687.00

120

3.00

24

600

610.0

822.90

107

3.00

26

650

660.0

949.00

98

3.00

28

700

711.0

1,107.70

90

3.00

30

750

762.0

1,278.60

82

3.00

32

800

813.0

1,461.80

76

3.00

34

850

863.6

1,655.60

71

3.00

36

900

914.0

1,860.20

66

3.00

38

950

965.2

2,081.00

62

3.00

40

1000

1,016.0

2,312.00

58

3.00

42

1050

1,067.0

2,541.00

55

3.00

44

1100

1,118.0

2,797.00

51

3.00

46

1150

1,168.0

3,060.00

49

3.00

48

1200

1,219.0

3,340.00

46

3.00

C. An automatic chemical dosing system shall be installed for monitoring and


dosing corrosion inhibitor into the Secondary chilled water system to

P:\61400\3_DOC\10_Tender_Doc\01_SE\CRN_53_MC 3_Building Works\Final\2010.03.20_Addendum 4_Tender\03.2_Project


Specifications\3.3.3 Building\Mechanical\SE-200-M-11307_T03_GS_Refrigeration_20.03.2010.DOC

Vous aimerez peut-être aussi