Vous êtes sur la page 1sur 76

Nomatterwhattheproject, orhowdifficultthetask, throughtheversatility ofourproductsandthetalents ofourdesignengineers, webelievedthatthere

SCAFFOLDING&FORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

COMPANY INTRODUCTION

AboutUs
APACScaffolding &Formwork System Ltd. specializes in the Manufacturing &Sale ofsystem scaffolding& Formwork. The company hasalwaysstrivedto set and maintain the veryhighest of standard in safety and the supply ofthe highest quality formworkand scaffolding components. Our team consists of Scaffolding and Formwork designEngineers who areexpertsin theirrespectivefields. Also you can consult with our expert teamof qualified DesignEngineers, and let us provide youwith drawings,design calculations and afull backup serviceforyourscaffoldingortemporarystructures.

SpecificAreasandExpertise:
FalseworkFacade,Viaduct,PerimeterScaffoldandTemporaryAccess SlabFormwork SuspendedSlabandBeamSoffit

WallFormworkShearwall,Corewall,Abutment,Singlesidedwall,DoublesidedwallandCircularTank Columns Square,RectangleandCircular ClimbingSystemCorewall,SilosandCircularTank

Ourstepsofsaleandhiringprocess:
ProjectDesignWewilldiscusswithyouyourrequirementsandifpossiblemakeanysuggestionstoloweryourcosts Quota onWewillofferyouawrittenquotedetailingallofthejobrequirements DeliveryOurexperiencedstaffwilldeliverthescaffoldingtoyourpreferredlocation Erection OurstaffwillprofessionallyinstallthescaffoldingtomeetallOccupationalHealth&Safetystandards DismantleUponfinishingyourjobourstaffwillcometoyoursite,carefullydismantleallscaffoldingfromthepremises

CostEffectiveness
Weaimtoprovidecosteffectivesolutions,takingintoconsiderationallaspectsofyourprojectsrequirementsincluding logistics.Ourdesignportfoliocoversadiverserangeofproductswhichhavevaryingfunctionsanddifferingmethodsandprocesses usedtomanufacturetheproduct.

Health&Safety
Duetotheprecariousnatureoftheconstructionindustryhealthandsafetyhasemergedasthemostimportantfactor whenundertakingaproject.APACcan assist inensuringthatyouarefullycompliantwithhealthandsafetyrequirementson scaffoldingandformworksfromtheinitialprojectenquirytoprojecthandover.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUSTOMER SATISFACTION
WhyWScaffoldingandFormwork?

Faster
Superiorsystemtechnology Shorterassemblytime Shorterdismantlingtime Lowerlabourcosts

Stronger
Verifiedhighloadbearingcapacity simpleconnectiononeachnode significantlylessweightthanothersystems Lowertransportcosts

Safer
ForGeneralconstruction Consistentquality ISO9001certified Stablestructurefrombaseout

Moreprofitable
Componentscanbeusedforproppingorgeneralscaffolding Increaseavailableusesforyourequipment Giveclientsawiderrangeofservices Greaterrevenue

SaveTime...SaveMoney

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CATALOGUEContents

1.0SYSTEMSCAFFOLD
1.1KwikstageScaffolding 1.2RinglockScaffolding 1.3CuplockScaffolding 1.4FrameScaffolding 1.5Tube&FittingSystem

Pages
410 1119 2025 2631 3236

2.0FORMWORKSYSTEM
2.1KwikDekFormwork 2.2RingFlex.Formwork 2.3CupDek.Formwork 2.4FrameFlexFormwor 2.5TableFormwork 2.6ColumnFormwork 2.7WallFormwork 2.8ClimbingSystem 2.9SparePart 3743 4446 4753 5455 5659 6063 6469 7073 7475

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEACCESSSCAFFOLDSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEIntroduction

Kwikstage scaffolding is used as industrialscaffoldingsystemsandhighstrengthsystems.Theycanbeusedby bricklayersoranytraderequiringaheavyduty typeofscaffold,especiallyconstructionandformwork. Heavyblocks of concreteused in formworktechniques areextremelydangerous if leftto set in inadequate formwork structures andnothandledproperly.Kwikstagescaffoldingisdependableasastrongtypeofaccessscaffoldingwhichistestedby engineersbeforebeingsold.Itcomplieswithstricthealthandsafetylaws.

Kwikstagescaffolding
Isatypeofscaffoldingusedinconstructionandformworkandisextremely popularduetoitsreliabilityandeasyconstructionandstrippingabilities. Theindustrialscaffoldingsystemsusedaremodularandhaveawedgefor allaccessscaffoldneeds.Thewedgeenableserectinganddismantlingtobesimple andfastwhilststilleradicatingtheriskofhavinglooseparts. Thescaffoldstaysinplacewithoutmovement,andhasdependableverticalalignment.

Staircasetower
Kwikstagestairtoweritcanbeerectedeasilyforvertical constructionsiteandpublictransportwiththeuseofstandard Kwikstagecomponentstogetherwithspeciallydesignedstaircase arms,whicharelocatedsoastoenablefastandsimpleaccessto everyoperationlevel.Thislargerconfigurationcanbebuildtoa heightof50metersubjecttotiesandloadings. Theplanmoduleis4.4meterlongoverall,incorporating acentrebayof1.8meterandtwo1.3mlandingmodulesateither end.Thisallowtheuseof1.3meterOmegatransomisconjunction withtimberorsteelplankstoformthelandingplatform.

Ladders
Theaccessladdersareconstructedofsolidsteelflatbarswith

roundbarrungs.Theyarejoinedtogetherandclampedtothe kwikstagescaffoldtoreachtherequiredheight.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGE Advantages

Speed&TimeSaving
ThespeedandtimesavingqualitiesoftheKwikstagescaffoldingmakeitauseful aidtofieldofconstruction.ToassembletheKwikstagescaffoldingsystemissimpleand requireslessmentodothejobthanothertypesofscaffolding. AssemblingtheKwikstageisnotonlysimpletimesavedbytheeasyconstructionofthe systemalsocutsbackonlabourtimeandsavescosts.

Simplicity&SafetyApplication:
The"V"pressedallowsupto4horizontaland4bracketstobesecuredtoasingle pressingatonelevelbysimplyhammeringthecaptivewedgelockpinintorigidplace. IndividualcomponentsoftheKwikstagesystemanditsaccessoriesaredesignedto enableasafewayoferectioninallapplications. Safetyofworkersworkingonthescaffoldingwithanyapplicationisthemostimportant factorwhichisguaranteedinthelongtermbythefirm.

Benefits
Fastertoerectthantraditionalscaffoldsystemupto4componentssecuredin oneaction,Uniquenodepoint,noloosecomponents,Heavydutyaccessupto4.0kN/m platformloading,acceptsscaffoldboardordekingplatforms.

Flexibility
Uneventerritoryandgroundisnotanissuewhenindustrialscaffoldingsystems suchasKwikstagescaffoldingareusedasitisflexibleintermsofwhereitcanbepositioned. ThismakesKwikstageusefulnotonlyinconstructionbutalsoforuseoffilmsetsforspecial eventsandmanyotherareaswherescaffoldingisrequired.

Variability
Kwikstageisveryadoptabletovarious application.Awiderangeofcomponentsenableits useforallknownstructures,whichcanbebuiltfrom scaffolding. Inanycase,basiccomponentsarefullyusedandonly fewadditionalelementsareusedduetoadoptation tothesituationontheconstructionsite.

Kwikstageisdesignedmultipurpose modularsystemwiththemainemphasis onconstructionofshoringfloorscentre andcentresbays. Sophisticateddetailsofthe systemenableensuringqualityandsafe shoringofeachconcreteorprefabricated structure. Kwikstageishasnoproblemwithangular

andarchbridgesaswellasbridgesin directionalandheightarch.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEComponents

StandardwithSpigot
ClustersoffourVpressingsat90weldedat495mmcentres alongthelengthofthestandard.

Transom
Itiseithermadeof50x50x5mmbacktobackangle bar,TshapedsteelprofileorrolledHypresssection withthesamefixingdeviceoneachendastheledger.

Length
4.0mStandardwithspigot 3.0mStandardwithspigot 2.5mStandardwithspigot 2.0mStandardwithspigot 1.5mStandardwithspigot 1.0mStandardwithspigot

Weight(kg)
23.98 17.64 14.81 11.98 9.16 6.34

Length
0.5mTransom 0.7mTransom 1.2mTransom 1.8mTransom 2.4mTransom

Weight(kg)
5.69 8.11 12.08 16.29 21.06

StandardwithoutSpigot Length
4.0mStandardwithoutspigot 3.0mStandardwithoutspigot 2.5mStandardwithoutspigot 2.0mStandardwithoutspigot 1.5mStandardwithoutspigot 1.0mStandardwithoutspigot

Weight(kg)
23.33 16.99 14.16 11.33 8.51 5.69

StageBoardBracket
Toextendthescaffoldbycantileveringforan additional1,2&3board.

LedgerBananatype
Itismadefromscaffoldtube48.8x3.2mmthicknesstube withwedge'BananaType'fixingateachendwhichfitsin thelocatinglugsontheverticalstandard.

Length
1StageBoardBracket 2StageBoardBracket 3StageBoardBracket

Weight(kg)
2.67 6.62 12.71

Length
0.7mBananaLedger 1.2mBananaLedger 1.8mBananaLedger 2.4mBananaLedger

Weight(kg)
3.45 5.25 7.28 9.5

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEComponents

DiagonalBrace
Bracesaremanufacturedfrom3.2mmtubewithaswivel wedgedeviceatbothends,tofitonthestandard.

LadderAccessTransom/Putlog
Ladderaccesstransomsprovideanopeningina ladderaccesskwikstagescaffoldingtower.

Length
762x1485mmDiagonalBrace,1769mm 1268x1485mmDiagonalBrace,2053mm 1828x1980mmDiagonalBrace,2795mm 2438x1980mmDiagonalBrace,3241mm 2438x2475mmDiagonalBrace,3574mm

Weight(kg)
5.68 6.32 8.24 9.42 10.26

Length
1.2mLadderAccessTransom 1.8mLadderAccessTransom 2.4mLadderAccessTransom

Weight(kg)
7.96 9.97 12.17

LoadingBayTransom TieBar
Aremanufacturedfromsteelangle,theysecurethe deckingontheStageBracket,avoidingspreading. CurvedStageBracket,avoidingspreading.Curvedlugs ateachendarelocatedinholesinthe2&3Board. TheTransomwedgeconnectsto2"V"pressingson thestandard,thetopchordisaninverted"T"section providingseatingforthedecking.

Length
2.4mLoadingBayTransom

Weight(kg)
37.0

Length
1.2mTieBar 1.8mTieBar 2.4mTieBar

Weight(kg)
2.98 3.84 5.38

WallTie ToeBoardBracket
ToeBoardBrackethold1or2toeboardsinposition andarefastenedwithwedgestothestandardalong thelengthofthescaffolding. Secureandtiescaffoldingtowalltiesbymeansof "S"hookconnections.

Length
0.2mWallTie 0.4mWallTie 0.6mWallTie

Weight(kg)
0.81 1.52 2.24

Weight(kg)
0.8

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEComponents

EndTowBoardBracket
Arelocatedinthe"V"pressingattheendofthescaffolding wedgedeviceatbothends,tofitonthestandard. providingtoeboardsupporttothecorners.

LadderBeams
Designedtoprovideaclearspanbetweenscaffolds, ladderbeamsare305mmdeepwith305fromcentre tocentrerungsandarefabricatedin48.3x4mmTHK hightensilesteeltube.Fullysaddleweldedatevery joint,theyprovideastrongyetconvenientsupport systemthatreadilyintegrateswithexistingscaffolding usingstandardfittingsclamps.

Weight(kg)
1.3

Length SteelLadder
Theladderaremadetohighstandardswhichinclude notchedendstomaintainmaximumstrength.
CanbemanufacturedinAluminumandSteel. 3.353mLadderBeam 4.877mLadderBeam 6.400mLadderBeam

Weight(kg)
25.58 45.83
65.74

BaseJack Length
6.0mSteelLadder 4.5mSteelLadder 3.0mSteelLadder 1.5mSteelLadder

Weight(kg)
52.30 38.12 24.88 12.15 Itusedtolevelthestandard onunevengrounds.

Weight(kg)
3.7

SteelLadderBracket
Isusedtosecuretheladderareplumbandvertical tothescaffolding.

Weight(kg)
3.3

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKSTAGEComponents

ClosedendSteelPlanks
Madeof1.8mmthicknesssteelsheetby230mmwide.Thesteel planksspansbetweenthetransomsgivinganonsliplevelsurface.

ScaffoldNet
Usedtosecuredperimeterfenceforsafety.

Length Length
2.4mClosedendSteelPlanks 1.8mClosedendSteelPlanks 1.2mClosedendSteelPlanks 0.7mClosedendSteelPlanks

Width
x x 2m 3m

Weight(kg)
16.31 12.23 8.37 4.95

50m 50m

Stillages LVLScaffoldBoard
Aremadeof38mminTHKby225mminwidthbydesiredlengthinmm. WaterProofPaintsonbothendsandtreatedwithchemicalflameretardant. WBP(PhenolicFormaldehydeResinGlue) ForStoringScaffoldingcomponentsmadefrom scaffoldingtube.

Weight(kg) Length
4.0mLVLScaffoldingBoard 3.0mLVLScaffoldingBoard 2.4mLVLScaffoldingBoard 2.0mLVLScaffoldingBoard 1.8mLVLScaffoldingBoard 1.2mLVLScaffoldingBoard 1.0mLVLScaffoldingBoard

Weight(kg)
18.80 14.10 11.28 9.40 8.46 5.64 4.70

33

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCKACCESSSCAFFOLDSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Introduction

Ringlockisworldmostwidelyusedscaffoldsystem.Itisafullygalvanizedmultipurposesteelscaffoldsystem
suitableforprovidinggeneralaccessandsupportingverticalloads. ThecomprehensiverangeofRinglockmaincomponentsallowsittobeusedtocreateahugerangeofaccessandsupport structures,staircasetowers,circularscaffold,loadingtowersandmobiletowers.Itsrigidnodejointreducestheneedofbracing givingclearuninteruptedworkingplatform,whichcanbeformedusingtraditionalscaffoldboardsorbatten. Ringlockisusedforallformsofaccessandsupportstructuresinthebuilding,aviation,events,constructionindustries, shipbuilding,industrialmaintenance,offshoreconstruction.

Versatility
Itcanbeerectedforstraight,curvedor circularconfigurationforbothaccessandsupport, andalsoforindependentandmobiletowers.

Durability
Therearenoloosecomponentsonthe Ringlockscaffoldsystemthatcanbelostorrequires maintenance.

TensileStrength
Bothverticalstandardandhorizontalledger aremanufacturedfrom1.9"outsidediameterby gauge10highstrengthsteeltubingwithaminimum yieldstrengthof50,000lbs/inandamin.ultimate tensilestrengthof75,000lbs/in.

EasilyStored
Individualpipeelementscanbepackedinbundles foreasystorageandtransportation.

MultiFunctional
Withtheuniversaljointandfullyinterchangeablecomponents,theringsystemcanbeusedinmostconstruction projects(Civil&Building)forbothfalseworkandaccess.AlsoconcertstagingandAviationindustry Ringlockscaffoldingcanbedesigned,engineered,andmanufacturedtofitanytypeofaircraftandmultipletypesof aircraftsaswell.Weprovidehighquality,yetrelativelylowcostaircraftdockingsystems.Thiswillresultinasafeandefficient workstructurethatwillbecosteffective. TheabilityofourTechnicalteamtogenerateaccurateCADdesigndrawingsforourclients,ensuressafe,fast&efficienterection times,whichareoftendemandedbytheaviationindustry. Allcomponentsarehotdippedgalvanizedfinishwithminimumzinccoatingof60micronsandmanufactured tointernationalstandard.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCKSafety

Safe
AllcomponentsareindividuallycheckedandmarkedwithQCpassedband.

Safety
Standardareassembledwithledgerandbraceusingsecurefixedwedge.

Economical
Easilyassembledsystemscaffoldsavetimeandlaborcost.

Strong
AllscaffoldtubeelementsaremadeofhighstrengthsteelofQ345. ThewedgeissimplyslidovertheRosetteRing.

AWEnigneeringExperienced
Providesstructuraldesigndrawingsattenderstageuptofullsite assemblydetailstogetherwithdesigncalculationssheetsasrequired.

Thewedgeisinsertedintooneoftherecesses.

Ahammerblowonthewedgetransformthe positiveconnectionintoanonpositiveone.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Components

Standardwithspigot
ThestandardshaveRosetteRingat0.50mcentrestoenable ledgerstobeattachedwhererequired.Standardareavailable inhotdipgalvanizedsteeltubing48.3x3.2mmTHK.

Staircase
ThestaircasesystemincorporatesRinglockstandard products.Thestairstringersaremanufacturedto specificationdependentontheheightandpitch required.

Length
0.5mwithSpigot 1.0mwithSpigot 1.5mwithSpigot 2.0mwithSpigot 2.5mwithSpigot 3.0mwithSpigot 4.0mwithSpigot

Weight(kg)
3.2 5.6 7.9 10.3 12.3 14.7 19.2

Standardwithoutspigot Length
0.5mwithoutSpigot 1.0mwithoutSpigot 1.5mwithoutSpigot 2.0mwithoutSpigot 2.5mwithoutSpigot 3.0mwithoutSpigot 4.0mwithoutSpigot

Weight(kg)
2.6 4.7 6.9 9.1 11.8 13.8 18.2

BaseCollar240
Thecollarisinsertedintothebasejacktojoinstandard.

Thesystemssafetyfeaturesinclude: Guardrailsandhandrails Nonslipnontilthookonboards Toeboardscanbeattachedwhenrequired Extrawidestairtreadstoallowforpassingof personnel TheScaffoldallowsforadditionalloadingonthe heavydutystaircaseandplatforms.

Weightkg
1.6

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Components

Ledger
Thisallowsquick,safeandeasyhookinginandlocking totheconnectingrosetteringoftheverticalpost.

ULedger Length
0.45mULedger 0.50mULedger 0.73mULedger

Weight(kg)
2.2 2.4 3.3

Length
0.25mLedger 0.39mLedger 0.45mLedger 0.50mLedger 0.73mLedger 0.90mLedger 1.00mLedger 1.04mLedger 1.09mLedger 1.29mLedger 1.40mLedger 1.50mLedger 1.57mLedger 2.00mLedger 2.07mLedger 2.50mLedger 2.57mLedger 3.00mLedger 3.07mLedger 4.14mLedger

Weight(kg)
1.7 1.9 2.4 2.6 3.2 4.0 4.1 4.2 4.5 5.4 5.5 5.9 6.0 7.6 7.9 9.7 9.8 11.1 11.5 15.2

LedgerwithReinforcement Adjustablebasejack
Isusedtolevelthescaffold. Weight3.7kg

Length
1.09mReinforcementLedger 1.40mReinforcementLedger

Weight(kg)
5.9 7.6

BridgingLedger Weight(kg)
3.7

Length
1.57mBridgingLedger 2.07mBridgingLedger 2.57mBridgingLedger 3.07mBridgingLedger

Weight(kg)
9.7 12.8 15.9 19.7

UBridgingLedger Length
1.57mUBridgingLedger 2.07mUBridgingLedger 2.57mUBridgingLedger 3.07mUBridgingLedger

ULedgerforDeckConfiguration Length
0.45mULedger 0.50mULedger 0.73mULedger 1.09mULedger 1.40mULedger 1.57mULedger 2.07mULedger 2.57mULedger 3.07mULedger

Weight(kg)
9.5 12.2 15.3 17.8

No.ofSteelDeck
1x0.32m 2x0.19m 2x0.32mor1x0.61m 3x0.32mor1x0.61m+1x0.32m 4x0.32mor2x0.61m 4x0.32m+1x0.19m 6x0.32m 7x0.32m+1x0.19 9x0.32m

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Components

DiagonalBrace
Bracesaremanufacturedfrom3.2mmtubewithaswivelwedge deviceatbothends,tofitonthestandard.

Length,LxH
for0.73mbaylength,2.0mbayheight for1.04mbaylength,2.0mbayheight for1.09mbaylength,2.0mbayheight for1.40mbaylength,2.0mbayheight for1.57mbaylength,2.0mbayheight for2.07mbaylength,2.0mbayheight for2.57mbaylength,2.0mbayheight for3.07mbaylength,2.0mbayheight for4.14mbaylength,2.0mbayheight for0.73mbaylength,1.0mbayheight for0.73mbaylength,1.5mbayheight for1.09mbaylength,0.5mbayheight for1.09mbaylength,1.00bayheight for1.09mbaylength,1.50bayheight for1.57mbaylength,0.50bayheight for1.57mbaylength,1.0mbayheight for1.57mbaylength,1.50bayheight for2.07mbaylength,0.50bayheight for2.07mbaylength,1.00bayheight for2.07mbaylength,1.50bayheight for2.57mbaylength,0.50bayheight for2.57mbaylength,1.0mbayheight for2.57mbaylength,1.50bayheight for3.07mbaylength,0.50bayheight for3.07mbaylength,1.0mbayheight for3.07mbaylength,1.50bayheight

Weight(kg)
6.9 7.7 7.1 7.6 7.8 8.9 9.6 10.6 14.1 4.3 5.5 4.1 4.9 5.9 5.8 6.4 7.4 7.3 7.5 8.3 8.5 8.9 9.6
9.7 10

10.6

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Components

DiagonalBrace,Metric Length,LxH
for2.00mbaylength,2.0mbayheight for2.50mbaylength,2.0mbayheight for3.00mbaylength,2.0mbayheight for1.00mbaylength,0.5mbayheight for1.00mbaylength,1.0mbayheight for1.00mbaylength,1.5mbayheight for2.00mbaylength,0.5mbayheight for2.00mbaylength,1.0mbayheight for2.00mbaylength,1.5mbayheight for2.50mbaylength,0.5mbayheight for2.50mbaylength,1.0mbayheight for2.50mbaylength,1.5mbayheight for3.00mbaylength,0.5mbayheight for3.00mbaylength,1.0mbayheight for3.00mbaylength,1.5mbayheight

Weight(kg)
8.9 10.1 11.3 3.9 4.8 5.8 7.1 7.6 7.8 8.3 8.7 9.5 9.5 9.8 10.4

SideBracket
Usedtoextendthescaffoldplatformbycantilevering foranadditionaldecks.

USideBracket Length
0.28mSideUBracketwithspigot 0.39mSideUBracketwithspigot 0.73mSideUBracketwithspigot 0.79mSideUBracketwith2wedgeheads 1.09mSideUBracketwith2wedgeheads

Weight(kg)
3.5 3.9 6.4 5.1 12.1

Length
0.26mSideBracketwithoutspigot 0.36mSideBracketwithoutspigot 0.73mSideBracketwithspigot 1.09mSideBracketwithwedgeheads

Weight(kg)
2.4 3.5 6.8 12.2

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCK Components

AccessSteelPlanks,0.32mwide Length
AccessSteelPlanks,0.73mx0.32mwide AccessSteelPlanks,1.09mx0.32mwide AccessSteelPlanks,1.29mx0.32mwide AccessSteelPlanks,1.40mx0.32mwide AccessSteelPlanks,1.57mx0.32mwide AccessSteelPlanks,2.07mx0.32mwide AccessSteelPlanks,2.57mx0.32mwide AccessSteelPlanks,3.07mx0.32mwide

UAccessSteelPlanks,0.32mwide Weight(kg)
7.1 9.4 10.1 10.8 12.6 16.1 19.0 22.5

Length
UAccessSteelPlanks,1.57mx0.32mwide UAccessSteelPlanks,2.07mx0.32mwide UAccessSteelPlanks,2.57mx0.32mwide UAccessSteelPlanks,3.07mx0.32mwide

Weight(kg)
10.0 11.6 14.8 16.1

UAccessSteelPlanks,0.19mwide Length AccessSteelPlanks,0.19mwide Length


AccessSteelPlanks,0.73mx0.19mwide AccessSteelPlanks,1.09mx0.19mwide AccessSteelPlanks,1.40mx0.19mwide AccessSteelPlanks,1.57mx0.19mwide AccessSteelPlanks,2.07mx0.19mwide AccessSteelPlanks,2.57mx0.19mwide AccessSteelPlanks,3.07mx0.19mwide

Weight(kg)
5.2 6.4 8.1 8.6 10.2 13.3 15.4

Weight(kg)
5.1 7.1 9.1 10.1 12.7 15.5 18.3

UAccessSteelPlanks,0.73mx0.19mwide UAccessSteelPlanks,1.09mx0.19mwide UAccessSteelPlanks,1.40mx0.19mwide UAccessSteelPlanks,1.57mx0.19mwide UAccessSteelPlanks,2.07mx0.19mwide UAccessSteelPlanks,2.57mx0.19mwide UAccessSteelPlanks,3.07mx0.19mwide

UAccessDeck,0.61mwide Length AccessDeck,0.61mwide Length


AccessDeck,0.73mx0.61mwide AccessDeck,1.09mx0.61mwide AccessDeck,1.57mx0.61mwide AccessDeck,2.07mx0.61mwide AccessDeck,2.57mx0.61mwide AccessDeck,3.07mx0.61mwide

Weight(kg)
7.3 9.8 13.2 16.5 19.4 24.3

Weight(kg)
7.3 9.8 13.2 16.5 19.4 24.3

UAccessDeck,0.73mx0.61mwide UAccessDeck,1.09mx0.61mwide UAccessDeck,1.57mx0.61mwide UAccessDeck,2.07mx0.61mwide UAccessDeck,2.57mx0.61mwide UAccessDeck,3.07mx0.61mwide

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGLOCKComponents

LatticeGirder
Aremadefromstandardtube48.3x3.2mmTHK.To spanindifferentbaystogiveclearaccessorto avoidobstructions.

UAccessDeckwithLadder,0.61mwide Length
UAccessDeck,2.57mx0.61mwithladder UAccessDeck,3.07mx0.61mwithladder

Weight(kg)
24.0 27.4

Length
5.14mLatticeGirder 6.14mLatticeGirder 7.71mLatticeGirder

Weight(kg)
55.5 64.8 82.9

ULatticeGirder,Steel Length
2.07mULatticeGirder 2.57mULatticeGirder 3.07mULatticeGirder 4.14mULatticeGirder 5.14mULatticeGirder 6.14mULatticeGirder

Weight(kg)
23.5 29.8 35.8 44.2 54.2 62.7

AccessDeckwithLadder,0.61mwide Length
AccessDeck,2.57mx0.61mwithladder AccessDeck,3.07mx0.61mwithladder

Weight(kg)
25.9 29.7

ULatticeGirderforDeckConfiguration Length
2.07mULatticeGirder 2.57mULatticeGirder 3.07mULatticeGirder 4.14mULatticeGirder 5.14mULatticeGirder 6.14mULatticeGirder

No.ofSteelDeck
6x0.32m 7x0.32mand1x0.19m 9x0.32m 12x0.32mand1x0.19m 15x0.32mand1x0.19m 18x0.32mand1x0.19m

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCKACCESSSCAFFOLDSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCK Introduction

CUPLOCKisamultipurposesteelscaffoldforgeneralaccessandsupportingverticalloads.Thelatestandthebest optionavailableintheglobalmarketiscuplockscaffoldsystem.Itisthesafestsystemofscaffoldingatpresent,itisprovenand tested.Itismadeoutofhightensilesteeltubewithspecialdesignedforgedorcastingtopcupsfabricatedatevery0.5mtoget thedesiredoptimumstrengthandsupport. CUPLOCKscaffoldsystemisveryversatilewayoferection&dismantling.Youcanerectinwhateverstructuralconfigurationyou want.Thematerialinthissysteminsinglepipesonly,soitisveryeasytotransport,transferanderect.Itrequireslessspacefor storage,nolooseitemsaretherewhichgetsmisplaced,thelockingsystemhereissuchdesignedthatnochancesofaccidents. Thelifeofcuplockscaffoldisinfinity.Wecansayitpaysbackinlong.Cuplockisaprovenandtestedformultipurpose innovativescaffoldsystemwhichcanbeusedforallaccessandsupportstructuresinthebuildingconstructionindustries,viaduct offshore,shipbuilding,refinery,facade,bridgesetc.

Faade
Cuplockisareliableandsafepartneralso onfacadesofvariouslayoutandheightshapes. Itisfacilatedbyexternalandinternalsidebrackets, bracingparts,operationdeckswithintegratedascents orladders,trussbeamsandanchoringpartswithits circularnodepoints.

SpeedofErection
Providesamajorsavingsinerectionand dismantlingtimesthusminimizingonsitecost.Itcan beerected80%fasterthantraditionalscaffoldings. Whennotinuse,itsmodularconstructionsensure minimalspacerequirementsforstorage. Nowedgesjustasimplelockingcupateach nodepointonthestandardsenablesconnectionof theendsofuptofourmembersinonelockingaction.

Operational
Industrialoperationscaffoldingsbelongstothemostdesiredapplicationsofthecuplocksystemworldwide.They provedgoodinrefineries,chemicalplants,powerstations,steelplantsaswellasanoilplatformsonoffshoreThesystem ensuresperfectsafetyofwork.APAC also deliverscomplexprojectandinstallationworksbothforoneoffordersandforlong termservicecontracts. Awiderangeofcomponentsenablesfindinganeconomicallyoptimumsolutionofallneedsofthecustomer.Ahighload bearingcapacityandrigidityofthesystem,evenscaffoldingwithheightexceeding100meterarenoproblem.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCK Advantages

Advantages
FastInstallationanddismantlingresultintimeandlabour saving,easyinstallationwithnoloosecomponents,lowmaintenance, quick,fasteningofhorizontals. Fourhorizontalscanbefastenedatonetimewithfirmclamping actionoftopcupmakingthejointrigid,versatileuseinconstruction, demolitionormaintenanceprojectsforanytypeofstructure, Lightweightbuthighloadscarryingcapacityperverticalaxialload to57kNandSafetywithproventrackrecord.

Durability
Noloosepartsandwithcorrosionprotectioneasilystored andmaintained.Cuplockdesignedishighlyresistancetodamage.

Versatility
Cuplockcanbeerectedforstraight,curvedandcircular configurationforbothaccessandsupport.

Simplicity&Strength
Thesuccessofcuplockliesinthenodepointorfastening method.Fourhorizontalcanbefastenedatonetimemakingavery rigidconnection. Thehorizontalbeardirectlyontheverticalsandarefirmly clampedbytheactionofthecup.Therearenoloosepartstolose. Therigidnodepointallowsforhighhorizontalloadsexperienced witha57kNlegload.Thelockingdeviceisformedbytwocups,a fixedlowercupwhichisweldedtotheverticalcomponentat prelocatedintervalsandslidingtopcup. TheforgedledgerbladeendsoftheCuplockhorizontal componentsarelocatedintothelowerbottomcup,thetopcupis moveddownandrotatedtosecurethecomponentsareinplace andahammerblowtheresultsinapositiverigidconnection.

Inviaductconstruction completescaffoldtowerscanbe movedhorizontallyusingspecialtrolleyandrail,thensimply craneliftedtothenextlocation,savingtimeandlaborcosts.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCK Components

StandardwithSpigot
Aremadefromahighgradesteeltubewith48.8x3.2mm wallthicknessandidentifiedbyaslidingforgedtopcup andpressedbottomcupswithspecialfabricatedatevery 500mmintervaltogetthedesiredstrength.

Ledger
Allhorizontalledgershaveidenticalforgedbladeends, withaminimumofprojectiontoavoiddamage.

Length
3.0meter(9'10") 2.5meter(8'2") 2.0meter(6'6") 1.5meter(4'11") 1.0meter(3'3")

Weight(kg)
16.8 14.1 11.4 8.7 6.1

Length
3.05meter(10')Horizontal 2.74meter(9')Horizontal 2.50meter(8'2")Horizontal 2.44meter(8')Horizontal 2.13meter(7')Horizontal 1.83meter(6')Horizontal 1.80meter(5'11")Horizontal 1.52meter(5')Horizontal 1.50meter(4'11")Horizontal 1.25meter(4'1")Horizontal 1.22meter(4')Horizontal 1.07meter(3'6")Horizontal 0.91meter(3')Horizontal 0.90meter(2'11")Horizontal 0.79meter(2'7")Horizontal 0.56meter(1'10")Horizontal

Weight(kg)
11.76 10.58 9.67 9.45 8.27 7.13 7.02 5.96 5.88 4.93 4.82 4.24 3.72 3.61 3.18 2.32

StandardwithoutSpigot Length
3.0meter(9'10") 2.5meter(8'2") 2.0meter(6'6") 1.5meter(4'11") 1.0meter(3'3")

Weight(kg)
16.15 13.45 10.75 8.05 5.45

Connector
Spigotisinsertedintothetoptojoinstandard.

Weight(kg)
0.65

ReinforcedLedger Length Weight(kg)


10.55 14.66 17.88 21.11 25.21 29.31 1.80mReinforcedLedger 2.50mReinforcedLedger 3.05mReinforcedLedger 3.60mReinforcedLedger 4.30mReinforcedLedger 5.00mReinforcedLedger

Adjustablebasejack
isusedtolevelthescaffold.

Weight(kg)
3.7

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCKComponents

SwivelBrace
Providesthebaybracingtoacuplock scaffoldsystem.Verticalsteeltubeare madeof48.3x2.5mmTHKandhas aswivellingendbladetoallowforeasy locationinthepointnode.

HopupBracket
Itisdesignedtoincreaseoverallwidthandextend workingplatforms.1boardismadefrom48.8 mm tubewithaledgerbladeandplateatoneend. 2&3boardsaremadeupofhorizontal,support braceandverticalpost.

Length
2.5x2.0mBrace3.2m 2.0x2.0mBrace3.0m 1.8x2.0mBrace2.7m 1.2x2.0mBrace2.4m 1.0x2.0mBrace2.2m

Weight(kg)
12.60 11.80 11.00 9.90 9.50

Length
BoardBracketExtension BoardBracket1'(1Board) BoardBracket1'10"(2Board) BoardBracket2'7"(3Board)

Weight(kg)
2.4 1.5 5.5 6.9

SteelPlankwithHook
Designedtobelightweight,safe,anddurableindirectresponseto userneeds.Thisisbestsuitedforworkingplatformforuseatahigh place,sinceitis20%lighterthantheconventionalplywoodboard, andsteelplankishighlyrecommendedtobeusedonconstructionsite.

OmegaTransom
Arefabricatedtwinanglesteelbarfixedwithadrop forgedledgerbladeattachedtobothends. Theoutwardstandingbottomlegoftheangles supportstheboardinacaptivemanner.

Length Length
3.00meter(10')SteelPlankwithhooks 2.50meter(8'2")SteelPlankwithhooks 2.00meter(7')SteelPlankwithhooks 1.80meter(5'11")SteelPlankwithhooks 1.50meter(4'11")SteelPlankwithhooks

Weight(kg)
13.16 9.58 6.81 5.17

Weight(kg)
20.23 16.72 13.98 12.52 10.66

2.5mOmegaTransom 1.8mOmegaTransom 1.25mOmegaTransom 0.9mOmegaTransom

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPLOCKComponents

AccessStair
Itcanbeerectedforverticalconstructionsiteandpublic transportwiththeusedofscaffoldstandardcomponents togetherwithspecialdesignedstaircasehandrail,which arelocatedsoastoenablefastandsimple.

CasterAdaptor
Unitsprovidefortheeasy conversionofcasterwheel fromthesystemsforuseof movablerollingtower.

Length
Staircase2.50x2.00meter Handrail2.50x2.00m Staircase3.05x2.00meter Handrail3.05x2.00m

Weight(kg)
47.0 14.0 51.0 15.0

Weight(kg)
5.6

LadderBracket
Isusedtosecuretheladderareplumbandvertical tothescaffolding.

BasePlate
Abaseforuniversaljack,alsoconnect toopenendedstandard.

Weight(kg)
3.3

Weight(kg)
0.9

IntermediateTransom SteelLadder
Canbeplacedanywherebetweenthe horizontalsforincreasingthesupport spaceandareusedwherewooden planksrequireintermediatesupport betweenspanoftwoledgers. Theladderaremadetohigh standardswhichinclude notchedendstomaintain maximumstrength.

Length
1.80mIntermediateTransom 1.50mIntermediateTransom 1.25mIntermediateTransom 1.07mIntermediateTransom 0.90mIntermediateTransom

Weight(kg)
8.63 7.21 6.10 5.14 4.32

Length
6.0mSteelLadder 4.5mSteelLadder 3.0mSteelLadder 1.5mSteelLadder

Weight(kg)
52.0 38.0 24.0 12.0

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEACCESSSCAFFOLDSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAME Introduction
FRAMEScaffoldthesystemhasbuiltinorattachable spigotandarelightweightwhichallowsfastassemblyand dismantling,Noskilledlabourrequired.Theframehastubular braceforbetterrigidity.Frameisalightweightaccessscaffolding

issuitableforalllightdutyapplicationsuchasfecadefor
painting,cleaning,plasteringandmaintenancework.

Durable,effecient&SavingLabourCost
SafetyhastopprioritywhenaFrameScaffoldformasonry

worksiserected.

Otherdemandsare:
Rapidhandling fewpla ormtypesforallbuildinggeometries Eecienttransport Compactstorage

HandyCostPerformance
Itischaracterizedbydurabilityandhighquality.Thishandyframe scaffoldsystemisespeciallysuitedforapplicationswherenospecialized equipmentisavailableoroutofreach.Closed,easytograptheprofile facilatatetheapplicationoftheframesandallowforasafeandlabourcost savingworkingevenunderwetconditions. Frameinthehandy,lightweightandlabourindependentframe scaffoldsystemwithanunbeatencostperformanceadvantageforusein AccessScaffoldSystem,housing,narrowConstruction,industrialfacade retention,reconstructionandrefurbishment.

LightdutyFrame
Thesystemhasbuiltremovablespigotorfixedspigotandare lightweightwhichallowsfasterassemblyanddismantling. Nospecialskilledlabourrequired&Theframehastubular braceforbetterregidityandstabilized.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEFeature

EasytoErect
FRAMEsystemisaningenioussystemwith fewbasiccomponentstomakeerectionsimple. Thecleverdesignwithframesandguardrailsthatare quicktoerectanddontrequirediagonalbracesmeans thatthescaffoldingissoonreadytouse.Andwhenthe jobisdone,itsequallyeasytodismantle. Featureremovablespigotandfliplockto ensuresafe,quickandsimpleconnectionsbetween Frames,CrossbraceandHorizontalbrace.

PrinciplesofDesign
Thedesignofscaffoldsshouldtakeinto accountofthefollowing: Thesafetyofpersonsusingthescaold Thesafetyofpersonsinthevicinityofthescaold Thescaoldstnessforitsintendedpurpose Thehandlingnormallyassociatedwithscaolding Thestrength,stabilityandrigidityofthe supportingstructure Thesafetyofpersonsengagedintheerec on, alterationanddismantlingofthescaffold

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEComponents

WalkthruFrame

Sizes
5'x6'7"WalkThruFrameFlipLock 3'x6'7"WalkThruFrameFlipLock 3'x5'1"WalkThruFrameFlipLock 2'x6'7"WalkThruFrameFlipLock

Weight(kg)
20.00 18.50 12.30 14.50

Typeoflockandsurfacefinishareavailableonrequest

MasonFrame

Sizes
5'x3'MasonBoxFrameDropLock 5'x4'MasonBoxFrameDropLock 5'x5'MasonBoxFrameDropLock 5'x6'4"MasonBoxFrameDropLock

Weight(kg)
16.8 18.5 20.2 22.3

Typeoflockandsurfacefinishareavailableonrequest

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEComponents

ShoringFrame

Sizes
4'x3'ShoringFrame(23/8"O.D.) 4'x4'ShoringFrame(23/8"O.D.) 4'x5'ShoringFrame(23/8"O.D.) 4'x6'ShoringFrame(23/8"O.D.)

Weight(kg)
15.50 20.80 24.50 30.40

Typeoflockandsurfacefinishareavailableonrequest

LadderFrame

Sizes
2'x3'1"LadderFrameFlipLock 3'x4'1"LadderFrameFlipLock 2'x6'7"LadderFrameFlipLock 3'x6'7"LadderFrameFlipLock

Weight(kg)
7.10 11.20 14.50 16.50

Typeoflockandsurfacefinishareavailableonrequest

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEComponents

CornerGuardRailPost

UheadJack

ScrewJack

Weight(kg)
3.8

Weight(kg)
5.68

Weight(kg)
4.85

CrossBrace Sizes
10'x4'CrossBrace 9'x4'CrossBrace 8'x4'CrossBrace 7'x4'CrossBrace 6'x4'CrossBrace 5'x4'CrossBrace

Staircase Weight(kg)
7.12 6.49 5.85 5.26 4.99 4.26 Itcanbeerectedforverticalconstruction siteandpublictransportwiththeusedof scaffoldstandardcomponentstogether withspecialdesignedstaircasehandrail, whicharelocatedsoastoenablefastand simple.

Length
Staircase5'x6'4" Staircase7'x6'4"

Weight(kg)
55.5 62.5

CasterWheel GuardRail CouplingPin Sizes


10'GuardRail 9'GuardRail 8'GuardRail 7'GuardRail 6'GuardRail 5'GuardRail

Weight(kg)
5.62

Weight(kg)
4.90 4.31 3.72 2.32 2.00 1.68

Weight(kg)
0.45

24"SideBracket

Weight(kg)
5.68

ColorLegend
Lightblue Grey Blue Green Red

Yellow

Orange

Black

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TUBE&FITTINGSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TUBE&FITTINGIntroduction

WeexportwiderangeofScaffoldtubeandaccessory includingcoldpressedfittingsanddropforged.Alltheseproducts aredesignedtobecompatiblewithstandardscaffoldtubes. Ourhighperformancecoldpressedanddropforgedfittings providethebuildingindustrywithcompletelysafeandeconomical solutionsforScaffoldingDesignasperBS/ENStandards. Wealsoundertakedesignandmanufacturingoftailormadesystems asperbuyer'srequirements.

Ourrangeofscaffoldingfittingshasanupperhandover conventionaltypeoftimberscaffoldinggivingbetterfittingsand durability.Tubeandfittingscaffoldsaregenerallynotcoveredby manufacturersspecifications,engineerscertificatesorproducer statements,hencetheneedtohavegeneralscaffolding requirementsforthem.

Ourrangeofscaffoldingfittingsareknownforitstechnicaldesign andthedurabilityitpossess.Thesearewidelyusedforsupporting manandmaterials,demolition,toolsandtacklesatthetime ofconstruction,alteration,maintenanceworks,civilengineeringand structuresforhospitalityevents.Wearesolutiontoallindustrial, constructionandalsohavingshareinthenuclearpower,paperand pulp,petrochemicalandshipbuilding.

Thesegeneralscaffoldingrequirementsmustalsobe usedwhenalteringproprietaryscaffoldswithtubeandfitting componentswhenthemanufacturersspecificationsorengineers requirementdonotincludethesealterations.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TUBE&FITTINGApplication

Taskanalysis&ProductManual
Itisbecominggenerallyacceptedthatonlargersites clientswantataskanalysiscompletedaspartofthedesignprocess. Thisisgenerallyprovidedinconjunctionwithhazardidentification. Forprefabricatedcomponentsandsystemsamanualshallbemade

availabletoenabletheproducttobeusedsafely.Forfaade
scaffoldsmadeofprefabricatedcomponentsseeEN128101.

EffectiveCost
Asascaffoldingbusinesscompanywetooidentifyand appreciatetherestraintsthatthistimeofeconomicuncertainty hasputuponusall. Thatiswhywefocusagreatdealofourtimeandeffortson ensuringwecanprovideyouwithverycompetitiverates.

Ourproductsofscaffoldingwhethertubesorfittingsare manufacturedinaccordancewithBSandENstandards.Ourfittings aresuppliedwithfullycaptivenuts&wrench.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TUBE&FITTINGComponents

DropforgeDoubleCoupler
Usedforconnectingtwotubescrossingatarightangle. Alsoknownas90degreeclamp.

JISPressedDoubleCoupler
Thistypeofcouplerisusedforconnectingscaffold tubesatrightangletoeachother.

Weight(kg)
0.98

Weight(kg)
0.65

JISPressedSwivelCoupler DropforgeSwivelCoupler
Usedforconnectingtwotubescrossingatanyangle. Alsoknownas360degreeclamp. SwivelCouplersconnecttwoscaffoldtubesatany angletoprovidealedgerbraceorsimilarbracing.

Weight(kg) Weight(kg)
1.12 0.65

BeamClamp SleeveCoupler
Usedforjoiningtwotubeslocatedcoaxially. Providesafixed90couplingofascaffoldtubeto anIbeamgirder.

Weight(kg)
1.12

Weight(kg)
1.5

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TUBE&FITTINGComponents

PutlogCoupler
Forrapiderectionordismantlingofputlogsandtransom.

DropforgeInternalJointPin
Designedforinternal'endtoend'connection.

Weight(kg)
0.62

Weight(kg)
1.54

BoardRetainingClamps
Scaffoldstopendsandscaffoldguardboardreturns

ScaffoldTube
Tubesaremanufacturedfrommildsteelstripsslitted fromhotrolledlowcarbonsteelcoils.Scaffoldtube conformingtoBritishStandardisavailableineither GalvanisedIronandBlackIron. Othersizesavailableonrequest.

areneatlyandefficientlylockedintothecorrect
positionsforamoresecure.

Weight(kg)
0.63

BasePlate
Usedtodistributetheloadofascaffoldinginstallation.

Weight(kg)
0.9

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEKSLABFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEKIntroduction

KwikDekSlabShoring&Decking
TheKwikDekSlabFormworkDeckingSystemreplacesthesecondaryandprimarybeaminsoffitsupportandprovides aflatsupportgridfordeckingoutwithplywoodorotherconventionalmaterials,labourcostsaregreatlyreducedinconjunction withthespeedofconstructiontoprovideaneconomicalsolutiontodeckingproblems. KwikDekrequiresfewerdifferentpiecesthanmostothersimilarsystemandcanbestoredinlessspace. Thisuniquesystemallowstheslabformworktobestrippedonly(3)threedaysafterconcretehasbeenpoured. TheDropheadallowsthesupportworktoremaininplacetherebyavoidingrepropping

FeaturesofthekwikDeksystem:
Maximumutilisationofequipment Eliminatesanydeflectionofslab Noreproppingrequired versatilewithunlimitedadjustments

KwikDekShoringandDeckingisahighlyversatile, verycompetitiveslabformworksystemcapableofbeing usedinmanyapplications: Bracesfittothestandardsusinghalfcouplersensuringno looseparts,minimisinglossanddamagecharges Simpleerectionprocedureensuresstringentsafetylevels canbeeasilyachieved Makeupareasaroundcolumnscanbesupportedsimplyby usinginfillbeams,savingcustomertimeandmoney Quickstrikingsystem,enablingearlyremovalofdeckbeams andplywood,savingtimeandcost Variableledgerpositionstosuitlegloading,increasing flexibilityofthesystem Quickandeasytoerectledgersandtransomsarefixedto theverticalstandardsusingcaptivewedgeconnections, eliminatingtheneedfortransversebracing

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEK Components

Standards
MadefromstandardScaffoldtube.TheyhaveVpressing weldedat495mm4wayconnectionsforledgers. AvailableLength:3.0m,2.5m,2.0m,1.5m&1.0m

Ledgers
TheyareweldedwithCpressandwedge,usedforeasy installationonthestandards. AvailableLength:2.4m,1.8m,1.2m,0.9m&0.6m

AdjustableBaseJack Drophead
Supportthedeckingbeamswhich areseatedontheprojected supportplate.
Itusedtolevelthestandard onunevengrounds.

AdjustableSpigotJack SpigotConnector
Usedtoconnecttwostandard. Itconnectsopenendedstandardwith dropheadanditisusedforadjusting

dropheadheights.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEK Components

DeckingBeams
Designedtosupportavarietyofbaysizes withamaximumloadonanysupporting legof40kN. AvailableLength:2.4m,1.8m&1.2m

CantileverFrame InfillBeams
Designedassecondarybeamstosupportplywood atpermissiblespans. SafeWorkingLoad:40kNUDL AvailableLength:1.8m,1.2m&0.9m Thecantileverbracketisusedtoextendtheslabformworkinareas wherethereisnosupportfrombelow.Itcanbeusedtosupporta beamorchannel. Typicalapplicationsareforslabextensionsandaccesswork. AvailableLength:1.5m&1.0m

BasePlate
Itisusedwhenthestandard areonevengrounds.

CantileverBeamBracket
AvailableLength:1.5m&1.0m

InternalBeamBracket UHead
AvailableLength:1.5m&1.0m

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEKAssembly

Step1
Erectionsequencefor4standardsand2ledgers.

Step4
Addthefourthstandardand2moreledgersinasimilar mannertocompletetheassemblyof4standardand4ledgers.

Spaceoutsocketbasesandstandinjacksifrequired

Step2
Assembleastandardonajackand2ledgersatright anglesinalower"V"pressingofthestandard.

Step5
Addtheupperlayerof4ledgersand2braces.Assemblethe upperjackanddropheadsonthecompletedsupportgrid.

Step3
Takeasecondstandardandassembleonanotherjack, fixingtheledgerendofthepreviouslyassembledledger intothe"V"pressingofthestandard.Repeatforthe thirdstandardtocompletearightangledcorner.

Step6
Finallyaddtheprimarybeamsandinfillbeamsinthecompleted supportstructureandasgridsarecompleted,tightenalljoints.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEKAssembly

Stage1
Completeslabandsupportsystemerected.

DismantlingProcedure
Strippingfollowsthesameprocedurethe techniquesofearlydismantlingarefollowedornot. Theadvantagesofearlystrippingisthattheprimary beamsandinfillsmayberemovedwhileconcrete soffitremainssupportedandcompletelyundisturbed duringitscuringperiod. Theprimarybeamsandinfillsmaythereforebereused thusgainingfurtherconcreteproductionwithonlyan additionalsetofsupprtingcomponents. Primarybeamsandinfillsmayberemovedbystriking thedropheadwedge.Whiletheprimaryheadremains incontactwiththeconcrete,thestrikingofthewedge allowsthebeamstodropabout115mmgiving sufficientclearancefortheremovaloftheinfills.

Stage2
Reinforcingsteelplacedandconcretepoured.Onedayafterconcreting thesecondsetofsupportcanbeerectedontheupperlevel.

Stage3
Afterthreedaysplywood,infillbeamsanddeckingbeamsarestripped withoutremovingthesupport.Adoublesetofsupportissupplied.

Up Stage4
Afterstrippinglevel1alldecking,ledgersandbracescanimmediately beplacedonthesecondsetofsupportpreviouslyerectedonlevel2.

Down

Whethertheadvantagesofearlystrikingaretaken ornot,completesafetyindismantlingoperationis ensuredasprimarybeamsandinfillscannotfalltothe groundafterstriking,butmustberemovedmanually. ToassembleKwikDekShoringandDeckingremove thedropheadassemblyfromthejackatoneendand connectittothebeam. Thecompletedwithitsdropheadcannowberaised anddroppedoverthejack.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

KWIKDEK TechnicalData

PermissibleLoadsonBaseComponents
VerticalAxialLoadto57kN TheLoadingwillvaryaccordingtothehorizontalloads takenintoaccountandtheactualextensionofthe jackrequired.

EarlyStripping
Earlystrippingisatechniquewherebythe isremoved34daysaftercastingtheslabbutwiththe supportingstructureofshoringremainingundisturbed forthefullcuringperiod. Afterstrikingtheprimarybeams,theinfillbeamsand theplywoodcanbeeasilyremovedandreusedonthe nextareaofscaffold. Thedropheadremainsatalltimesincontactwiththe undersideoftheslabensuringpropersupportatall times.

Standard"V"pressing
Maximumsafeshearloadoneach"V"pressingis10kN.

BeforeStriking
Dropheadsupportingbeamsinraisedposition.

DropheadTechnicalDetails
Safeloadcarryingcapacityof40kN

KwikDekShoringGUIDE
Atleasttwolacinglevelshavetobeusedoneach standards.Whencalculatingtwohorizontalforces, includeforwindforces,theeffectofeccentricity, andoutofverticalityinaccordancewithBritish Standard5975. Takecarethatthestructureisstableintheunloaded condition,especiallyiftowersornarrowstructures areused.Allstandardshouldbeerectedplumb. Horizontalforcesshouldbedistributedoverall standardsasevenlyaspossible. Footingsshouldbeprovidedtopreventsettlement ofthestandards.

AfterStriking
Dropheadinstruckposition.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGFLEXSLABFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGFLEXIntroduction

RINGFLEXisalightweightmodularscaffold systemthatrequiresnoloosefittings,shortenserection anddismantlingtimeandsavelaborcost. Eachcomponentsfitspreciselyintotheuniquering rosetteandlockssecurelybysimplyhammeringa captivewedgeintoplace.Thesystempreengineered andmeasuredcomponentsandfitstogetherinasafe andefficientconfiguration. EverypieceofAPAC RingFlex componentsishotdip galvanized,hightensilesteelwhichlimitscorrosion andincreasethelifeoftheequipment.

SpeedofErection&Dismantling:
Providesmajorsavingsinerectionandstrippingtime thusminimizingonsitecost.Whennotinuse,itsmodular constructionensuresminimumspacerequirementforstorage.

Shoringsupport:
Usedinbeamandsuspendedslabshoringtoprovide supporttodownstandbeamswithouttheneedforadditional scaffoldingandortimbersupport.

withanextensivelineofefficiencyenhancing accessoriesAPAC RingFlex isoneofthemostcost effectivesystemslabformworkintheworld.

Efficient
APAC RingFlex reduces labor costs and improves schedulingbyeliminatingloosefittingsfromthe systemsdesign.Withfewerpiecesthanothersystem reduceshandlingonsiteandmakesshippingefficient. Nobulkyframesorheavysteelpartsmakethesystem easytoload,unload,erectandstrip.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

RINGFLEX Components

Standard
withRosetteringinevery500mmforamaximum of8connections.ForsmallopeningsintheRosette determinetherightangleconnection,forfourlarger openingspermitconnectionsatanyangles. Length3.0m,2.5m,2.0m,1.5m,1.0m

ledger
Theresultisaconnectionwithhighjunctionpointrigidity.

Length2.5m,2.0m,1.8m,1.5m,1.2m,0.9m,0.6m,0.3m ExternalBeamBracket

InternalBeamBracket

Length Length
1.0m 1.5m 1.0m 1.5m

BaseJack H20Beam

Length5.9m,4.9m,4.5m,3.9m,3.3m,2.9m,2.5m,2.0m,1.5m UheadJack

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEKSLABFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEKIntroduction

CupDekSlabDecking&Propping
CupDekSlabFormworkDeckingSystemisaprovenmultipurposescaffoldwhichcanbeusedforallformsofaccess andsupportstructuresinthebuilding,constructionindustries,viaduct,offshore,shipyard,oilrefineries,bridges,construction maintenanceandbuildingfacade.

BenefitsoftheCupDeksystem:
Fastertoerectthantraditionalsystemsupto4components securedinoneaction Uniquenodepoint,noloosecomponents Highgradetubeupto25%lighter Highdamageresistant versatilebaysizes

CupDekDeckingandProppingisversatileavailable indifferentsizeswhichprovidearangeofproppingheights. CupDekSlabFormworkaremultifunctionalandcanbeused tobackpropbothbeamsandslabsuntiltheconcretehascured.

Theyarealsowidelyusedtosupportfloorcentresonwhichdecking platesareplacedtoformlightslabssuitableforhighrisebuilding andlowcosthousingdevelopments.Thefloorcentresareadjustable tocaterfordifferentwidthsbetweenwalls.

Specialapplication:
TheCuplocksystemcanbeusedforcreatingmanyspecial structuresaccordingtovariousneedsandrequiredofthecustomer suchaspodiums,suspendedslaboperation,bridgedeckingetc.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEK Components

Standards
Aremadefromahighgradesteeltubewith48.3mmdia.by3.2mm wallthicknessandidentifiedbyaslidingforgedtopcupandpressed bottomcupswithspecialfabricatedatevery500mmintervaltoget thedesiredstrength. Eachstandardtakesamaximumlegloadofcapacityof57kN.

Ledgers
Allhorizontalledgershaveidenticalforgedblade ends,withaminimumofprojectiontoavoiddamage.

Length(m)
2.5 1.8 1.5 1.2 0.9 0.6

EffectiveLength,(m)
0.8 1.0 1.3 1.5 1.8 2.0 2.3 2.5 2.8 3.0

UniversalJack
Itconnectsopenendedstandardwith dropheadanditisusedforadjusting

dropheadheights.

SocketBaseAdaptor
Itprovidesabasefortheuniversaljack, alsoconnectuniversaljacktodrophead.

Drophead
Thequickstripdropheadsuppliedalongwithnutsandbolts isdesignedtofitonstandardshoringpropsandsocketbase adaptortosuitanysystemscaffolding.

BaseJack
Itusedtolevelthestandard onunevengrounds.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEK Components

DeckingBeams
Including10cmwidetopflangewhicheliminatesthenecessity foraplywoodinfill,tocutdownmaintenancecost. AvailableLength:2.5m,1.8m&1.2m

CantileverFrame
AvailableLength:1.5m&1.0m

InfillBeams CantileverBracket
Usedtoprovideskeletalsupportforplywooddecking. Usedtosupportexternalbeam.

Uhead
Itusedforspecialapplicationfor infillareasandbeams.

Sizes:150x170x6 150x200x6

InternalBracket Connectorwithbolt&nut
Usedtosupportinternalbeam. Itisusedtoconnectbetweentwostandard.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEKAssembly

Phase1
Erectionsequencefor4standardsand2ledgers.

Phase4
Addthefourthstandardand2moreledgersinasimilar mannertocompletetheassemblyof4standardand4ledgers.

Spaceoutsocketbasesandstandinjacksifrequired

Phase2
Assembleastandardonajackand2ledgersatright anglesinalower"V"pressingofthestandard.

Phase5
Addtheupperlayerof4ledgersand2braces.Assemblethe upperjackanddropheadsonthecompletedsupportgrid.

Phase3
Takeasecondstandardandassembleonanotherjack, fixingtheledgerendofthepreviouslyassembledledger intothe"V"pressingofthestandard.Repeatforthe thirdstandardtocompletearightangledcorner.

Phase6
Finallyaddtheprimarybeamsandinfillbeamsinthecompleted supportstructureandasgridsarecompleted,tightenalljoints.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEKAssembly

Phase1
Completeslabandsupportsystemerected.

CupdekStrikingProcedure
Strippingfollowsthesameprocedurethe techniquesofearlydismantlingarefollowedornot. Theadvantagesofearlystrippingisthattheprimary beamsandinfillsmayberemovedwhileconcrete soffitremainssupportedandcompletelyundisturbed duringitscuringperiod. Theprimarybeamsandinfillsmaythereforebereused thusgainingfurtherconcreteproductionwithonlyan additionalsetofsupprtingcomponents. Primarybeamsandinfillsmayberemovedbystriking thedropheadwedge.Whiletheprimaryheadremains incontactwiththeconcrete,thestrikingofthewedge allowsthebeamstodropabout115mmgiving sufficientclearancefortheremovaloftheinfills.

Phase2
Reinforcingsteelplacedandconcretepoured.Onedayafterconcreting thesecondsetofsupportcanbeerectedontheupperlevel.

Phase3
Afterthreedaysplywood,infillbeamsanddeckingbeamsarestripped withoutremovingthesupport.Adoublesetofsupportissupplied.

Up Phase4
Afterstrippinglevel1alldecking,ledgersandbracescanimmediately beplacedonthesecondsetofsupportpreviouslyerectedonlevel2.

Down

Whethertheadvantagesofearlystrikingaretaken ornot,completesafetyindismantlingoperationis ensuredasprimarybeamsandinfillscannotfalltothe groundafterstriking,butmustberemovedmanually. ToassembleKwikDekShoringandDeckingremove thedropheadassemblyfromthejackatoneendand connectittothebeam. Thecompletedwithitsdropheadcannowberaised anddroppedoverthejack.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CUPDEK TechnicalData

PermissibleLoadsonBaseComponents
VerticalAxialLoadto57kN TheLoadingwillvaryaccordingtothehorizontalloads takenintoaccountandtheactualextensionofthe jackrequired.

EarlyStripping
Earlystrippingisatechniquewherebythe isremoved34daysaftercastingtheslabbutwiththe supportingstructureofshoringremainingundisturbed forthefullcuringperiod. Afterstrikingtheprimarybeams,theinfillbeamsand theplywoodcanbeeasilyremovedandreusedonthe nextareaofscaffold. Thedropheadremainsatalltimesincontactwiththe undersideoftheslabensuringpropersupportatall times.

DropheadTechnicalDetails BeforeStriking
Safeloadcarryingcapacityof40kN Dropheadsupportingbeamsinraisedposition.

CupDekShoringGUIDE
ForStandardatthebeginningandendofarow,theloadingfigures ofthetopandbaseliftshavetobereducedby5%,exceptifjack bracingisused. ThisalsoappliestotheuseofCuplockintowersandsinglebays. Atleasttwolacinglevelshavetobeusedoneach standards.Whencalculatingtwohorizontalforces, includeforwindforces,theeffectofeccentricity, andoutofverticalityinaccordancewithBritish Standard5975. Takecarethatthestructureisstableintheunloaded condition,especiallyiftowersornarrowstructures areused.Allstandardshouldbeerectedplumb. Horizontalforcesshouldbedistributedoverall standardsasevenlyaspossible. Footingsshouldbeprovidedtopreventsettlement ofthestandards.

AfterStriking
Dropheadinstruckposition.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEFLEXSLABFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

FRAMEFLEXComponents

MasonFrame Sizes
5'x3'MasonBoxFrameDropLock 5'x4'MasonBoxFrameDropLock 5'x5'MasonBoxFrameDropLock 5'x6'4"MasonBoxFrameDropLock

WalkthruFrame Sizes
5'x6'7"WalkThruFrameFlipLock 3'x6'7"WalkThruFrameFlipLock 3'x5'1"WalkThruFrameFlipLock 2'x6'7"WalkThruFrameFlipLock

CrossBrace Sizes
10'x4'CrossBrace 9'x4'CrossBrace 8'x4'CrossBrace 7'x4'CrossBrace 6'x4'CrossBrace 5'x4'CrossBrace

GuardRail Sizes
10'GuardRail 9'GuardRail 8'GuardRail 7'GuardRail 6'GuardRail 5'GuardRail

AluminumBeam
Twodifferentprofileareavailable: A150Beam: BendingMomentexceeds6kNm Size: 150x80mm Weight: 3.162kg/m Length: Anylengthupto10m

BaseJack

Uheadjack

A165Beam: Size: Weight: Length:

BendingMomentexceeds6kNm 150x80mm 3.162kg/m Anylengthupto10m

ColorLegend Red Green

Blue

Yellow

Grey

Orange

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TABLEFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TABLEFORM Introduction

AWTable formSystemisaversatiletypescapableofhandlingvirtuallyanyslabformingproject.Canbeusedon alltypesofbuildingconstructionorforanytypewhereanadjustableloadbearingmemberisrequired. Thehightensilesteelpinislocatedthroughaslotintheoutersectionandaholeontheinnersectionforcoarseadjustment. thecastcollarlocatedbelowthepingivesfineadjustmentforleavingorstriking.

TheFlexibleheightadjustmentthesystemissuited:
Tosupportslabformworkatanyheight Tobuildslabtablesforlargeslabsurfaces Tosupportconcretebeamsorprefabricatedslabs

Features:
Thequickloweringsystemreleasesthestressinthe propwithonestrikeofahammerblow Extendableinheightwithdierentsizesofprops Modulardesignforver calbuildingsofvirtually anyrequiredheight Poten alwindloadcanbetransferredinto theprops Tripodasassemblyauxiliaryforprops Dierentsizes,modelswithcoveringallloadsand measurements. Manufacturedwithhighresistanncesteeltubes.

ShoringSystemAdvantage:
Thesamecomponentsareusedfordifferentapplicationandthe numberandpositionofthepropsisdeterminedbythesystem. Themostimportantrequirementsofabuildingcanbemeeteasily andflexibly: Groundplanlayout Buildingtype Slabthickness Concretenish Floorheight

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TABLEFORM Components

ShoringProps
Propforshoringwithlevelplateavailablefor shoringinvariouslength,andwiththeoptionoftheclassic sleeve,onironorcastiron,orwiththeexternalthread. Availablecolorsarered,navyblueandgray,orthereisthe possibilityforweatherresistanceofelectroplatedor hotdipgalvanization. Propsisversatileavailableindifferentsizeswhichprovidearangeof proppingheights.Propsaremultifunctionalandcanbeusedto backpropbothbeamsandslabsuntiltheconcretehascured. Theyarealsowidelyusedtosupportfloorcentresonwhichdecking platesareplacedtoformlightslabssuitableforlowcosthousing developments.Thefloorcentresareadjustabletocaterfordifferent widthsbetweenwalls.

Props30 ExtensionRange
Eurex30/250(147250) Eurex30/300(172300) Eurex30/350(197350) Eurex30/400(222400)

Weight(kg)
15.33 17.21 21.18 25.44

Props20 ExtensionRange
Eurex20/250(147250) Eurex20/300(172300) Eurex20/350(197350) Eurex20/400(222400) Eurex20/550(297550)

Weight(kg)
13.95 15.83 18.37 23.76 35.11

ECOProps ExtensionRange
ECOProp(175312) ECOProp(198335) ECOProp(259395) ECOProp(320487)

Weight(kg)
13.75 15.92 17.58 21.85

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

TABLEFORM Components

AluminumBeam Length
5.9mAlsikBeam 4.9mAlsikBeam 4.5mAlsikBeam 3.9mAlsikBeam 3.3mAlsikBeam 2.9mAlsikBeam 2.5mAlsikBeam 2.0mAlsikBeam 1.5mAlsikBeam

WedgePropHead Weight(kg)
19.47 16.17 14.85 12.87 10.89 9.57 8.25 6.60 4.95

Weight(kg)
16.67

Uhead

H20Beam Length
5.9mH20Beam 4.9mH20Beam 4.5mH20Beam 3.9mH20Beam 3.3mH20Beam 2.9mH20Beam 2.5mH20Beam 2.0mH20Beam 1.5mH20Beam

Weight(kg)
2.75

Weight(kg)
29.50 24.50 22.50 19.50 16.50 14.50 12.50 10.00 7.50

H20SupportingHead

Weight(kg)
1.54

RailingClamp Tripod Weight(kg)


8.55

Weight(kg)
9.12

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

COLUMNFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

COLUMNIntroduction

SteelWaler&AluminumBeamSystem
Duetohighstrengthandrigidityofthesteelwalers,smalloverallformworkdepthwhencomparedtoothermethods, SteelwalerandAluminumbeamsystemistheidealsolutiontoyourcolumnformworkneeds,especiallywhenrepeatedusage andcranehandlingarerequired. Formscanbequicklyassembledtoperfectrightangleshapeandliftedintoposition,wheretheycanbeconnectedtogetherand plumbedinamatterofminutes.

Advantage:
Allowsstandardcranehandledcolumnformstobeassembledformultipleuse Ensuresrightanglecornersandsquarecolumns Adjustablesizes(200x2001200x1200) easytoassemble

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

COLUMN Components

SteelWaler
Itisatwin100x50mmchennelsection. Weight22kg/m

UniversalClamp
UsedtoconnectAluminumtowaler.Simpleindesign preventrotationandensurepositiveconnection.

Weight(kg)
0.52

AngleTieBracket
Itisaheavydutybracketforexternalcornerties. Fixedtowalerswiththehelpofwedge.

Weight(kg) AluminumBeam
Twodifferentprofileareavailable: 2.50

PropConnector
Fittedtoformworkbywedge,they provideattachmentforPushpullProps.

Weight(kg)
2.0 A150Beam: BendingMomentexceeds6kNm Size: 150x80mm Weight: 3.162kg/m Length: Anylengthupto10m

LiftingBracket
ConnecttotheAluminumbeamforcranehandling offorms.Twobracketareusedperpanel.

A165Beam: Size: Weight: Length:

BendingMomentexceeds6kNm 150x80mm 3.162kg/m Anylengthupto10m

Weight(kg)
4.5

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

COLUMN TechnicalData

CalculationsarebasedonConcretePressureupto100kN/sq.m

COLUMN WIDTH (mm) 200 300 400 500 600 700 800 900 1000 1200

NO.OF BEAMS (pcs) 8 8 12 12 12 16 16 20 20 24

PANEL HEIGHT (M) 2.00 2.60 3.00 3.50 4.00 4.50 5.20 6.00

A 0.30 0.30 0.40 0.40 0.40 0.40 0.40 0.40

COLUMNWALERSSPACING (M) B C D 1.00 1.60 1.60 1.10 1.20 1.00 1.60 1.00 1.20 1.20 1.00 1.20 1.60 0.80 1.00 1.40

1.40

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALLFORMWORK

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALLIntroduction

AWdesigns,manufactures and supplies afull rangeofsystemformworkfrom flying table formsto climbing system.
Theshutteringpanelisusedtoformconcretestructuressuchasretainingwalls,dams,reservoirs,watertowersandbridges. ASPA'sengineers,supportedbyexperienceddraughtsmen,havehadextensiveexperienceindesigningpurposemadesteel forms.AlldesignsareCADgeneratedandaresupportedbyuptodatedesignprogrammes.

Economical:
Virtuallyeliminatestimber Robust,resistancetodamage Standardelementssuitplywoodsheetsizewithoutcutting Componentseasilytransportedandstored Fewstandardcomponentssimplifiesstockrequirements

Versatile:
Unlimitedadjustment ForWalls,Beams&HeavySlabsupport Complexshapepossible

LabourSaving:
Aluminumbeamsspeedupassembly Simpleerectionanddismantling Noskilledlabourrequired LightWeight

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALL Components
SteelWaler
Itisatwin100x50mmchennelsection.Designedtomake

UniversalClamp
UsedtoconnectAluminumtowaler.Simpleindesign preventrotationandensurepositiveconnection.

elementsusingstandardsizeplywoodsheets. Simple,positiveconnections110kNtieloadcapacity.
Weight22kg/m

Weight(kg) Length (m)


1.17 2.39 3.61 4.83 0.52

AngleTieBracket
Itisaheavydutybracketforexternalcornerties. Fixedtowalerswiththehelpofwedge.

Alumi

Weight(kg) numBeam
Twodifferentprofileareavailable: 2.5

PropConnector
Fittedtoformworkbywedge,they provideattachmentforPushpullProps.

Weight(kg)
2.0 A150Beam: BendingMomentexceeds6kNm Size: 150x80mm Weight: 3.162kg/m Length: Anylengthupto10m

LiftingBracket
ConnecttotheAluminumbeamforcranehandling offorms.Twobracketareusedperpanel.

A165Beam: Size: Weight: Length:

BendingMomentexceeds6kNm 150x80mm 3.162kg/m Anylengthupto10m

Weight(kg)
4.5

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALL Components
WedgeA
Theyareheavydropforgedwedge,whichprovides highstrengthconnections.

Splicer
Splicerprovidesstandardconnectionsbetweenpanel. Minimumadjustmentlengthis710mm.

Weight(kg)
1.0

Weight(kg)
4.1

WedgeS AccessBracket
Simplebutrobustbracketwithpositivewedgefixing forprovidingwalkwaysonlargeforms.Itisprovide withspigotforfixingguardrailpost. Simplerobustwedgeforconnectionofaccessories.

Weight(kg)
0.3

Weight(kg)
11.0

InternalCornerConnector
Providestightpositiveconnectiosatinternalcorners. ensure90 cornereverytime.

InternalSplice
Forconnectionbetweenpanelswheremakeupareasis required.Canalsobeusedtoextendpanelsforstopend andexternalcornerdetails.

Weight(kg)
11.0

Length (mm)
960 1460 1960

HingeWalerC

onnector

Usedwhenthereisachangeinanglebetweenpanels. Canbeusedincircularstructure.

Weight(kg)
17.0

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALL Components
ECOWALL
STEELWALERS

PLYWOODSIZES (18mmThk) STEELWALERSIZES (mm) CONCRETEPRESSURE (kN/m) 40 50 60 80 90

1219 1170 S (mm) 363 363 272 272 272 N 4 4 5 5 5 S (mm) 330 330 288 288 256

2438 2390 N 8 8 9 9 10 S (mm) 353 353 321 294 294

3657 3610 N 11 11 12 13 13 S (mm) 339 339 316 296 296

4876 4830 N 15 15 16 17 17

SAluminumbeamsspacingcentertocenter NNo.ofAluminumbeamsperpanel

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

WALL Components
ECOWALL
STEELWALERS

CONCRETE PRESSURE (kN/M) 50 65 75 80 80 80 80 80

PANEL HEIGHT (M) 2.0 2.6 3.0 3.5 4.0 4.5 5.2 6.0 A 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

AFLEXSTEELWALERSSPACING (M) B C D 1.0 1.2 1.6 1.0 1.2 1.0 1.6 1.0 1.2 1.2 1.0 1.2 1.6 0.9 1.0 1.2

1.6

CONCRETE PRESSURE (kN/M) 50 65 75 80 80 80 80 80

PANEL HEIGHT (M) 2.0 2.6 3.0 3.5 4.0 4.5 5.2 6.0 W1 32.9 52.5 72.0 67.5 71.9 75.5 72.0 68.0

AFLEXSTEELWALERSLOAD (kN/M) W2 W3 W4 15.1 32.0 40.5 56.4 28.1 79.6 40.5 78.4 57.0 21.1 88.0 87.5 40.5 76.0 86.6 84.0

W5

36.1

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CLIMBINGSYSTEM

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CLIMBINGIntroduction
Wgangform PROUPCLIMBINGSYSTEMiscranehandledandfixedtotheconcretewithanchororfixingscrews. Theplumbingbrackethasanadjustmentscrewwhichisusedforverticalalignment.Thehangingbracketprovidesasafeworking platformforgroutingandremovalofloweranchors. SteelWalerhaveplandimensionsof100mmdeepx152mmwideandaredesignedtocarrymaximummomentsof50kN/mwith asafetyfactorof2:1.Accessbracketsprovideforathreeboardworkingplatform.Theaccessbracketcanbeattachedtothe Aluminumbeamattherequiredposition.

Thisclimbingsystemiscranehandledandiseasily plumbedandaligned.Aminimumamountofcrane timeisrequiredtosimplylifttheshutterandhook itontotheclimbingconewhichwascastintothe concreteonthepreviouspour. Thepushpullpropsallowstheformworktoberolled backtoenablethepanelstobecleanedandoiledin positionwithouthavingtolowertheshuttertothe groundorthefloorbelow.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CLIMBINGSystem

PROUP(APAC Jump formClimbing)Systemprovidesasignificantadvantages:bracketextensions,secondary platforms,ladderextensionsetc.areassembledfromgroundlevelundersimpleandsafetyassemblyconditions. ThePROUPSystemisprovenandcosteffectivetechnologyforbuildinghigherthan20floors.

PROUPClimbingbracketisareliableandsafesystemforforming concreteonelevatedstructures.Itcanbeformedquicklyandsafelyatany height.Thewallshutteraremovedalongwiththeclimbingbracketreducing theoverallcycletime. Alongwiththebracketanhangingaccessplatformisprovidedforsafeworking whencarryingoutfinishingwork,repairingtieholes,retachingconcretefinish, andremovinganchorsusedonpreviouspour. TheShutterfittedtotheclimbingbrackethasthreeaxisofmovement enabletheverticalwalltobeconstructedatanyangle. SlidingunitofClimbingBracket
Itgivestherequiredverticality,horizontalorangularmovementtotheshutter. Itconsistoftopandswivelbaseadaptorjackandacarriage.

LiftWall
PROUPversatilesystemisexcellentfortheformingofliftshaftsandstaircase walls.APAC climbing systemsareusedforeasystrippingandquickassembly time.APAC internal platformprovidesasafeworkingplatformwhicheliminates theneedforaccessscaffolding.

TieSystem
Allitemsrecoverableaftercastingexceptforplastictube.

PushpullProp
Thepushpullprophasadoublecollar,whichenablesthewallsandcolumns tobeaccuratelyplumbed.Usedinconjunctionwithcolumnboxesforspeedy erectionandeaseofalignment.

PROUPClimbingPlatformareinternallyoncorewallandliftshaftto provideasafeworkingareaforfixingandsupportingtheformwork.Sameas theclimbingbracketitisusedfortheconstructionofverticalwall.


Theplatformcanbemovedverticallyuptheinternalopeningwithoutdismantlingtheshutterthisreducesthecycle timeconsiderably.Theclimbingplatformcanbemadetoanysizeorshapeoftheopeningandcanbemadeadjustabletoallow reuseondifferentsimilaropeningdimensions.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

CLIMBING Installation
AWPRO UPClimbingSystem comprisesverticalformworkandsafetyplatformasasingleunit.Itremainssecurely attachedtothebuildingandlifting.Thuswindvelocitydonotaffectthebuildingprocess.Assemblyisatgroundtoimproved safetyandspeed. InstallationprocedureofAWPZKUPClimbingFormworkSystem Step1Wallformworkisreadytostrip Step2Removeties,pullawayshutteronclimbingbracketusingslidingunit,installanchorboltintofixingscrew. Step3Liftformtonextlevelsettheformontheanchorbolt.Attachingtheguardrailextensionsatgroundlevel. Step4Pullclimbingplatformshutterawayfromthewallandlifttonextlevel. Step5Withshutterinthesetbackpositiontheycanbecleanedandrolled.Reinforcementsteelbarcanalsobefixed. Step6Moveformsbackintothepositioned,fixedties,checkforplumbandalignment.Formreadytopour.

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

SPAREParts

Wingnut15,0.32kg

RosetteRing,0.50kg

LedgerBlade,0.22kg

FlangeNut15,0.64kg

LedgerHead,0.53kg

BraceHead,0.40kg

PlateWasher15,0.88kg

BraceHead,0.65kg

BottomCup,0.55kg

WalerPlate15,0.62kg

RinglockWedge,0.10kg

TopCup,0.22kg

HexagonalNut15,0.21kg

JackNut,0.55kg

UClipHead,0.67kg

WaterBarrier15,0.54kg

PropCollar,0.98kg

BananaHead,1.15kg

RapidClamp1012,0.54kg

PropPin, 0.44kg

FlangeClamp,1.52kg

5.8mTierod15,8.64kg

ThreadedCollar,1.54kg

UniClamp,0.10kg

APAC SCAFFOLD & FORMWORK SYSTEM LTD No.5,Hufu Road,Suzhou City,China 215000 Tel:+86 512 8886 0762 Fax:+86 512 96570200026 Email:Info@apacscaffold.com

SPAREParts

CouplingPinw/oCollar

SnapPin

GravityPin

CouplingPin1/8"Collar

CotterPin

SpringRetainer

CouplingPin1"Collar

FastLock

SlideLock

CasterWheelStemtype8"

FlipLock

SlideLockPin

CasterWheelPlatetype8"

DropLock

SnapOn

Vous aimerez peut-être aussi