DIVISION 2100: CLEARING AND GRUBBING.............................................................................2 2101 Scope ................................................................................................................................2 2102 Description of Work .........................................................................................................2 2103 Execution of Work............................................................................................................3 2104 Measurement and Payment...............................................................................................4 Item 21.01 Clearing and grubbing ...................................................................................4 Item 21.02 Removal and grabbing of large trees and tree stumps...................................4 Item 21.03 Reclearing of surfaces ...................................................................................4 Item 21.04 Removal and storage of selected vegetation: ................................................4 DIVISION 2200: DEMOLITION, REMOVAL, DISPOSAL OR STORAGE OF EXISTING STRUCTURES AND INSTALLATIONS...........................................................................................5 2201 Scope ................................................................................................................................5 2202 Construction Requirements for Demolition and Removal of Existing Structures ...........5 2203 Construction Requirements for Demolition And Removal of Existing Road Pavements.........................................................................................................................5 2204 Construction Requirements for Existing Public Utilities .................................................6 2205 Measurement and Payment...............................................................................................6 Item 22.01 Clearing and grubbing at inlets and outlets of hydraulic structures ..............6 Item 22.02 Cleaning out of hydraulic structures..............................................................6 Item 22.03 Take up or down and set aside for reuse or remove to store off Site ............6
Page 2000-1
Page2000-2
This work shall be measured and paid for under Division 9600, payitem 96.01. Where topsoil can be removed without the necessity of first performing clearing and grubbing, no payment will be made for clearing and grubbing under this Division. (d) Conservation of vegetation Where provided for in the project specification, certain designated plants encountered in the road reserve and borrow areas shall be carefully protected by the Contractor.
Page 2000-3
The girth of trees or stumps shall be measured at the narrowest point of the tree or stump in the first meter of its height above ground level. Trees and stumps with a girth exceeding 1 m shall be measured individually and classified according to size in increments of 1 m as indicated above. Item 21.03 Reclearing of surfaces (on the written instructions of the engineer only) .. ........................................................................................................ hectare (ha) The unit of measurement for reclearing areas which have previously been cleared shall be the hectare. The quantity shall be measured to the nearest 0.1 ha. Item 21.04 Removal and storage of selected vegetation: (a) Cost of removal, storing, protection and replanting in a protected and fenced-off area of selected vegetation ..............................................................................provisional sum (b) Charge on provisional sum ............................................................... percentage (%)
Page2000-4
Standard Technical Specification - 2002 Series 2000: Site Clearance Division 2200: Demolition, Removal, Disposal Or Storage Of Existing Structures And Installations
DIVISION 2200: DEMOLITION, REMOVAL, DISPOSAL OR STORAGE OF EXISTING STRUCTURES AND INSTALLATIONS
2201 SCOPE
This Division covers the demolition, disconnection, removal or part removal, disposal and or storage of buildings, bridges, drainage structures, retaining walls, wells, buildings, service ducts, foundations, fencing, walls, kerbs, old pavements, abandoned pipelines, disused public utilities and any other obstructions which are not designated or permitted to remain, except for the obstructions to be removed and disposed of under other items in the contract.
2203 CONSTRUCTION REQUIREMENTS FOR DEMOLITION AND REMOVAL OF EXISTING ROAD PAVEMENTS
(a) Method and Equipment Existing road pavements shall be demolished by excavation, scarifying or milling using appropriate equipment approved by the Engineer.
Page 2000-5
Series 2000: Site Clearance Standard Technical Specification -2002 Division 2200: Demolition, Removal, Disposal Or Storage Of Existing Structures And Installations
(b) Disposal or Storage of Materials Material resulting from the demolition of existing road pavements shall be disposed of or stored as instructed by the Engineer.
The unit of measurement shall be the cubic meter (m3) of material removed from hydraulic structures where instructed by the Engineer so that the structures are cleaned as specified. Payment under this item will normally only be made once during the duration of the contract. Item 22.03 Take up or down and set aside for reuse or remove to store off Site the following (i) Blockwork and stone work .............................................................cubic meter (m3)
Page2000-6
Standard Technical Specification - 2002 Series 2000: Site Clearance Division 2200: Demolition, Removal, Disposal Or Storage Of Existing Structures And Installations
(ii)
(iii) kerbs, channels, edgings, combined drainage and curb blocks, fencing, safety fences and the like, copings, string courses and the like .............................linear meter (lm) (iv) Cable............................................................................................... linear meter (lm) (v) Road lighting columns, brackets and wall mountings, traffic signs, reflecting road studs, gates, stiles, street furniture, communications cabinets, posts, brackets, signal indicators, shelves, racking, frames, electronic units and the like............................... number (vi) (vii) Chamber covers and frames, gully gratings and frames and the like.............number Individual blocks, features or stones ............................................................ number
The measurement for take up or down and set aside for reuse or remove to store off Site blockwork, stonework, paved areas and the like, brickwork, kerbs, channels, edgings, combined drainage and kerb blocks, fencing, safety fences and the like, copings, string courses and the like, cable, road lighting columns, brackets and wall mountings, traffic signs, reflecting road studs, gates, stiles, street furniture and the like; communications cabinets, posts, brackets, signal indicators, shelves, racking, frames, electronic units and the like; chamber covers and frames, gully, gratings and frames and the like; individual blocks, features or stones shall be the volumes, areas, lengths or numbers stated in the Contract.