Académique Documents
Professionnel Documents
Culture Documents
Veena Avula
Rajesh Ramchandani
Real-time,
Virtualization user-controlled
+ provisioning
Multi-tenancy +
Pay-per-use
Efficiency Cost
Application as a Service
Software as a Service
$114,360
$120,000.00
$100,000.00
First year cost of storage
$80,000.00
$96,000.00
$14,400.00
$13,200.00
$300,000.00
$250,000.00
3 year cost of storage
$50,000.00
$39,600.00 $55, 080.00
$55, 080.00
$20,000.00 $9 ,0 00.00
$0.00 $5 ,0 00.00
Assumptions:
* Data size is 10TB
●
Cost of storage is list price of Amazon S3
●
2% of videos watched 300 times each per month (200GB data transfer 300 times each month)
●
Bandwidth committed at Co-Lo is 200MB burstable upto 1GB @ $1200 per month
●
Full rack is co-lo'ed @ $600 per month, power @ $500 per month
* Hardware prices are Listed Sun Startup Essentials prices
Sun Open Cloud Platform @ Structure09 2009 8
Large scale Cloud Testing
One year Large scale Cloud Testing cost analysis
$2,500,000.00
$2.17 Million
Annual Cost of large scale Cloud Testing
$1,500,000.00
Recurr ing c ost of cloud Testing
$1 ,0 00,00 0.00
Engineering Resources
Software License
Infrastructure cost
$1,000,000.00
$430,000
$500,000.00
$770,000. 00
$3 50,00 0.00
$80,000.00
$0.00
In-house infrastructure Public Cloud
Infrastructure types
Assumptions:
●
Load testing performance of upto 100,000 concurrent users * Hardware needed is 150 dual quad-core servers (approx. price per server is $5,000)
●
Cost of storage is $20,000 * Software license purchased for load testing (subscription approx. $1M)
●
Avg. cost of testers assumed to be $80,000 per year * Database license cost may be additional, assumed $0 here
●
List price of Cloud Testing is $3500 / hour (Soasta)
TCO numbers provided by Soasta Sun Open Cloud Platform @ Structure09 2009 9
Large scale Cloud Testing
3 year Large scale Cloud Testing TCO comparison
$6,000,000.00
$4.97 Million
$5,000,000.00
Annual Cost of Large scale testing
$1 ,2 00,00 0.00
$4,000,000.00
$2,000,000.00
$1.29 Million
$1,000,000.00
$1 ,0 50,00 0.00
$770,000. 00
$2 40,00 0.00
$0.00
In-house infrastructure Public Cloud
Infrastructure types
Assumptions:
●
Load testing performance of upto 100,000 concurrent users * Hardware needed is 150 dual quad-core servers (approx. price per server is $5,000)
●
Cost of storage is $20,000 * Software license purchased for load testing (subscription approx. $1M)
●
Avg. cost of testers assumed to be $80,000 per year) * Database license cost may be additional, assumed $0 here
●
List price of Cloud Testing is $3500 / hour
TCO numbers provided by Soasta Sun Open Cloud Platform @ Structure09 2009 10
Cloud Test Lab Management
$350,000.00
Testing Lab 3 yesr TCO comparison
$298,000
$300,000.00
$80,000.00
$250,000.00
$200,000.00
$17,000.00
$50,000.00 $14,000.00
$99,000.00
$37,000.00
$0.00
In-house infrastructure Public Cloud
Availability
Security
Compliance
Privacy
THE
NETWORK
is the
Computer
App Desktop
Catalog VM Cloud IDE
Virtualization Layer
OpenSolaris + Xen or VirtualBox
Storage: ZFS + COMSTAR - Network: Crossbow
Physical Layer:
- Sun Servers
- Sun Storage
- Sun and 3rd party Networking
Thank you.
26
26
Navigating a world of many
Clouds
Veena Avula
Rajesh Ramchandani
27
27