Vous êtes sur la page 1sur 36

ANNULAL VELOCITY (OPEN HOLE) A.V./HOLE OPENER G.P.M. = EXPANDED HOLE SIZE = O.D. OF HOLE OPENER = ANSWER = A.V.

/DRILL COLLARS I.D. OF HOLE = O.D. OF D.C. = ANSWER = A.V./HEVY WT. D.P. I.D. OF HOLE = O.D. OF HEVY WT. D.P. = ANSWER = A.V./DRILL PIPE I.D. OF HOLE = O.D. OF D.P. = ANSWER = A.V. INSIDE RISER I.D. OF RISER = O.D. OF PIPE = ANSWER = (SERIES 1) 177 4.500 6.000 -275 (SERIES 3) 8.500 6.500 145 (SERIES 5) 8.500 5.000 92 (SERIES 7) 8.500 5.000 92 (SERIES 9) 16.000 5.000 19 I.D. O.D. FT/MIN. I.D. O.D. FT/MIN. I.D. O.D. FT/MIN. I.D. O.D. FT/MIN. G.P.M. I.D. O.D. FT/MIN. (CASED HOLE) A.V. BESIDE LOCKOMATIC

I.D. OF CSG. = O.D. OF LOCKOMATIC = ANSWER = A.V./DRILL COLLARS I.D. OF CSG. = O.D. OF D.C. = ANSWER = A.V./HEVY WT. D.P. I.D. OF CSG. = O.D. OF HEVY WT. D.P. = ANSWER = A.V./DRILL PIPE I.D. OF CSG. = O.D. OF D.P. = ANSWER =

500 ANNULAR VELOCITY (FT./MIN.) 450 400 350 300 250 200 150 100 50 0

472.8888889

179.0010449 151.5629286 99.30666667 121.8161778 121.8161778 85.6091954 85.6091954 0 437 PUMP RATE (GPM)

Page 1

(SERIES 2) 400 6.085 5.750 1094 (SERIES 4) 6.085 4.750 300 (SERIES 6) 6.085 3.500 175 (SERIES 8) 8.675 5.000 86 I.D. O.D. FT/MIN. I.D. O.D. FT/MIN. I.D. O.D. FT/MIN.

I.D. O.D. FT/MIN.

Series1 Series2 Series3 Series4 Series5 Series6 Series7 Series8 Series9

Page 2

"BUOYANCY FACTOR" MUD WEIGHT BUOYANCY FACTOR WEIGHT OF PIPE IN AIR WEIGHT OF PIPE IN MUD BLOCK WEIGHT TOTAL INDICATOR WEIGHT 14 0.790 10780 8516 500000 508516 LBS/GAL. LBS LBS LBS LBS

800000 700000 600000 WEIGHT (LBS.) 500000


BUOYANCY FACTOR WEIGHT OF PIPE IN AIR WEIGHT OF PIPE IN MUD BLOCK WEIGHT TOTAL INDICATOR WEIGHT

400000
300000

200000
100000 0 15 LBS/GAL.

Page 3

DOUBLE ACTING TRIPLEX PUMP DATA LINER SIZE = PUMP ROD O.D. = STROKE = ANSWER (BBLS/STROKE) = PUMP (EFF.) = ANSWER (BBLS/STROKE (EFF) = ANSWER (GALLONS/STROKE EFF) = PIPE I.D. = TOTAL DEPTH = ANSWER (BBLS) = ANSWER (STROKES) = ANSWER (GALLONS) = AMSWER (STROKES) = "REQUIRED STROKES/MINUTE" LINER SIZE = PUMP ROD O.D. = STROKE = PUMP (EFF.) = REQUIRED G.P.M. = ANSWER = S.P.M.

5.000 1.500 12.000 0.1391 0.90 0.1252 5.26 2.441 10000 58 462 2431 462

I.D. O.D. INCHES BBLS/STROKE % BBLS/STROKE EFF. GALLONS/STROKE EFF. I.D. DEPTH TOTAL BBLS REQ. TO FILL PIPE TOTAL STROKES REQ. TO FILL PIPE TOTAL GALLONS REQ. TO FILL PIPE TOTAL STROKES REQ. TO FILL PIPE

6.000 1.500 12.000 0.90 200 26

I.D. O.D. INCHES % G.P.M. S.P.M.

O . . .

FILL PIPE TO FILL PIPE TO FILL PIPE TO FILL PIPE

DEGREE SUB KICK SWEEP LENGTH BELOW SUB DEGREE OF SUB = ANSWER = FISHING TOOLS O.D. = ANSWER = 9 7.5 13.50 9.625 18.31 FEET Degrees RADIUS INCHES O.D. MAX. RADIUS INCHES

DOUBLE ACTING DUPLEX PUMP DATA LINER SIZE = PUMP ROD O.D. = STROKE = ANSWER (BBL/STK) = PUMP EFF = 6.000 1.500 12.000 0.1355 0.90 I.D. O.D. INCHES BBLS/STROKE % BBLS/STROKE EFF. GALLONS/STROKE EFF. I.D. FEET REQ. BBLS TO FILL HOLE REQ. STROKES TO FILL HOLE REQ. GALLONS TO FILL HOLE REQ. STROKES TO FILL HOLE

ANSWER (BBLS/STK EFF.) = 0.1220 ANSWER (GALLONS/STK EFF.) = PIPE I.D. = TOTAL DEPTH = ANSWER (BBLS) = ANSWER (STROKES)= ANSWER (GALLONS) = ANSWER (STROKES) = 5 2.441 1000 6 47 243 47

"REQUIRED STROKES/G.P.M." LINER SIZE = 6.000 PUMP ROD O.D. = 1.500 STROKE = 12.000 PUMP (EFF.) = 0.90 REQUIRED G.P.M. = 200 ANSWER = S.P.M. 39 I.D. O.D. INCHES % G.P.M. S.P.M. 318.08 339.28 0.79 0.380 5.69 5.12

"HYDRAULIC PRESSURE TO LBS OF PULL" CASING I.D. = WORK-STRING O.D. = P.S.I. = ANSWER = 12.250 0.000 5000 589,277 I.D. O.D. P.S.I. LBS OF PULL

LBS OF PULL

"LOCKOMATIC PRESSURE DROP "

#2 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = #3 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = #4 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = #5 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = #6 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = #7 LOCKOMATIC MUD WEIGHT = G.P.M. = ANSWER = 12.0 250 251 LBS G.P.M. P.S.I. 12.0 250 583 LBS G.P.M. P.S.I. 12.0 250 1046 LBS G.P.M. P.S.I. 12.0 250 2007 LBS G.P.M. P.S.I. 16.0 250 3034 LBS G.P.M. P.S.I. 14.5 120 633 LBS G.P.M. P.S.I.

"PRESSURE DROP ON TOOL" MUD WEIGHT = G.P.M. = BIT JET #1 = BIT JET #2 = BIT JET #3 = BIT JET #4 = BIT JET #5 = BIT JET #6 = BIT JET #7 = BIT JET #8 = BIT JET #9 = BIT JET #10 = ANSWER = 11 350 0.406 0.406 0.406 0 0 0 0 0 0 0 823 LBS G.P.M. I.D. I.D. I.D. I.D. I.D. I.D. I.D. I.D. I.D. . I.D. P.S.I.

P.S.I. TO G.P.M.

REQ. P.S.I. = MUD WEIGHT = ORIFICE #1 = ORIFICE #2 = ORIFICE #3 = ORIFICE #4 = ORIFICE #5 = ORIFICE #6 = ANSWER =

SINGLE ACTING TRIPLEX PUMP DATA LINER SIZE = STROKE = ANSWER (BBLS/STROKE) = PUMP (EFF.) = ANSWER (EFF.) = ANSWER (G.P.S. EFF.) = PIPE I.D. = TOTAL DEPTH = ANSWER = ANSWER (STROKES) = ANSWER (GALLONS) = ANSWER (STROKES) = 5.500 12.000 0.0882 95.00 8.3743 351.7208 3.750 13810 188.65 23 7923 23 I.D. INCHES BBLS/STROKE % BBLS /STROKE EFF. GALLONS/STROKE EFF. I.D. FEET REQ. BBLS TO FILL HOLE REQ. STROKES TO FILL HOLE REQ. GALLONS TO FILL HOLE REQ. STROKES TO FILL HOLE

"REQUIRED STROKES/G.P.M." LINER SIZE = STROKE = PUMP (EFF.) = REQ. G.P.M. = ANSWER (REQ. S/M) = 5.50 12.00 95.00 350 1.00 I.D. INCHES % G.P.M. REQUIRED STROKES/MINUTE

STRETCH CHART PIPE O.D. = PIPE I.D. = OVER-PULL = LENGTH OF PIPE = 5.000 4.250 50000.00 12437.00 45.653 O.D. I.D. LBS FEET INCHES

FREE-POINT CHART PIPE O.D. = PIPE I.D. = OVER-PULL = STRETCH (IN INCHES) = ANSWER = FREE-POINT 5.000 4.250 50000 38.000 10352

ANSWER =

O.D. I.D. LBS. INCHES FEET

CAPACITY OF DRILL STRING I.D. OF DRILL COLLARS = LENGTH OF DRILL COLLARS = ANSWER (BBLS) = I.D. OF HEVY WT. DRILL PIPE = LENGHT OF HEVY WT. DRILL PIPE = ANSWER (BBLS) = I.D. OF WORK STRING = LENGTH OF WORK STRING = ANSWER BBLS) = ANSWER (BBLS)= 2.88 321 2.58 3.13 321 3.05 3.75 11234 153.46 159.09 I.D. FEET BBLS. I.D. FEET BBLS. I.D. FEET BBLS. TOTAL BBLS.

CAPACITY BETWEEN CASGING & 1 STRING OF PIPE I.D. OF CASING O.D. OF DRILL COLLARS LENGTH OF DRILL COLLARS ANSWER = = = = 8.50 7.00 370.00 8.36 7.00 370.00 8.36 7.00 370.00 8.36 25.07 8.50 7.00 370.00 8.36 33.43 I.D. O.D. LENGTH BBLS O.D. LENGTH BBLS O.D. LENGTH BBLS BBLS I.D. O.D. LENGTH BBLS BBLS

O.D. OF HEVY WT. DRILL PIPE = LENGTH OF HEVY WT. DRILL PIPE = ANSWER = O.D. OF DRILL PIPE OR TUBING = LENGTH OF DRILL PIPE OR TUBING = ANSWER = ANSWER (FOR THE ABOVE THREE) = I.D. OF RISER O.D. OF WORKSTRING LENGTH OF RISER ANSWER = = = =

TOTAL ANSWER =

PRESSURE LOSSES INSIDE DRILL STRING


WATER BASE MUD MUD WEIGHT = PLASTIC VIS. = G.P.M. = SPECIAL STRING BELOW D.C. LENGTH = I.D. = "DRILL COLLARS #1" LENGTH = I.D. = "DRILL COLLARS #2" BIT JET #8 LENGTH = I.D. = HEAVY WEIGHT D.P. LENGTH = I.D. = "DRILL PIPE #1" LENGTH = I.D. = "DRILL PIPE #2" LENGTH = I.D. = SPECIAL STRING = DRILL COLLARS #1 DRILL COLLARS #2 HEAVY WT. D.P. DRILL PIPE #1 DRILL PIPE #2 DRILL STRING P/L = 0.00 0.000 0 0 0 0 0 0 0 FT. I.D. #DIV/0! = = = = = P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. 0.00 0.000 FT. I.D. #DIV/0! 0.00 0.000 FT. I.D. #DIV/0! 0.00 0.000 FT. I.D. #DIV/0! BIT JET #10 = BIT JET #9 = = 0.00 0.000 FT. I.D. #DIV/0! 0.00 0.000 FT. I.D. #DIV/0! BIT JET #5 BIT JET #6 BIT JET #7 = = = 12.0 12 350 LBS. P/V G.P.M. 0.00011965 39.1783843 PRESSURE DROP ON TOOLS

BIT JET #1 BIT JET #2 BIT JET #3 BIT JET #4

= = = =

PRESSURE LOSSES INSIDE DRILL STRING

SSURE DROP ON TOOLS

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I.

MAXIMUM TOOL LENGTH DRILLING RADIUS HOLE DIAMETER TOOL DIAMETER ANSWER ANSWER 30 4.5 3 66.068 5.506 FEET I.D. O.D. INCHES FEET

PRESSURE LOSSES INSIDE DRILL STRING


OIL BASE MUD MUD WEIGHT = PLASTIC VIS. = G.P.M. = SPECIAL STRING BELOW D.C. LENGTH = I.D. = "DRILL COLLARS #1" LENGTH = I.D. = "DRILL COLLARS #2" BIT JET #8 LENGTH = I.D. = HEAVY WEIGHT D.P. LENGTH = I.D. = "DRILL PIPE #1" LENGTH = I.D. = "DRILL PIPE #2" LENGTH = I.D. = SPECIAL STRING = DRILL COLLARS #1 DRILL COLLARS #2 HEAVY WT. D.P. DRILL PIPE #1 DRILL PIPE #2 DRILL STRING P/L = 0.00 0.000 17 16 16 82 754 0 886 FT. I.D. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. 9543.00 4.250 FT. I.D. 234.89 3.125 FT. I.D. 31.67 2.875 FT. I.D. BIT JET #9 BIT JET #10 = = = 0.000 0.000 0.000 P.S.I. P.S.I. P.S.I. 31.56 2.875 FT. I.D. 31.97 2.875 FT. I.D. 12.3 18 500 PRESSURE DROP ON TOOLS LBS. P/V G.P.M. BIT JET #1 BIT JET #2 BIT JET #3 BIT JET #4 BIT JET #5 BIT JET #6 BIT JET #7

= = = = = = =

0.000 0.000 0.000 0.000 0.000 0.000 0.000

P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I. P.S.I.

= = = = =

173516609.xls.ms_office

Cement Conversion Table 1 Sack = 1.1 Cubic Feet 1 Sack = 8.2286 U.S. Gallons = .1959 Bbls. 1 Barrel = 5.1042 Sacks 1Barrel = 9702 Cubic Inches= 5.6146 Cubic Feet

Page 24

173516609.xls.ms_office

3 1/8" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH

45 3

5 3/4" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH

46 3

ANSWER = 6.617641 3 3/4" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH

ANSWER = 8.3160388 7 1/4" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH ANSWER = 8 1/4" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH

70 4.5

0 0 0

ANSWER = 10.83223 4 1/2" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH ANSWER = 5 1/2" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH ANSWER =

0 0 0

50 3

ANSWER = 9.97126666 11 3/4" O.D. CUTTER KNIFE SWING KNIFE ANGLE KNIFE LENGTH

0 0 0

35 21

ANSWER = 31.5902103

Page 25

ROUNDS OF TORQUE FOR MAKE-UP PIPE O.D. PIPE I.D. REQ. TORQUE (FT./LBS.) ANSWER = = = = 5 4.276 25000 1.720 O.D. I.D. FT./LBS. ROUNDS PER 1000 FT.

173516609.xls.ms_office

CHANGE IN TUBING LENGTH DUE TO CHANGE IN AGERAGE TEMPERATURE LENGTH OF STRING = AVERAGE TEMPERATURE CHANGE = ANSWER = 10500 68 59

INCHES

CHANGE IN TUBING FORCE DUE TO CHANGE IN AVERAGE TUBING TEMPERATURE PIPE O.D. = PIPE I . D. = AVERAGE TEMPERATURE CHANGE = ANSWER = 2.875 2.441 68 25,506

LBS.

BALLONING EFFECT FORCE CHANGE TUBING PRESSURE COMPONENT PIPE I.D. = PRESSURE CHANGE = ANSWER = 2.991 3200 13,490

LBS.

TUBING WILL LENGTHEN DUE TO A DECREASE IN AVERAGE TUBING PRESSURE RESULTING IN A DOWN FORCE. TUBING WILL SHORTEN DUE TO AN INCREASE IN AVERAGE TUBING PRESSURE RESULTING IN AN UP FORCE.

BALLOONING EFFECT FORCE CHANGE ANNULUS PRESSURE COMPONENT. PIPE O.D. = PRESSURE CHANGE = ANSWER = 2.875 3400 13,243

LBS.

TUBING WILL LENGTHEN DUE TO AN INCREASE IN AVERAGE ANNULAR PRESSURE RESULTING IN A DOWN FORCE. TUBING WILL SHORTEN DUE TO A DECREASE IN AVERAGE ANNULAR PRESSURE RESULTING IN AN UP FORCE.

Page 28

173516609.xls.ms_office

Page 29

STRETCH IN PIPE HANGING IN WELL BORE PIPE O.D. PIPE I.D. LENGTH OF PIPE WEIGHT OF PIPE MUD WEIGHT ANSWER = = = = = = 3.5 2.75 19000 13.3 12.3 214.747 O.D. I.D. FT. LBS/FT. LBS/GALLON INCHES

Time Number of Sets of Lockomatic Expanding Hole Opener Cutters to be Used.

Length of Hole Section Drilled = 500 Average Bit Life = 246 Number of Bits Required = 2.03252033 Original Hole Size Drilled = Expanded Hole Size = 8.5 12.25

Feet Feet Bits O.D. (in.) O.D. (in.) Ft./Hr. Hours Sets Sets Hours

Average Rate of Penetration = 3.62318841 Total Hours to Drill Original Hole Section = 138 Ratio of Lockomatic Cuter Sets Required Per Bit used to Drill Original Hole Section = 1.1 Required Sets of Cutters = Estimated Time = 2.2 149

MAX WEIGHT ON CUTTERS EXPANDED GUAGE = PILOT HOLE = ANSWER = 12.25 8.5 INCHES INCHES

11250 LBS.

Page 31

MAXIMUM ROUNDS OF TORQUE PER 1000 FEET OF FREE PIPE PIPE O.D. PIPE I.D. MIN. YIELD STRENGTH OF PIPE HOOK LOAD ANSWER ANSWER = = = = = = 5.000 3.000 100000 175500 101965 3.646 O.D. I.D. FT./LBS. LBS. MAX. TORQUE/1000 FT. MAX. ROUNDS/1000 FT.

Time and Number of Sets of Lockomatic Expanding Hole Opener Cutters to be Used.
Length of Hole Section Drilled = Average Bit Life = Number of Bits Required = Original Hole Size Drilled = Expanded Hole Size = Average Rate of Penetration = Total Hours to Drill Original Hole Section = "Ratio of Lockomatic Cuter Sets Required Per Bit used to Drill Original Hole Section" = Required Sets of Cutters = Estimated Time = MAX WEIGHT ON CUTTERS EXPANDED GUAGE = PILOT HOLE = ANSWER = RECOMMENDED RPM'S BIT SIZE USED TO DRILL ORIGIONAL HOLE = RPM'S USED TO DRILL ORIGIONAL HOLE = RPM'S TO USE EXPANDING HOLE SECTION = 8.5 100 69 O.D. (in.) RPM'S RPM'S 12.250 O.D. (in.) 8.500 O.D. (in.) 11,250 LBS. 500.00 230.29 2.17 8.5 12.25 2.72 183.75 Feet Feet Bits O.D. (in.) O.D. (in.) Ft./Hr. Hours

1.1 2.3 198

Sets Sets Hours

INFORMATION OBTAINED FROM BIT RECORD (ORIGIONAL WELL BORE) No. Bits Used 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. Bits Used = Total Hole Drilled = Average Bit Life = Total Hours = Average Ft./Hr. = TYPE OF BIT Smith SDT Smith SDT Sm. S13GJ Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT Smith SDT 14 3,224 230.29 183.75 17.55 DEPTH IN 11476 11690 11975 12212 12415 12657 12847 13150 13447 13693 13939 14186 14432 14679 Bits Feet Ft./Bit Hrs. Ft./Hr. DEPTH OUT 11690 11975 12212 12415 12657 12847 13150 13447 13693 13939 14186 14432 14679 14700 TOTAL FOOTAGE 214 285 237 203 242 190 303 297 246 246 247 246 247 21

A Smith SDT Bit Design was used to drill the o

hole and the only problem seen was the bear

A recommendation is to change to the Smith Cone Design for the Hole Oper.

NOTE: FROM 13,447' TO 14,700' ALL RELATED PROPERTIES WERE FIGURED OFF AN AVERAGE, BASED ON ABOVE DATA.

Page 34

Time and Number of Sets of Lockomatic Expanding Hole Opener Cutters to be Used.

HOURS RUN 11.5 13.5 12.5 13 13.5 13.5 14.5 13 13.125 13.125 13.125 13.125 13.125 13.125

FT. HR. 18.61 21.11 18.96 15.62 17.93 14.07 20.90 22.85 18.75 18.75 18.75 18.75 18.75 18.75

A Smith SDT Bit Design was used to drill the origional hole and the only problem seen was the bearing life. A recommendation is to change to the Smith FDT Cone Design for the Hole Oper.

Page 35

Milling Weights and Speeds

ROTARY SHOE MILLING WEIGHTS OUTSIDE DIAMETER = 6 INSIDE DIAMETER = 4.5 SQUARE AREA = 12.37005 POUNDS PER SQUARE INCH = 300 ANSWER = 3,711 FLAT BOTTOM SHOE THICKNESS OF WATER COURSES = 0.25 WIDTH OF WATER COURSE = 0.75 NUMBER OF WATER CORPSE = 4 TOTAL AREA = 0.75 ANSWER = 11.62 TOTAL ANSWER = 3,486

INCHES INCHES SQ. AREA LBS. LBS. INCHES INCHES TOTAL SQ. AREA SQ. AREA LBS.

ROTARTY SHOES AND JUNK MILL ROTARY SPEEDS OUTSIDE DIAMETER OF SHOE or FISH= 6.00 INCHES ROTARY SPEED= 180.00 RPM ANSWER = 282.86 FEET/MIN. RECOMMENDED SPEED FOR INSERTS: 200-600 FEET/MIN RECOMMENDED SPEED FOR CRUSHED CARBIDED: 150-350 FEET/MIN

MILL- MILLING WEIGHT OUTSIDE DIAMETER = TOTAL SQUARE INCHES = NUMBER OF WATER COURSES = WIDTH OF WATER COURSES = LENGTH OF WATER COURSES = TOTAL SQUARE INCHES = WEIGHT PER SQUARE INCH = ANSWER =

6 28.27 4 0.75 1 1.50 300 8,032

INCHES SQ. AREA TOTAL INCHES INCHES SQ. INCHES LBS. LBS.

Page 36