Vous êtes sur la page 1sur 5

CURRICULUM VITAE G.

kiran Hno: 364,2nd floor Saraswati vihar Gurgaon , Haryana CAREER OBJECTIVE: Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people which will help me to explore fully and realize my potential willing to work as a key player in challenging & creative environment. PROFESSIONAL QUALIFICATION: Process designer with over 8.6 years experience in developing and drafting process flow sheets including PFD, UFD, P&ID's during various phases of projects in oil and gas, refineries, petrochemical field. Proficient in working with Smart Plant P&ID, Auto plant p&id, and Auto CAD, Micro station. SOFTWARE PROFICIENCY: v v v v SMART PLANT P&ID AUTO PLANT P&ID AUTO CAD MICROSTATION Phone: +919958332379 Email: k.godishela@yahoo.com

Operating System: Windows NT, 2000 Professional & Windows, 98 XP. CURRENT EMPLOYMENT DETAILS: March 2011 to till date: Working as a process designer with BECHTEL INDIA Pvt.Ltd Through Talascend Gurgaon, HARYANA PREVIOUS EMPLOYMENT HISTORY: Sep2009 to Feb 2011: Worked as a process designer with Petrofac India Pvt Ltd, MUMBAI Aug. 2008 to March 2009: Worked as a process designer with BECHTEL INDIA Pvt.Ltd. through Sarvatra Integrated Services Gurgaon, HARYANA. Feb 2008 Aug. 2008: Worked as a designer with L&T CHIYODA Pvt. Ltd, BARODA on behalf of ARYA SYSTEMS Pvt Ltd, Hyderabad. March 2005 Feb. 2008: Worked as a designer with AVINEON INDIA Pvt Ltd, Hyderabad.

EDUCATIONAL QUALIFICATIONS: QUALIFICATION INSTITUTION : : Diploma in Mechanical Engineering. S.S.Govt Polytechnic, Zaheerabad, AP.

BECHTEL INDIA PVT LTD, Designation: Process Designer BPWND (EGYPT-WEST NILE DELTA PROJECT) LONDON, U.K

Project Description:
West Nile Delta(WND) project is located in the North Alexandria, in this project we have been working in utilities area scope , My role in this project is to prepare P&IDs,using with SPPID 2009. PFDs and UFDs,For preparation of PFDs & UFDs MSDs we are using Microstationv8 Responsibilities included: Creating Process & Instrumentation Diagrams using Intergraphs Smart Plant P&ID. And co-ordination with London office administrator regarding SPPID related issues in p&ids Extract reports from the Database for LDT, Valve list, General Equipment, instrument List and Specialty items list. And also we import the data if there are any changes in those lists.

CHEVRON (PASCAGOULA REFINERY BASE OIL PROJECT) HOUSTON, U.S.A

Project Description:
Introduce lube base oil (LBO) production capability through combination of revamped and grassroots facilities. Project is Located at east of Pascagoula City, Mississippi, U.S.A. My role in this project is to prepare P&IDs, PFDs and UFDs. For preparation of PFDs & UFDs we are using AUTOCAD Responsibilities included: Creating Process & Instrumentation Diagrams using Intergraphs Smart Plant P&ID. Extract reports from the Database for LDT, Valve list, General Equipment, Electrical Load List and Specialty items. And also we import the data if there are any changes in those lists

TAKREER (CARBON BLOCK DELAYED CROKER) FEED ABU DHABI OIL REFINERY, U.A.E

Project Description:
The overall objective of project is to upgrade all the RFCC slurry from RRE refinery (on going project) My role in this project is to prepare P&IDs, PFD and UFD. To prepare PFD & UFDs we are using Smart Plant 2007 and Micro station J. Responsibilities included: Creating Process & Instrumentation Diagrams using Intergraphs Smart Plant P&ID. Extract reports from the Database for LDT, Valve list, General Equipment, Electrical Load List and Specialty items. And also we import the data if there are any changes in those lists

TAKREER (RUWAIS REFINERY EXPANSION) ABU DHABI OIL REFINERY, U.A.E

Project Description:
The Main Purpose of Ruwais Refinery Expansion Project is to use the Residue from the existing refinery and produce kerosene, diesel, and naphtha by Rfcc (residue fluidized catalytic cracking). My role in this project is to prepare P&IDs, PFD and UFD. To prepare PFD & UFDs we are using Smart Plant 2007 and Micro station J. Responsibilities included: Creating Process & Instrumentation Diagrams using Intergraphs Smart Plant P&ID. Extract reports from the Database for LDT, Valve list, General Equipment, Electrical Load List and Specialty items. And also we import the data if there are any changes in those lists

PETROFAC INDIA PVT LTD MUMBAI Designation: Process Designer ELMERK PROJECT PETROFAC-MUMBAI

Project Description:
Conversion of manual process & Instrumentation into Smart plant P&ID which is intelligent software. Responsibilities comprise drafting and Back checking of P&IDs Responsibilities included: Creating Process & Instrumentation Diagrams using Intergraphs Smart Plant P&ID and back checking of drawings Extract reports from the Database for MTOs LDTs, Valve list, General Equipment, Electrical Load List and Specialty items. And also we import the data if there are any changes in those lists Updating of Smart plant database with Line and Equipment Design Parameters Generation of reports from Smart plant and back checking of the engineering data.

KHARCHAGANAK PHASE III PETROFAC.U.K

Project Description:
Conversion of manual process & Instrumentation into Smart plant P&ID which is intelligent software. Responsibilities comprise drafting and Back checking of P&IDs Responsibilities included: Drafting and back checking of drawings Updating of Smart plant database with Line and Equipment Design Parameters Generation of reports from Smart plant and back checking of the engineering data

L&T CHIYODA, BARODA Designation: Designer PERAL GTL- Qatar:

Project Description:
Worked on PERAL GTL project, responsibilities comprise drafting and back checking of P&IDs. Also helping and resolving customization requirements and issues. Responsibilities included: Creating Intelligent P&IDs using Smart Plant P&ID Updating of Smart plant database with Line and Equipment Design Parameters Generation of reports from Smart plant and back checking of the engineering data Environment.

KARNAPHULI FERTILIZER CO LTD CHIYODA, JAPAN

Project Description: Work included conversion of existing drawings in AutoCAD format to Smart Plant P&ID. This brings the general P&IDs in to Intelligent P&IDs. Activities also included adding engineering data and generation of reports such as valves list, line list and equipment list. Coordination with the group for carrying out the various activities for P&ID creations Responsibilities included:
Conversion of existing P&IDs in AutoCAD to Smart plant Drafting and back checking of drawings

Troubleshooting and Production enhancement activities

AVINEON INDIA PVT LTD HYDERABAD Designation: Designer SAUDI ARABIAN OIL COMPANY SAUDI ARAMCO, U.A.E

Project Description:
Saudi Armco had their existing process and instrumentation diagrams in Micro station dgn format. The objective of this project is to convert the existing drawings to Smart Plant. Also the software helps in automatic generation of reports, like line list equipment list control valve lists. Responsibilities included: Conversion of existing P&IDs in Micro station to Smart plant Drafting and back checking of drawings Updating of Smart plant database with Line and Equipment Design Parameters Generation of reports from Smart plant and back checking of the engineering data Environment.

KHURSANIYAH GAS PLANT SAUDHI ARAMCO, U.A.E

Project Description:
Saudi Aram co maintains its existing process and instrumentation diagrams in Micro station format. The objectives of this project is to convert the existing micro station drawings to Smart Plant P&IDs Responsibilities included: Creating Intelligent P&IDs using Smart Plant P&ID On screen QC of P&IDs using Smart Plant P&ID. Quality Assurance of all the deliverables as per the Standards/Procedures

PETROCANADA, CANADA.

Project Description:
Petro Canada maintains its existing process and instrumentation diagrams in AutoCad dwg format. Now it has planned to convert these drawings into Bentley Auto Plant that is intelligent software and is database driven. Also the software helps in automatic generation of reports, Bill of Materials, besides prompting for feasible and reliable data to be fed-in. The objective of this project is to generate P&ID drawings in Auto Plant. Responsibilities included: Creating Process & Instrumentation Diagrams using Bentley Auto Plant Troubleshooting and Production enhancement activities Quality Checking : : : : : : : GODISHELA KIRAN 16-09-1981 ENGLISH, HINDI, AND TELUGU INDIAN MALE MARRIED G. KIRAN S/O- G.NARAYANA, H. NO. : 5-112, KORATIKAL, ATMAKUR (M), NALGONDA- 508111,A.P-INDIA

PERSONAL PROFILE: NAME DATE OF BIRTH LANGUAGES KNOWN NATIONALITY SEX MARITAL STATUS PERMANENT ADDRESS

PASSPORT DETAILS: H3889870 DATE OF EXPIRY: 10/05/2019 DECLARATION:

I hereby declare that the above information is true to the best of my knowledge. Date:28-08-2013 Place: Gurgaon (G.KIRAN)

Vous aimerez peut-être aussi