The Development of Shamkha South Infrastructure Works Lot 4

Operation/Task: Location/Area: Item Installation and Use of temporary Electrical Supplies South Shamkha Lot 4 Hazards/Risks Identified Electrocution Fire Risk Rating
S L RR

Hazard / Impact Risk Assessment


HIRA No: Method Statement Title: Method Statement No: Control Measures Temporary supplies will be planned to take into account foreseen load requirements, environmental conditions, progress of work and compatibility/maintenance of equipment. Competence of electrical subcontractors will be checked before contracting work. The installation will be certified before being brought into use. Locked supply cabinets will form part of the system. Offices, stores, drying rooms and canteens will be regarded as permanent installations. Supply and distribution units will be lockable and the keys controlled. Signs warning of electrical hazard will be displayed on supply units. Fire extinguishers (carbon dioxide) will be available adjacent to distribution units. Rubber gloves and rubber mats to an appropriate standard are to be used for live work. All cables will be routed so as to prevent damage to cables and avoid tripping hazards. Permit to work system or other suitable means of control to be used when work on live systems is foreseen. Operatives will not be permitted to work alone on live systems. Only competent electricians are authorised to install or modify temporary supplies; certification will be obtained after modification. Systems will be monitored for physical damage and will be checked and recertified every 3 months.
Revision: Date Issued: Page No:

22

Activity Installation and Use of temporary Electrical Supplies

Residual Risk
S L RR

Responsibility Operator Operator

4 4 2

4 4 4

16 16 8

4 4 2

2 2 1

8 8 2

Monitoring Responsibility Supervisor Supervisor

Damage to Equipment

SBD SMS SMSP09/F02 Issue No: 01

02 Nov 10 1 of 2

The Development of Shamkha South Infrastructure Works Lot 4


Operation/Task: Location/Area: Item Installation and Use of temporary Electrical Supplies South Shamkha Lot 4 Hazards/Risks Identified Risk Rating
S L RR

Hazard / Impact Risk Assessment


HIRA No: Method Statement Title: Method Statement No: Control Measures Electricians will receive additional training in the above standards and HSE guidance material, toolbox talks will be given at regular intervals.. 22

Activity Installation and Use of temporary Electrical Supplies

Residual Risk
S L RR

Responsibility Supervisor

Monitoring Responsibility PM

KEY:

S = Severity Rating 1. Negligible 2. Minor Injury / Minor Spill / Leak 3. Major Injury (RIDDOR) / Major Spill / Contamination 4. Fatality / Serious Hazardous Release 5. Multiple Fatality / Multiple Catastrophe

L = Likelihood of Occurrence 1. Improbable 2. Remote 1 10% 3. Possible 10 50% 4. Probable 50 90% 5. Almost certain 90%+

5 4 3 2 1

5 4 3 2 1 1

RR = Risk Rating 10 15 20 8 12 16 6 9 12 4 6 8 2 3 4 2 3 4 Likelihood

25 20 15 10 5 5

R O Y G

Unacceptable risk, plan out or add further controls Acceptable only if no other method viable and with high level controls in place Acceptable with suitable controls Acceptable, no further action required

HIRA Prepared by (Name): HIRA Approved by (Name):

Severity

Signature: Signature:

Date: Date:

SBD SMS SMSP09/F02 Issue No: 01

Revision: Date Issued: Page No:

02 Nov 10 2 of 2